HomeMy WebLinkAbout430 N West Ave_PWD2673_2026 Permit#: 2673
Permit Date: 08/12/21
Permit Type: GRADING
Project Nam e Autum nvood Properties Paving
Applicant Nam a Bakhtiar Ardi Pribadi
Applicant Address: 430 N. West Ave Ste. 1
Applicant, City, State, Zip: Arlington,WA98223
Contact Person: Bakhtiar Pribadi
Phone: 415-601-0095
Em ail: dr_pribadi@autum rivooddental.com
Scope of Work: Repaving and redevelopm ant of parking lot and adding 2 catch basins
Valuation: 34067.81
Project#::
ID Code: CED
Permit Issued: 08/25/2021
Permit Expires: 02/21/2022
Status: COMPLETE
Assigned To: Raelynn Jones
Property
Parcel# Address L egal Description O wner Nam e Omer Phone Zoning
00618100500100 4 30 N WEST AVE A UTUMNWOOD 699 Other
PROPERTIES LLC Miscellaneous
Services NEC
Contractors
Contractor P rim ay Contact P hone A ddress C ontractor Type L icense License#
Fidalgo Paving& 360-652-2380 1 6825 45 Road C onstruction Contractor labor&Industries FIDALPC946BK
Construction
08/19/202108/19/202108/19/202108/19/202112/13/202112/13/2021
Plan Reviews
Date Review Type D escription A ssigned To T arget Date
08/12/2021 GRADING C ED INSPECTOR 08/19/2021
08/12/2021 GRADING I nstall Oil water separators in both CB's per detail. N ova Heaton 08/19/2021
08/12/2021 G RADING P WSTORM REV 0 8/19/2021
08/12/2021 G RADING N o Com m nts P LANNING 0 8/19/2021
11/29/2021 A S-BUILT N ova Heaton 1 2/13/2021
11/29/2021 A S-BUILT C ED INSPECTOR 1 2/13/2021
Fees
Fee D escription N otes A m curt
Processing/Technology $25.00
Civil Perm 1 $2,044.07
Credit Card Service $62.07
Total $2,131.14
Paym efts
Date Paid By D escription P aym art Type A ccepted By A m aunt
08/23/2021 Bakhtiar Pribadi 8 8136915 $2,069.07
08/23/2021 88136915 R aelynn Jones $62.07
O itstanding Balance $0.00
Notes
Date Note C reated By:
11/29/2021 Routed applicants as-built response to Nova/Brian via em al R aelynn Jones
11/24/2021 Sent follow up em dl for project closeout letter R aelynn Jones
11/02/2021 Sent Project closeout letter to applicant R aelynn Jones
10/28/2021 All punchlist item sapproved per BG. R aelynn Jones
08/12/2021 Em dled contractor for business license R aelynn Jones
Uploaded Files
Date File Nam e
08/12/2021 9460493-8-11 Autum nvood site plan.pdf
08/12/2021 9460492-8-11 Autum rood invoice.pdf
08/12/2021 9460491-8-11 Autum rood Application.pdf
08/12/2021 9460490-8-11 Autum rood CCWxlsx
CONSTRUCTION PERMIT APPLICATION
Community&Economic Development
City of Arlington • 18204 5911,Avenue NE • Arlington,WA 98223 • Phone(360)403-3551
CIVIL(TYPE I) GRADING/PAVING/DRAINAGE(TYPE II) O RIGHT OF WAY(TYPE III) O
TYPE I&II ONLY NEW DEVELOPMENT REDEVELOPMENT
Project Name: Autumnwood Properties Lot Repaving
00618100500100
Snohomish County Tax Parcel I.D. #:
Project Address/Location: 430 N. West Ave, Arlington, WA, 98223
Description of Project: Parking Lot Repaving and redevelopment of 2 catch basins
OWNER
Bakhtiar Ardi Pribadi
Name:
Address: 430 N. West Ave Ste 1
city:Arlington State: WA Zip-98223 Phone: 4156010095
Eiiiail:dr—pribadi@autumnwooddental.com
APPLICANT
Name:
see above
Address: see above
City: see above State:see above Zi :98223 Phone:see above
Email:
see above
ENGINEER
Name: n/a
Address: n/a
City: n/a State:n/a Zip- n/a Phone: n/a
Email: n/a License #: n/a Expiration: n/a
CONTRACTOR
Name:
Fidalgo Paving
Address: 16825 45th Rd
Arlington State:WA Zip- 98223 Phone:2062276410
Email:office@fidaIgopaving.com License #: n/a Ex iration:n/a
1, hereby certify that 1 have read and examined this application, City of Arlington Municipal Code, Standard Plan & Specifications. Performance of the
proposed work shall follow all applicable laws and regulations.The owner/applicant shall assume full and complete responsibility for said work and shall
be responsible for the acquisition and compliance of all applicable permits and/or authorizations which may include,but not limited to,Right of Way
Permit,WSDW Hvdrav�ena ►6,p^MvaIWSDOE Notice of Intent(NOI),National Pollutant Discharge Elimination System (NPDES),Army Corp.of
Engineers Per red Species Act and the Forest Practices Application(FPA).
Signature Kay:...........��«.........
Print Name: Bakhtiar A Pribadi Date: 08/10/2021
Pagel of 2 REV 11/2018
Complete package constitutes all items. Only complete submittals will be accepted.
