Loading...
HomeMy WebLinkAbout19817 74th Ave Ne_BLD6321_2025 Permit Packet Coversheet Community and Economic Development City of Arlington • 18204 59th Avenue NE • Arlington, WA 98223 • Phone (360) 403-3551 Page 1 of 1 Permit Number: Permit Type: Address/Parcel: Completed (Month/Year): Land Use ˆ Notice of Decision ˆ Staff Report ˆ Application ˆ Narrative ˆ Legal Description ˆ Vicinity Map ˆ Site Plan ˆ Landscape Plan ˆ Complete Streets Checklist ˆ Traffic Impact Analysis ˆ Snohomish County Traffic Mitigation Offer ˆ WSDOT Traffic Offer Form ˆ Tree Survey ˆ Stormwater Drainage Report ˆ Geotech Report ˆ Critical Area Evaluation Form ˆ SEPA Checklist ˆ Public Notice Material ˆ Noticing and Related Documents ˆ Water / Sewer Availability Certificate ˆ Unanticipated Discovery Plan Form ˆ Aerial Photo of Site ˆ Proposed Building Materials ˆ Lighting Plans and Lighting Cut Sheets ˆ Color Elevations ˆ Design Matrix ˆ Plat Map ˆ Title Report ˆ Lot Closures ˆ Preliminary Civil Plans ˆ Archaeological Survey o Confidential Documents. Contact the City to obtain. ˆ Topography (Existing Conditions) ˆ CC&R’s ˆ Deeds / Easements / Conveyances /Dedications ˆ Developer’s Agreement ˆ Recorded Copies ˆ Bonding or Assignment of Funds o Confidential Documents. Contact the City to obtain. ˆ Letters and Project Documents ˆ Other: Civil ˆ Issued Permit ˆ Application ˆ Other Applications ˆ Construction Calculation Worksheet ˆ Approved Plans ˆ Review Comment Form ˆ Letters and Project Documents ˆ Other Agency Permits ˆ Reports: o Drainage Report Pg: o Stormwater Pg: o Geotech Pg: o All Other Reports ˆ SEPA and Noticing Materials ˆ Inspections ˆ As-Builts ˆ Other: Building ˆ Issued Permit ˆ Application ˆ Additional Applications ˆ Approved Plans ˆ Site Plan ˆ Letters and Project Documents ˆ Calculations ˆ Project Specification Manuals ˆ Reports ˆ Certificate of Occupancy ˆ Inspections ˆ Other: BLD6321 Commercial Racking 19817 74th Ave Ne February 2025 ✔ ✔ ✔ ✔ ✔ CITY OF ARLINGTON 18204 59th Avenue NE, Arlington, WA 98223 INSPECTIONS: 360-403-3417 - Permit Center: 360-403-3551 BUILDING PERMIT 19817 74TH AVE NE Parcel #: 31051400200700 Permit #: 6321 PERMIT EXPIRES 180 DAYS AFTER DATE OF ISSUANCE. Scope of Work: Installation of selective pallet racking Valuation: 20000.00 OWNER APPLICANT CONTRACTOR GAYTEWAY BUSINESS PARK, LLC Toyotalift Northwest CJ's Installation Services LLC P.O. BOX 1727 19305 72nd Ave S 1108 21st St SE BELLEVUE, WA 98009 Kent Puyallup, WA 98372 2067138115 8448707074 LIC: CJSINIS850D4 EXP: 04/20/2025 MECHANICAL CONTRACTOR PLUMBING CONTRACTOR LIC #:EXP:LIC #:EXP: JOB DESCRIPTION PERMIT TYPE:COMMERCIAL RACKING CODE YEAR:2021 STORIES:1 CONST. TYPE:llB DWELLING UNITS:OCC GROUP:S-1; Storage Mod Hazard BUILDINGS:OCC LOAD: PERMIT APPROVAL The issuance or granting of this permit shall not be construed to be a permit for, or approval of, any violation of this Code or any other ordinance or order of the City, of any state or federal law, or of any order, proclamation, guidance advice or decision of the Governor of this State. To the extent the issuance or granting of this permit is interpreted to allow construction activity during any period of time when such construction is prohibited or restricted by any state or federal law, or order, proclamation, guidance advice or decision of the Governor of this State, this permit shall not authorize