HomeMy WebLinkAbout17831 59th Ave Ne_BLD333_2026
CITY OF ARLINGTON
TEMPORARY
CERTIFICATE OF OCCUPANCY
INTERNATIONAL BUILDING CODE SEC. 110
NOTE: THIS CERTIFICATE DOES NOT CERTIFY ELECTRICAL WORK
At 17821 59th Ave. NE Building Permit Number 2014333
Name & Address of Owner Occupant Load Number of Stories
AAMP c/o GreenFire Production N/A 1
7922 Skipley Rd. Type of Construction/Sprinkler system required Use
Snohomish, WA 98290 V-B YES I502
Producer/Processor
HAS BEEN INSPECTED AND APPROVED AS COMPLYING WITH
THE Tenant Improvement
THE 2012 EDITION OF THE INTERNATIONAL BUILDING CODE FOR GROUP F-1 OCCUPANCY
ISSUED THIS 17th DAY OF October , 2014.
BY Christopher Young
BUILDING OFFICIAL
CONDITIONS:
1. Completion of Grow Rooms
2. Final Electrical on all work
COMMERCIAL REMODEL
PERMIT APPLICATION
Department of Community & Economic Development
City of Arlington • 18204 59th Ave NE • Arlington, WA 98223
Phone (360) 403-3551
THIS APPLICATION MUST BE ACCOMPANIED BY THREE (3) SETS OF CONSTRUCTION
PLANS, TWO (2) SETS OF STRUCTURAL CALCULATIONS, ONE (1) SET OF NREC ENERGY
CODE APPLICATIONS AND ONE (1) OCCUPANTS STATEMENT OF INTENDED USE.
Type of Permit: Change of Use/Remodel Commercial Addition
Tenant Improvement
Project Address: 17831 59th AVE NE Parcel ID#
Project Valuation: 40,000.00
Project Description: TENNANT IMPROVEMENT
Legal Description: N/A
Owner: JIM ROSE
Address: 3316 FUHRMAN AVE E SUIT 100
City: SEATTLE State: WA ZIP: 98102
Contact Person: KEITH HOLTON Phone: 5306935038
Cell Phone:
5306
9350
38
Fax Number:
E-mail: BBREC@YMAIL.COM
Address: 7922 SKIPLEY RD
City: SNOHOMIS State: WA ZIP: 98290
H
Contractor Information
Contractor: VERNON LOVELACE Phone: 4257738949
Address: 7625 172ND ST SE
City: SNOHOMISH State: WA ZIP: 98296
License Number: COLORAC906R7 Expiration: 3/19/2015
Plumbing Contractor: N/A Phone: N/A
Address: N/A
City: N/A State: N/A ZIP: N/A
License Number: N/A Expiration: N/A
Mechanical Contractor: N/A Phone: N/A
Address: N/A
City: N/A State: N/A ZIP: N/A
License Number: N/A Expiration: N/A
Project Name/Tenant: GREEN FIRE TI
Site Address:
20196 Cavanaugh Ct, Mount
Vernon 98274
Bldg/Suite/Unit 7
IBC Construction Type: INDUSTRIAL IBC Occupancy Type: F2
Description of Use: AGRICULTURE
Building Square Footage: 30,000 Number of Stories: 1
Square Footage Per Floor: N/A
Will there be any installation, modification or removal of the following?
(Check all that apply)
Automatic fire extinguishing systems
Compressed gas systems
Fire alarm and detection systems
Fire pumps
Flammable and combustible liquids (tanks, piping etc…)
Hazardous materials
High piled/rack storage
Industrial ovens/furnace
Private fire hydrants
Spraying or dipping operations
Standpipe systems
Temporary membrane structure, tents (>200sq ft) or canopies (>400 sq ft)
Provide details on any of the above checked items:
Installation, changes, modifications or removal of any of the above may require additional
submittals,information, or permits during the plan review or construction process.
Building Division:
The Building Division shall review any revisions and addenda. Approved copies will be given to the
contractor to maintain as part of the approved plan set.
The City Inspector will monitor the special inspection functions for compliance with the agreement
and the approved plans.
