Loading...
HomeMy WebLinkAbout7301 197th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`__abc]a]deffghijhklmnopiq   ]^]]r_cbc]brb]acstppkuvhijwxyfopiq Q  ]sr^az{bccb`bcs|nmwmn}fg~lmnnxwopiq   ]szs]^^bc]a]dtppwmxnmuyopiq PRE-CONSTRUCTION MEETING AGENDA Community & Economic Development City of Arlington • 18204 59th Avenue NE • Arlington, WA 98223 • Phone (360) 403 3551 Project Name: Project No.: Date: 1) Submittal Documents _____ Contractor contacts and 24 hr emergency numbers _____ Proof of insurance listing the City of Arlington as additional insured _____ Performance Bond must be on file _____ Contractor’s License _____ Drafts of easements and dedications must be in for review _____ Copies of other agency permits or proof that the application is in progress _____ One week prior to the pre-construction meeting. Submittals for all materials and subcontractor approvals _____ Department of Ecology General Construction Stormwater Permit _____ CESCL Name: ________________________________________CESCL#__________ 2) _____ Right of Way Permits 3) _____ Call for locates 811 4) _____ Inspection scheduling and frequency 5) _____ Copy of the City of Arlington Design and Construction Standards and Specifications or show proof of ownership. (Available online) 6) Inspections shall include, but are not be limited to: General Inspections - Kevin Olander - 360-913-5546 Traffic Control and Drainage/Erosion (TESC) Curb/Gutter/Sidewalk/Driveway Installation Methods Grade compaction, preparation and approval Staking Requirements Staking requirements Bedding Curb ramp location approval Suitability of native backfill & compaction Source/Mix Design/Truck Tickets requirements Workmanship Materials Testing (if required) Will CDF be required? Protection from weather and vandalism Lamping and videotaping if required Grade compaction, preparation and approval Suitability of native backfill & compaction requirements Irrigation Roadway Materials Subgrade preparation, approval & compaction Approval prior to backfill results Top course requirements, approval & compaction Revised 10/2016 results Blue tops (if required) Source/Mix Design/Truck Tickets ATB & CL. B installation requirements & approval Workmanship & protection until cured Landscaping Striping, Signage and Permanent Barricades Planting schedule and methods Paint/Thermoplastics/RPM’s Approve changes, additions and/or deletions Workmanship & protection until cured Onsite inspection prior to and during planting MUTCD Required ï‚· Verify root barrier installation Posts and installation requirements ï‚· Planting methods & before planting mulch Sign duplicates installation Monumentation ï‚· Staking & top mulch installation Inspect final grade for lawn installation (Hydro seed/sod) Inspect miscellaneous landscape items Final Inspection Lighting Fencing Sewer Inspections - 360-403-3508 or Jay Lemke 425-754-7443 Installation methods Materials Staking requirements Will CDF be required? Bedding Testing Suitability of native backfill & compaction requirements Water Inspections - Gary Schlagel 360-403-3529 or 360-403-3526 Installation methods Materials FDC/Fire Department Connection (F) Thrust blocks Staking requirements Testing & Purity Bedding (if required) Hydrant RPM’s ï‚· Water/Sewer connection fees must be paid prior to meter installation and side sewer inspection. Call the Permit Center for more information ï‚· Bulk hydrant use contact 360-403-3526 ï‚· Inspections may be charged at $127.00 per hour, ½ hour minimum PLEASE BE ADVISED! FAILURE TO CALL FOR INSPECTION MAY RESULT IN WORK BEING LEFT EXPOSED AND/OR REMOVED AND RECONSTRUCTED It is the responsibility of the Owner, Developer and Contractor to call and arrange for appropriate inspections. Onsite tailgate meetings with each individual inspector prior to installation of their related facilities are MANDATORY. Those persons who are actually performing the work are required to attend. Revised 10/2016