such work and shall not be valid. The building official is authorized to prevent occupancy or use of a structure where in violation of this Code, any other City ordinances of this jurisdiction or any other ordinance or executive order of the City, or of any state or federal law, or of any order, proclamation, guidance advice or decision of the Governor. The building official is authorized to suspend or revoke this permit if it is determined to be issued in error or on the basis of incorrect, inaccurate or incomplete information, or in violation of any City ordinance, regulation or order, state or federal law, or any order, proclamation, guidance or decision of the Governor. I AGREE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUCTION AND IN DOING THE WORK AUTHORIZED THEREBY; NO PERSON WILL BE EMPLOYED IN VIOLATION OF THE LABOR CODE OF THE STATE OF WASHINGTON RELATING TO WORKMEN'S COMPENSATION INSURANCE AND RCW 18.27. THIS APPLICATION IS NOT A PERMIT UNTIL SIGNED BY THE BUILDING OFFICIAL OR HIS/HER DEPUTY AND ALL FEES ARE PAID. IT IS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR A CERTIFICATE OF OCCUPANCY HAS BEEN GRANTED. IBC110/IRC110. SALES TAX NOTICE: Sales tax relating to construction and construction materials in the City of Arlington must be reported on your sales tax return form and coded City of Arlington #3101. 01/22/2025 Applicant Signature Date Building Official Date 1/22/2025 CONDITIONS Adhere to approved plans. Call for inspection. The property owner shall ensure that the construction project complies with all applicable zoning codes and regulations. The property owner shall also ensure that the construction project does not cause any adverse impact on the surrounding environment or community. The property owner shall be responsible for obtaining all necessary permits and approvals from the relevant authorities before commencing construction. The property owner shall ensure that the construction project complies with all applicable design review requirements. THIS PERMIT AUTHORIZES ONLY THE WORK NOTED. THIS PERMIT COVERS WORK TO BE DONE ON PRIVATE PROPERTY ONLY. ANY CONSTRUCTION ON THE PUBLIC DOMAIN (CURBS, SIDEWALKS, DRIVEWAYS, MARQUEES, ETC.) WILL REQUIRE SEPARATE PERMISSION. PERMIT FEES Date Description Fee Amount 01/23/2025 Processing/Technology $25.00 01/23/2025 Building Permit $481.09 01/23/2025 Building Plan Review $312.71 Total Due:$818.80 Total Payment:$818.80 Balance Due:$0.00 CALL FOR INSPECTIONS Call by 3:30 pm for next day inspection, allow 48 hours for Fire Inspections When calling for an inspection please leave the following information: Permit Number, Type of Inspection being requested, and whether you prefer morning or afternoon INSPECTION INFORMATION Pass/Fail COMMERCIAL TENANT IMPROVEMENT PERMIT APPLICATION Community and Economic Development City of Arlington • 18204 59th Ave NE • Arlington, WA 98223 • Phone (360) 403-3551 The following information is required for Commercial, Multi-Family, and Mixed-Use Building Permit Applications. Mark each box to designate that the information has been provided. Please submit this checklist as part of the submittal documents. See ASSISTANCE BULLETIN #30 for detailed design requirements. EACH BUILDING OR STRUCTURE REQUIRES A SEPARATE SUBMITTAL. SUBMIT ELECTRONIC FILES FOR EACH OF THE FOLLOWING; Incomplete applications will not be accepted. 