The City Inspector shall be responsible for approving various stages of construction to be covered
and work to proceed.
Design Professionals:
The architect and engineer will clearly indicate on the plans and specifications for the specific types
of special inspection required, and shall include a schedule for inspection and testing.
The architect and engineer will coordinate their revisions and addenda process in such a way as to
insure all required City approvals are obtained, prior to work shown on the revisions being
performed.
Owner:
The project owner, or the architect or engineer acting as the owners agent, shall employ the special
inspector or agency.
ENFORCEMENT:
A failure of the special inspector or firm to perform in keeping the requirements of the IBC, the
approved plans and this document may void this agreement and the Building Officials approval of
the special inspector. In such case a new special inspector and/or firm would need to be proposed
for approval. A failure of the design and/or construction parties to perform in accordance with this
agreement may result in a STOP WORK notice being posted on the project, until nonconforming
items have been resolved.
ACKNOWLEDGEMENTS:
The building permit does not include any mechanical, electrical, plumbing or fire sprinkler/alarm
work. These permits are issued separately. Mechanical, electrical, plumbing, or fire sprinkler/
alarm permits require a separate permit application and may also require separate plan review.
Please note that any tenant improvement work in a space that involves food handling or preparation
requires Snohomish County Health District approval before the permit can be issued. You must
provide the Permit Center a copy of the approval letter or the approved plans. Contact the
Snohomish County Health District at (425) 339-5250 with any questions or for more information.
An intake appointment is required for all large Tenant Improvement Building Permit Applications. To
determine if your project requires an intake appointment, to schedule an appointment or to ensure
that you have the most current information, please contact the City of Arlington Permit Center at
(360) 403-3551 or by email to permitcenter@arlingtonwa.gov.
I have read and agree to comply with the terms and conditions of this agreement.
Please Attach Plans and Supporting Documents (PDF Only)
PERMIT MAP2.pdf
STAFF USE ONLY:
Permit Number: Accepted Receipt #
By:
Date Received: Amount Received:
By submission of this form, I hereby certify that the above information is correct and that the
construction on, and the occupancy and the use of the above-described property will be in
accordance with the laws, rules and regulation of the State of Washington.
Permit #: 333
Permit Date: 03/28/14
Permit Type: COMMERCIAL ALTERATION
Project Name: Green Fire
Applicant Name: Keith Holton
Applicant Address: 7922 Skipley Rd
Applicant, City, State, Zip: Snohomish, WA 98290
Contact: Keith Holton
Phone: 530-693-5038
Email: bbrec@ymail.com
Scope of Work:
Valuation: 40000.00
Square Feet: 0
Number of Stories: 1
Construction Type:
Occupancy Group:
ID Code:
Permit Issued: 04/16/2014
Permit Expires:
Form Permit Type:
Status: COMPLETE
Assigned To:
Property
Parcel # Address Legal Description Owner Name Owner Phone Zoning
ARLINGTON
ADVANCED 637 Warehousing &
31052200403600 17831 59TH AVE NE
MANUFACTURING Storage Services
PARK
Contractors
Contractor Primary Contact Phone Address Contractor Type License License #
Color & Arches CONSTRUCTION
Vernon Lovelace 425-773-8949 7625 172nd St SE COLORAC906R7
Corporation LLC CONTRACTOR
Inspections
Date Inspection Type Description Scheduled Date Completed Date Inspector Status
C20. BUILDING T.I. for I502
05/15/2014 05/15/2014 z.Christopher Young Completed
FINAL Producer/Processor
Plan Reviews
Date Review Type Description Assigned To Review Status
Sprinkler and mechanical permits are deferred
COMMERCIAL
03/28/2014 Need lighting power allowance compliance form z.Christopher Young
ALTERATION
Fire extinguishers per IFC required
Fees
Fee Description Notes Amount
Building Permit Table 4-1 $710.38
State Surcharge - 1st DU Residential - 1st Unit $4.50
Building Plan Review Table 4-2 $461.75
