Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
107 5th St_PJ25-00109_2026
CONSTRUCTION PERMIT APPLICATION Community & Economic Development City of Arlington • 18204 59th Avenue NE • Arlington, WA 98223 • Phone (360) 403-3551 CIVIL (TYPE I) □ GRADING/PAVING/DRAINAGE (TYPE II) □ RIGHT OF WAY (TYPE III) TYPE I &II ONLY NEW DEVELOPMENT □ REDEVELOPMENT □ Pro·ect Name: P-097789 Snohomish County Tax Parcel I.D. #: 00618100101100 Project Address/ Location: 107 W 5th St Arlington WA/W 5th St & N West Ave Description of Project: Access two manhole lids under asphalt. Needs to be raised to grade and exposed. OWNER Name: Address: City: State: Zip: Phone: Email: APPLICANT Name: Ziply Fiber Northwest, LLC Address: 426 E Casino Rd. City: Everett State: WA Zip: 98208 Phone: 402-670-8384 Email: grpatcopermits(@ziply.com ENGINEER Name: Address: City: State: Zip: Phone: Email: License#: Expiration: CONTRACTOR Name: Pacific Cable Construction, Inc. Address:P.O. Box 573 Citv: Woodinville State: WA Zip:98072 Phone: 425-348-7735 Email: Luke@oaccab.com License#: PAC IFC C 954PJ Expiration: I, hereby certify that I have read and examined this application, City of Arlington Municipal Code, Standard Plan & Specifications. Performance of the proposed work shall follow all applicable laws and regulations. The owner/applicant shall assume full and complete responsibility for said work and shall be responsible for the acquisition and compliance of all applicable pem1its and/or authorizations which may include, but not limited to, Right of W'iry Penuit, WSOW Hydraulic Project Approval (HPA), WSDOE Notice of Intent (NOi), National Pollutant Discharge Elimination System (NPDES), Anny Corp. of Engineers Permits, the requirements oft11e Endangered Species Act; and the Forest Practices Application (FPA). Signature __________________________________________ _ Print Name: _____________________________ Mark Robertson Date: __________12/11/2025 _ Page 1 of2 REVll/2018 Complete package constitutes all items. Only complete submittals will be accepted. Civil -Submittal Requirements, Type I: D Complete Application; D Construction Plans including cut / fill quantities; ■2 full size plan sets 2 2" x 3 4" • PDF file of the complete plan set ■2 full size set of landscape plans 2 2" x 34" D Marysville Utility plans, ifapplicable (2 sets); D Drainage Analysis including calculations and downstream analysis (2 sets) and (PDF file); refer to Stormwater Drainage Requirements; D Geotechnical Report (2 sets) and (PDF file); D SEPA is required if 500 or more cubic yards of cut/ fill is proposed (not required if included with a Land Use Permit); D Grading cut/ fill quantity: ________ _ D Design Vehicle - demonstrate turning radius include 45' Fire truck, dual axle, 2 56 inch wheel base; D Complete Streets Checklist D Drafts of easement(s) dedication(s), and/or CAPE(s) for review; D Flood Hazard Permit Application and required documentation if project is within 100 year flood plain; refer to Flood Hazard guidance documents; D Construction Calculation Worksheet; D NPDES Permit (if required); See Storm Water Drainage Report, New or Redevelopment Flowcharts; D Assurance Device will be required prior to Permitlssuance (Bond or Assignment of Funds); D Permit Fee due at time of permit submittal. Grading/ Paving/ Drainage Submittal Requirements, Type II: D Complete Application; D Construction Plans including import/export quantities; ■2 full size plan sets 2 2" x 3 4" ■PDF file of the complete plan set D Drainage Analysis including calculations and