HomeMy WebLinkAbout19817 74th Ave Ne_BLD6321_2025
Permit Packet Coversheet
Community and Economic Development
City of Arlington • 18204 59th Avenue NE • Arlington, WA 98223 • Phone (360) 403-3551
Page 1 of 1
Permit Number: Permit Type:
Address/Parcel: Completed (Month/Year):
Land Use
Notice of Decision
Staff Report
Application
Narrative
Legal Description
Vicinity Map
Site Plan
Landscape Plan
Complete Streets Checklist
Traffic Impact Analysis
Snohomish County Traffic Mitigation Offer
WSDOT Traffic Offer Form
Tree Survey
Stormwater Drainage Report
Geotech Report
Critical Area Evaluation Form
SEPA Checklist
Public Notice Material
Noticing and Related Documents
Water / Sewer Availability Certificate
Unanticipated Discovery Plan Form
Aerial Photo of Site
Proposed Building Materials
Lighting Plans and Lighting Cut Sheets
Color Elevations
Design Matrix
Plat Map
Title Report
Lot Closures
Preliminary Civil Plans
Archaeological Survey
o Confidential Documents. Contact the
City to obtain.
Topography (Existing Conditions)
CC&R’s
Deeds / Easements / Conveyances
/Dedications
Developer’s Agreement
Recorded Copies
Bonding or Assignment of Funds
o Confidential Documents. Contact the
City to obtain.
Letters and Project Documents
Other:
Civil
Issued Permit
Application
Other Applications
Construction Calculation Worksheet
Approved Plans
Review Comment Form
Letters and Project Documents
Other Agency Permits
Reports:
o Drainage Report Pg:
o Stormwater Pg:
o Geotech Pg:
o All Other Reports
SEPA and Noticing Materials
Inspections
As-Builts
Other:
Building
Issued Permit
Application
Additional Applications
Approved Plans
Site Plan
Letters and Project Documents
Calculations
Project Specification Manuals
Reports
Certificate of Occupancy
Inspections
Other:
BLD6321 Commercial Racking
19817 74th Ave Ne February 2025
✔
✔
✔
✔
✔
CITY OF ARLINGTON
18204 59th Avenue NE, Arlington, WA 98223
INSPECTIONS: 360-403-3417 - Permit Center: 360-403-3551
BUILDING PERMIT
19817 74TH AVE NE
Parcel #: 31051400200700
Permit #: 6321
PERMIT EXPIRES 180 DAYS AFTER
DATE OF ISSUANCE.
Scope of Work: Installation of selective pallet racking Valuation: 20000.00
OWNER APPLICANT CONTRACTOR
GAYTEWAY BUSINESS PARK, LLC Toyotalift Northwest CJ's Installation Services LLC
P.O. BOX 1727 19305 72nd Ave S 1108 21st St SE
BELLEVUE, WA 98009 Kent Puyallup, WA 98372
2067138115 8448707074
LIC: CJSINIS850D4 EXP: 04/20/2025
MECHANICAL CONTRACTOR PLUMBING CONTRACTOR
LIC #:EXP:LIC #:EXP:
JOB DESCRIPTION
PERMIT TYPE:COMMERCIAL RACKING CODE YEAR:2021
STORIES:1 CONST. TYPE:llB
DWELLING UNITS:OCC GROUP:S-1; Storage Mod Hazard
BUILDINGS:OCC LOAD:
PERMIT APPROVAL
The issuance or granting of this permit shall not be construed to be a permit for, or approval of, any violation of this Code or any
other ordinance or order of the City, of any state or federal law, or of any order, proclamation, guidance advice or decision of the
Governor of this State. To the extent the issuance or granting of this permit is interpreted to allow construction activity during any
period of time when such construction is prohibited or restricted by any state or federal law, or order, proclamation, guidance advice
or decision of the Governor of this State, this permit shall not authorize such work and shall not be valid. The building official is
authorized to prevent occupancy or use of a structure where in violation of this Code, any other City ordinances of this jurisdiction or
any other ordinance or executive order of the City, or of any state or federal law, or of any order, proclamation, guidance advice or
decision of the Governor. The building official is authorized to suspend or revoke this permit if it is determined to be issued in error or
on the basis of incorrect, inaccurate or incomplete information, or in violation of any City ordinance, regulation or order, state or
federal law, or any order, proclamation, guidance or decision of the Governor.
