HomeMy WebLinkAbout20410 Smokey Point Blvd_BLD349_2026
Job Number: Drawing:
A1.1
12c-3306
SITE PLAN
PARKING PERMITSTATE DISABLED
ACCESSIBLE REQUIRED
VAN
Job Number: Drawing:
A1.2
12c-3306
SITE DETAILS
Job Number: Drawing:
A2.0
12c-3306
OCCUPANCY FLOOR PLAN
Job Number: Drawing:
A2.1
12c-3306
MAIN FLOOR PLAN
Job Number: Drawing:
A2.2
12c-3306
UPPER FLOOR PLAN
Job Number: Drawing:
A2.3
12c-3306
ROOF PLAN
Job Number: Drawing:
A2.4
12c-3306
MAIN FLOOR REFLECTED CEILING PLAN
Job Number: Drawing:
A2.5
12c-3306
UPPER FLOOR REFLECTED CEILING PLAN
Job Number: Drawing:
A2.6
12c-3306
MAIN FLOOR FINISH PLAN
Job Number: Drawing:
A2.7
12c-3306
UPPER FLOOR FINISH PLAN
Job Number: Drawing:
A2.8
12c-3306
ENLARGED FLOOR PLANS
Job Number: Drawing:
A3.1
12c-3306
EXTERIOR ELEVATIONS
Job Number: Drawing:
A3.2
12c-3306
EXTERIOR ELEVATIONS
Job Number: Drawing:
A4.1
12c-3306
WALL SECTIONS
Job Number: Drawing:
A4.2
12c-3306
WALL SECTIONS
Job Number: Drawing:
A4.3
12c-3306
WALL SECTIONS
Job Number: Drawing:
A5.1
12c-3306
SCHEDULES
Job Number: Drawing:
A5.2
12c-3306
SITE DETAILS
Job Number: Drawing:
A5.3
12c-3306
SITE DETAILS
Job Number: Drawing:
A5.4
12c-3306
STOREFRONT ELEVATIONS
Job Number: Drawing:
A1.1
12c-3306
SITE PLAN
PARKING
PERMITSTATE DISABLED
ACCESSIBLE
REQUIRED
VAN
Job Number: Drawing:
A1.2
12c-3306
SITE DETAILS
Job Number: Drawing:
A2.0
12c-3306
OCCUPANCY FLOOR PLAN
Job Number: Drawing:
A2.1
12c-3306
MAIN FLOOR PLAN
Job Number: Drawing:
A2.2
12c-3306
UPPER FLOOR PLAN
Job Number: Drawing:
A2.3
12c-3306
ROOF PLAN
Job Number: Drawing:
A2.4
12c-3306
MAIN FLOOR REFLECTED CEILING PLAN
Job Number: Drawing:
A2.5
12c-3306
UPPER FLOOR REFLECTED CEILING PLAN
Job Number: Drawing:
A2.6
12c-3306
MAIN FLOOR FINISH PLAN
Job Number: Drawing:
A2.7
12c-3306
UPPER FLOOR FINISH PLAN
Job Number: Drawing:
A2.8
12c-3306
ENLARGED FLOOR PLANS
Job Number: Drawing:
A3.1
12c-3306
EXTERIOR ELEVATIONS
Job Number: Drawing:
A3.2
12c-3306
EXTERIOR ELEVATIONS
Job Number: Drawing:
A4.1
12c-3306
WALL SECTIONS
Job Number: Drawing:
A4.2
12c-3306
WALL SECTIONS
Job Number: Drawing:
A4.3
12c-3306
WALL SECTIONS
Job Number: Drawing:
A5.1
12c-3306
SCHEDULES
Job Number: Drawing:
A5.2
12c-3306
SITE DETAILS
Job Number: Drawing:
A5.3
12c-3306
SITE DETAILS
Job Number: Drawing:
A5.4
12c-3306
STOREFRONT ELEVATIONS
Permit Information
Date 3/8/2013
Permit Number 24
Project Name Arlington Chevrolet
Applicant Name GFK Engineering
Applicant Address 1726 Holbrook Avenue
City, State, Zip Everett, WA 98203
Contact Greg Krabbe
Phone 425-551-5401
Description Full Site Civil
Site Address 20410 Smokey Point Blvd
Permit Type PWD
Project Cost 0.00
Project # 0
Status Issued
Permit Issued 3/10/2014
Permit Expires 9/10/2016
Email
Memo
Assigned To Launa Peterson
Property Information Owner Information
Parcel#: 31050800301000 LANE PROPERTIES LLC
LANE PROPERTIES LLC 10515 EVERGREEN WAY
20410 SMOKEY POINT BLVD EVERETT, WA 98204
Contractors
Primary
Contractor Name Phone Email Contractor Type License License #
Contact
425-551-
Arlington Chevrolet Tom Lane tlane@dwaynelane.com Owner
