Loading...
HomeMy WebLinkAbout17831 59th Ave Ne_BLD333_2026 CITY OF ARLINGTON TEMPORARY CERTIFICATE OF OCCUPANCY INTERNATIONAL BUILDING CODE SEC. 110 NOTE: THIS CERTIFICATE DOES NOT CERTIFY ELECTRICAL WORK At 17821 59th Ave. NE Building Permit Number 2014333 Name & Address of Owner Occupant Load Number of Stories AAMP c/o GreenFire Production N/A 1 7922 Skipley Rd. Type of Construction/Sprinkler system required Use Snohomish, WA 98290 V-B YES I502 Producer/Processor HAS BEEN INSPECTED AND APPROVED AS COMPLYING WITH THE Tenant Improvement THE 2012 EDITION OF THE INTERNATIONAL BUILDING CODE FOR GROUP F-1 OCCUPANCY ISSUED THIS 17th DAY OF October , 2014. BY Christopher Young BUILDING OFFICIAL CONDITIONS: 1. Completion of Grow Rooms 2. Final Electrical on all work COMMERCIAL REMODEL PERMIT APPLICATION Department of Community & Economic Development City of Arlington • 18204 59th Ave NE • Arlington, WA 98223 Phone (360) 403-3551 THIS APPLICATION MUST BE ACCOMPANIED BY THREE (3) SETS OF CONSTRUCTION PLANS, TWO (2) SETS OF STRUCTURAL CALCULATIONS, ONE (1) SET OF NREC ENERGY CODE APPLICATIONS AND ONE (1) OCCUPANTS STATEMENT OF INTENDED USE. Type of Permit: Change of Use/Remodel Commercial Addition Tenant Improvement Project Address: 17831 59th AVE NE Parcel ID# Project Valuation: 40,000.00 Project Description: TENNANT IMPROVEMENT Legal Description: N/A Owner: JIM ROSE Address: 3316 FUHRMAN AVE E SUIT 100 City: SEATTLE State: WA ZIP: 98102 Contact Person: KEITH HOLTON Phone: 5306935038 Cell Phone: 5306 9350 38 Fax Number: E-mail: BBREC@YMAIL.COM Address: 7922 SKIPLEY RD City: SNOHOMIS State: WA ZIP: 98290 H Contractor Information Contractor: VERNON LOVELACE Phone: 4257738949 Address: 7625 172ND ST SE City: SNOHOMISH State: WA ZIP: 98296 License Number: COLORAC906R7 Expiration: 3/19/2015 Plumbing Contractor: N/A Phone: N/A Address: N/A City: N/A State: N/A ZIP: N/A License Number: N/A Expiration: N/A Mechanical Contractor: N/A Phone: N/A Address: N/A City: N/A State: N/A ZIP: N/A License Number: N/A Expiration: N/A Project Name/Tenant: GREEN FIRE TI Site Address: 20196 Cavanaugh Ct, Mount Vernon 98274 Bldg/Suite/Unit 7 IBC Construction Type: INDUSTRIAL IBC Occupancy Type: F2 Description of Use: AGRICULTURE Building Square Footage: 30,000 Number of Stories: 1 Square Footage Per Floor: N/A Will there be any installation, modification or removal of the following? (Check all that apply) Automatic fire extinguishing systems Compressed gas systems Fire alarm and detection systems Fire pumps Flammable and combustible liquids (tanks, piping etc…) Hazardous materials High piled/rack storage Industrial ovens/furnace Private fire hydrants Spraying or dipping operations Standpipe systems Temporary membrane structure, tents (>200sq ft) or canopies (>400 sq ft) Provide details on any of the above checked items: Installation, changes, modifications or removal of any of the above may require additional submittals,information, or permits during the plan review or construction process. Building Division: The Building Division shall review any revisions and addenda. Approved copies will be given to the contractor to maintain as part of the approved plan set. The City Inspector will monitor the special inspection functions for compliance with the agreement and the approved plans. The City Inspector shall be responsible for approving various stages of construction to be covered and work to proceed. Design Professionals: The architect and engineer will clearly indicate on the plans and specifications for the specific types of special inspection required, and shall include a schedule for inspection and testing. The architect and engineer will coordinate their revisions and addenda process in such a way as to insure all required City approvals are obtained, prior to work shown on the revisions being performed. Owner: The project owner, or the architect or engineer acting