I AGREE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUCTION AND IN DOING THE WORK
AUTHORIZED THEREBY; NO PERSON WILL BE EMPLOYED IN VIOLATION OF THE LABOR CODE OF THE
STATE OF WASHINGTON RELATING TO WORKMEN'S COMPENSATION INSURANCE AND RCW 18.27.
THIS APPLICATION IS NOT A PERMIT UNTIL SIGNED BY THE BUILDING OFFICIAL OR HIS/HER DEPUTY AND
ALL FEES ARE PAID.
IT IS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL A FINAL INSPECTION HAS BEEN
MADE AND APPROVAL OR A CERTIFICATE OF OCCUPANCY HAS BEEN GRANTED. IBC110/IRC110.
SALES TAX NOTICE: Sales tax relating to construction and construction materials in the City of Arlington must be reported on
your sales tax return form and coded City of Arlington #3101.
01/22/2025
Applicant Signature Date Building Official Date
1/22/2025
CONDITIONS
Adhere to approved plans. Call for inspection.
The property owner shall ensure that the construction project complies with all applicable zoning codes and regulations. The property
owner shall also ensure that the construction project does not cause any adverse impact on the surrounding environment or
community. The property owner shall be responsible for obtaining all necessary permits and approvals from the relevant authorities
before commencing construction. The property owner shall ensure that the construction project complies with all applicable design
review requirements.
THIS PERMIT AUTHORIZES ONLY THE WORK NOTED. THIS PERMIT COVERS WORK TO BE DONE ON PRIVATE
PROPERTY ONLY. ANY CONSTRUCTION ON THE PUBLIC DOMAIN (CURBS, SIDEWALKS, DRIVEWAYS,
MARQUEES, ETC.) WILL REQUIRE SEPARATE PERMISSION.
PERMIT FEES
Date Description Fee Amount
01/23/2025 Processing/Technology $25.00
01/23/2025 Building Permit $481.09
01/23/2025 Building Plan Review $312.71
Total Due:$818.80
Total Payment:$818.80
Balance Due:$0.00
CALL FOR INSPECTIONS
Call by 3:30 pm for next day inspection, allow 48 hours for Fire Inspections
When calling for an inspection please leave the following information:
Permit Number, Type of Inspection being requested, and whether you prefer morning or afternoon
INSPECTION INFORMATION Pass/Fail
COMMERCIAL TENANT IMPROVEMENT
PERMIT APPLICATION
Community and Economic Development
City of Arlington • 18204 59th Ave NE • Arlington, WA 98223 • Phone (360) 403-3551 The following information is required for Commercial, Multi-Family, and Mixed-Use Building Permit Applications. Mark each box to designate that the information has been provided. Please submit this checklist as part of the submittal documents. See ASSISTANCE BULLETIN #30 for detailed design requirements.
EACH BUILDING OR STRUCTURE REQUIRES A SEPARATE SUBMITTAL. SUBMIT ELECTRONIC FILES FOR EACH OF THE FOLLOWING; Incomplete applications will not be accepted.
1.Plan Review fee is due at time of submittal and remaining balance will be due at time of issuance.2.The City of Arlington does not review or inspect electrical systems. Contact Labor and Industries at lni.wa.gov or360-416-3000.