5401
BHC Consultants, 206-505-
William Hill William.Hill@bhcconsultants.com A/E
LLC 3400
Gaffney 425-355- Construction Labor &
info@gaffneyconstruction.com GAFFNCI104K3
Construction 5500 Contractor Industries
GFK Consulting, 425-347- State of
Greg Krabbe gkrabbe@comcast.net A/E 34192
Inc. 2898 Washington
Inspection
Scheduled Completed Assigned
Date Type Description Time Status
Date Date To
4/15/2014 Roadway Roadway widening of SP Blvd. along project frontage.Asphalt 4/14/2014 10:00 4/15/2014 Marc Completed
Construction section of 3" 1/2 " HMA on 4" ATB 8'6" W. Pavement section Hayes
was placed upon 18-24 " ballast rock with 3" CSBC.
Overexcavation of the native soils along entire frontage
widening occurred 4/8 - 4/11 under direction of Geotest and
backfilled with the 2"X4" ballast rock, capped with 3"-4"
CSBC.Existing asphalt was sawcut back 1' EOP to provide a
neatline for paving joint. Lakeside Ind.
1)Lift station 11 F/M tapped on 4/4/14 and a 2" gate valve
Sewer installed per plan 2)4" Steel casing and sch 80 PVC FM PW-Sew-
4/4/2014 00:00 Assigned
Inspections installed under roadway 4/9/14 3)Backflow preventer installed Rev
4/11/14 per plan
Review
Date Type Description Target Date Completed Date Assigned To Status
3/8/2013 Water/Sewer 6/19/2013 PW-Sew-Rev Approved
3/8/2013 Water/Sewer Revised submittal page 13 4/24/2014 4/17/2014 PW-Wat-Rev Complete
3/8/2013 Grading/Paving Resubmittal - Sheet 9 11/7/2014 Marc Hayes In Review
3/8/2013 Full Site Civil Permit Tracking Launa Peterson Assigned
3/8/2013 Full Site Civil No issue with the proposed site layout 5/10/2013 5/7/2013 Chris Young Complete
3/8/2013 Full Site Civil Paul said Tom approved. 5/10/2013 5/8/2013 Tom Cooper Approved
Fees
Fee Description Notes Amount
Additonal Plan Review Fee 341.82.00.01 3rd Review $212.00
Additonal Plan Review Fee 341.82.00.01 4th Review $212.00
Additonal Plan Review Fee 341.82.00.01 5th Review $212.00
Report Review Fee 341.82.00.01 Wetland Report $529.00
Report Review Fee 341.82.00.01 Storm/Geotech $529.00
Site Civil Review 341.82.00.01 $11,530.28
Traffic Mitigation 345.85.00.02 58.27 PMPHT $228,106.45
Total $241,330.70
Payments
Date Paid By Amount Description Payment Type Accepted By
3/27/2015 Lane Properties $228,106.45 check #9590 Launa Peterson
2/25/2014 Lane Properties $12,166.28 check #9359 Launa Peterson
3/8/2013 Lane Properties, Inc. $1,058.00 Reports, wetland, drainage, storm check # 9132 Launa Peterson
Total $241,330.70 Amount Outstanding: $0.00
Notes
Date Note
2/17/2015 Bond 2215146 Revised Amount - lp
1/23/2015 Bond 2215146 release of $142,500.00 - balance remains for TESC.
1/22/2015 ROW Maintenance Bond Received $28,500.00 #3112409
1/7/2015 Emailed MB Request for ROW -lp
11/20/2014 Traffic Fees are based on the Traffic Report. WSDOT $31,500.00 (875 ADT @ $36.00 per) Paid Receipt # 0350
11/13/2014 Pre-Construction meeting 8:30-9:30 (Airport "WSDOT" Conference Room)
10/30/2014 Greg Krabbe submitted one copy of sheet 9. Routed to Marc for review.