1.Plan Review fee is due at time of submittal and remaining balance will be due at time of issuance.2.The City of Arlington does not review or inspect electrical systems. Contact Labor and Industries at lni.wa.gov or360-416-3000. A.DEFERRED SUBMITTALSIf the project requires any of the following, a Deferred Submittal Request MUST be completed. Deferred submittals requireseparate applications, plans and plan review.1.Mechanical Plans (if not included in the plan set)2.Plumbing Plans (if not included in the plan set)3.Fire Sprinkler4.Fire Alarm5.Signage B.SPECIAL INSPECTION AND TESTING AGREEMENTA Special Inspection Firm is required to perform special inspections for the following type of work.*The Special Inspection and Testing Agreement MUST be submitted with the Building Application. I acknowledge that all items designated as submittal requirements must accompany my Tenant Improvement Permit Application to be considered a complete submittal. REQUIRED DOCUMENTS City of Arlington Commercial Tenant Improvement Permit Application Site Plan Architectural Plans Structural Plans Structural Calculations Mechanical System Modifications, (if applicable) Plumbing System Modifications, (if applicable) Project Specification Manuals, (if applicable) WSEC Compliance Forms, (if applicable) https://waenergycodes.com/ Special Inspection and Testing Agreement Deferred Submittal Request Airport Property Lease (if building is located within the Arlington Airport Property Boundary) COMMERCIAL TENANT IMPROVEMENT REV03.2022 Page 2 of 7 INSTALLATION, MODIFICATION OR REMOVAL MAY REQUIRE A SEPARATE PERMIT SUBMITAL *CHECK ALL THAT APPLYAutomatic fire extinguishing systems Compressed gas systems Fire pumps Flammable and combustible liquids (tanks, piping etc.) Standpipe systems Hazardous materials Private fire hydrants Industrial ovens/furnace Fire alarm and detection systems Spraying or dipping operations High piled/rack storage Temporary membrane structure, tents (>200 sq. ft.) or canopies (>400 sq. ft.) Provide details on any of the above checked items: _________________________________________________________________________ Type of Permit: New Space Addition Alteration Project Scope of Work: Primary Contact: Owner Architect Engineer Contractor COMMERCIAL TENANT IMPROVEMENT REV03.2022 Page 3 of 7 MECHANICAL SYSTEM INFORMATION •New gas piping requires a pressure test hooking to any appliance •Sediment traps (drips) are required on all gas lines •Gas lines are required to be supported/secured per IFGS, Section 415 •Proper Combustion air and venting required for all appliances •A shut-off valve is required within 6 feet of each appliance MECHANICAL PERMIT FEES (per unit) Additional Plan Review fees x $ 75.00 = $ Air Cond. Unit ≤100Btu/h x $ 15.00 = $ Air Cond. Unit >100Btu/h x $ 25.00 = $ Air Cond. Unit >500Btu/hp x $ 50.00 = $ Air Handling Units x $ 15.00 = $ Base Mechanical Fee $ 25.00 $ 25.00 Boiler <100Btu/h >3hp x $ 15.00 = $ Boiler >1 million Btu/h<50hp x $ 25.00 = $ Boiler >1.5 million Btu/h<50hp x $ 50.00 = $ Boiler >100Btu/h 3-15hp x $ 15.00 = $ Boiler >500Btu/h 15-30hp x $ 25.00 = $ Commercial Hoods -Type I x $ 25.00 = $ Commercial Hoods -Type II x $ 50.00 = $ Diffusers x $ 15.00 = $ Dryer Ducting x $ 15.00 = $ Ductwork (drawings required) x $ 25.00 = $ Evaporative Coolers x $ 15.00 = $ Exhaust/Ventilation Fans x $ 15.00 = $ Fireplace/Insert/Stove x $ 15.00 = $ Forced Air Heat ≤100 Btu/h x $ 15.00 = $ Forced Air Heat >100 Btu/h x $ 25.00 = $ Gas Clothes Dryer x $ 15.00 = $ Gas Fired AC ≤100 Btu/h x $ 15.00 = $  New Installation  Addition  Alteration Replaced  Gas Piping Gas Piping Specification and complete Schematic PAGE 4 Not Applicable Proposed Piping Size: ½”  ⅝”  ¾”  1”  1½”  2”Inlet Pressure: Pressure Drop: Specific Gravity: N/A COMMERCIAL TENANT IMPROVEMENT REV03.2022 Page 4 of 7 MECHANICAL PERMIT FEES (per unit) Gas Fired AC >100 Btu/h x $ 25.00 = $ Gas Fired AC > 500 Btu/h x $ 50.00 = $ Gas Piping ≤ 5 units x $ 15.00 = $ Gas Piping > 5 units (plus <5 units) x $ 2.00 = $ Heat Exchangers x $ 15.00 = $ Heat Pump-Condensing Unit x $ 25.00 = $ Hot Water Heat Coils x $ 15.00 = $ Miscellaneous Appliance - regulated by mechanical code, not otherwise specified x $ 15.00 = $ Pkg. Units ≤100btu x $ 25.00 =$ Pkg. Units >100btu x $ 50.00 =$ Range/Cook top-Gas Fired x $ 15.00 =$ Refrigeration Unit ≤100Btu/h x $ 15.00 =$ Refrigeration Unit >100Btu/h x $ 25.00 =$ Refrigeration Unit >500Btu/h x $ 50.00 =$ Re-inspection fee (all) x $ 75.00 =$ Unit Heaters ≤ 100 Btu/h x $ 15.00 =$ Unit Heaters >100 Btu/h x $ 25.00 =$ VAV Boxes (Variable Air Volume, part of air conditioning system) x $ 10.00 = $ Wall Heaters - Gas Fired x $ 25.00 =$ Water Heater - Gas Fired x $ 25.00 =$ Permit Fee $ Table 4-8; Plan Review Fee $ Processing/Technology Fee $25.00 Total $ PRESSURE PIPING SCHEMATICCOMPLETE FOR GAS PIPING ONLY – USE A SEPARATE SHEET, IF NECESSARY SCHEMATIC IS TO SCALE SCHEMATIC NOT TO SCALEShow Pipe Size(s) and Length(s) from meter to all appliances NOTE: Any interior pressure regulators must be indicated N/A COMMERCIAL TENANT IMPROVEMENT REV03.2022 Page 5 of 7 PLUMBING SYSTEM INFORMATION The following items need to be specified on the plans: Fixture specifications and equipment with locations. Location and type of all backflow assemblies for each fixture. Calculations for Grease Interceptor. Pipe size and location of sanitary and potable water systems. Riser diagram of waste, vent, and rain water systems, including sizes. Medical gas piping riser diagram, type of gas, storage room and size of piping. PLUMBING PERMIT FEES (per fixture) Commercial plumbing permits are required to submit line drawings. A plan review fee of 65% per Table 4-6 for plumbing permits will be assessed at time of submittal. Includes two (2) inspections with permit. Additional Plan Review fees x $ 75.00 = Alteration/repair piping x $ 15.00 = Backflow Assembly x $25.00 = Base Plumbing Fee $ 25.00 $25.00 Bath/Shower Combo x $ 15.00 = Building Main Waste x $ 25.00 = Clothes Washer x $ 15.00 = Dishwasher x $ 15.00 = Drinking Fountain x $ 15.00 = Floor Drains x $ 15.00 =  New Installation  Addition  Alteration Replaced  Industrial N/A COMMERCIAL TENANT IMPROVEMENT REV03.2022 Page 6 of 7 PLUMBING PERMIT FEES (per fixture) Grease Interceptor x $ 75.00 = Grease Trap x $ 25.00 = Hose Bibb x $ 15.00 = Icemaker/Refrigerator x $ 15.00 = Irrigation – per meter x $ 25.00 = Kitchen Sink & Disposal x $ 15.00 = Laundry Tray x $ 15.00 = Lavatory x $ 15.00 = Med Gas Piping ≤ 5 inlets/outlets x $ 60.00 = Med Gas Piping > 5 inlets/outlets (plus ≤ 5 inlets/outlets) x $ 5.00 = Miscellaneous – regulated by plumbing code, not otherwise specified x $ 15.00 = Pretreatment Interceptor x $ 15.00 = Re-inspection