A.DEFERRED SUBMITTALSIf the project requires any of the following, a Deferred Submittal Request MUST be completed. Deferred submittals requireseparate applications, plans and plan review.1.Mechanical Plans (if not included in the plan set)2.Plumbing Plans (if not included in the plan set)3.Fire Sprinkler4.Fire Alarm5.Signage
B.SPECIAL INSPECTION AND TESTING AGREEMENTA Special Inspection Firm is required to perform special inspections for the following type of work.*The Special Inspection and Testing Agreement MUST be submitted with the Building Application.
I acknowledge that all items designated as submittal requirements must accompany my Tenant
Improvement Permit Application to be considered a complete submittal.
REQUIRED DOCUMENTS City of Arlington Commercial Tenant Improvement Permit Application Site Plan Architectural Plans Structural Plans Structural Calculations Mechanical System Modifications, (if applicable) Plumbing System Modifications, (if applicable) Project Specification Manuals, (if applicable) WSEC Compliance Forms, (if applicable) https://waenergycodes.com/ Special Inspection and Testing Agreement Deferred Submittal Request Airport Property Lease (if building is located within the Arlington Airport Property Boundary)
COMMERCIAL TENANT IMPROVEMENT
REV03.2022 Page 2 of 7
INSTALLATION, MODIFICATION OR REMOVAL MAY REQUIRE A SEPARATE PERMIT SUBMITAL
*CHECK ALL THAT APPLYAutomatic fire extinguishing systems Compressed gas systems Fire pumps Flammable and combustible liquids (tanks, piping etc.) Standpipe systems Hazardous materials Private fire hydrants Industrial ovens/furnace Fire alarm and detection systems Spraying or dipping operations High piled/rack storage Temporary membrane structure, tents (>200 sq. ft.) or canopies (>400 sq. ft.) Provide details on any of the above checked items: _________________________________________________________________________
Type of Permit: New Space Addition Alteration
Project Scope of Work:
Primary Contact: Owner Architect Engineer Contractor
COMMERCIAL TENANT IMPROVEMENT
REV03.2022 Page 3 of 7
MECHANICAL SYSTEM INFORMATION
•New gas piping requires a pressure test hooking to any appliance
•Sediment traps (drips) are required on all gas lines
•Gas lines are required to be supported/secured per IFGS, Section 415
•Proper Combustion air and venting required for all appliances
•A shut-off valve is required within 6 feet of each appliance
MECHANICAL PERMIT FEES (per unit)
Additional Plan Review fees x $ 75.00 = $ Air Cond. Unit ≤100Btu/h x $ 15.00 = $ Air Cond. Unit >100Btu/h x $ 25.00 = $ Air Cond. Unit >500Btu/hp x $ 50.00 = $ Air Handling Units x $ 15.00 = $ Base Mechanical Fee $ 25.00 $ 25.00 Boiler <100Btu/h >3hp x $ 15.00 = $ Boiler >1 million Btu/h<50hp x $ 25.00 = $ Boiler >1.5 million Btu/h<50hp x $ 50.00 = $ Boiler >100Btu/h 3-15hp x $ 15.00 = $ Boiler >500Btu/h 15-30hp x $ 25.00 = $ Commercial Hoods -Type I x $ 25.00 = $ Commercial Hoods -Type II x $ 50.00 = $ Diffusers x $ 15.00 = $ Dryer Ducting x $ 15.00 = $ Ductwork (drawings required) x $ 25.00 = $ Evaporative Coolers x $ 15.00 = $ Exhaust/Ventilation Fans x $ 15.00 = $ Fireplace/Insert/Stove x $ 15.00 = $ Forced Air Heat ≤100 Btu/h x $ 15.00 = $ Forced Air Heat >100 Btu/h x $ 25.00 = $ Gas Clothes Dryer x $ 15.00 = $ Gas Fired AC ≤100 Btu/h x $ 15.00 = $