9/15/2014 Remand review documents uploaded.
5/2/2014 Emailed revised sheets 9 & 13; Gaffney, Lane, Krabbe, PW-Water & hard copy to Marc.
2/7/2014 Performance Bond $288,257.06
6/5/2013 Large plan set is located in the Permit Center.
Email History
Date Emailed To
5/7/2013 cyoung@arlingtonwa.gov,tcooper@arlingtonwa.gov
6/5/2013 eanderson@arlingtonwa.gov,frapelyea@arlingtonwa.gov,mhayes@arlingtonwa.gov,jlemke@arlingtonwa.gov,dsmith@arlingtonwa.gov
8/7/2013
9/16/2013 mhayes@arlingtonwa.gov
3/26/2014 tlane@dwaynelane.com
3/26/2014 lpeterson@arlingtonwa.gov
4/11/2014 mhayes@arlingtonwa.gov
4/17/2014 PW-Wat-Rev@arlingtonwa.gov
Uploaded Files
Upload File
Date File
3/27/2015 3:01:54 PM WSDOT Traffic Payment Receipt.pdf Delete
2/17/2015 8:05:02 AM PB_TESC 2215146.pdf Delete
1/23/2015 8:31:14 AM MB_3112409.pdf Delete
12/1/2014 4:21:27 PM Lane Recorded Dedication.pdf Delete
9/14/2014 11:00:00 PM Civil Sheet 9 RO comments.pdf Delete
9/14/2014 11:00:00 PM Arlington Remand Review.pdf Delete
5/1/2014 11:00:00 PM 29-14 Revised 9 13..pdf Delete
4/16/2014 11:00:00 PM 17-2014 Resubmittal pg 13.pdf Delete
2/24/2014 11:00:00 PM Performance Bond.pdf Delete
9/15/2013 11:00:00 PM HydroKleen Engineer Spec Drawing.pdf Delete
9/15/2013 11:00:00 PM FloGardPlusCBasBroc.pdf Delete
9/15/2013 11:00:00 PM Bond Quantity Engineer Cost Est.xlsx Delete
9/15/2013 11:00:00 PM 13.pdf Delete
9/15/2013 11:00:00 PM Arlington Chevy Erosion 8 6 13 (1).pdf Delete
9/15/2013 11:00:00 PM Arlington Chevrolet SWPPP .pdf Delete
9/11/2013 11:00:00 PM 13 3-20 GIM Minutes.pdf Delete
8/6/2013 11:00:00 PM 6.pdf Delete
8/6/2013 11:00:00 PM Arlington Chevy response 2.pdf Delete
8/6/2013 11:00:00 PM Arlington Chevy Erosion 8 6 13.pdf Delete
8/6/2013 11:00:00 PM Arlington Chevrolet Dealership Revised Floodplain Impact Analysis Report July 25 2013.pdf Delete
8/6/2013 11:00:00 PM 1-13 BHC Arlington Chevrolet 3rd Rev - Hyd Analysis.pdf Delete
6/23/2013 11:00:00 PM NPDES WAR126963 ltr.pdf Delete
6/23/2013 11:00:00 PM Hearing Calendar.pdf Delete
6/23/2013 11:00:00 PM 24-13 Arlington Chevrolet Review -2nd submittal BHC.pdf Delete
6/4/2013 11:00:00 PM GFK Response Letter.pdf Delete
6/4/2013 11:00:00 PM 3.pdf Delete
6/4/2013 11:00:00 PM Abbreviated Civil Plan Review.pdf Delete
4/11/2013 11:00:00 PM 12-2013 Sent to BHC.pdf Delete
Date: 01/22/2026
Permit #: 349
Permit Date: 04/17/2014
Review Date: 04/17/2014
Permit Type: COMMERCIAL BUILDING
Review Type: COMMERCIAL BUILDING
Target Date:
Scheduled
Time:
Completed
04/30/2014
Date:
Description: Received plan review comments that addressed both the Architectural and the Structural issues.
Lighting Power Allowance and lighting controls will be deferred.