Civil-Submittal Requirements,Type I:
❑ Complete Application;
❑ Construction Plans including cut/fill quantities;
■ 2 fill size plan sets 2 2"x 34"
■ PDF file of the complete plan set
■ 2 fill size set of landscape plans 2 2"x 34"
❑ Marysville Utility plans,if applicable(2 sets);
❑ Drainage Analysis including calculations and downstream analysis (2 sets)and(PDF file);refer to Stormwater Drainage
Requirements;
❑ Geotechnical Report(2 sets) and(PDF file);
❑ SEPA is required if 500 or more cubic yards of cut/fill is proposed(not required if included with a Land Use Permit);
❑ Grading cut/fill quantity: ,
❑ Design Vehicle-demonstrate turning radius include 45'Fire trunk,dual axle, 256 inch wheel base;
❑ Complete Streets Checklistn/a
❑ Drafts of easement(s) dedication(s),and/or CAPE(s) for review;
❑ Flood Hazard Permit Application and required documentation if project is within 100 year flood plain;refer to Flood
Hazard guidance documents;
❑ Construction Calculation Worksheet;
❑ NPDES Permit(if required);See Storm Water Drainage Report,New or Redevelopment Flowcharts;
❑ Assurance Device will be required prior to Permit Issuance (Bond or Assignment of Funds);
❑ Permit Fee due at tine of permit submittal.
Grading I Paving I Drainage Submittal Requirements.Type II:
❑ Complete Application;
❑ Construction Plans including import/export quantities;
■ 2 fill size plan sets 2 2"x 34"
■ PDF file of the complete plan set
❑ Drainage Analysis including calculations and downstream analysis (2 sets)and(PDF file);refer to Stormwater Drainage
Requirements;
❑ Geotechnical Report(2 sets) and(PDF file);
❑ SEPA is required if 500 or more cubic yards of cut/fill is proposed(not required if included with a Land Use Permit);
❑ Grading cut/fill quantity:see Fida Igo
❑ Construction Calculation Worksheet;
❑ NPDES Permit(if required);See Storm Water Drainage Report,New or Redevelopment Flowcharts;
❑ Permit fee due at time of permit submittal.
Right of Way Submittal Requirements.Type III:
❑ Complete Application;
❑ Construction Plans;
❑ Traffic Control Plan;
❑ Road Closure Request;
❑ Temporary Erosion&Sediment Control(TESL) Plan;
❑ Certificate of Insurance with the City of Arlington named as Additional Insured;
❑ Assurance Device will be required prior to Permit Issuance(Bond or Assignment of Funds);
❑ Engineers Estimated Cost of Construction;$ n/a
❑ Permit fee due at time of permit issuance.
Page 2 of 2
ESTIMATE/CONTRACT AGREEMENT
PAVING & CONSTRUCTION, LLC.
16825 45 ROAD-ARLINGTON,WA 98223 LICENSED,BONDED AND INSURED � " ON
PH:360-652-2380 FAX:360-652-2480 "AN EQUAL OPPORTUNITY EMPLOYER" Nm
EMAIL: office@fidalgopaving.com MEMBER
FP&C JOB## DATE: 6/22 f 2020 d Ki,J S,, ---h I.-r..,
CONTRACTING PARTY: LOCATION&TYPE OF WORK:
AUTUMNWOOD PROPERTIES AUTUMNWOOD DENTAL
ATTN:ARDI PRIBADI 430 N.WEST AVE
430 N.WEST AVE,STE#1 ARLINGTON,WA 98223
ARLINGTON,WA 98223
(OFF) (415) 601-0095 (CELL)
FAX dr pribadi@autumnwooddental.com EMAIL
APPROXIMATE UNIT DESCRIPTION UNIT
QUANTITY PRICE.
PARKING LOT
9,100 SF REMOVE&REPLACE THE ENTIRE APSHALT PARKING LOT WITH 2" OF LUMP SUM $21,000.00
ASPHALT COMPACTED
1 EACH INSTALL ASPHALT RAMP LUMP SUM $350.00
1 EACH INSTALL TYPE 1 CATCH BASIN 60 LF OF 8"PIPE. LUMP SUM $4,500.00
LAYOUT AND STRIPE THE PARKING LOT LUMP SUM $700.00
SUBJECT TO THE TERMS AND CONDITIONS ON REVERSE SIDE(PAGE 2)
CLARIFICATIONS: 1). PRICE IS BASED ON WORK BEING DONE DURING NORMAL WORKDAY HOURS.
2). WASHINGTON STATE RETAIL SALES TAX IS NOT INCLUDED. APPLICABLE SALES TAX WILL BE ADDED TO THE
INVOICED AMOUNT UNLESS A CURRENT R£SELLER PERMIT IS ON FILE WITH FIDALGO PAVING&CONSTRUCTION,LLC.
3). ACKNOWLEDGE ADDENDUM(S):
EXCLUSIONS: ALL ITEMS NOT SPECIFIED ABOVE,INCLUDING,BUT NOT LIMITED TO:
ENGINEERING,TRAFFIC CONTROL,PERMITS,GRINDING,SURVEY,AND MATERIAL TRANSFER DEVICE/VEHICLE(MTD/V).
*IF YOU WOULD LIKE TO PROCEED WITH THE PERFORMANCE OF THIS WORK,PLEASE SIGN BELOW AND ON PAGE 3-"NOTICE TO CUSTOMER"AND
RETURN BOTH PAGES TO OUR OFFICE VIA FAX,EMAIL OR REGULAR MAIL. ONCE RECEIVED,WE WILL CONSIDER THIS A LEGAL AND BINDING
CONTRACT AGREEMENT FOR THE PERFORMANCE OF THE HEREINABOVE WORK.