downstream analysis (2 sets) and (PDF file); refer to Stormwater Drainage Requirements; D Geotechnical Report (2 sets) and (PDF file); D SEPA is required if 500 or more cubic yards of cut/fill is proposed (not required if included with a Land Use Permit); D Grading cut/ fill quantity: _________ _ D Construction Calculation Worksheet; D NPDES Permit (ifrequired); See Storm Water Drainage Report, New or Redevelopment Flowcharts; D Permit fee due at time of permit submittal. Right of Way Submittal Requirements, Type III: 131' Complete Application; 5a Construction Plans; Traffic Control Plan; □ Road dosure Request; □ Temporary Erosion & Sediment Control (TESC) Plan; □ Certificate oflnsurance with the City of Arlington named as Additional Insured; □ Assurance Device will be required prior to Permit Issuance (Bond or Assignment of Funds); Engineers Estimated Cost of Construction; $ ____________ 8363.56 _, QI Permit fee due at time of permit issuance. Page 2 of2 Right-of-Way Permit Application For submittal checklist, see below. * denotes required fields Project Information * Project Name: P-097789 * Description of Project: Access two manhole lids under asphalt needs to be raised to grade and exposed. Engineers Estimated Cost of Construction; $ 8363.56 . Contact Information Owner Information * Owner Name: Ziply Fiber Northwest LLC * Office No.: 426 Casino Rd * Email Address: arianne.mommsen@ziply.com * Cell No.: 4026708384 * Mailing Address: 426 Casino Rd Everett WA 98208 * City: Everett, WA, 98208 * State: WA * Zip: 98258 Engineer Information Engineer Name: Office No.: Email Address: Cell No.: Mailing Address: City: State: Zip: Professional License Number: Expiration Date: Contractor Details Primary Contractor: Ziply Fiber Northwest LLC Office No.: Email Address: arianne.mommsen@ziply.com Cell No.: Mailing Address: 426 Casino Rd Everett WA 98208 City: Everett, WA, 98208 State: Washington Zip: 98258 L&I Contractor PACIFCC954PM License Number: Expiration Date: 2026-05-31 Acknowledgement I, hereby certify that I have read and examined this application, City of Arlington Municipal Code, Standard Plan & Specifications. Performance of the proposed work shall follow all applicable laws and regulations. The owner/applicant shall assume full and complete responsibility for said work and shall be responsible for the acquisition and compliance of all applicable permits and/or authorizations which may include, but not limited to, Right of Way Permit, WSDW Hydraulic Project Approval (HPA), WSDOE Notice of Intent (NOI), National Pollutant Discharge Elimination System (NPDES), Army Corp. of Engineers Permits, the requirements of the Endangered Species Act, and the Forest Practices Application (FPA). * Print Name: Mark Robertson * Date: Submittal Checklist Complete package constitutes all items. Only complete submittals will be accepted. Electronic files shall be PDF and submitted through this portal, email or downloadable link to file server. Construction Plans; refer to Design Requirements and Chapter 1 of the City of Arlington’s Design and Construction Standards and Specifications Manual for required sheets. Traffic Control Plan. Road Closure Request. Temporary Erosion & Sediment Control (TESC) Plan if new or replaced hard surfacing is being constructed. Certificate of Insurance with the City of Arlington named as Additional Insured. Permit fee and any assurarnce device (Bond or Assignment of Funds) due at time of permit issuance. An invoice with link for payment will be sent to the applicant email address once permit