HomeMy WebLinkAbout3318 185th Pl Ne Garage 8_BLD1872_2025 Concrete Inspection & Compressive Strength Test Report
PROJECT: The Villas at Arlington JOB #: 18-0760
ADDRESS: 18506 Smokey Point Boulevard, Arlington, WA REPORT #: CB055
PERMIT #: 1866,1867, 1868,1869, 1870, 1872 DATE: 7/9/2019
CLIENT: Villas at Arlington Partners LLLP PAGE #: 1 of 2
CONTRACTOR: Exxel Pacific INSPECTOR: Tim Martin
Placement Location: Garage 2, 3 and 5: Continuous Stem Walls/Garage 4, 6, 8 and the Bus Stop Structure - Continuous
Footings
Sample Location: Stem Walls, First Truck End of Chute
Field Data: Eq. No.
Supplier Miles Sand and Gravel Company Slump, in. (C143) 6.50 19
Mix # 0260AC Air Content, % (C231) NT
Mix Description 6SK. 7/8" Pea Gravel, WRA, AEA, 1% NC Unit Weight, pcf (C138) NT
Truck/Ticket # CO69 / 616755 Air/Mix Temp.,°F (C1064) 72 / 70 TM06
Strength Required 3000 psi at 28 days Field Cure Temperature, °F NT TM06
Quantity Placed, cy 35 Cure Method - Initial / Final Container / Water Tank
Time Batched 11:03 am Water Added on Job, gals 8
Time Sampled 12:12 pm Water Requested by Contractor
Laboratory Data:
Lab Test Age Test Total Load Avg.D Area Compressive
No. (Days) Date (lbs) (in) (in²) Strength (psi)
98587 7 07-16 46110 3.99 12.50 3690 TYPE 2:
98588 28 08-06 60460 4.00 12.57 4810 TYPE 2:
98589 28 08-06 56920 4.00 12.57 4530 TYPE 2:
98590 28 08-06 58520 4.00 12.57 4660 TYPE 2:
98591 Hold 00-00 0 0.00 0.00 0
Reinforcement Inspection Yes n/a: not applicable Specimen Size 4" X 8"
Reinforcement Conforms Yes n/t: not tested Test Reference ASTM C31/C39/C1231
Comments: GeoTest was on site as requested to inspect the placement of concrete at
locations mentioned above. The reinforcing steel was in place in accordance with the structural
drawings. The concrete was placed using a boom pump and was mechanically consolidated
COPIES: brian.j.anderson7@gmail.com, charliesr@cmaarch.com, chumphrey@safebuilt.com, cobyj@exxelpacific.com, Reviewed by
davidb@exxelpacific.com, davidh@exxelpacific.com, dennist@cgengineering.com, dspencer@safebuilt.com, jaredu@cg
engineering.com, jkim@avscommunities.com, jonr@exxelpacific.com ...and 6 more.
This report shall not be reproduced except in full, without the written approval of GeoTest Services, Inc.
The above test results relate to the sample (or location) tested.
Concrete Inspection & Compressive Strength Test Report
PROJECT: The Villas at Arlington JOB #: 18-0760
CLIENT: Villas at Arlington Partners LLLP REPORT #: CB055
CONTRACTOR: Exxel Pacific PAGE #: 2 of 2
Concrete Inspection & Compressive Strength Test Report
PROJECT: The Villas at Arlington JOB #: 18-0760
ADDRESS: 18506 Smokey Point Boulevard, Arlington, WA REPORT #: CB063
PERMIT #: 1871, 1872, 1873 DATE: 9/10/2019
CLIENT: Villas at Arlington Partners LLLP PAGE #: 1 of 3
CONTRACTOR: Exxel Pacific INSPECTOR: John Silk
Placement Location: Garages 7, 8 and 9 Footings
Sample Location: 1st Truck Mid-load Taken at Hopper at 10 Cubic Yards
Field Data: Eq. No.