"YOUR SIGNATURE BELOW ALSO ACKNOWLEDGES RECEIPT OF OUR"NOTICE TO CUSTOMER"STATEMENT AS PRINTED ON PAGE 3 OF THIS
ESTIMATE/CONTRACT AGREEMENT"
CONTRACTING PARTY'S AUTHORIZED REPRESENTATIVE: FIDALGO PAVI CONSTRUCTION,LLC.
WASHINGTON R,ACFOR'S LICENSE NO.FIDALPC946BK
i
S.Ardi Pribadi DDS Digitally signed by
ACCEPTED BY: PRIBADI.BAKHTIAR.A.1289659915 BY:
DIT EMS,03LIM GU70ffMnt,
PRINTED NAME: ou=DoD,ou=PKI,ou=USAF, IEFE ON (2061227-6410(CELL)
c n=PRI BADI.8 AKHTIAR.A.1289659
915
Date:2020.09.03 07:56:15.0700'
FIDALGO PAVING &CONSTRUCTION, LLC. CONTRACT AGREEMENT
NOTICE TO CUSTOMER
NOTICE TO Cl'STO.ME,R
Business Name: Fidaleo Paviniz& Construction. LLC.
This contractor is registered with the State of Washington, license No. FIDALPC946BK, and has
posted with the state a bond of Twelve Thousand Dollars ($12,000.00) for the purpose of
satisfying claims against the contractor for breach of contract including negligent or improper
work in the conduct of the contractor's business. The expiration date of this contractor's license is
01;12/2022.
THIS BOND MIGHT NOT BE SUFFICIENT TO COVER A CLAIM THAT MIGHT
ARISE FROM THE WORK DONE UNDER YOUR CONTRACT.
This bond or deposit is not for your exclusive use because it covers all work performed by this
contractor. The bond or deposit is intended to pay valid claims up to Twelve Thousand Dollars
($12,000.00) that you and other customers, suppliers, subcontractors, or taxing authorities may
have.
FOR GREATER PROTECTION YOU MAY WITHHOLD A PERCENTAGE OF YOUR
CONTRACT.
You may withhold a contractually defined percentage of your construction contract as retainage
for a stated period of time to provide protection to you and help insure that your project «ill be
completed as required by your contract.
YOUR PROPERTY MAY BE LIENED.
If a supplier of materials used in your construction project or an employee or subcontractor of
your contractor or subcontractors is not paid, your property may be liened to force payment and
you could pay twice for the same work.
FOR ADDITIONAL PROTECTION, YOU MAY REQUEST THE CONTRACTOR TO
PROVIDE YOU WITH ORIGINAL "LIEN RELEASE" DOCUMENTS FROM EACH
SUPPLIER OR SUBCONTRACTOR ON YOUR PROJECT.
The contractor is required to provide you with further information about lien release documents
if you request it. General information is also available from the state Department of Labor and
Industries.
THIS;NOTICE IS GIVEN PURSUANT TO RCW 18.27.114
.Acknowleduement of Receipt of Notice to Customer: Digitally signed by
FRIRADI,RAKHTIAR A 1269659
915
03SEP2020 DN-US,o=US Government
Dated: uu-D9D 9u-P10.-USAF
crt=PFIDAERHARHTIAR A 1289
654915
Date 202009 03 07 57 37
.0700
Signature of Customer(Contracting Party)
PAGE 3OF3
107
506 107
� I
r
3
z •�
W Sth St W Sth St W 5th St W Sth St
. N" W 5th St
EXIT.CB _
430 NW Ave, � "'• - e
Z'
Arlington,Wf 98223
* 1 � yF-
�• .r 110 i12
1^ N OI Arlington Inspire Hair Studio
I I I Laundry Station and Creative Designs
�i NEW CB �
•
1 • ram.►
111 "e Licensing
yI Yard Drain
i `II (replace)❑1 =s
•_M- OI9K-
1wn r �•'
T _ AZ�Tran
Transmissi
Google
Y �� CONTRUCTION PLAN REVIEW &
INSPECTION FEE WORKSHEET
��lINGS�� Community&Economic Development Department
City of Arlington . 18204 59th Avenue NE . Arlington WA 98223 . (360)403-3551
This form is to be completed and submitted with Type I , Type 11 Type III Construction Permit Application.
1) Based on permit type requested (Type I,Type II or Type III), complete the form as follows:
. Type I permits complete all sections.
. Type 11 permits complete as follows:
- Grading Only-Complete Temporary Erosion and Sediment Control (TESC).
- Stormwater Drainage Only-Complete the Temporary Erosion and Sediment Control and Stormwater
Drainage Section for Public or Private
. Type III permits complete the Temporary Erosion and Sediment Control (TESC).
2) The developer shall enter the quantities shown on the construction drawings into the Construction Calculation
Worksheet. This document is used to determine the amount of plan reivew and inspection fees due to the city.
3) Excel will auto-calculate the relevant fields and subtotals throughout the document. Only the'Quantity'columns should
be completed.
4) The summary page calculates the fees due at intake for Civil and Stormwater Drainage construction permits only. This
does not include fees for Grading or those required by other departments or agencies. Grading fees are based on Cubic
Yard Quantity and shall be calculated at time of permit submittal. Grading fees shall be paid at permit submittal.