is reviewed and approved. LEGEND: City of Arlington N EXISTING TERMINAL PROPOSED TERMINAL 360.563.9000 EXISTING UTILITY POLE 708 First Street Snohomish, WA 98290 PROPOSED NEW POLE EOP EXISTING HANDHOLE EOP PROPOSED NEW HANDHOLE [2'x3'] Everett, WA 98206 EXISTING MANHOLE EOP EOP PROPOSED NEW MANHOLE EOP EOP EXISTING FLOWER POT EOP EOP P-097789 PROPOSED NEW FLOWER POT 25' W 5th St & West Ave EXISTING UNDERGROUND UTILITY P-097789-Atco-WP.dwg 107 W 5th St Arlington WA PROPOSED UNDERGROUND CONSTRUCTION [HAND DIG, BORE] EOP EOP EOP EOP 20' EXISTING AERIAL SPAN EOP EOP PROPOSED AERIAL SPAN CENTER LINE PARCEL LIMITS [PROPERTY LINE] EOP EDGE OF PAVEMENT EOP EOP ROW RIGHT OF WAY WORK DETAILS: EOP EOP Access dual lid manhole under asphalt. Raise to grade and expose. PROJECT NUMBER:PROJECT ADDRESS:NEAREST INTERSECTIONFILE NAME: EOP EOP MINIMUM STANDARDS FOR DIRECTIONAL BORING STREET CROSSINGS DATE: EX. GRADE DESIGNED BY: ATCO CONTACT: 48" MIN 12" MIN BORE PIT FROM EX. UTILITIES RECEIVE PIT SCALE: SHEET: - PLACE END MARKER WITH UTILITY OWNER'S NAME DESCRIBING CONDUIT - BORE PIT TO BE BACKFILLED AND COMPACTED IN 12" LIFTS WITH MATERIAL REMOVED - FLOW OF ANY NEARBY DRAINAGE MUST BE MAINTAINED AT ALL TIMES - PROTECT ROOTS AT ALL TREE LOCATIONS, FIELD ADJUST AS NECESSARY TYPICAL BORE DETAILS N City of Arlington 360.563.9000 708 First Street Snohomish, WA 98290 Everett, WA 98206 P-097789 W 5th St & West Ave P-097789-Atco-TCP.dwg 107 W 5th St Arlington WA Work Area COVER SHEET PROJECT NUMBER:PROJECT ADDRESS:LOCATION: FILE NAME: DATE: 12.4.2025 REVIEWED BY: M. LUNA WTCS# 013184 DESIGNED BY: M. Robertson ATCO CONTACT: 832.758.0094 mark.robertson@atcotelecom.com SCALE: SHEET: VICINITY MAP NOT TO SCALE 01 NO: 1 OF 3 LEGEND: ATCO COMMUNICATIONS SERVICES, LLC AS THE DESIGNER OF THIS TRAFFIC CONTROL PLAN, MAKES NO REPRESENTATION AS TO ITS GENERAL ADEQUACY OR BEING APPROVED FOR IMPLEMENTATION. APPROVAL MUST RESULT FROM THE TRAFFIC ENGINEER OR OTHER PUBLIC OFFICIAL HAVING STATUTORY S ENFORCEMENT AUTHORITY IN THE JURISDICTION. UTILIZATION AND IMPLEMENTATION OF THIS PLAN SIGNALIZED INTERSECTION SHALL BE A RESULT OF THE APPROVAL. REF. MUTCD 2009 6A - 01 (10) PHASE 1 N TRAFFIC SAFETY DRUM PCMS X TYPE III BARRICADE W20-1 SIGN LEGEND: WORK TRUCK 360.563.9000 708 First Street Snohomish, WA 98290 WORK ZONE LIMITS X KEEP W20-3 ROAD ROAD RIGHT LANE CENTER LANE PORTABLE SIGN WORK CLOSED CLOSED CLOSED SIDEWALK AHEAD AHEAD AHEAD AHEAD EXISTING SIGN RIGHT X DRIVEWAY W20-2 W20-1 W20-5R W1-4L W20-5C R4-7B W20-3 Everett, WA 98206 PARKWAY ARROW BOARD West Ave N SIDEWALK (WHERE REQUIRED) (25 MPH) X ROAD DIRECTION OF TRAFFIC W20-5C CLOSED (NOT PAVEMENT MARKINGS) R4-7B PARKWAY P-097789 ONLY FLAGGER-SPOTTER R11-2 R3-1 R3-2 W1-4R R3-5R W 5th St & West Ave FLAGGER STATION DETOUR DETOUR 107 W 5th St Arlington WA P-097789-Atco-TCP.dwg DETOUR R3-2 65' Shift Taper M4-9(R) AHEAD W1-4R M4-9(S) M4-9R M4-9S X X X W20-2 W20-3 24' R3-2 W20-1 PCMS WORK DETAILS: SIDEWALK W20-2 PARKWAY Parking Access dual lid manhole under asphalt. Raise to R4-7B 17' grade and expose. Area R3-1 M4-9(S) R11-2 M/H W20-3 M/H R9-3 R9-3 R9-3B(R) R9-3B(L) PARKWAY SIDEWALK R4-7B 12' R3-1 R3-5R W 5th St 65' Shift Taper (25 MPH) R3-5R NOTE: TRAFFIC CONTROL PLAN MON. - FRI. = 7:00am TO 4:00pm PROJECT NUMBER:PROJECT ADDRESS:LOCATION: FILE NAME: R4-7B CHANNELIZATION DEVICE SIDEWALK PARKWAY SPACING (feet) MPH TAPER TANGENT West Ave N 50 / 70 40 80 DATE: 12.4.2025 W1-4L X 35 / 45 30 60 (25 MPH) 25 / 30 20 40 REVIEWED BY: M. LUNA WTCS# 013184 W20-5R X SIGN SPACING = X (1) DESIGNED BY: M. Robertson FREEWAY & EXPRESSWAYS 55 / 70 MPH 1500' ± W20-3 RURAL HIGHWAYS 60 / 65 MPH 800' ± ATCO CONTACT: 832.758.0094 MINIMUM LANE SHIFT TAPER LENGTH = L/2 (feet) X RURAL ROADS 45 / 55 MPH 500' ± mark.robertson@atcotelecom.com RURAL ROADS & URBAN ARTERIALS 35 / 40 MPH 350' ± LANE POSTED SPEED (MPH) SIDEWALK WIDTH W20-2 RURAL ROADS & URBAN ARTERIALS 25 / 30 MPH 200' ± (2) SCALE: SHEET: (feet) 25 30 35 40 45 50 55 60 65 70 RESIDENTIAL & BUSINESS DISTRICTS X 10 55 75 105 135 225 250 275 300 325 350 URBAN STREETS 25 MPH OR LESS 100' ± (2) W20-1 1"=50' 11 60 85 115 150 250 275 305 330 370 385 (1) ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE INTERCHANGE RAMPS, 02 X AT-GRADE INTERSECTIONS AND DRIVEWAYS 12 65 90 125 160 270 300 330 360 390 420 (2) THIS SPACE MAY BE REDUCED IN URBAN AREAS TO FIT ROADWAY CONDITIONS. NO: 2 OF 3 PCMS ATCO COMMUNICATIONS SERVICES, LLC AS THE DESIGNER OF THIS TRAFFIC CONTROL PLAN, MAKES NO REPRESENTATION AS TO ITS GENERAL ADEQUACY OR BEING APPROVED FOR IMPLEMENTATION. APPROVAL MUST RESULT FROM THE TRAFFIC ENGINEER OR OTHER PUBLIC OFFICIAL HAVING STATUTORY ENFORCEMENT AUTHORITY IN THE JURISDICTION. UTILIZATION AND IMPLEMENTATION OF THIS PLAN SHALL BE A RESULT OF THE APPROVAL. REF. MUTCD 2009 6A - 01 (10) PHASE 1 N DETOUR 177th St NE WORK DETAILS: 360.563.9000 708 First Street Access dual lid manhole under asphalt. Raise to Snohomish, WA 98290 grade and expose. West Ave N Division St Division St PCMS LOCATION TBD BY CITY OF ARLINGTON PCMS Everett, WA 98206 DETOUR PCMS 1 2 M4-9R W 5TH ST DETOUR CLOSED AT USE ALTERNATE P-097789 ROUTE W AVE NORTH DETOUR 2.0 SEC M4-9S END N Olympic Ave DETOUR 177th St NE West Ave N DETOUR W 5th St & West Ave M4-9R M4-8a P-097789-Atco-TCP.dwg M4-9L 107 W 5th St Arlington WA Work W 5th St W 5th St Area END DETOUR DETOUR PCMS West Ave N M4-8a DETOUR M4-9S DETOUR END DETOUR PCMS LOCATION TBD M4-9L M4-8a M4-9R N Olympic Ave BY CITY OF ARLINGTON W 4th St W 4th St W 4th St PCMS 1 2 S/B 177th St NE West Ave N TRAFFIC CONTROL PLAN DETOUR DETOUR WEST AVE N USE ALTERNATE CLOSED ROUTE PROJECT NUMBER:PROJECT ADDRESS:LOCATION: FILE NAME: AHEAD M4-9R M4-9L 2.0 SEC DATE: 12.4.2025 PCMS LOCATION TBD N Olympic Ave BY CITY OF ARLINGTON PCMS REVIEWED BY: M. LUNA WTCS# 013184 PCMS DESIGNED BY: M. Robertson 1 2 ATCO CONTACT: 832.758.0094 W 5TH ST mark.robertson@atcotelecom.com CLOSED AT USE ALTERNATE ROUTE W AVE NORTH SCALE: SHEET: 2.0 SEC NOT TO 03 SCALE NO: 3 OF 3 City of Arlington 18204 59th Avenue NE, Arlington, Washington 98223 Phone: 360-403-3551 Invoice Number: 25-0121 INVOICE Invoice Date: December 16, 2025 Account Number: 3148292788 Bill To: Invoice Questions? Phone: 360-403-3551 ATCO Telecommunications 708 First St. Email: ced@arlingtonwa.gov Invoice Due Date: December 16, 2025 Record Number: Project 25-0109 Parcel Number: 00618100101100 Location: 107 5TH ST Date Description Paid Date Amount Paid Balance December 11, Processing/Technology Fee (320.341.43.00.02) $25.00 2025 December 11, Right of Way (006.322.40.00.02) $501.81 2025 TOTAL: Project Fees $526.81 $526.81 ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- --------------------------------------------------------- REMITTANCE INFORMATION If you are paying by check, please include this portion with your payment and remit to the address listed on this invoice. Remittance Information Invoice Account Total Due Your payment is due by December 16, 2025 This Number Number Invoice 25-0121 3148292788 $526.81 ATCO Telecommunications 708 First St. 18204 59th Avenue NE Arlington, Washington 98223 Phone: 