Loading...
HomeMy WebLinkAbout20410 Smokey Point Blvd_BLD349_2026 Job Number: Drawing: A1.1 12c-3306 SITE PLAN PARKING PERMITSTATE DISABLED ACCESSIBLE REQUIRED VAN Job Number: Drawing: A1.2 12c-3306 SITE DETAILS Job Number: Drawing: A2.0 12c-3306 OCCUPANCY FLOOR PLAN Job Number: Drawing: A2.1 12c-3306 MAIN FLOOR PLAN Job Number: Drawing: A2.2 12c-3306 UPPER FLOOR PLAN Job Number: Drawing: A2.3 12c-3306 ROOF PLAN Job Number: Drawing: A2.4 12c-3306 MAIN FLOOR REFLECTED CEILING PLAN Job Number: Drawing: A2.5 12c-3306 UPPER FLOOR REFLECTED CEILING PLAN Job Number: Drawing: A2.6 12c-3306 MAIN FLOOR FINISH PLAN Job Number: Drawing: A2.7 12c-3306 UPPER FLOOR FINISH PLAN Job Number: Drawing: A2.8 12c-3306 ENLARGED FLOOR PLANS Job Number: Drawing: A3.1 12c-3306 EXTERIOR ELEVATIONS Job Number: Drawing: A3.2 12c-3306 EXTERIOR ELEVATIONS Job Number: Drawing: A4.1 12c-3306 WALL SECTIONS Job Number: Drawing: A4.2 12c-3306 WALL SECTIONS Job Number: Drawing: A4.3 12c-3306 WALL SECTIONS Job Number: Drawing: A5.1 12c-3306 SCHEDULES Job Number: Drawing: A5.2 12c-3306 SITE DETAILS Job Number: Drawing: A5.3 12c-3306 SITE DETAILS Job Number: Drawing: A5.4 12c-3306 STOREFRONT ELEVATIONS Job Number: Drawing: A1.1 12c-3306 SITE PLAN PARKING PERMITSTATE DISABLED ACCESSIBLE REQUIRED VAN Job Number: Drawing: A1.2 12c-3306 SITE DETAILS Job Number: Drawing: A2.0 12c-3306 OCCUPANCY FLOOR PLAN Job Number: Drawing: A2.1 12c-3306 MAIN FLOOR PLAN Job Number: Drawing: A2.2 12c-3306 UPPER FLOOR PLAN Job Number: Drawing: A2.3 12c-3306 ROOF PLAN Job Number: Drawing: A2.4 12c-3306 MAIN FLOOR REFLECTED CEILING PLAN Job Number: Drawing: A2.5 12c-3306 UPPER FLOOR REFLECTED CEILING PLAN Job Number: Drawing: A2.6 12c-3306 MAIN FLOOR FINISH PLAN Job Number: Drawing: A2.7 12c-3306 UPPER FLOOR FINISH PLAN Job Number: Drawing: A2.8 12c-3306 ENLARGED FLOOR PLANS Job Number: Drawing: A3.1 12c-3306 EXTERIOR ELEVATIONS Job Number: Drawing: A3.2 12c-3306 EXTERIOR ELEVATIONS Job Number: Drawing: A4.1 12c-3306 WALL SECTIONS Job Number: Drawing: A4.2 12c-3306 WALL SECTIONS Job Number: Drawing: A4.3 12c-3306 WALL SECTIONS Job Number: Drawing: A5.1 12c-3306 SCHEDULES Job Number: Drawing: A5.2 12c-3306 SITE DETAILS Job Number: Drawing: A5.3 12c-3306 SITE DETAILS Job Number: Drawing: A5.4 12c-3306 STOREFRONT ELEVATIONS Permit Information Date 3/8/2013 Permit Number 24 Project Name Arlington Chevrolet Applicant Name GFK Engineering Applicant Address 1726 Holbrook Avenue City, State, Zip Everett, WA 98203 Contact Greg Krabbe Phone 425-551-5401 Description Full Site Civil Site Address 20410 Smokey Point Blvd Permit Type PWD Project Cost 0.00 Project # 0 Status Issued Permit Issued 3/10/2014 Permit Expires 9/10/2016 Email Memo Assigned To Launa Peterson Property Information Owner Information Parcel#: 31050800301000 LANE PROPERTIES LLC LANE PROPERTIES LLC 10515 EVERGREEN WAY 20410 SMOKEY POINT BLVD EVERETT, WA 98204 Contractors Primary Contractor Name Phone Email Contractor Type License License # Contact 425-551- Arlington Chevrolet Tom Lane tlane@dwaynelane.com Owner 5401 BHC Consultants, 206-505- William Hill William.Hill@bhcconsultants.com