as the owners agent, shall employ the special inspector or agency. ENFORCEMENT: A failure of the special inspector or firm to perform in keeping the requirements of the IBC, the approved plans and this document may void this agreement and the Building Officials approval of the special inspector. In such case a new special inspector and/or firm would need to be proposed for approval. A failure of the design and/or construction parties to perform in accordance with this agreement may result in a STOP WORK notice being posted on the project, until nonconforming items have been resolved. ACKNOWLEDGEMENTS: The building permit does not include any mechanical, electrical, plumbing or fire sprinkler/alarm work. These permits are issued separately. Mechanical, electrical, plumbing, or fire sprinkler/ alarm permits require a separate permit application and may also require separate plan review. Please note that any tenant improvement work in a space that involves food handling or preparation requires Snohomish County Health District approval before the permit can be issued. You must provide the Permit Center a copy of the approval letter or the approved plans. Contact the Snohomish County Health District at (425) 339-5250 with any questions or for more information. An intake appointment is required for all large Tenant Improvement Building Permit Applications. To determine if your project requires an intake appointment, to schedule an appointment or to ensure that you have the most current information, please contact the City of Arlington Permit Center at (360) 403-3551 or by email to permitcenter@arlingtonwa.gov. I have read and agree to comply with the terms and conditions of this agreement. Please Attach Plans and Supporting Documents (PDF Only) PERMIT MAP2.pdf STAFF USE ONLY: Permit Number: Accepted Receipt # By: Date Received: Amount Received: By submission of this form, I hereby certify that the above information is correct and that the construction on, and the occupancy and the use of the above-described property will be in accordance with the laws, rules and regulation of the State of Washington. Permit #: 333 Permit Date: 03/28/14 Permit Type: COMMERCIAL ALTERATION Project Name: Green Fire Applicant Name: Keith Holton Applicant Address: 7922 Skipley Rd Applicant, City, State, Zip: Snohomish, WA 98290 Contact: Keith Holton Phone: 530-693-5038 Email: bbrec@ymail.com Scope of Work: Valuation: 40000.00 Square Feet: 0 Number of Stories: 1 Construction Type: Occupancy Group: ID Code: Permit Issued: 04/16/2014 Permit Expires: Form Permit Type: Status: COMPLETE Assigned To: Property Parcel # Address Legal Description Owner Name Owner Phone Zoning ARLINGTON ADVANCED 637 Warehousing & 31052200403600 17831 59TH AVE NE MANUFACTURING Storage Services PARK Contractors Contractor Primary Contact Phone Address Contractor Type License License # Color & Arches CONSTRUCTION Vernon Lovelace 425-773-8949 7625 172nd St SE COLORAC906R7 Corporation LLC CONTRACTOR Inspections Date Inspection Type Description Scheduled Date Completed Date Inspector Status C20. BUILDING T.I. for I502 05/15/2014 05/15/2014 z.Christopher Young Completed FINAL Producer/Processor Plan Reviews Date Review Type Description Assigned To Review Status Sprinkler and mechanical permits are deferred COMMERCIAL 03/28/2014 Need lighting power allowance compliance form z.Christopher Young ALTERATION Fire extinguishers per IFC required Fees Fee Description Notes Amount Building Permit Table 4-1 $710.38 State Surcharge - 1st DU Residential - 1st Unit $4.50 Building Plan Review Table 4-2 $461.75 Total $1,176.63 Attached Letters Date Letter Description 03/31/2014 Building Permit Payments Date Paid By Description Payment Type Accepted By Amount 04/16/2014 Green Fire cash Launa Black $1,176.63 Outstanding Balance $0.00 Uploaded Files Date File Name 10/17/2014 819598-17831 59th Ave..doc 03/28/2014 