Loading...
HomeMy WebLinkAbout135 S French Ave_BLD405_2026 BUILDING INSPECTION REPORT - Commercial Permit No. 405 Address: 135 S. French St. Contractor: Krueger Sheet Metal Owner: Arlington School District Date: 8/6/2014 ☐ APPROVAL ☒ PARTIAL APPROVAL ☐ CORRECTION ☐ OTHER INSPECTION: Commercial Re-Roof FOOTING: ☐ GROUNDWORK: ☐ FOUNDATION: ☐ HYDRO: ☐ SLAB: ☐ SPRINKLER: ☐ FRAMING: ☐ FIRE ALARM: ☐ SHEAR WALL: ☐ ACCESS: ☐ CEILING GRID: ☐ ADA: ☐ RATED ASSEMBLY: ☐ FIRE FINAL: ☐ INSULATION: ☒ BLDG FINAL: ☐ Date: 8/6/2014 Inspector: YOUNG Permit #: 405 Permit Date: 06/16/14 Permit Type: COMMERCIAL RE-ROOF Project Name: Haller Middle School Applicant Name: Krueger Sheet Metal Applicant Address: P.O. Box 2963 Applicant, City, State, Zip: Spokane, WA 99220 Contact: Alex Phone: 509-489-0221 Email: alex@ksmetal.net Scope of Work: Re-roof Valuation: 300000.00 Square Feet: 0 Number of Stories: 0 Construction Type: Occupancy Group: ID Code: Permit Issued: 08/05/2014 Permit Expires: Form Permit Type: Status: COMPLETE Assigned To: Launa Black Property Parcel # Address Legal Description Owner Name Owner Phone Zoning ARLINGTON SCHL 681 Nursery, Primary 31051100102000 135 S FRENCH AVE DIST 16 & Secondary School Contractors Contractor Primary Contact Phone Address Contractor Type License License # CONSTRUCTION Labor & Krueger Sheet Metal Alex 509-489-0221 P.O. Box 2963 KRUEGSM356O9 CONTRACTOR Industries Plan Reviews Date Review Type Description Assigned To Review Status Ok to issue with the following conditions; 06/16/2014 RESIDENTIAL RE-ROOF All interior drains must be tested after roof installation z.Christopher Young Asbestos abated prior to demolition Fees Fee Description Notes Amount Re-Roof Residential Residential $2,824.56 Total $2,824.56 Attached Letters Date Letter Description 06/18/2014 Building Permit Payments Date Paid By Description Payment Type Accepted By Amount Haller Middle School 08/05/2014 Krueger Sheet Metal Check #0591 $2,824.56 Re-Roof Outstanding Balance $0.00 Uploaded Files Date File Name 08/06/2014 135 S. French.docx 06/16/2014 Re-Roof Permit Application response (2).pdf 06/16/2014 Haller - Specifications-1.pdf