A/E LLC 3400 Gaffney 425-355- Construction Labor & info@gaffneyconstruction.com GAFFNCI104K3 Construction 5500 Contractor Industries GFK Consulting, 425-347- State of Greg Krabbe gkrabbe@comcast.net A/E 34192 Inc. 2898 Washington Inspection Scheduled Completed Assigned Date Type Description Time Status Date Date To 4/15/2014 Roadway Roadway widening of SP Blvd. along project frontage.Asphalt 4/14/2014 10:00 4/15/2014 Marc Completed Construction section of 3" 1/2 " HMA on 4" ATB 8'6" W. Pavement section Hayes was placed upon 18-24 " ballast rock with 3" CSBC. Overexcavation of the native soils along entire frontage widening occurred 4/8 - 4/11 under direction of Geotest and backfilled with the 2"X4" ballast rock, capped with 3"-4" CSBC.Existing asphalt was sawcut back 1' EOP to provide a neatline for paving joint. Lakeside Ind. 1)Lift station 11 F/M tapped on 4/4/14 and a 2" gate valve Sewer installed per plan 2)4" Steel casing and sch 80 PVC FM PW-Sew- 4/4/2014 00:00 Assigned Inspections installed under roadway 4/9/14 3)Backflow preventer installed Rev 4/11/14 per plan Review Date Type Description Target Date Completed Date Assigned To Status 3/8/2013 Water/Sewer 6/19/2013 PW-Sew-Rev Approved 3/8/2013 Water/Sewer Revised submittal page 13 4/24/2014 4/17/2014 PW-Wat-Rev Complete 3/8/2013 Grading/Paving Resubmittal - Sheet 9 11/7/2014 Marc Hayes In Review 3/8/2013 Full Site Civil Permit Tracking Launa Peterson Assigned 3/8/2013 Full Site Civil No issue with the proposed site layout 5/10/2013 5/7/2013 Chris Young Complete 3/8/2013 Full Site Civil Paul said Tom approved. 5/10/2013 5/8/2013 Tom Cooper Approved Fees Fee Description Notes Amount Additonal Plan Review Fee 341.82.00.01 3rd Review $212.00 Additonal Plan Review Fee 341.82.00.01 4th Review $212.00 Additonal Plan Review Fee 341.82.00.01 5th Review $212.00 Report Review Fee 341.82.00.01 Wetland Report $529.00 Report Review Fee 341.82.00.01 Storm/Geotech $529.00 Site Civil Review 341.82.00.01 $11,530.28 Traffic Mitigation 345.85.00.02 58.27 PMPHT $228,106.45 Total $241,330.70 Payments Date Paid By Amount Description Payment Type Accepted By 3/27/2015 Lane Properties $228,106.45 check #9590 Launa Peterson 2/25/2014 Lane Properties $12,166.28 check #9359 Launa Peterson 3/8/2013 Lane Properties, Inc. $1,058.00 Reports, wetland, drainage, storm check # 9132 Launa Peterson Total $241,330.70 Amount Outstanding: $0.00 Notes Date Note 2/17/2015 Bond 2215146 Revised Amount - lp 1/23/2015 Bond 2215146 release of $142,500.00 - balance remains for TESC. 1/22/2015 ROW Maintenance Bond Received $28,500.00 #3112409 1/7/2015 Emailed MB Request for ROW -lp 11/20/2014 Traffic Fees are based on the Traffic Report. WSDOT $31,500.00 (875 ADT @ $36.00 per) Paid Receipt # 0350 11/13/2014 Pre-Construction meeting 8:30-9:30 (Airport "WSDOT" Conference Room) 10/30/2014 Greg Krabbe submitted one copy of sheet 9. Routed to Marc for review. 9/15/2014 Remand review documents uploaded. 