5) If an item that is part of your project does not exist in the spreadsheet complete the Write-In-Items section with the item,
quantity and associated unit cost. There are a few unit prices that are blank, please complete them accordingly.
6) Inspection fees shall be calculated for Private Development during the review process and shall be paid upon permit
issuance.
PROJECT COSTS PUBLIC TOTAL PRIVATE TOTAL TOTAL PROJECT COST
$ 34,067.81
Verify formula, totals do not match
PLAN REVIEW& INSPECTION FEES
PLAN REVIEW&INSPECTION FEE (6%of Project Value) $
GRADING FEE(4) (Cubic Yard ) $
Review fees due at time of submittal Total Review Fees Due $
An Assurance Device such as a Performance Bond or Assignment of Funds needs to be on file with the City of Arlington prior
to permit issuance. The Assurance Device shall be 150% of the Construction Calculation Worksheet which are as follows:
Road and Alley (Public)
Stormwater Drainage and Grading (Public)
Utilities (Public)
Temporary Erosion and Sediment Control (Public and Private)
ASSURANCE DEVICE
Base Calculation of Performance Device $
PERFORMANCE DEVICE 150% Amount Due $
Base Calculation of Maintenance Device $
MAINTENANCE DEVICE 20% Amount Due $ -
1 Rev 7/2017
CONSTRUCTION CALCULATION WORKSHEET
TEMPORARY EROSION &SEDIMENT CONTROL Include Public Improvements &Private Development
Description Unit Price Unit Quantity Cost Reference#
Backfill &compaction-embankment $ 6.50 CY $ -
Check dams $ 78.00 EACH $ - BMP C207
Catch Basin Protection $ 35.50 EACH $ -
Crushed surfacing 1 1/4" minus $ 18.00 TON $ - WSDOT 9-03.9(3)
Ditching $ 8.00 CY $ -
Excavation-bulk $ 3.00 CY $ -
Fence, silt $ 2.00 LF $ - BMP C233
Fence,Temporary(NGPA) $ 2.00 LF $ -
Geotextile Fabric $ 2.50 SY $ -
Hay Bale Silt Trap $ 0.50 EACH $ -
Hydroseeding $ 4,200.00 ACRE $ - BMP C120
Interceptor Swale/Dike $ 1.00 LF $ -
Jute Mesh $ 2.00 SY $ - BMP C122
Level Spreader $ 1.75 LF $ -
Mulch, by hand, straw, 3"deep $ 3.00 SY $ - BMP C121
Mulch, by machine, straw, 2"deep $ 1.00 SY $ - BMP C121
Piping,temporary, CPP, 6" $ 12.50 LF $ -
Piping,temporary, CPP, 8" $ 19.00 LF $ -
Piping,temporary, CPP, 12" $ 24.00 LF $ -
Plastic covering, 6mm thick, sandbagged $ 3.00 SY $ - BMP C123
Rip Rap, machine placed; slopes $ 50.00 CY $ - WSDOT 9-13.1(2)
Rock Construction Entrance, 50'xl5'xl' $ 1,800.00 EACH $ - BMP C105
Rock Construction Entrance, 100'xl5'xl' $ 3,600.00 EACH $ - BMP C105
Sediment pond riser assembly $ 3,050.00 EACH $ - BMP C241
Sediment trap, 5' high berm $ 21.00 LF $ - BMP C240
Sed.trap, 5'high, riprapped spillway berm section $ 79.00 LF $ - BMP C240
Seeding, by hand $ 1.00 SY $ - BMP C120
Sodding, 1"deep, level ground $ 8.00 SY $ - BMP C120
Sodding, 1"deep, sloped ground $ 9.50 SY $ - BMP C120
TESC Supervisor $ 84.00 HR $ -
Water truck, dust control $ 130.00 HR $ - BMP C140
WRITE-IN-ITEMS
SUBTOTAL(TESC Only): $ -
MOBILIZATION 10%: $ -
CONTINGENCY 15%: $ -
TOTAL: $ -
Rev 7/2017
CONSTRUCTION CALCULATION WORKSHEET
STORMWATER DRAINAGE Public Private
Public Improvements Private Development
Description Unit Price Unit Quantity Cost Quantity Cost
Access Road, Retention/Detention $ 26.00 SY $ - $ -
*(CBs include frame and lid)
Beehive $ 90.00 EACH $ - $ -
CB Type 1 $ 1,650.00 EACH $ - 1 $ 1,650.00
CB Type IL $ 1,850.00 EACH $ - $ -
CB Type 11,48" Dia $ 2,550.00 EACH $ - $for additional depth over 4' $ 650.00 FT $ - $ -
CB Type 11, 54" Dia $ 2,700.00 EACH $ - $for additional depth over 4' $ 600.00 FT $ - $ -
CB Type 11, 60" Dia $ 2,900.00 EACH $ - $for additional depth over 4' $ 750.00 FT $ - $ -
CB Type 11, 72" Dia $ 4,000.00 EACH $ - $for additional depth over 4' $ 900.00 FT $ - $ -
Through-curb Inlet Framework(Add) $ 550.00 EACH $ - $ -
Cleanout, PVC, 4" $ 200.00 EACH $ - $ -