Review
Status:
Assigned To: z.Christopher Young
Time In:
Time Out:
Hours:
Property Information
Parcel#: 31050800301000 LANE PROPERTIES LLC
LANE PROPERTIES LLC 10515 EVERGREEN WAY
20410 SMOKEY POINT BLVD EVERETT, WA 98204
Zoning: 910 Undeveloped (Vacant) LandLot: Block:
Permit #: 349
Permit Date: 04/17/14
Permit Type: COMMERCIAL BUILDING
Project Name: Arlington Chevrolet
Applicant Name: Tom Lane
Applicant Address: 21015 SR 9 NE
Applicant, City, State, Zip: Arlington, WA 98223
Contact: Ross Jameson
Phone: 425-252-2153
Email: ross@2812architecture.com
Scope of Work: Car Dealership
Valuation: 2400000.00
Square Feet: 35117
Number of Stories: 2
Construction Type:
Occupancy Group:
ID Code:
Permit Issued: 03/27/2015
Permit Expires:
Form Permit Type:
Status: COMPLETE
Assigned To: Launa Black
Property
Parcel # Address Legal Description Owner Name Owner Phone Zoning
20410 SMOKEY POINT LANE 910 Undeveloped
31050800301000
BLVD PROPERTIES LLC (Vacant) Land
Contractors
Contractor Primary Contact Phone Address Contractor Type License License #
GAFFNEY 8105 Broadway CONSTRUCTION
425-355-5500 UBI 600 173 764
CONSTRUCTION Avenue CONTRACTOR
GAFFNEY 8105 Broadway CONSTRUCTION Labor &
425-355-5500 GAFFNCI104K3
CONSTRUCTION Avenue CONTRACTOR Industries
2812 ARCHITECTS Adam Clark 425-252-2153 2812 Colby Ave AIA/PE
Kosnik 10511 19th Ave
Dan Kosnik 425-357-9600 AIA/PE
Engineering, PC SE
Inspections
Date Inspection Type Description Scheduled Date Completed Date Inspector Status
Added 2nd floor area above
service desk & customer
C20. BUILDING
09/15/2015 lounge, engineering in file. 09/15/2015 09/15/2015 BUILDING Approved
FINAL
Load rating required for
storage area created.
C20. BUILDING
08/07/2015 Framing / Insulation 08/07/2015 08/07/2015 BUILDING Approved
FINAL
C20. BUILDING
08/07/2015 08/07/2015 08/07/2015 BUILDING Approved
FINAL
C20. BUILDING Parapet / soffit steel framing.
07/10/2015 07/09/2015 07/09/2015 BUILDING Approved
FINAL Note no attachment detail!
C20. BUILDING
04/03/2015 New Auto Dealership 03/24/2015 BUILDING Completed
FINAL
Plan Reviews
Date Review Type Description Assigned To Review Status
Received plan review comments that addressed both the
COMMERCIAL
04/17/2014 Architectural and the Structural issues. Lighting Power z.Christopher Young
BUILDING
Allowance and lighting controls will be deferred.
COMMERCIAL
04/17/2014 Landscape plans - with building plans in the review room.
BUILDING
1. Provide fire extinguishers
COMMERCIAL
04/17/2014 2. Provide a Knox Box (contact FD for application) z.Tom Cooper
BUILDING
3. Provide signage at FDC that will prevent blocking of>
Fees
Fee Description Notes Amount
Building Permit Table 4-1 $14,054.58
State Surcharge - 1st DU Residential - 1st Unit $4.50
Building Plan Review Table 4-2 $9,135.48
Total $23,194.56
Attached Letters
Date Letter Description
05/08/2014 Building Permit
Payments
Date Paid By Description Payment Type Accepted By Amount
03/27/2015 Lane Properties check #9589 Launa Black $23,194.56
Outstanding Balance $0.00
Notes
Date Note Created By:
05/07/2014 Emailed Tom Cooper re: comments for review. Launa Black
Uploaded Files
Date File Name
11/24/2015 1373817-Lane elevator.pdf
10/22/2015 1336372-Arlington Chevrolet.doc
09/16/2015 1283905-Lane Mezz Engineering.pdf
03/27/2015 1021098-349_Issued Building Permit.pdf
04/30/2014 Lane Chevrolet - Structural - KE response.docx
04/30/2014 Lane Chevrolet - Architectural.docx