Supplier Miles Sand and Gravel Company Slump, in. (C143) 4.25
Mix # 2550C Air Content, % (C231) NA
Mix Description 5.5 Sack, Poly Unit Weight, pcf (C138) NT
Truck/Ticket # C142 / 617965 Air/Mix Temp.,°F (C1064) 63 / 77
Strength Required 4000 psi at 28 days Field Cure Temperature, °F 60-78
Quantity Placed, cy 10 of 23 Cure Method - Initial / Final Container / Moist Room
Time Batched 11:52 am Water Added on Job, gals 15
Time Sampled 12:55 pm Water Requested by Contractor
Laboratory Data:
Lab Test Age Test Total Load Avg.D Area Compressive
No. (Days) Date (lbs) (in) (in²) Strength (psi)
355 7 09-17 62390 4.01 12.63 4940 TYPE 3:
356 28 10-08 0 0.00 0.00 0
357 28 10-08 0 0.00 0.00 0
358 28 10-08 0 0.00 0.00 0
359 Hold 00-00 0 0.00 0.00 0
Reinforcement Inspection Yes n/a: not applicable Specimen Size 4" X 8"
Reinforcement Conforms Yes n/t: not tested Test Reference ASTM C31/C39/C1231
Comments: GeoTest on site for inspection of the garage footings referenced above. Concrete
was placed via boom pump truck and mechanically consolidated with a high cycle vibrator. All
elements inspected were in conformance with approved drawings.
COPIES: brian.j.anderson7@gmail.com, charliesr@cmaarch.com, chumphrey@safebuilt.com, cobyj@exxelpacific.com, Reviewed by
davidb@exxelpacific.com, davidh@exxelpacific.com, dennist@cgengineering.com, dspencer@safebuilt.com, jaredu@cg
engineering.com, jkim@avscommunities.com, jonr@exxelpacific.com ...and 6 more.
This report shall not be reproduced except in full, without the written approval of GeoTest Services, Inc.
The above test results relate to the sample (or location) tested.
Concrete Inspection & Compressive Strength Test Report
PROJECT: The Villas at Arlington JOB #: 18-0760
CLIENT: Villas at Arlington Partners LLLP REPORT #: CB063
CONTRACTOR: Exxel Pacific PAGE #: 2 of 3
Concrete Inspection & Compressive Strength Test Report
PROJECT: The Villas at Arlington JOB #: 18-0760
CLIENT: Villas at Arlington Partners LLLP REPORT #: CB063
CONTRACTOR: Exxel Pacific PAGE #: 3 of 3
Concrete Inspection & Compressive Strength Test Report
PROJECT: The Villas at Arlington JOB #: 18-0760
ADDRESS: 18506 Smokey Point Boulevard, Arlington, WA REPORT #: CB063
PERMIT #: 1871, 1872, 1873 DATE: 9/10/2019
CLIENT: Villas at Arlington Partners LLLP PAGE #: 1 of 3
CONTRACTOR: Exxel Pacific INSPECTOR: John Silk
Placement Location: Garages 7, 8 and 9 Footings
Sample Location: 1st Truck Mid-load Taken at Hopper at 10 Cubic Yards
Field Data: Eq. No.
Supplier Miles Sand and Gravel Company Slump, in. (C143) 4.25
Mix # 2550C Air Content, % (C231) NA
Mix Description 5.5 Sack, Poly Unit Weight, pcf (C138) NT
Truck/Ticket # C142 / 617965 Air/Mix Temp.,°F (C1064) 63 / 77
Strength Required 4000 psi at 28 days Field Cure Temperature, °F 60-78
Quantity Placed, cy 10 of 23 Cure Method - Initial / Final Container / Moist Room
Time Batched 11:52 am Water Added on Job, gals 15
Time Sampled 12:55 pm Water Requested by Contractor
Laboratory Data:
Lab Test Age Test Total Load Avg.D Area Compressive
No. (Days) Date (lbs) (in) (in²) Strength (psi)
355 7 09-17 62390 4.01 12.63 4940 TYPE 3:
356 28 10-08 75890 4.01 12.63 6010 TYPE 2:
357 28 10-08 77280 4.01 12.63 6120 TYPE 2:
358 28 10-08 76730 4.01 12.63 6080 TYPE 3:
359 Hold 00-00 0 0.00 0.00 0
Reinforcement Inspection Yes n/a: not applicable Specimen Size 4" X 8"
Reinforcement Conforms Yes n/t: not tested Test Reference ASTM C31/C39/C1231
Comments: GeoTest on site for inspection of the garage footings referenced above. Concrete
was placed via boom pump truck and mechanically consolidated with a high cycle vibrator. All
elements inspected were in conformance with approved drawings.