Cleanout, PVC, 6" $ 250.00 EACH $ - $ -
Cleanout, PVC, 8" $ 300.00 EACH $ - $ -
Culvert, Box ft x ft $ - LS $ - $ -
Culvert, PVC, 4" $ 12.00 LF $ - $ -
Culvert, PVC, 6" $ 17.00 LF $ - $ -
Culvert, PVC, 8" $ 19.00 LF $ - 60 $ 1,140.00
Culvert, PVC, 12" $ 30.00 LF $ - $ -
Culvert, CMP, 8" $ 23.00 LF $ - $ -
Culvert, CMP, 12" $ 35.00 LF $ - $ -
Culvert, CMP, 15" $ 42.00 LF $ - $ -
Culvert, CMP, 18" $ 47.00 LF $ - $ -
Culvert, CMP, 24" $ 69.00 LF $ - $ -
Culvert, CMP, 30" $ 100.00 LF $ - $ -
Culvert, CMP, 36" $ 150.00 LF $ - $ -
Culvert, CMP,48" $ 194.00 LF $ - $ -
Culvert, CMP, 60" $ 310.00 LF $ - $ -
Culvert, CMP, 72" $ 400.00 LF $ - $ -
Culvert, Concrete, 8" $ 36.00 LF $ - $ -
Culvert, Concrete, 12" $ 43.00 LF $ - $ -
Culvert, Concrete, 15" $ 52.00 LF $ - $ -
Culvert, Concrete, 18" $ 55.00 LF $ - $ -
Culvert, Concrete, 24" $ 85.00 LF $ - $ -
Culvert, Concrete, 30" $ 136.00 LF $ - $ -
Culvert, Concrete, 36" $ 165.00 LF $ - $ -
Culvert, Concrete,42" $ 196.00 LF $ - $ -
Culvert, Concrete,48" $ 210.00 LF $ - $ -
Culvert, CPP, 6" $ 16.00 LF $ - $ -
Culvert, CPP, 8" $ 22.00 LF $ - $ -
Culvert, CPP, 12" $ 28.00 LF $ - $ -
Culvert, CPP, 15" $ 34.00 LF $ - $ -
Culvert, CPP, 18" $ 39.00 LF $ - $ -
Rev 7/2017
CONSTRUCTION CALCULATION WORKSHEET
Culvert, CPP, 24" $ 49.00 LF $ - $ -
Culvert, CPP, 30" $ 62.00 LF $ - $ -
Culvert, CPP, 36" $ 69.00 LF $ - $ -
Ditching $ 12.00 CY $ - $ -
Flow Dispersal Trench (1,436 base+) $ 40.00 LF $ - $ -
French Drain (3'depth) $ 39.00 LF $ - $ -
Geotextile, laid in trench, polypropylene $ 5.00 SY $ - $ -
Infiltration pond testing $ 125.00 HR $ - $ -
Mid-tank Access Riser,48"dia, 6'deep $ 2,025.00 EACH $ - $ -
Pipe, High Density Water Pipe (HDWP) $ 160.00 LF $ - $ -
Pipe, C900 $ 90.00 LF $ - $ -
Pond Overflow Spillway $ 18.00 Sy $ $
Restrictor/Oil Separator, 12" $ 1,500.00 EACH $ $
Restrictor/Oil Separator, 15" $ 1,550.00 EACH $ $
Restrictor/Oil Separator, 18" $ 1,680.00 EACH $ $
Riprap, placed $ 52.00 CY $ $
Tank End Reducer(36" Dia) $ 1,280.00 EACH $ $
Thru-Inlet at CB $ 150.00 EACH $ $
Trash Rack, 12" $ 320.00 EACH $ $
Trash Rack, 15" $ 325.00 EACH $ - $ -
Trash Rack, 18" $ 350.00 EACH $ - $ -
Trash Rack, 21" $ 375.00 EACH $ - $ -
WRITE-IN-ITEMS
$ - $ - $ -
SUBTOTAL: $ - $ 2,790.00
MOBILIZATION 10%: $ -
CONTINGENCY 15%: $ -
TOTAL: $ - $ 2,790.00
Rev 7/2017
CONSTRUCTION CALCULATION WORKSHEET
GENERAL ITEMS Public Improvements Private Development
Description Unit Price Unit Quantity Cost Quantity Cost
Backfill &Compaction-embankment $ 8.00 CY $ - $ -
Backfill &Compaction-trench $ 11.00 CY $ - $ -
Clear/Remove Brush, by hand (acre) $ 2,363.00 ACRE $ - $ -
Bollards-fixed $ 325.00 EACH $ - $ -
Bollards-removable $ 600.00 EACH $ - $ -
Clearing/Grubbing/Tree Removal $ 6,000.00 ACRE $ - $ -
Excavation -bulk $ 2.50 CY $ - $ -
Excavation -Trench $ 5.00 CY $ - $ -
Fencing, cedar, 6'high $ 25.00 LF $ - $ -
Fencing, chain link,4' $ 19.50 LF $ - $ -
Fencing, chain link, vinyl coated, 6'hig $ 18.00 LF $ - $ -
Fencing, chain link, gate,vinyl coated, $ 1,563.00 EACH $ - $ -
Fencing, split rail, 3'high $ 14.00 LF $ - $ -
Fill &compact-common barrow $ 27.00 CY $ - $ -
Fill &compact-gravel base $ 30.00 CY $ - $ -
Fill &compact-screened topsoil $ 45.00 CY $ - $ -
Gabion, 12"deep, stone filled mesh $ 62.00 SY $ - $ -
Gabion, 18"deep, stone filled mesh $ 86.00 SY $ - $ -
Gabion, 36"deep, stone filled mesh $ 152.00 SY $ - $ -
Grading,fine, by hand $ 2.00 SY $ - $ -
Grading,fine,with grader $ 1.25 SY $ - 1011 $ 1,263.75
Guard Post $ 90.00 EACH $ - $ -
Monuments $ 104.00 EACH $ - $ -
Sensitive Areas Sign $ 20.00 EACH $ - $ -
Sodding, 1"deep, sloped ground $ 10.00 SY $ - $ -
Topsoil Type A(imported) $ 30.00 CY $ - $ -
Traffic control crew(2 flaggers ) $ 98.00 HR $ - $ -