Fee (all) x $ 75.00 = Roof Drains x $ 15.00 = Shower (only) x $ 15.00 = Sink (bar, service, etc.) x $ 15.00 = Toilets x $ 15.00 = Urinal x $ 15.00 = Vacuum Breakers x $ 25.00 = Water Heater x $ 25.00 = Water Heater - Tankless x $ 25.00 = Permit Fee Table 4-6; Plan Review Fee Processing/Technology Fee $25.00 Total New Addition/Alteration  Medical Automotive Based  Industrial Office Restaurant Machine Shop Other: ____________________________________ CROSS CONNECTION  Coffee Urn/Espresso Hydrotherapy Equip.Steam Generators Carbonated Bev.Dental Equip.Dye Vats Fume Hoods Laboratory Equip.Pressure Washers Degreasers Autoclave/Sterilizers Cooling Towers  Aquarium Swimming Pools Sprinkler w/chemicals  WASTEWATER DISCHARGEDoes the plumbing system currently have a grease interceptor? Yes No Don’t Know Yes No Don’t Know N/A COMMERCIAL TENANT IMPROVEMENT REV03.2022 Page 7 of 7 Yes No Don’t KnowDoes your business require a NPDES permit? Yes No Don’t KnowI hereby certify that the above information is correct and that the construction on, and the occupancy and the use of the above-described property will be in accordance with the laws, rules and regulation of the State of Washington. Signature Print Name Date SPECIAL INSPECTION AND TESTING AGREEMENT Community and Economic Development City of Arlington • 18204 59th Ave NE • Arlington, WA 98223 • Phone (360) 403-3551 Page 1 of 4 - REV03.2022 In accordance with International Building Code Chapter 17, where application is made for construction as described in this section, the Owner or the License Design Professional responsible for, and acting as the owner’s agent shall employ one or more Special Inspectors to provide inspections during construction. Before a permit can be issued: The owner, Architect or Engineer of record acting as the owner's agent, shall complete this agreement, including the required acknowledgements, and attach structural tests and inspections schedules. A pre-construction conference with the parties involved may be required to review the special inspection requirements and procedures. Property Address: Lot #: Parcel ID No.: Subdivision: Project Description: Primary Contact: Owner Architect Engineer Contractor Owner Name: Office No.: Email Address: Cell No.: Mailing Address: City: State: Zip: Architect Name: Office No.: Email Address: Cell No.: Mailing Address: City: State: Zip: Professional License Number: Expiration Date: Engineer Name: Office No.: Email Address: Cell No.: Mailing Address: City: State: Zip: Professional License Number: Expiration Date: Contractor Name: Office No.: Email Address: Cell No.: Mailing Address: City: State: Zip: L&I Contractor License Number: Expiration Date: 4/20/25 19817 74th Ave NE 31051400204800 Installation of selective pallet racking EQT Exeter michelle.busse@eqtexeter.com 2707 Jahn Ave NW, suite B6 Gig Harbor WA 98335 Enhao Zhang (909)596-7186 1815 Wright Ave La Verne CA 91750 21022747 CJ's Installation Services LLC CJsInstallationServicesLLC@outlook.com (844)870-2074 1108 21ST ST SE Puyallup WA 98372 CJSINIS850D4 ben@scedinc.com Page 2 of 4 - REV03.2022 SPECIAL INSPECTION AND TESTING SHALL MEET THE MINIMUM REQUIREMENTS OF 2018 IBC. THE FOLLOWING CONDITIONS ARE ALSO APPLICABLE. 