COPIES: brian.j.anderson7@gmail.com, charliesr@cmaarch.com, chumphrey@safebuilt.com, cobyj@exxelpacific.com, Reviewed by
davidb@exxelpacific.com, davidh@exxelpacific.com, dennist@cgengineering.com, dspencer@safebuilt.com, jaredu@cg
engineering.com, jkim@avscommunities.com, jonr@exxelpacific.com ...and 6 more.
This report shall not be reproduced except in full, without the written approval of GeoTest Services, Inc.
The above test results relate to the sample (or location) tested.
Concrete Inspection & Compressive Strength Test Report
PROJECT: The Villas at Arlington JOB #: 18-0760
CLIENT: Villas at Arlington Partners LLLP REPORT #: CB063
CONTRACTOR: Exxel Pacific PAGE #: 2 of 3
Concrete Inspection & Compressive Strength Test Report
PROJECT: The Villas at Arlington JOB #: 18-0760
CLIENT: Villas at Arlington Partners LLLP REPORT #: CB063
CONTRACTOR: Exxel Pacific PAGE #: 3 of 3
Concrete Inspection & Compressive Strength Test Report
PROJECT: The Villas at Arlington JOB #: 18-0760
ADDRESS: 18506 Smokey Point Boulevard, Arlington, WA REPORT #: CB064
PERMIT #: 1871, 1872, 1873 DATE: 9/13/2019
CLIENT: Villas at Arlington Partners LLLP PAGE #: 1 of 2
CONTRACTOR: Exxel Pacific INSPECTOR: Tim Martin
Placement Location: Stem Walls at Garage 7, 8 and 9
Sample Location: Garage 7 and 8, Sampled at end of Mixer Chute
Field Data: Eq. No.
Supplier Miles Sand and Gravel Company Slump, in. (C143) 6.50 19
Mix # 02550C Air Content, % (C231) NT
Mix Description 5.5sk. 7/8", Pea. WRA Unit Weight, pcf (C138) NT
Truck/Ticket # CO11 / 618088 Air/Mix Temp.,°F (C1064) 70 / 74 TM06
Strength Required 3000 psi at 28 days Field Cure Temperature, °F 49/67 TM06
Quantity Placed, cy 20 Cure Method - Initial / Final Container / Water Tank
Time Batched 1:58 A.M Water Added on Job, gals 15
Time Sampled 2:40 P.M Water Requested by Contractor
Laboratory Data:
Lab Test Age Test Total Load Avg.D Area Compressive
No. (Days) Date (lbs) (in) (in²) Strength (psi)
591 7 09-20 47420 4.00 12.57 3770 TYPE 3:
592 28 10-11 62780 4.00 12.57 4990 TYPE 2:
593 28 10-11 63360 4.00 12.57 5040 TYPE 2:
594 28 10-11 63170 4.00 12.57 5030 TYPE 2:
595 Hold 00-00 0 0.00 0.00 0
Reinforcement Inspection Yes n/a: not applicable Specimen Size 4" X 8"
Reinforcement Conforms Yes n/t: not tested Test Reference ASTM C31/C39/C1231
Comments: GeoTest was on site as requested to inspect the concrete placement at the above
locations. The reinforcing steel was in place in accordance with the project drawings. The
concrete was placed using a boom pump and was mechanically consolidated.
COPIES: brian.j.anderson7@gmail.com, charliesr@cmaarch.com, chumphrey@safebuilt.com, cobyj@exxelpacific.com, Reviewed by
davidb@exxelpacific.com, davidh@exxelpacific.com, dennist@cgengineering.com, dspencer@safebuilt.com, jaredu@cg
engineering.com, jkim@avscommunities.com, jonr@exxelpacific.com ...and 6 more.