Trail,4"chipped wood $ 9.00 SY $ - $ -
Trail,4"crushed cinder $ 10.00 SY $ - $ -
Trail,4"top course $ 9.50 SY $ - $ -
Wall, retaining, concrete $ 66.00 SF $ - $ -
Wall, rockery $ 13.00 SF $ - $ -
WRITE-IN-ITEMS
Subtotal $ - Subtotal $ 1,263.75
Rev 7/2017
CONSTRUCTION CALCULATION WORKSHEET
STREET IMPROVEMENT Public Improvements Private Development
Description Unit Price Unit Quantity Cost Quantity Cost
AC Grinding,4'wide machine< 1000sy $ 35.00 SY $ - $ -
AC Grinding,4'wide machine 1000-2001 $ 8.50 SY $ - 1011 $ 8,593.50
AC Grinding,4'wide machine>2000sy $ 2.50 SY $ - $ -
AC Removal/Disposal/Repair $ 60.00 SY $ - $ -
Barricade, Type 1 $ 36.00 LF $ - $ -
Barricade Type II $ 25.00 LF $ - $ -
Barricade, Type III ( Permanent) $ 55.00 LF $ - $ -
Conduit, 2" $ 5.00 LF $ - $ -
Curb&Gutter, rolled $ 20.00 LF $ - $ -
Curb&Gutter,vertical $ 15.00 LF $ - $ -
Curb and Gutter, demolition and disposE $ 20.00 LF $ - $ -
Curb, extruded asphalt $ 5.00 LF $ - $ -
Curb, extruded concrete $ 4.50 LF $ - $ -
Guard Rail $ 30.00 LF $ - $ -
Sawcut, asphalt, 3"depth $ 3.50 LF $ - $ -
Sawcut, concrete, per 1"depth $ 3.00 LF $ - $ -
Sealant, asphalt $ 2.00 LF $ - $ -
Shoulder, gravel, 4"thick $ 11.00 SY $ - $ -
Sidewalk, 4"thick $ 40.00 SY $ - $ -
Sidewalk,4"thick, demolition and dispo $ 36.00 SY $ - $ -
Sidewalk, 6"thick $ 45.00 SY $ - $ -
Sidewalk, 6"thick, demolition and dispo $ 45.00 SY $ - $ -
Signs $ - LS $ - $ -
Sign, Handicap $ 100.00 EACH $ - $ -
Striping, per stall $ 7.50 EACH $ - $ -
Street Light System $ - LS $ - $ -
Traffic Signal $ - LS $ - $ -
Traffic Signal Modification $ - LS $ - $ -
Striping,thermoplastic, (for crosswalk) $ 3.50 SF $ - $ -
Striping,4" reflectorized line $ 0.40 LF $ - $ -
AC Patching/Trenching Restoration $ 100.00 TON $ - $ -
Controlled Density Fill (CDF) $ 90.00 CY $ - $ -
WRITE-IN-ITEMS
$ - $ - $ -
$ - $ - $ -
Subtotal $ - Subtotal $ 8,593.50
Rev 7/2017
CONSTRUCTION CALCULATION WORKSHEET
TREET SURFACING/PAVEMENT Public Improvements Private Development
Description Unit Price Unit Quantity F Cost Quantity Cost
Asphalt Overlay, 1.5"AC $ 12.00 SY $ - $ -
Asphalt Overlay, 2"AC $ 15.00 SY $ - 1011 $ 15,165.00
Asphalt Road 2", First 2500 SY $ 10.00 SY $ - $ -
Asphalt Road 2", Qty. over 2500SY $ 9.00 SY $ - $ -
Asphalt Road 3", First 2500 SY $ 15.00 SY $ - $ -
Asphalt Road 3", Qty. over 2500 SY $ 13.00 SY $ - $ -
Asphalt Road 5", First 2500 SY $ 22.00 SY $ - $ -
Asphalt Road 5", Qty. Over 2500 SY $ 22.00 SY $ - $ -
Asphalt Road 6", First 2500 SY $ 25.00 SY $ - $ -
Asphalt Road 6", Qty. Over 2500 SY $ 24.00 SY $ - $ -
Asphalt Treated Base,4"thick $ 14.00 SY $ - $ -
Gravel Base Course 2" $ 7.50 SY $ - $ -
Gravel Base Course 4" $ 15.00 SY $ - $ -
Gravel Base Course 6" $ 22.50 SY $ - $ -
Gravel Road,4" rock, First 2500 SY $ 15.00 SY $ - $ -
Gravel Road,4" rock, Qty. over 2500 S $ 11.00 SY $ - $ -
Concrete Road, 5", no base, over 2500 $ 22.00 SY $ - $ -
Concrete Road, 6", no base, over 2500 $ 32.00 SY $ - $ -
Thickened Edge $ 11.00 LF $ - $ -
WRITE-IN-ITEMS
$ - $ - $ -
$ - $ - $ -
Subtotal $ - Subtotal $ 15,165.00
Rev 7/2017
CONSTRUCTION CALCULATION WORKSHEET
WATER SYSTEM Public Improvements Private Development
Description Unit Price Unit Quantity F Cost Quantity Cost
Blowoff $ 1,800.00 EACH $ - $ -
Connection to Existing Water Main $ 2,000.00 EACH $ - $ -
Ductile Iron Watermain,CL 52,6 Inch Dia $ 65.00 LF $ - $ -
Ductile Iron Watermain,CL 52,8 Inch Dia $ 85.00 LF $ - $ -
Ductile Iron Watermain,CL 52, 10 Inch Dia $ 103.00 LF $ - $ -
Ductile Iron Watermain,CL 52, 12 Inch Dia. $ 125.00 LF $ - $ -
Gate Valve,6 inch Dia $ 250.00 EACH $ - $ -
Gate Valve,8 Inch Dia $ 380.00 EACH $ - $ -
Gate Valve, 10 Inch Dia $ 425.00 EACH $ - $ -