5/2/2014 Emailed revised sheets 9 & 13; Gaffney, Lane, Krabbe, PW-Water & hard copy to Marc. 2/7/2014 Performance Bond $288,257.06 6/5/2013 Large plan set is located in the Permit Center. Email History Date Emailed To 5/7/2013 cyoung@arlingtonwa.gov,tcooper@arlingtonwa.gov 6/5/2013 eanderson@arlingtonwa.gov,frapelyea@arlingtonwa.gov,mhayes@arlingtonwa.gov,jlemke@arlingtonwa.gov,dsmith@arlingtonwa.gov 8/7/2013 9/16/2013 mhayes@arlingtonwa.gov 3/26/2014 tlane@dwaynelane.com 3/26/2014 lpeterson@arlingtonwa.gov 4/11/2014 mhayes@arlingtonwa.gov 4/17/2014 PW-Wat-Rev@arlingtonwa.gov Uploaded Files Upload File Date File 3/27/2015 3:01:54 PM WSDOT Traffic Payment Receipt.pdf Delete 2/17/2015 8:05:02 AM PB_TESC 2215146.pdf Delete 1/23/2015 8:31:14 AM MB_3112409.pdf Delete 12/1/2014 4:21:27 PM Lane Recorded Dedication.pdf Delete 9/14/2014 11:00:00 PM Civil Sheet 9 RO comments.pdf Delete 9/14/2014 11:00:00 PM Arlington Remand Review.pdf Delete 5/1/2014 11:00:00 PM 29-14 Revised 9 13..pdf Delete 4/16/2014 11:00:00 PM 17-2014 Resubmittal pg 13.pdf Delete 2/24/2014 11:00:00 PM Performance Bond.pdf Delete 9/15/2013 11:00:00 PM HydroKleen Engineer Spec Drawing.pdf Delete 9/15/2013 11:00:00 PM FloGardPlusCBasBroc.pdf Delete 9/15/2013 11:00:00 PM Bond Quantity Engineer Cost Est.xlsx Delete 9/15/2013 11:00:00 PM 13.pdf Delete 9/15/2013 11:00:00 PM Arlington Chevy Erosion 8 6 13 (1).pdf Delete 9/15/2013 11:00:00 PM Arlington Chevrolet SWPPP .pdf Delete 9/11/2013 11:00:00 PM 13 3-20 GIM Minutes.pdf Delete 8/6/2013 11:00:00 PM 6.pdf Delete 8/6/2013 11:00:00 PM Arlington Chevy response 2.pdf Delete 8/6/2013 11:00:00 PM Arlington Chevy Erosion 8 6 13.pdf Delete 8/6/2013 11:00:00 PM Arlington Chevrolet Dealership Revised Floodplain Impact Analysis Report July 25 2013.pdf Delete 8/6/2013 11:00:00 PM 1-13 BHC Arlington Chevrolet 3rd Rev - Hyd Analysis.pdf Delete 6/23/2013 11:00:00 PM NPDES WAR126963 ltr.pdf Delete 6/23/2013 11:00:00 PM Hearing Calendar.pdf Delete 6/23/2013 11:00:00 PM 24-13 Arlington Chevrolet Review -2nd submittal BHC.pdf Delete 6/4/2013 11:00:00 PM GFK Response Letter.pdf Delete 6/4/2013 11:00:00 PM 3.pdf Delete 6/4/2013 11:00:00 PM Abbreviated Civil Plan Review.pdf Delete 4/11/2013 11:00:00 PM 12-2013 Sent to BHC.pdf Delete Date: 01/22/2026 Permit #: 349 Permit Date: 04/17/2014 Review Date: 04/17/2014 Permit Type: COMMERCIAL BUILDING Review Type: COMMERCIAL BUILDING Target Date: Scheduled Time: Completed 04/30/2014 Date: Description: Received plan review comments that addressed both the Architectural and the Structural issues. Lighting Power Allowance and lighting controls will be deferred. Review Status: Assigned To: z.Christopher Young Time In: Time Out: Hours: Property Information Parcel#: 31050800301000 LANE PROPERTIES LLC LANE PROPERTIES LLC 10515 EVERGREEN WAY 20410 SMOKEY POINT BLVD EVERETT, WA 98204 Zoning: 910 Undeveloped (Vacant) LandLot: Block: Permit #: 349 Permit Date: 04/17/14 Permit Type: COMMERCIAL BUILDING Project Name: Arlington Chevrolet Applicant Name: Tom Lane Applicant Address: 21015 SR 9 NE Applicant, City, State, Zip: Arlington, WA 98223 Contact: Ross Jameson Phone: 425-252-2153 Email: ross@2812architecture.com Scope of Work: Car Dealership Valuation: 2400000.00 Square Feet: 35117 Number of