This report shall not be reproduced except in full, without the written approval of GeoTest Services, Inc.
The above test results relate to the sample (or location) tested.
Concrete Inspection & Compressive Strength Test Report
PROJECT: The Villas at Arlington JOB #: 18-0760
CLIENT: Villas at Arlington Partners LLLP REPORT #: CB064
CONTRACTOR: Exxel Pacific PAGE #: 2 of 2
Concrete Inspection & Compressive Strength Test Report
PROJECT: The Villas at Arlington JOB #: 18-0760
ADDRESS: 18506 Smokey Point Boulevard, Arlington, WA REPORT #: CB067
PERMIT #: 1871, 1872, 1873 DATE: 9/24/2019
CLIENT: Villas at Arlington Partners LLLP PAGE #: 1 of 2
CONTRACTOR: Exxel Pacific INSPECTOR: Tim Martin
Placement Location: Interior Slabs on Grade at Garages 7, 8 and 9
Sample Location: Load 1, Placed at Garage 7
Field Data: Eq. No.
Supplier Miles Sand and Gravel Company Slump, in. (C143) 5.50 19
Mix # 02550C Air Content, % (C231) NT
Mix Description 5.5sk. 7/8", Pea, WRA Unit Weight, pcf (C138) NT
Truck/Ticket # C145 / 618291 Air/Mix Temp.,°F (C1064) 56 / 67 TM08
Strength Required 3000 psi at 28 days Field Cure Temperature, °F NT
Quantity Placed, cy 44 Cure Method - Initial / Final Container / Water Tank
Time Batched 6:35 A.M Water Added on Job, gals 7
Time Sampled 7:10 A.M Water Requested by Contractor
Laboratory Data:
Lab Test Age Test Total Load Avg.D Area Compressive
No. (Days) Date (lbs) (in) (in²) Strength (psi)
1061 7 10-01 61340 4.00 12.57 4880 TYPE 3:
1062 28 10-22 0 0.00 0.00 0
1063 28 10-22 0 0.00 0.00 0
1064 28 10-22 0 0.00 0.00 0
1065 Hold 00-00 0 0.00 0.00 0
Reinforcement Inspection Yes n/a: not applicable Specimen Size 4" X 8"
Reinforcement Conforms Yes n/t: not tested Test Reference ASTM C31/C39/C1231
Comments: GeoTest was on site as requested to inspect the concrete placement at the
locations mentioned above. The placement of the reinforcing steel and the concrete was found
to be in accordance with the project’s drawings.
COPIES: brian.j.anderson7@gmail.com, charliesr@cmaarch.com, chumphrey@safebuilt.com, cobyj@exxelpacific.com, Reviewed by
davidb@exxelpacific.com, davidh@exxelpacific.com, dennist@cgengineering.com, dspencer@safebuilt.com, jaredu@cg
engineering.com, jkim@avscommunities.com, jonr@exxelpacific.com ...and 6 more.
This report shall not be reproduced except in full, without the written approval of GeoTest Services, Inc.
The above test results relate to the sample (or location) tested.
Concrete Inspection & Compressive Strength Test Report
PROJECT: The Villas at Arlington JOB #: 18-0760
CLIENT: Villas at Arlington Partners LLLP REPORT #: CB067
CONTRACTOR: Exxel Pacific PAGE #: 2 of 2
Photo shows the contractor
placing the concrete at garage
seven.
Concrete Inspection & Compressive Strength Test Report
PROJECT: The Villas at Arlington JOB #: 18-0760
ADDRESS: 18506 Smokey Point Boulevard, Arlington, WA REPORT #: CB067
PERMIT #: 1871, 1872, 1873 DATE: 9/24/2019
CLIENT: Villas at Arlington Partners LLLP PAGE #: 1 of 2
CONTRACTOR: Exxel Pacific INSPECTOR: Tim Martin
Placement Location: Interior Slabs on Grade at Garages 7, 8 and 9
Sample Location: Load 1, Placed at Garage 7
Field Data: Eq. No.