BLD 333 Application.pdf 03/28/2014 BLD 333 Wall Sections.pdf 03/28/2014 BLD 333 Layout.pdf BUSINESS LICENSE APPLICATION Department of Community & Economic Development City of Arlington • 18204 59th Ave NE • Arlington, WA 98223 Phone (360) 403-3551 Business License Year: July 1st through June 30th - ANNUAL LICENSE FEE: (due with application) July 1-Sept 30 - $60.00; Prorated Fees: Oct-Dec $45; Jan-Mar $30; Apr-Jun $75 ($15 for current & $60 for coming year) Type of Application: New Business Business Name: Green Fire Production Inc Physical Address: 17831 59th Avenue NE Bldg 7 Arlington WA 98223 Mailing Address: PO Box 2496 Snohomish WA 98291 Business Owner Name: Keith Holton E-mail: bbrec@ymail.com Business Phone 530-693-5038 Number: Owner Phone Number: 530-693-5038 Manager/Contact Name: Keith Holton Emergency Number: 530-693-5038 Is the business located Yes Building Square Feet: 30,845 in a rental unit? Building Owner Name: Jim Rose Phone: Mailing Address: 3316 Fuhrman Avenue E Suite 200 Seattle WA 98102 Is your business located No at your residence? If yes, what is your How many square feet homes total square used for business? footage? Description of Business: I 502 Producer/Processor WA State UBI Number: 603 358 531 Professional License: Health Liquor Permit: License: Additional Licenses: 603 337 793 Burglar Alarm: Yes Fire Alarm: Yes Sprinkler System: Yes Basement: No Do you have or plan to have amusement devices (games, pull tabs)? No Do you intend to have indoor/outdoor storage or warehousing in Yes connection with your business? If so, please describe: Does your business involve any assembly of materials? No If so, please describe: Does assembly involve any of the following? Paint Spraying? No Cutting or Welding? No Electrical Processing? No Chemical Processing? 1 Are any of the following used or stored at your business location? Flammable Liquids? 1 Combustible Liquids? 0 Compressed Gases? 1 Toxic Substances? 0 Highly Combustible 0 Exotic Metals? No Solids? Please list any Hazardous Chemicals: To comply with Title III SARA Superfund Federal Regulations, the following must be submitted with your application for review by the Arlington Fire Department: 1. Material Data Safety Sheets (MSDS) - If you use chemicals in your business you receive these sheets with them. 2. Tier 1 & 2 Emergency and Hazardous Chemical Inventory. If you intend to make structural alterations or modifications to the building or site, or intend to erect a sign, please contact the City of Arlington Permit Center at 18204 59th Ave NE or by calling (360) 403-3551. Any alterations or modifications require a permit and must be obtained prior to any changes or alteration to the business. Proposed Building Use Other CROSS CONNECTION Does the building in which your business will be located have No a backflow prevention device? If yes, please list the type: STORMWATER Does the onsite Stormwater flow offsite? Don't Know Are there any active wells on the property? Don't Know Do you have a Stormwater Control Plan? Don't Know Does your business require an industrial No Permit # Stormwater permit? Will your business produce waste that requires special handling? No If yes, please list: WASTEWATER Does the plumbing system currently have a grease interceptor? No Date grease trap/interceptor was last cleaned (provide date): Does the plumbing system currently have an oil / water separator? No Date oil / water separator was last cleaned (provide service record): Is water used in the business process (washing, rinsing, cooling)? Yes Does your business require a NPDES permit? Don't Know Signature: Keith Holton Date: 03/13/14 By submission of this form, I hereby certify that the above information is correct and that the construction, installation for the above mentioned property will be in accordance with the applicable laws of the City of Arlington and the State of Washington.