Stories: 2 Construction Type: Occupancy Group: ID Code: Permit Issued: 03/27/2015 Permit Expires: Form Permit Type: Status: COMPLETE Assigned To: Launa Black Property Parcel # Address Legal Description Owner Name Owner Phone Zoning 20410 SMOKEY POINT LANE 910 Undeveloped 31050800301000 BLVD PROPERTIES LLC (Vacant) Land Contractors Contractor Primary Contact Phone Address Contractor Type License License # GAFFNEY 8105 Broadway CONSTRUCTION 425-355-5500 UBI 600 173 764 CONSTRUCTION Avenue CONTRACTOR GAFFNEY 8105 Broadway CONSTRUCTION Labor & 425-355-5500 GAFFNCI104K3 CONSTRUCTION Avenue CONTRACTOR Industries 2812 ARCHITECTS Adam Clark 425-252-2153 2812 Colby Ave AIA/PE Kosnik 10511 19th Ave Dan Kosnik 425-357-9600 AIA/PE Engineering, PC SE Inspections Date Inspection Type Description Scheduled Date Completed Date Inspector Status Added 2nd floor area above service desk & customer C20. BUILDING 09/15/2015 lounge, engineering in file. 09/15/2015 09/15/2015 BUILDING Approved FINAL Load rating required for storage area created. C20. BUILDING 08/07/2015 Framing / Insulation 08/07/2015 08/07/2015 BUILDING Approved FINAL C20. BUILDING 08/07/2015 08/07/2015 08/07/2015 BUILDING Approved FINAL C20. BUILDING Parapet / soffit steel framing. 07/10/2015 07/09/2015 07/09/2015 BUILDING Approved FINAL Note no attachment detail! C20. BUILDING 04/03/2015 New Auto Dealership 03/24/2015 BUILDING Completed FINAL Plan Reviews Date Review Type Description Assigned To Review Status Received plan review comments that addressed both the COMMERCIAL 04/17/2014 Architectural and the Structural issues. Lighting Power z.Christopher Young BUILDING Allowance and lighting controls will be deferred. COMMERCIAL 04/17/2014 Landscape plans - with building plans in the review room. BUILDING 1. Provide fire extinguishers COMMERCIAL 04/17/2014 2. Provide a Knox Box (contact FD for application) z.Tom Cooper BUILDING 3. Provide signage at FDC that will prevent blocking of> Fees Fee Description Notes Amount Building Permit Table 4-1 $14,054.58 State Surcharge - 1st DU Residential - 1st Unit $4.50 Building Plan Review Table 4-2 $9,135.48 Total $23,194.56 Attached Letters Date Letter Description 05/08/2014 Building Permit Payments Date Paid By Description Payment Type Accepted By Amount 03/27/2015 Lane Properties check #9589 Launa Black $23,194.56 Outstanding Balance $0.00 Notes Date Note Created By: 05/07/2014 Emailed Tom Cooper re: comments for review. Launa Black Uploaded Files Date File Name 11/24/2015 1373817-Lane elevator.pdf 10/22/2015 1336372-Arlington Chevrolet.doc 09/16/2015 1283905-Lane Mezz Engineering.pdf 03/27/2015 1021098-349_Issued Building Permit.pdf 04/30/2014 Lane Chevrolet - Structural - KE response.docx 04/30/2014 Lane Chevrolet - Architectural.docx 04/17/2014 structural calculations dated 08-22-13 Part2.pdf 04/17/2014 structural calculations dated 08-22-13 Part1.pdf 04/17/2014 Envelope Summary.pdf 04/17/2014 Application (23).pdf Date: 01/22/2026 Permit #: 349 Permit Date: 04/17/2014 Review Date: 04/17/2014 Permit Type: COMMERCIAL BUILDING Review Type: COMMERCIAL BUILDING Target Date: Scheduled Time: Completed 05/07/2014 Date: Description: 1. Provide fire extinguishers 2. Provide a Knox Box (contact FD for application) 3. Provide signage at FDC that will prevent blocking of> Review Status: Assigned To: z.Tom Cooper Time In: Time Out: Hours: Property Information Parcel#: 31050800301000 LANE PROPERTIES LLC LANE PROPERTIES LLC 10515 EVERGREEN WAY 20410 SMOKEY POINT BLVD EVERETT, WA 98204 Zoning: 910 Undeveloped (Vacant) LandLot: Block: Permit Information Date 4/17/2014 Permit Number 349 Project Name Arlington Chevrolet Applicant Name Tom Lane Applicant Address 21015 SR 9 NE City, State, Zip Arlington, WA 98223 Contact Ross Jameson Phone 425-252-2153 Email ross@2812architecture.com Permit Type Commercial New Site Address 20410 Smokey Point Blvd Valuation 2400000.00 Status Ready to Issue Permit Issued Permit Expires Square Feet 35117 Type of Construction/Occupancy Load Number of Stories 2 Proposed Use Car Dealership Assigned To Launa Peterson Property Information Owner Information Parcel#: 31050800301000 LANE PROPERTIES LLC LANE PROPERTIES LLC 10515 EVERGREEN WAY 20410 SMOKEY POINT BLVD EVERETT, WA 98204 Contractors Contractor Contractor Name Primary Contact Phone Email License License # Type Adam Clark / Ryan 425-252- 2812 ARCHITECTS adam@2812architecture.com AIA/PE Ellinghaus 2153 425-357- Dan Kosnik Kosnik Engineering, PC dan@kosnik.com AIA/PE 9600 GAFFNEY 425-355- Labor & info@gaffneyconstruction.com CONTRACTOR GAFFNCI104K3 CONSTRUCTION 5500 Industries Review Target Completed Assigned Date Type Description Status Date Date To Received plan review comments that addressed both the Architectural Commercial Chris 4/17/2014 and the Structural issues. Lighting Power Allowance and lighting 4/30/2014 Approved Building Young controls will be deferred. 4/17/2014 Landscape plans - with building plans in the review room. 4/28/2014 Complete Commercial Troy Building Davis Commercial 1. Provide fire extinguishers 2. Provide a Knox Box (contact FD for Tom Approved with 4/17/2014 5/7/2014 Building application) 3. Provide signage at FDC that will prevent blocking of> Cooper Conditions Fees Fee Description Notes Amount Building Permit Fee 322.10.00.00 $14,054.58 Building Plan Review Fee 345.83.00.00 $9,135.48 State Building Code Surcharge Fee 386.00.01.00 $4.50 Total $23,194.56 Notes Date Note 5/7/2014 Emailed Tom Cooper re: comments for review. Email History Date Emailed To 4/18/2014 lpeterson@arlingtonwa.gov,tdavis@arlingtonwa.gov,tcooper@arlingtonwa.gov 4/18/2014 cyoung@arlingtonwa.gov Uploaded Files Upload File Date File 4/30/2014 Structural - KE response.docx Delete 4/30/2014 Architectural.docx Delete 4/17/2014 22-13 Part2.pdf Delete 4/17/2014 22-13 Part1.pdf Delete 4/17/2014 Envelope Summary.pdf Delete 4/17/2014 Application (23).pdf Delete Permit #24 Address Payment Info Address 20410 SMOKEY POINT BLVD Receipt # 1204703 City ARLINGTON Date 3/27/2015 State WA Paid By Lane Properties Zip 98223-8269 Description Payment Type check #9590 Accepted By Launa Peterson Fees Paid Fee Fee Description Amount Traffic Mitigation 345.85.00.02 228,106.45 Total Payment: 228,106.45