Supplier Miles Sand and Gravel Company Slump, in. (C143) 5.50 19
Mix # 02550C Air Content, % (C231) NT
Mix Description 5.5sk. 7/8", Pea, WRA Unit Weight, pcf (C138) NT
Truck/Ticket # C145 / 618291 Air/Mix Temp.,°F (C1064) 56 / 67 TM08
Strength Required 3000 psi at 28 days Field Cure Temperature, °F NT
Quantity Placed, cy 44 Cure Method - Initial / Final Container / Water Tank
Time Batched 6:35 A.M Water Added on Job, gals 7
Time Sampled 7:10 A.M Water Requested by Contractor
Laboratory Data:
Lab Test Age Test Total Load Avg.D Area Compressive
No. (Days) Date (lbs) (in) (in²) Strength (psi)
1061 7 10-01 61340 4.00 12.57 4880 TYPE 3:
1062 28 10-22 72040 4.01 12.63 5700 TYPE 2:
1063 28 10-22 73680 4.01 12.63 5830 TYPE 2:
1064 28 10-22 73780 4.01 12.63 5840 TYPE 2:
1065 Hold 00-00 0 0.00 0.00 0
Reinforcement Inspection Yes n/a: not applicable Specimen Size 4" X 8"
Reinforcement Conforms Yes n/t: not tested Test Reference ASTM C31/C39/C1231
Comments: GeoTest was on site as requested to inspect the concrete placement at the
locations mentioned above. The placement of the reinforcing steel and the concrete was found
to be in accordance with the project’s drawings.
COPIES: brian.j.anderson7@gmail.com, charliesr@cmaarch.com, chumphrey@safebuilt.com, cobyj@exxelpacific.com, Reviewed by
davidb@exxelpacific.com, davidh@exxelpacific.com, dennist@cgengineering.com, dspencer@safebuilt.com, jaredu@cg
engineering.com, jkim@avscommunities.com, jonr@exxelpacific.com ...and 6 more.
This report shall not be reproduced except in full, without the written approval of GeoTest Services, Inc.
The above test results relate to the sample (or location) tested.
Concrete Inspection & Compressive Strength Test Report
PROJECT: The Villas at Arlington JOB #: 18-0760
CLIENT: Villas at Arlington Partners LLLP REPORT #: CB067
CONTRACTOR: Exxel Pacific PAGE #: 2 of 2
Photo shows the contractor
placing the concrete at garage
seven.
LATERAL FRAMING INSPECTION REPORT
PROJECT: The Villas at Arlington JOB #: 18-0760
ADDRESS: 18506 Smokey Point Boulevard, Arlington, WA REPORT #: LF091
PERMIT #: 1871, 1872, 1873, 1881, 1882 DATE: 10/2/2019
CLIENT: Villas at Arlington Partners LLLP PAGE #: 1 of 2
CONTRACTOR: Exxel Pacific INSPECTOR: Tim Martin
Item(s) Inspected Location
Framing and Sheathing of Walls Garages 7, 8 and 9
Framing BBQ Enclosures
Reference Drawings: Structural Drawings
Items Inspected Comments
Lumber grade, species, size Per Plan
Structural panel grade and thickness, glue Rated Sheathing (Car Decking @ BBQ)
Shear wall/diaphragm length, location Per Plan
Panel edges bear on framing members Where Required
Diaphragm chord, drag strut, braces and related Gable Ends and Interior Wall at the Garages , Bracing Per Plan
Connection of blocking to wall top plates Yes at Garages
Gypsum board with wood framing conforms
3" nom. framing in place, nails staggered where shown
Foundation plates or sills on concrete are treated Yes at Garages
Base-plate bolting complies Per SW Schedule
Nail diameter, length, number of lines, spacing Per Plan
Pneumatic or mechanically driven fasteners conform
Nail heads driven flush Satisfactory
Hold down, type, location HDU2 Holdowns at Garages Were In Place Per Plan
Lag bolts/proper hole size Lag Bolts at BBQ Were Installed Earlier
Cold-formed framing-proper size, gage, spacing
Screw type, spacing, driven flush
Cold-formed welding conforms (AWS D1.1 and D1.3)
Other
The above items were conforming Nonconforming Items (see below)
Comments: GeoTest was on site as requested to inspect the above items. See the following
page for additional comments. AMENDED 10/14/19: Please see LF093 for conforming
reinspection.