New Installation Addition Alteration Replaced Gas Piping
Gas Piping Specification and complete Schematic PAGE 4 Not Applicable
Proposed Piping Size: ½” ⅝” ¾” 1” 1½” 2”Inlet Pressure: Pressure Drop: Specific Gravity:
N/A
COMMERCIAL TENANT IMPROVEMENT
REV03.2022 Page 4 of 7
MECHANICAL PERMIT FEES (per unit) Gas Fired AC >100 Btu/h x $ 25.00 = $ Gas Fired AC > 500 Btu/h x $ 50.00 = $ Gas Piping ≤ 5 units x $ 15.00 = $ Gas Piping > 5 units (plus <5 units) x $ 2.00 = $ Heat Exchangers x $ 15.00 = $ Heat Pump-Condensing Unit x $ 25.00 = $ Hot Water Heat Coils x $ 15.00 = $ Miscellaneous Appliance - regulated by mechanical code, not otherwise specified x $ 15.00 = $ Pkg. Units ≤100btu x $ 25.00 =$ Pkg. Units >100btu x $ 50.00 =$ Range/Cook top-Gas Fired x $ 15.00 =$ Refrigeration Unit ≤100Btu/h x $ 15.00 =$ Refrigeration Unit >100Btu/h x $ 25.00 =$ Refrigeration Unit >500Btu/h x $ 50.00 =$ Re-inspection fee (all) x $ 75.00 =$ Unit Heaters ≤ 100 Btu/h x $ 15.00 =$ Unit Heaters >100 Btu/h x $ 25.00 =$ VAV Boxes (Variable Air Volume, part of air conditioning system) x $ 10.00 = $ Wall Heaters - Gas Fired x $ 25.00 =$ Water Heater - Gas Fired x $ 25.00 =$ Permit Fee $ Table 4-8; Plan Review Fee $ Processing/Technology Fee $25.00 Total $
PRESSURE PIPING SCHEMATICCOMPLETE FOR GAS PIPING ONLY – USE A SEPARATE SHEET, IF NECESSARY
SCHEMATIC IS TO SCALE SCHEMATIC NOT TO SCALEShow Pipe Size(s) and Length(s) from meter to all appliances
NOTE: Any interior pressure regulators must be indicated
N/A
COMMERCIAL TENANT IMPROVEMENT
REV03.2022 Page 5 of 7
PLUMBING SYSTEM INFORMATION
The following items need to be specified on the plans:
Fixture specifications and equipment with locations.
Location and type of all backflow assemblies for each fixture.
Calculations for Grease Interceptor.
Pipe size and location of sanitary and potable water systems.
Riser diagram of waste, vent, and rain water systems, including sizes.
Medical gas piping riser diagram, type of gas, storage room and size of piping.
PLUMBING PERMIT FEES (per fixture) Commercial plumbing permits are required to submit line drawings. A plan review fee of 65% per Table 4-6 for plumbing permits will be assessed at time of submittal. Includes two (2) inspections with permit. Additional Plan Review fees x $ 75.00 = Alteration/repair piping x $ 15.00 = Backflow Assembly x $25.00 = Base Plumbing Fee $ 25.00 $25.00 Bath/Shower Combo x $ 15.00 = Building Main Waste x $ 25.00 = Clothes Washer x $ 15.00 = Dishwasher x $ 15.00 = Drinking Fountain x $ 15.00 = Floor Drains x $ 15.00 =
New Installation Addition Alteration Replaced Industrial
N/A
COMMERCIAL TENANT IMPROVEMENT
REV03.2022 Page 6 of 7
PLUMBING PERMIT FEES (per fixture) Grease Interceptor x $ 75.00 = Grease Trap x $ 25.00 = Hose Bibb x $ 15.00 = Icemaker/Refrigerator x $ 15.00 = Irrigation – per meter x $ 25.00 = Kitchen Sink & Disposal x $ 15.00 = Laundry Tray x $ 15.00 = Lavatory x $ 15.00 = Med Gas Piping ≤ 5 inlets/outlets x $ 60.00 = Med Gas Piping > 5 inlets/outlets (plus ≤ 5 inlets/outlets) x $ 5.00 = Miscellaneous – regulated by plumbing code, not otherwise specified x $ 15.00 = Pretreatment Interceptor x $ 15.00 = Re-inspection Fee (all) x $ 75.00 = Roof Drains x $ 15.00 = Shower (only) x $ 15.00 = Sink (bar, service, etc.) x $ 15.00 = Toilets x $ 15.00 = Urinal x $ 15.00 = Vacuum Breakers x $ 25.00 = Water Heater x $ 25.00 = Water Heater - Tankless x $ 25.00 = Permit Fee Table 4-6; Plan Review Fee Processing/Technology Fee $25.00 Total