360-403-3551 Civil Use - Right of Way Permit Parcel: 00618100101100 Permit #: 25-00109 Permit Address: 107 5TH ST Permit Expiration: March 28, 2026 Description of Work: Access two manhole lids under asphalt needs to be raised to grade and exposed. OWNER APPLICANT CONTRACTOR ATCO Telecommunications Ziply Fiber Northwest LLC 708 First St. 107 5TH ST ARLINGTON, WA, 98223 4026708384 permits@atcotelecom.com registration_number : PERMIT APPROVAL The issuance or granting of this permit shall not be construed to be a permit for, or approval of, any violation of this Code or any other ordinance or order of the City, of any state or federal law, or of any order, proclamation, guidance advice or decision of the Governor of this State. To the extent the issuance or granting of this permit is interpreted to allow construction activity during any period of time when such construction is prohibited or restricted by any state or federal law, or order, proclamation, guidance advice or decision of the Governor of this State, this permit shall not authorize such work and shall not be valid. The building official is authorized to prevent occupancy or use of a structure where in violation of this Code, any other City ordinances of this jurisdiction or any other ordinance or executive order of the City, or of any state or federal law, or of any order, proclamation, guidance advice or decision of the Governor. The building official is authorized to suspend or revoke this permit if it is determined to be issued in error or on the basis of incorrect, inaccurate or incomplete information, or in violation of any City ordinance, regulation or order, state or federal law, or any order, proclamation, guidance or decision of the Governor. It is unlawful to use or occupy a building or structure until a final inspection has been made and approval or a Certificate of Occupancy has been granted. This permit authorizes only the work noted and covers work to be done on private property only. Any construction on public domain (curbs, sidewalks, driveways, marquees, etc.) will require a separate permit. The property owner shall ensure that the construction project complies with all applicable zoning codes and regulations. The property owner shall also ensure that the construction project does not cause any adverse impact on the surrounding environment or community. The property owner shall be responsible for obtaining all necessary permits and approvals from the relevant authorities before commencing construction. The property owner shall ensure that the construction project complies with all applicable design review requirements. CONDITIONS The applicant is required to notify the Communications Department Manager; 360-403-3441 or 1.) slopez@arlingtonwa.gov; mkruger@arlingtonwa.gov and Community and Economic Development 360-403-3551 or ced@arlingtonwa.gov three days prior to any traffic deviation. Traffic Control must comply with the current version of MUTCD. Work Hours are 7 am to 7 pm Monday - Saturday (no work on Sundays or City Recognized Holidays). Inspections are not available on Saturday or Sunday. Non-motorized traffic control must be provided if any part of the work impacts existing non-motorized 2.) facilities. Non-motorized traffic control measures shall provide a level of accessibility that are, at minimum, equal to the existing conditions of the site. Two days before starting work, the applicant must have all utilities located. One Call is a public utility locating 3.) service (#811 or 1-800-424-5555). Privately installed