COPIES: brian.j.anderson7@gmail.com, charliesr@cmaarch.com, chumphrey@safebuilt.com, cobyj@exxelpacific.com, Reviewed by
davidb@exxelpacific.com, davidh@exxelpacific.com, dennist@cgengineering.com, dspencer@safebuilt.com, jaredu@cg
engineering.com, jkim@avscommunities.com, jonr@exxelpacific.com ...and 5 more.
This report shall not be reproduced except in full, without the written approval of GeoTest Services, Inc.
LATERAL FRAMING INSPECTION REPORT
PROJECT: The Villas at Arlington JOB #: 18-0760
CLIENT: Villas at Arlington Partners LLLP REPORT #: LF091
CONTRACTOR: Exxel Pacific PAGE #: 2 of 2
The contractor addressed all
nonconforming items found
prior to our leaving the site
except for the missing flat
blocking at both BBQ
enclosures. The project's
drawings show in addition to
the vertical blocking shown in
this photo flat blocking at the
top of the beam is needed
between each roof joist.
The contractor was informed
of this item.
LATERAL FRAMING INSPECTION REPORT
PROJECT: The Villas at Arlington JOB #: 18-0760
ADDRESS: 18506 Smokey Point Boulevard, Arlington, WA REPORT #: LF091
PERMIT #: 1871, 1872, 1873, 1881, 1882 DATE: 10/2/2019
CLIENT: Villas at Arlington Partners LLLP PAGE #: 1 of 2
CONTRACTOR: Exxel Pacific INSPECTOR: Tim Martin
Item(s) Inspected Location
Framing and Sheathing of Walls Garages 7, 8 and 9
Framing BBQ Enclosures
Reference Drawings: Structural Drawings
Items Inspected Comments
Lumber grade, species, size Per Plan
Structural panel grade and thickness, glue Rated Sheathing (Car Decking @ BBQ)
Shear wall/diaphragm length, location Per Plan
Panel edges bear on framing members Where Required
Diaphragm chord, drag strut, braces and related Gable Ends and Interior Wall at the Garages , Bracing Per Plan
Connection of blocking to wall top plates Yes at Garages
Gypsum board with wood framing conforms
3" nom. framing in place, nails staggered where shown
Foundation plates or sills on concrete are treated Yes at Garages
Base-plate bolting complies Per SW Schedule
Nail diameter, length, number of lines, spacing Per Plan
Pneumatic or mechanically driven fasteners conform
Nail heads driven flush Satisfactory
Hold down, type, location HDU2 Holdowns at Garages Were In Place Per Plan
Lag bolts/proper hole size Lag Bolts at BBQ Were Installed Earlier
Cold-formed framing-proper size, gage, spacing
Screw type, spacing, driven flush
Cold-formed welding conforms (AWS D1.1 and D1.3)
Other
The above items were conforming Nonconforming Items (see below)
Comments: GeoTest was on site as requested to inspect the above items. See the following
page for additional comments. AMENDED 10/14/19: Please see LF093 for conforming
reinspection.
COPIES: brian.j.anderson7@gmail.com, charliesr@cmaarch.com, chumphrey@safebuilt.com, cobyj@exxelpacific.com, Reviewed by
davidb@exxelpacific.com, davidh@exxelpacific.com, dennist@cgengineering.com, dspencer@safebuilt.com, jaredu@cg
engineering.com, jkim@avscommunities.com, jonr@exxelpacific.com ...and 5 more.
This report shall not be reproduced except in full, without the written approval of GeoTest Services, Inc.