Gate Valve, 12 Inch Dia $ 500.00 EACH $ - $ -
Fire Hydrant Assembly,with Guard Posts $ 3,000.00 EACH $ - $ -
Fire Hydrant Assembly,without Guard Posts $ 2,500.00 EACH $ - $ -
Air-Vac,8 Inch Dia $ 6,000.00 EACH $ - $ -
Air-Vac,10 Inch Dia $ 7,500.00 EACH $ - $ -
Air-Vac, 12 Inch Dia $ 12,000.00 EACH $ - $ -
Pressure Reducing Valve Assembly,8 In. Di $ 3,800.00 EACH $ - $ -
Pressure Reducing Valve Assembly, 10 In. D $ 4,200.00 EACH $ - $ -
Pressure Reducing Valve Assembly, 12 In. D $ 5,000.00 EACH $ - $ -
Valve Marker Post $ 350.00 EACH $ - $ -
WRITE-IN-ITEMS
$ - $ - $ -
$ - $ - $ -
Subtotal $ - Subtotal $ -
Rev 7/2017
CONSTRUCTION CALCULATION WORKSHEET
SANITARY SEWER Public Improvements Private Development
Description Unit Price Unit —Q—u—a—ntit—yF Cost Quantity Cost
Connection to Existing Sewer Main $ - EACH $ - $ -
Clean Outs $ 500.00 EACH $ - $ -
Grease Interceptor, 500 gallon $ 6,000.00 EACH $ - $ -
Grease Interceptor, 1000 gallon $ 10,000.00 EACH $ - $ -
Grease Interceptor, 1500 gallon $ 15,000.00 EACH $ - $ -
Side Sewer Pipe, PVC.4 Inch Dia $ 8.00 LF $ - $ -
Side Sewer Pipe, PVC. 6 Inch Dia $ 12.00 LF $ - $ -
Sewer Pipe, PVC, 8 inch Dia $ 33.00 LF $ - $ -
Sewer Pipe, PVC, 12 Inch Dia $ 41.00 LF $ - $ -
Sewer Pipe, PVC, Inch Dia $ - LF $ - $ -
Lift Station (Entire System) $ - LS $ - $ -
Manhole,48 Inch Dia $ 3,000.00 EACH $ - $for additional depth over 4 feet/per fo $ 532.00 FEET $ - $ -
Manhole, 54 Inch Dia $ 3,500.00 EACH $ - $for additional depth over 4 feet/per fo $ 532.00 FEET $ - $ -
Manhole, 60 Inch Dia $ 3,700.00 EACH $ - $for additional depth over 4 feet/per fo $ 532.00 FEET $ - $ -
Manhole, 72 Inch Dia $ 4,000.00 EACH $ - $for additional depth over 4 feet/per fo $ 625.00 FEET $ - $ -
Manhole, 96 Inch Dia $ 5,000.00 EACH $ - $for additional depth over 4 feet/per fo $ 625.00 FEET $ - $ -
Outside Drop $ - LS $ - $ -
Inside Drop $ - LS $ - $ -
Pipe, C-900 $ 90.00 LF $ - $ -
Pipe, High Density Water Pipe(HDWP) $ 160.00 LF $ - $ -
WRITE-IN-ITEMS
$ - $ - $ -
Subtotal $ - Subtotal $ -
Rev 7/2017
CONSTRUCTION CALCULATION WORKSHEET
LANDSCAPING &VEGETATION Include Public Improvements &Private Development
Description Unit Price Unit Quantity Cost
Street Trees $ 500.00 EACH $ -
Root Barrier EACH $ -
Median Landscaping $ - LS $ -
Right-of-Way Landscaping $ - LS $ -
Wetland Landscaping $ - LS $ -
Private Landscaping $ - LS $ -
WRITE-IN-ITEMS
$ - $ -
$ - $ -
Subtotal $ -
(INCLUDES GENERAL, STREET,SURFACING,WATER, PUBLIC PRIVATE
SEWER, LANDSCAPING) SUBTOTAL $ - $ 25,022.25
MOBILIZATION 10%: $ - $ 2,502.23
CONTINGENCY 15%: $ - $ 3,753.34
GRANDTOTAL: $ - $ 31,277.81
Rev 7/2017
CITY OF ARLINGTON
18204 59th Avenue NE,Arlington,WA 98223
INSPECTIONS:360-403-3417-Permit Center:360-403-3551
CIVIL PERMIT
430 N WEST AVE Permit#:2673
Project Name:Autumnwood Properties Paving Parcel#:00618100500100
LOC/Project#: Expires: February 21, 2022
OWNER APPLICANT CONTRACTOR
AUTUMNWOOD PROPERTIES LLC Bakhtiar Ardi Pribadi Fidalgo Paving&Construction
430 N WEST STE 1 430 N.West Ave Ste. 1 16825 45 Road
ARLINGTON,WA 98223-6831 Arlington,WA 98223 Arlington,WA 98223
415-601-0095 360-652-2380
LIC#:FIDALPC946BK
EXP:01/12/2022
JOB DESCRIPTION
Grading/Paving
CONDITIONS
Install Oil water separators in both CB's per detail.It is the responsibility of the Owner,Developer and Contractor to adhere to the
approved plans,verify compliance with the City of Arlington Municipal Code,Public Works Design and Construction Standards,
International Code Council(ICC),applicable local,state and federal requirements or any order,proclamation,guidance or decision
of the Governor. In addition,construction sites shall adhere to current COVID-19 Jobsite Safety Requirements as per local,state
and federal regulations.