1. Duties and Responsibilities of Special Inspector a. Observe Work: The Special Inspector shall observe the work for conformance with City of Arlington approved (stamped) design drawings and specifications and applicable workmanship provisions of the IBC The Architect/ Engineer-reviewed shop drawings and/ or project drawings may be used only as an aid to inspection. b. Report Non-Conforming Items: The Special Inspector shall bring non-conforming items to the attention of the Contractor and note all such items in the daily report. If any item is not resolved in a timely manner or is about to be incorporated in the work, the Special Inspector shall immediately notify the City of Arlington by telephone or in person, and notify the project Architect or Engineer. c. Furnish Daily Reports: Each Special Inspector shall complete and sign an inspection report for each day's inspections to remain at the job site with the contractor for review by the City of Arlington. d. Furnish Weekly Reports: The Special Inspector or agency shall furnish weekly reports of tests and inspections directly to the City of Arlington, project Architect/ Engineer, and others as designated. These reports must include the following: i.Description of daily inspections and test made, with applicable locations. ii.Listing of all non-conforming items. iii.Report on how non-conforming items were resolved or unresolved, as applicable. iv.Itemize all changes authorized by the Architect/ Engineer of Record and City of Arlington if not included in non-conformance items. e. Furnish Final Report: The Special Inspector or inspection agency shall submit a final signed report to the City of Arlington stating that all items requiring special inspection and testing were fulfilled and reported, and to the best of his/ her knowledge, in conformance with the approved design drawings, specifications, approved change orders and the applicable workmanship provisions of the IBC. Items not in conformance, unresolved items or any discrepancies in inspection coverage (i.e., missed inspections, periodic inspections when inspection was required, etc.) shall be specifically itemized in this report. 2. Contractor Responsibilities a. Notify the Special Inspector: The Contractor is responsible for notifying the Special Inspector or agency regarding individual inspection items on the summary schedule and as noted on the City of Arlington approved plan as specified by the Architect and or Engineer of record. b. Provide Access to Approved Plans: The Contractor is responsible for providing the Special Inspector access to approved plans at the job site. c. Retain Special Inspection Records: The Contractor is also responsible for retaining at the job site all Special Inspection records submitted by the Special Inspector and providing these records for review by City of Arlington, upon request. 3. City of Arlington a. Approve Special Inspector: The City of Arlington shall approve all Special Inspectors prior to performing any inspection. b. Monitor Special Inspection: Work requiring special inspection and the performance of Special Inspectors shall be monitored by the City of Arlington. His/ Her approval must be obtained prior to placement of concrete or similar activities in addition to that of the Special Inspector. Page 3 of 4 - REV03.2022 4. Owner Responsibilities a. Funding: The project owner or the Architect or Engineer of record acting as the owner's agent shall fund the Special Inspection Services. 