facilities must also be located using a private utility locating service. Private property owners which may be affected by the proposed work must be notified in advance of potential 4.) disruptions in access or utility services. Restoration of any infrastructure affected by the installation shall be per City of Arlington Standards & 5.) Specifications within a period not to exceed 7 days from completion of the installation. Trench Restoration shall be per Standard Detail R-140; Contact the City Engineer for Roadway Restoration requirements, 360-403-3512. INSPECTIONS Inspection Line: 360-403-3417 Call for inspections by 3:30 pm for next day inspection. Please allow 48 hours for Fire Inspections. Please provide the following information when leaving a message: Permit Number, Type of Inspection, and provide preference of morning or afternoon inspection. Inspection Portal: Please login to customer portal and submit for the desired inspection type for the permit. APPROVED BY Admin - Thad Newport Development Services Engineering Manager ASSOCIATED FEES Date Description Paid Date Amount Paid Balance December 11, Processing/Technology Fee (320.341.43.00.02) $25.00 2025 December 11, Right of Way (006.322.40.00.02) $501.81 2025 TOTAL: Project Fees $526.81 $526.81 Credit/Debit Card 121 Payment Successful December 17, 2025 $526.81 $0.00 Project Information General Information Project # 25-00109 Parcel # 00618100101100 Building ID Location 107 5TH ST Project Type Civil Use Project Use Right of Way Parent Project # Subdivision Applicant Name ATCO Telecommunications Address 708 First St. Applicant Email permits@atcotelecom.co Phone 4026708384 Cell m Owner Name Ziply Fiber Northwest LLC Address 107 5TH ST ARLINGTON, WA, 98223 Owner Email Phone Cell Contractor Address Contractor Email Phone Cell Property Information Type/Improveme Accessory/Struct nt ure Current Use Proposed Use Current Zoning Proposed Zoning Project Cost Project Value 8363.56 Current Use And Access two manhole lids under asphalt needs to be raised to grade and exposed. Proposed Changes Lot Width Lot Depth Map Number Total Area of Building & Accessory Total Area of All Man-made Improvements Structures (Sq Ft) (Sq Ft) General Notes Restrictions / Variances © Community Development Online Portal Page 1 of 5 January 28, 2026 11:10AM Structure Information Structure Type # of Stories Usable Floor Area (Sq Ft) Structure Height # of Units Load per Floor (Lbs) Sign Dimensions # of Bedrooms # of Bathrooms Occupancy With Chairs Tables & Chairs Empty Room Foundation Foundation Type Footing Depth Material Foundation Information Setbacks Front & 0 0 Setbacks Right & 0 0 Rear Left Sides Setbacks Information Water Utility Sewage Utility Gas Utility Electric Utility Driveway Width # of Off Street # of Off Street Parking Loading Miscellaneous Information © Community Development Online Portal Page 2 of 5 January 28, 2026 11:10AM Contractors License # Business Name Type Contact PACIFCC954PJ Pacific Cable Construction Out of City Timothy Jones © Community Development Online Portal Page 3 of 5 January 28, 2026 11:10AM Inspections Inspection # Inspection Type Status Date Inspector 26-0030 Civil - Right of Way Pass January 12, 2026 Brian Grieve Inspections © Community Development Online Portal Page 4 of 5 January 28, 2026 11:10AM Fees Fee Type Date Debit Credit Balance Project Fees December 11, 2025 $526.81 $526.81 $526.81 $0.00 T O T A L $526.81 $526.81 $0.00 © Community Development Online Portal Page 5 of 5 January 28, 2026 11:10AM Powered by TCPDF (www.tcpdf.org)