INSPECTIONS
• INSPECTIONS (360-403-3417) MUST BE CALLED IN BEFORE 3:30 PM TO BE ON THE NEXT
BUSINESS DAY INSPECTION SCHEDULE • Inspections are Monday-Friday with exception of Local,
State or Federal Holidays. Building, Storm and Civil Inspections - 8 am to 4:30 pm; Water or Sewer
inspections - 8:00 am to 3:30 pm • To cancel or modify an inspection -Building, Storm or Civil call 360-
403-3433; Water or Sewer call 360-403-3526 • It is the responsibility of the Owner, Developer and
Contractor to call and arrange for appropriate inspections. Onsite tailgate meetings are advised with each
individual inspector prior to installation of their related facilities with those persons who are actually
performing the work. • Failure to call for inspection may result in work being left exposed and/or removed
and reconstructed • Re-inspections may be charged at $127.00 per hour, '/2 hour minimum for failure to call
for inspection.
PERMIT APPROVAL
Work to be performed as described and/or shown in the approved plans and/or application for the above named project is approved
for construction by the City of Arlington Public Works Department. All work is subject to field inspection.
t--/ Nova Heaton 8/23/2021
Development Services Manager or Designee Print Name Date
Signature
The issuance or granting of this permit shall not be construed to be a permit for,or approval of,any violation of this Code or any
other ordinance or order of the City,of any state or federal law,or of any order,proclamation,guidance advice or decision of the
Governor of this State.To the extent the issuance or granting of this permit is interpreted to allow construction activity during any
period of time when such construction is prohibited or restricted by any state or federal law,or order,proclamation,guidance
advice or decision of the Governor of this State,this permit shall not authorize such work and shall not be valid.The building
official is authorized to prevent occupancy or use of a structure where in violation of this Code,any other City ordinances of this
jurisdiction or any other ordinance or executive order of the City,or of any state or federal law,or of any order,proclamation,
guidance advice or decision of the Governor.The building official is authorized to suspend or revoke this permit if it is determined
to be issued in error or on the basis of incorrect,inaccurate or incomplete information,or in violation of any City ordinance,
regulation or order,state or federal law,or any order,proclamation,guidance or decision of the Governor.
I hereby certify that I have read and examined this permit,the City of Arlington Land Use Code,the most current edition of the
City of Arlington Standards and Specifications know the same to be true and correct all provision or laws and ordinances
governing this type of work will be compiled with,which may include but are not limited to: Other City of Arlington
development permits,WSDW Hydraulic Project Approval(HPA),WSDOE Notice of Intent(NO[),National Pollution Discharge
Elimination Systems(NPDES),and Corp of Forest Practices Application(FPA).I also understande that all insurance,approved
submittals for all materials and contractor's license.
The contractor shall hold the City of Arlington harmless from any loss or damage to any person or property in the performance of
said work.
SALES TAX NOTICE:Sales tax relating to construction and construction materials in the City of Arlington must be reported on
your sales tax return form and coded City of Arlington#3101.
Bakhtiar Pribadi 25AUG2021
Applicant Signature Print Name Date
PERMIT FEES
Date Name Description Fee Amount
08/23/2021 Processingrrechnology Fee $25.00
08/23/2021 Site Civil Review $2,044.07
Total Due: $2,069.07
Total Payment: $0.00
Balance Due: $2,069.07
CALL FOR INSPECTIONS
Call by 3:30 pm for next day inspection,allow 48 hours for Fire Inspections
When calling for an inspection please leave the following information:
Permit Number,Type of Inspection being requested,and whether you prefer morning or afternoon
WIN
City of Arlington
Community & Economic Development
I!D I
November 2, 2021
Autumnwood Properties, LLC
430 N.West Ave.Ste. 1
Arlington,WA 98223
RE: Project Closeout
Project Name: Autumnwood Properties Paving
Project Address: 430 N.West Ave
Project No.: PWD-2673
Dear Mr. Pribadi,
The construction project for Autumnwood Properties Paving has been completed and submittal of
all items related to the project closeout shall be required:
1. As-Built plans:
a. Plans shall adhere to the Public Works Design and Construction Standard 1-11.
b. Shall include all public and private infrastructure
c. Submit one (1) full paper set along with the electronic format(PDF)
d. AutoCAD files will be required with As-Built plan final approval
Please feel free to reach out should you have any questions. 360-403-3551
Sincerely,
,/7 f
f
Raelynn Jones
Permit Technician
Community&Economic Development