Total $1,176.63
Attached Letters
Date Letter Description
03/31/2014 Building Permit
Payments
Date Paid By Description Payment Type Accepted By Amount
04/16/2014 Green Fire cash Launa Black $1,176.63
Outstanding Balance $0.00
Uploaded Files
Date File Name
10/17/2014 819598-17831 59th Ave..doc
03/28/2014 BLD 333 Application.pdf
03/28/2014 BLD 333 Wall Sections.pdf
03/28/2014 BLD 333 Layout.pdf
BUSINESS LICENSE APPLICATION
Department of Community & Economic Development
City of Arlington • 18204 59th Ave NE • Arlington, WA 98223
Phone (360) 403-3551
Business License Year: July 1st through June 30th - ANNUAL LICENSE FEE: (due with application)
July 1-Sept 30 - $60.00; Prorated Fees: Oct-Dec $45; Jan-Mar $30; Apr-Jun $75 ($15 for current & $60 for coming year)
Type of Application: New Business
Business Name: Green Fire Production Inc
Physical Address: 17831 59th Avenue NE Bldg 7 Arlington WA 98223
Mailing Address: PO Box 2496 Snohomish WA 98291
Business Owner Name: Keith Holton
E-mail: bbrec@ymail.com
Business Phone 530-693-5038
Number:
Owner Phone Number: 530-693-5038
Manager/Contact Name: Keith Holton
Emergency Number: 530-693-5038
Is the business located Yes Building Square Feet: 30,845
in a rental unit?
Building Owner Name: Jim Rose Phone:
Mailing Address: 3316 Fuhrman Avenue E Suite 200 Seattle WA 98102
Is your business located No
at your residence?
If yes, what is your How many square feet
homes total square used for business?
footage?
Description of Business: I 502 Producer/Processor
WA State UBI Number: 603 358 531
Professional License: Health Liquor
Permit: License:
Additional Licenses: 603 337 793
Burglar Alarm: Yes Fire Alarm: Yes
Sprinkler System: Yes Basement: No
Do you have or plan to have amusement devices (games, pull tabs)? No
Do you intend to have indoor/outdoor storage or warehousing in Yes
connection with your business?
If so, please describe:
Does your business involve any assembly of materials? No
If so, please describe:
Does assembly involve any of the following?
Paint Spraying? No Cutting or Welding? No
Electrical Processing? No Chemical Processing? 1
Are any of the following used or stored at your business location?
Flammable Liquids? 1 Combustible Liquids? 0
Compressed Gases? 1 Toxic Substances? 0
Highly Combustible 0 Exotic Metals? No
Solids?
Please list any
Hazardous Chemicals:
To comply with Title III SARA Superfund Federal Regulations, the following must be submitted with your
application for review by the Arlington Fire Department:
1. Material Data Safety Sheets (MSDS) - If you use chemicals in your business you receive these sheets with
them.
2. Tier 1 & 2 Emergency and Hazardous Chemical Inventory.
If you intend to make structural alterations or modifications to the building or site, or intend to erect a sign, please
contact the City of Arlington Permit Center at 18204 59th Ave NE or by calling (360) 403-3551. Any alterations or
modifications require a permit and must be obtained prior to any changes or alteration to the business.
Proposed Building Use Other
CROSS CONNECTION
Does the building in which your business will be located have No
a backflow prevention device?
If yes, please list the
type:
STORMWATER
Does the onsite Stormwater flow offsite? Don't Know
Are there any active wells on the property? Don't Know
Do you have a Stormwater Control Plan? Don't Know
Does your business require an industrial No Permit #
Stormwater permit?
Will your business produce waste that requires special handling? No
If yes, please list:
WASTEWATER
Does the plumbing system currently have a grease interceptor? No
Date grease trap/interceptor was last cleaned (provide date):
Does the plumbing system currently have an oil / water separator? No
Date oil / water separator was last cleaned (provide service record):
Is water used in the business process (washing, rinsing, cooling)? Yes
Does your business require a NPDES permit? Don't Know
Signature: Keith Holton Date: 03/13/14
By submission of this form, I hereby certify that the above information is correct and that the
construction, installation for the above mentioned property will be in accordance with the
applicable laws of the City of Arlington and the State of Washington.