Loading...
HomeMy WebLinkAbout18824 Smokey Point Blvd Unit 105_BLD23_2026 Permit #: 23 Permit Date: 03/06/13 Permit Type: COMMERCIAL ALTERATION Project Name: Jake's House Church Applicant Name: Applicant Address: Applicant, City, State, Zip: Contact: Phone: 360-659-8900 Email: Scope of Work: Valuation: 150323.00 Square Feet: 0 Number of Stories: 0 Construction Type: Occupancy Group: ID Code: Permit Issued: Permit Expires: Form Permit Type: Status: COMPLETE Assigned To: Launa Black Property Parcel # Address Legal Description Owner Name Owner Phone Zoning 18824 SMOKEY POINT Smokey Point 637 Warehousing & 01100600000200 BLVD UNIT 105 Enterprises Storage Services Contractors Contractor Primary Contact Phone Address Contractor Type License License # 18824 Smokey PowerCo Drywall CONSTRUCTION 360-631-3655 Point Blvd, Unit Labor & Industries POWERDS902L1 Systems CONTRACTOR 101 18824 Smokey Jake's House Church Steve Chilson 425-231-3500 Point Blvd. Unit APPLICANT 101 Inspections Date Inspection Type Description Scheduled Date Completed Date Inspector Status All work completed per approved plan. OK to C20. BUILDING 06/27/2013 occupy pending final 06/27/2013 06/27/2013 z.Christopher Young Approved FINAL electrical, which will be conducted later today. Sprinkler extension was on FS07. FIRE 220psi hydro and holding. 05/17/2013 05/17/2013 05/17/2013 z.Christopher Young Approved SPRINKLER FINAL All piping, bracing, and heads installed per plan Framing at mezzanine installed per approved plan. L&I wouldn't conduct their inspection because the stairs 04/26/2013 C09. FRAMING weren't complete and the 04/26/2013 04/26/2013 z.Christopher Young Approved inspector said he doesn't climb ladders or use scissor lifts. Gave the ok to rock one side. C20. BUILDING 04/26/2013 04/26/2013 z.Christopher Young Approved FINAL Steel columns, beams, joists, C20. BUILDING bracing, bolts, and welds 04/12/2013 04/12/2013 04/12/2013 z.Christopher Young Approved FINAL completed per plan. Ok to pour pan deck. Pier footings and strip footings installed per C20. BUILDING 03/26/2013 approved plan. Received 03/27/2013 03/26/2013 z.Christopher Young Completed FINAL Geotech report for new footings Groundwork DWV on 10 C19. PLUMBING 03/22/2013 feet of head - no leaks. OK 03/22/2013 03/22/2013 z.Christopher Young Approved FINAL to cover. Plan Reviews Date Review Type Description Assigned To Review Status Plan review is complete for the T.I. All other permits COMMERCIAL No Comment 03/06/2013 (plumbing, mechanical, sprinkler, etc.) will be deferred z.Christopher Young ALTERATION Received submittals 1. Add minimum of (2) fire extinguishers to new area, one COMMERCIAL No Comment 03/07/2013 at each stairway. z.Tom Cooper ALTERATION Received 2. Submit plans for fire sprinkler changes. COMMERCIAL No Comment 03/06/2013 Job Tracking Launa Black ALTERATION Received Fees Fee Description Notes Amount Building Permit Table 4-1 $1,670.58 State Surcharge - 1st DU Residential - 1st Unit $4.50 Building Plan Review Table 4-2 $1,085.88 Total $2,760.96 Attached Letters Date Letter Description 03/19/2013 Building Permit Payments Date Paid By Description Payment Type Accepted By Amount 03/19/2013 Jakes House TI check # 501 Launa Black $2,760.96 Outstanding Balance $0.00 Uploaded Files Date File Name 03/06/2013 23-Application.pdf