New Addition/Alteration Medical Automotive Based Industrial
Office Restaurant Machine Shop Other: ____________________________________
CROSS CONNECTION
Coffee Urn/Espresso Hydrotherapy Equip.Steam Generators
Carbonated Bev.Dental Equip.Dye Vats
Fume Hoods Laboratory Equip.Pressure Washers
Degreasers Autoclave/Sterilizers Cooling Towers
Aquarium Swimming Pools Sprinkler w/chemicals
WASTEWATER DISCHARGEDoes the plumbing system currently have a grease interceptor? Yes No Don’t Know
Yes No Don’t Know
N/A
COMMERCIAL TENANT IMPROVEMENT
REV03.2022 Page 7 of 7
Yes No Don’t KnowDoes your business require a NPDES permit? Yes No Don’t KnowI hereby certify that the above information is correct and that the construction on, and the occupancy and the use of the above-described property will be in accordance with the laws, rules and regulation of the State of Washington.
Signature Print Name Date
SPECIAL INSPECTION AND TESTING AGREEMENT
Community and Economic Development
City of Arlington • 18204 59th Ave NE • Arlington, WA 98223 • Phone (360) 403-3551
Page 1 of 4 - REV03.2022
In accordance with International Building Code Chapter 17, where application is made for construction as described
in this section, the Owner or the License Design Professional responsible for, and acting as the owner’s agent shall
employ one or more Special Inspectors to provide inspections during construction.
Before a permit can be issued: The owner, Architect or Engineer of record acting as the owner's agent, shall
complete this agreement, including the required acknowledgements, and attach structural tests and inspections
schedules. A pre-construction conference with the parties involved may be required to review the special inspection
requirements and procedures.
Property Address:
Lot #: Parcel ID No.: Subdivision:
Project Description:
Primary Contact: Owner Architect Engineer Contractor
Owner Name: Office No.:
Email Address: Cell No.:
Mailing Address: City: State: Zip:
Architect Name: Office No.:
Email Address: Cell No.:
Mailing Address: City: State: Zip:
Professional License Number: Expiration Date:
Engineer Name: Office No.:
Email Address: Cell No.:
Mailing Address: City: State: Zip:
Professional License Number: Expiration Date:
Contractor Name: Office No.:
Email Address: Cell No.:
Mailing Address: City: State: Zip:
L&I Contractor License Number: Expiration Date: 4/20/25
19817 74th Ave NE
31051400204800
Installation of selective pallet racking
EQT Exeter
michelle.busse@eqtexeter.com
2707 Jahn Ave NW, suite B6 Gig Harbor WA 98335
Enhao Zhang (909)596-7186
1815 Wright Ave La Verne CA 91750
21022747
CJ's Installation Services LLC
CJsInstallationServicesLLC@outlook.com (844)870-2074
1108 21ST ST SE Puyallup WA 98372
CJSINIS850D4
ben@scedinc.com
Page 2 of 4 - REV03.2022
SPECIAL INSPECTION AND TESTING SHALL MEET THE MINIMUM REQUIREMENTS OF 2018 IBC. THE
FOLLOWING CONDITIONS ARE ALSO APPLICABLE.