04/17/2014 structural calculations dated 08-22-13 Part2.pdf
04/17/2014 structural calculations dated 08-22-13 Part1.pdf
04/17/2014 Envelope Summary.pdf
04/17/2014 Application (23).pdf
Date: 01/22/2026
Permit #: 349
Permit Date: 04/17/2014
Review Date: 04/17/2014
Permit Type: COMMERCIAL BUILDING
Review Type: COMMERCIAL BUILDING
Target Date:
Scheduled
Time:
Completed
05/07/2014
Date:
Description: 1. Provide fire extinguishers 2. Provide a Knox Box (contact FD for application) 3. Provide
signage at FDC that will prevent blocking of>
Review Status:
Assigned To: z.Tom Cooper
Time In:
Time Out:
Hours:
Property Information
Parcel#: 31050800301000 LANE PROPERTIES LLC
LANE PROPERTIES LLC 10515 EVERGREEN WAY
20410 SMOKEY POINT BLVD EVERETT, WA 98204
Zoning: 910 Undeveloped (Vacant) LandLot: Block:
Permit Information
Date 4/17/2014
Permit Number 349
Project Name Arlington Chevrolet
Applicant Name Tom Lane
Applicant Address 21015 SR 9 NE
City, State, Zip Arlington, WA 98223
Contact Ross Jameson
Phone 425-252-2153
Email ross@2812architecture.com
Permit Type Commercial New
Site Address 20410 Smokey Point Blvd
Valuation 2400000.00
Status Ready to Issue
Permit Issued
Permit Expires
Square Feet 35117
Type of Construction/Occupancy Load
Number of Stories 2
Proposed Use Car Dealership
Assigned To Launa Peterson
Property Information Owner Information
Parcel#: 31050800301000 LANE PROPERTIES LLC
LANE PROPERTIES LLC 10515 EVERGREEN WAY
20410 SMOKEY POINT BLVD EVERETT, WA 98204
Contractors
Contractor
Contractor Name Primary Contact Phone Email License License #
Type
Adam Clark / Ryan 425-252-
2812 ARCHITECTS adam@2812architecture.com AIA/PE
Ellinghaus 2153
425-357-
Dan Kosnik Kosnik Engineering, PC dan@kosnik.com AIA/PE
9600
GAFFNEY 425-355- Labor &
info@gaffneyconstruction.com CONTRACTOR GAFFNCI104K3
CONSTRUCTION 5500 Industries
Review
Target Completed Assigned
Date Type Description Status
Date Date To
Received plan review comments that addressed both the Architectural
Commercial Chris
4/17/2014 and the Structural issues. Lighting Power Allowance and lighting 4/30/2014 Approved
Building Young
controls will be deferred.
4/17/2014 Landscape plans - with building plans in the review room. 4/28/2014 Complete
Commercial Troy
Building Davis
Commercial 1. Provide fire extinguishers 2. Provide a Knox Box (contact FD for Tom Approved with
4/17/2014 5/7/2014
Building application) 3. Provide signage at FDC that will prevent blocking of> Cooper Conditions
Fees
Fee Description Notes Amount
Building Permit Fee 322.10.00.00 $14,054.58
Building Plan Review Fee 345.83.00.00 $9,135.48
State Building Code Surcharge Fee 386.00.01.00
$4.50
Total $23,194.56
Notes
Date Note
5/7/2014 Emailed Tom Cooper re: comments for review.
Email History
Date Emailed To
4/18/2014 lpeterson@arlingtonwa.gov,tdavis@arlingtonwa.gov,tcooper@arlingtonwa.gov
4/18/2014 cyoung@arlingtonwa.gov
Uploaded Files Upload File
Date File
4/30/2014 Structural - KE response.docx
Delete
4/30/2014 Architectural.docx
Delete
4/17/2014 22-13 Part2.pdf
Delete
4/17/2014 22-13 Part1.pdf
Delete
4/17/2014 Envelope Summary.pdf
Delete
4/17/2014 Application (23).pdf
Delete
Permit #24
Address Payment Info
Address 20410 SMOKEY POINT BLVD Receipt # 1204703
City ARLINGTON Date 3/27/2015
State WA Paid By Lane Properties
Zip 98223-8269 Description
Payment Type check #9590
Accepted By Launa Peterson
Fees Paid
Fee Fee Description Amount
Traffic Mitigation 345.85.00.02 228,106.45
Total Payment: 228,106.45