5. Architect or Engineer of Record Responsibilities a. Drawings: The Architect or Engineer of record shall include special inspection requirements on the design drawings and specifications. b. Schedule Inspections: Provide a summary schedule of required inspections which would outline frequency of inspections for items which may require multiple inspections which may include but are not limited to concrete and grout testing, compaction, testing of backfill and or road beds as recommended by the geo-tech engineer, and structural welding as work progresses. 6. Indicate items requiring special inspection, structural testing, or structural observations by checking the appropriate box. ܆ STRUCTURAL STEEL ………………………………………………………………. (IBC 1705.2.1 & 1705.12.1) ܆ STEEL CONSTRUCTION OTHER THAN STRUCTURAL STEEL ……. (IBC 1705.2.2) տ CONCRETE CONSTRUCTION …………………………………………………….(IBC 1705.3) տ MASONRY CONSTRUCTION ……………………………………………………...(IBC 1705.4) տ WOOD CONSTRUCTION ……………………………………………………………(IBC 1705.5, 1705.11.1 & 1705.12.2) տ SOILS CONSTRUCTION ……………………………………………………………..(IBC 1705.6) տ DRIVEN DEEP FOUNDATIONS ………………………………………………….(IBC 1705.7) տ CAST-IN-PLACE DEEP FOUNDATIONS ………………………………………(IBC 1705.8) տ HELICAL PILE FOUNDATIONS ………………………………………………….(IBC 1705.9) տ SPRAYED FIRE-RESISTANT MATERIALS …………………………………..(IBC 1705.14) տ MASTIC AND INTUMESCENT FIRE-RESISTANT COATINGS ………..(IBC 1705.15) տ EXTERIOR INSULATION AND FINISH SYSTEMS (EIFS) ………………(IBC 1705.16) ܆ FIRE-RESISTANT PENETRATIONS AND JOINTS ……………………….. (IBC 1705.17) Only required for high-rise buildings or those assigned to Risk Category III or IV per IBC Table 1604.5. ܆ SMOKE CONTROL ……………………………………………………………………. (IBC 1705.18) ܆ ARCHITECTURAL COMPONENTS …………………………………………….. (IBC 1705.12.5) Only required for buildings located within Seismic Design Category D, E, or F ܆ PLUMBING, MECHANICAL & ELECTRICAL COMPONENTS …………. (IBC 1705.12.6) Only required for buildings located within Seismic Design Category C, D, E, or F ܆ SEISMICALLY ISOLATED SYSTEMS …………………………………………... (IBC 1705.12.8) Material alternatives or unusual design applications ܆ SPECIAL CASES ………………………………………………………………………... (IBC 1705.1.1) ܆ MISCELLANEOUS AREA These inspections may be recommended by the Architect/Engineer and are to be approved by the Building department. ✔ ✔ Teajalam Gounden / AAR Testing and Inspection 1/7/2025 Digitally signed by Teajalam Gounden DN: C=US, E=tgounden@aartesting.com, O="AAR Testing and Inspection, Inc.", CN=Teajalam Gounden Date: 2025.01.07 16:05:21-08'00' ENHAO ZHANG 01/14/25        #$ %&'()(*(+,-./01(23&+.6$ 7-*-8()&98-:8/10;84<<== > ? +@A0BECF 0+8D!6# ,&)(+,0(+G!6  ? H I5 @@0(+J8-*-8()&98+1K2-'!LM!N +;8())(8&-+-9;0)028&A0O())08:(23&+.P5Q!6 KQS ?H!LE!= !6 ))U#W!Q BX YB8-:(.0-@%(Z(:@[D!< [==Q<     I\= ?     EQ= ]7=^6<! '0:0;&((1)&;@@:0;; 0.(),0;2:&O8&-+ 1+0:('0 1+0:]/-+0 >H ??a7%b UB]_    c7dcUeBBB]f e8-: ]:&'(:*-+8(28 ]/-+0 @@:0;; -+8:(28-:7*O0 &20+;0B0:A&20;HaaH???a H ;8B8BB7e777-+;8:j28&-+-+8:(28-:         !"#$"#$!$% &'(()&*+&,*-. /0*+ *-. 1 2  - 356  96:;"  96:;$ABC+ PQRSTRUVWXYZR[\X]^_YZ`PQRSTRUVabbSRcd[R_U4 /  4 3 / g/4&hi$$"!%=?<:,   $$"!%=?<: j  5j klmC CM noK26- 3stuvvuts`swsxwvstyPz{|tsvy}~~stuvvutt`swsxwvssyPz{|tsvyabbY]uvv€‚]t€ƒƒ]„|XcxXdw‚s]€]wsX€uv]yc_ZZXYcRdSy[XUdU[yRZbY_ XZXU[ydcusww„vX€cuwXT‚ƒx„|Xdw„Xtsx‚ucs„yvs|‚v|xƒ`~bXcRdSyRU~bXc[R_Uyuu‚€X|„ww€||vtTsƒtƒƒcu]ƒxxws„„Xxys‚`vsvv`uy…RZdSd†dUyT_Vyc…X‡