1. Duties and Responsibilities of Special Inspector
a. Observe Work:
The Special Inspector shall observe the work for conformance with City of Arlington approved (stamped)
design drawings and specifications and applicable workmanship provisions of the IBC The Architect/
Engineer-reviewed shop drawings and/ or project drawings may be used only as an aid to inspection.
b. Report Non-Conforming Items:
The Special Inspector shall bring non-conforming items to the attention of the Contractor and note all such
items in the daily report. If any item is not resolved in a timely manner or is about to be incorporated in the
work, the Special Inspector shall immediately notify the City of Arlington by telephone or in person, and
notify the project Architect or Engineer.
c. Furnish Daily Reports:
Each Special Inspector shall complete and sign an inspection report for each day's inspections to remain at
the job site with the contractor for review by the City of Arlington.
d. Furnish Weekly Reports:
The Special Inspector or agency shall furnish weekly reports of tests and inspections directly to the City of
Arlington, project Architect/ Engineer, and others as designated. These reports must include the following:
i.Description of daily inspections and test made, with applicable locations.
ii.Listing of all non-conforming items.
iii.Report on how non-conforming items were resolved or unresolved, as applicable.
iv.Itemize all changes authorized by the Architect/ Engineer of Record and City of Arlington if not included
in non-conformance items.
e. Furnish Final Report:
The Special Inspector or inspection agency shall submit a final signed report to the City of Arlington stating
that all items requiring special inspection and testing were fulfilled and reported, and to the best of his/ her
knowledge, in conformance with the approved design drawings, specifications, approved change orders and
the applicable workmanship provisions of the IBC. Items not in conformance, unresolved items or any
discrepancies in inspection coverage (i.e., missed inspections, periodic inspections when inspection was
required, etc.) shall be specifically itemized in this report.
2. Contractor Responsibilities
a. Notify the Special Inspector:
The Contractor is responsible for notifying the Special Inspector or agency regarding individual inspection
items on the summary schedule and as noted on the City of Arlington approved plan as specified by the
Architect and or Engineer of record.
b. Provide Access to Approved Plans:
The Contractor is responsible for providing the Special Inspector access to approved plans at the job site.
c. Retain Special Inspection Records:
The Contractor is also responsible for retaining at the job site all Special Inspection records submitted by the
Special Inspector and providing these records for review by City of Arlington, upon request.
3. City of Arlington
a. Approve Special Inspector:
The City of Arlington shall approve all Special Inspectors prior to performing any inspection.
b. Monitor Special Inspection:
Work requiring special inspection and the performance of Special Inspectors shall be monitored by the City
of Arlington. His/ Her approval must be obtained prior to placement of concrete or similar activities in
addition to that of the Special Inspector.
Page 3 of 4 - REV03.2022
4. Owner Responsibilities
a. Funding:
The project owner or the Architect or Engineer of record acting as the owner's agent shall fund the Special
Inspection Services.
5. Architect or Engineer of Record Responsibilities
a. Drawings:
The Architect or Engineer of record shall include special inspection requirements on the design drawings
and specifications.
b. Schedule Inspections:
Provide a summary schedule of required inspections which would outline frequency of inspections for items
which may require multiple inspections which may include but are not limited to concrete and grout testing,
compaction, testing of backfill and or road beds as recommended by the geo-tech engineer, and structural
welding as work progresses.
6. Indicate items requiring special inspection, structural testing, or structural observations by checking the
appropriate box.
܆ STRUCTURAL STEEL ………………………………………………………………. (IBC 1705.2.1 & 1705.12.1)
܆ STEEL CONSTRUCTION OTHER THAN STRUCTURAL STEEL ……. (IBC 1705.2.2)
տ CONCRETE CONSTRUCTION …………………………………………………….(IBC 1705.3)
տ MASONRY CONSTRUCTION ……………………………………………………...(IBC 1705.4)
տ WOOD CONSTRUCTION ……………………………………………………………(IBC 1705.5, 1705.11.1 & 1705.12.2)
տ SOILS CONSTRUCTION ……………………………………………………………..(IBC 1705.6)
տ DRIVEN DEEP FOUNDATIONS ………………………………………………….(IBC 1705.7)
տ CAST-IN-PLACE DEEP FOUNDATIONS ………………………………………(IBC 1705.8)
տ HELICAL PILE FOUNDATIONS ………………………………………………….(IBC 1705.9)
տ SPRAYED FIRE-RESISTANT MATERIALS …………………………………..(IBC 1705.14)
տ MASTIC AND INTUMESCENT FIRE-RESISTANT COATINGS ………..(IBC 1705.15)
տ EXTERIOR INSULATION AND FINISH SYSTEMS (EIFS) ………………(IBC 1705.16)
܆ FIRE-RESISTANT PENETRATIONS AND JOINTS ……………………….. (IBC 1705.17)
Only required for high-rise buildings or those assigned to Risk Category III or IV per IBC Table 1604.5.
܆ SMOKE CONTROL ……………………………………………………………………. (IBC 1705.18)
܆ ARCHITECTURAL COMPONENTS …………………………………………….. (IBC 1705.12.5)
Only required for buildings located within Seismic Design Category D, E, or F
܆ PLUMBING, MECHANICAL & ELECTRICAL COMPONENTS …………. (IBC 1705.12.6)
Only required for buildings located within Seismic Design Category C, D, E, or F
܆ SEISMICALLY ISOLATED SYSTEMS …………………………………………... (IBC 1705.12.8)
Material alternatives or unusual design applications
܆ SPECIAL CASES ………………………………………………………………………... (IBC 1705.1.1)
܆ MISCELLANEOUS AREA
These inspections may be recommended by the Architect/Engineer and are to be approved by the Building
department.
✔
✔
Teajalam Gounden / AAR Testing and Inspection 1/7/2025
Digitally signed by Teajalam Gounden
DN: C=US, E=tgounden@aartesting.com, O="AAR Testing and Inspection, Inc.",
CN=Teajalam Gounden
Date: 2025.01.07 16:05:21-08'00'
ENHAO ZHANG 01/14/25
#$ %&'()(*(+,-./01(23&+.6$ 7-*-8()&98-:8/10;84<<==
>?+@A0BECF 0+8D!6# ,&)(+,0(+ G!6
?
H
I5 @@0(+J8-*-8()&98+1K2-'!LM!N +;8())(8&-+-9;0)028&A0O())08:(23&+.P5Q!6 KQS
?H!LE!=
!6 ))U#W!Q BX
YB8-:(.0-@%(Z(:@[D!< [==Q<
I\= ? EQ= ]7=^6<! '0:0;&((1)&;@@:0;; 0.(),0;2:&O8&-+ 1+0:('0 1+0:]/-+0
>H
??a7%b UB]_
c7dcUeBBB]fe8-: ]:&'(:*-+8(28 ]/-+0 @@:0;; -+8:(28-:7*O0 &20+;0B0:A&20;HaaH???a
H
;8B8BB7e777-+;8:j28&-+-+8:(28-:
!"#$"#$!$% &'(()&*+&,*-. /0*+*-. 12 - 356
96:;"
96:;$ABC+ PQRSTRUVWXYZR[\X]^_YZ`PQRSTRUVabbSRcd[R_U4
/ 4
3 / g/4&hi$$"!%=?<:,
$$"!%=?<: j
5j
klmCCM noK26-
3stuvvuts`swsxwvstyPz{|tsvy}~~stuvvutt`swsxwvssyPz{|tsvyabbY]uvv€‚]t€ƒƒ]„|XcxXdw‚s]€]wsX€uv]yc_ZZXYcRdSy[XUdU[yRZbY_ XZXU[ydcusww„vX€cuwXT‚ƒx„|Xdw„Xtsx‚ucs„yvs|‚v|xƒ`~bXcRdSyRU~bXc[R_Uyuu‚€X|„ww€||vtTsƒtƒƒcu]ƒxxws„„Xxys‚`vsvv`uy…RZdSd†dUyT_Vyc…X‡