LATERAL FRAMING INSPECTION REPORT
PROJECT: The Villas at Arlington JOB #: 18-0760
CLIENT: Villas at Arlington Partners LLLP REPORT #: LF091
CONTRACTOR: Exxel Pacific PAGE #: 2 of 2
The contractor addressed all
nonconforming items found
prior to our leaving the site
except for the missing flat
blocking at both BBQ
enclosures. The project's
drawings show in addition to
the vertical blocking shown in
this photo flat blocking at the
top of the beam is needed
between each roof joist.
The contractor was informed
of this item.
SPECIAL INSPECTION SUMMARY
PROJECT: The Villas at Arlington – Garage 8 JOB #: 18â€0760
ADDRESS: 18506 Smokey Point Blvd, Arlington, WA 98223 DATE: 10â€22â€2019
CLIENT: Villas at Arlington Partners LLLP PERMIT #: 1872
CONTRACTOR: Exxel Pacific PAGE: 1 of 1
This letter summarizes our special inspection and testing efforts for The Villas at Arlington – Garage
8 project located in Arlington, Washington. GeoTest’s services took place from October 9, 2018
through October 22, 2019. Our testing and inspections included the following scope of work:
TEST/INSPECTION ITEM REFERENCE
Concrete Break Reports CB055, CB063 &
ï‚· Reinforced Concrete
CB064
ï‚· Lateral Framing Lateral Framing Inspection Report LF091
All work requiring special inspection for the project to date has been completed. To the best of
our knowledge the inspected work is in conformance with the approved project plans and
specifications and the applicable workmanship provisions of the International Building Code. All
related laboratory tests performed by GeoTest have met or exceeded the minimum test
requirements.
This is GeoTest’s final special inspection and testing submittal for The Villas at Arlington – Garage
8 project. If we can be of further assistance, please contact the undersigned.
Copies: Villas at Arlington Partners LLLP Safe Built
Charles Morgan and Associates LLC The Alliant Company
City of Arlington Anderson, Brian
Exxel Pacific Charles Morgan and Associates LLC Logan Senrud
CG Engineering Technical Director
This report shall not be reproduced except in full, without the written approval of GeoTest Services, Inc.
Permit #: 1872
Permit Date: 03/09/18
Permit Type: COMMERCIAL BUILDING
Project Name: Villas at Arlington
Applicant Name: Villas at Arlington, LLLP
Applicant Address: 105 Cresent Bay Drive, Suite D
Applicant, City, State, Zip: Laguna Beach, CA 92651
Contact: Carmel Gregory
Phone: 425-778-8500
Email: carmelg@cgengineering.com
Scope of Work: Garage for Multi-Family Development
Valuation: 43020.00
Square Feet: 900
Number of Stories: 1
Construction Type:
Occupancy Group:
ID Code:
Permit Issued: 11/01/2018
Permit Expires:
Form Permit Type:
Status: COMPLETE
Assigned To: Kristin Foster
Property
Parcel # Address Legal Description Owner Name Owner Phone Zoning
VILLAS AT 137 Multiple Family
31052000100800 3318 185TH PLACE NE
ARLINGTON 101 - 200 Units
Contractors
Contractor Primary Contact Phone Address Contractor Type License License #
323A CONSTRUCTION
EXXEL PACIFIC INC 360-734-2872 UBI 601 175 198
TELEGRAPH RD CONTRACTOR
323A CONSTRUCTION Labor and
EXXEL PACIFIC INC 360-734-2872 EXXELPI073KN
TELEGRAPH RD CONTRACTOR Industries
Plan Reviews
Date Review Type Description Assigned To Review Status
COMMERCIAL
03/09/2018 BUILDING
BUILDING
Fees
Fee Description Notes Amount
Building Plan Review Table 4-2 $521.88
Building Plan Review Table 4-2 $16.11
Building Permit Table 4-1 $827.67
Processing/Technology $25.00
State Surcharge - Commercial Commercial Only $25.00
Total $1,415.66
Attached Letters
Date Letter Description
09/20/2018 Building Permit
Payments
Date Paid By Description Payment Type Accepted By Amount
03/08/2018 Alliant Capital Ltd. 18506 Garage 8 Check #104500 Kristin Foster $521.88
10/11/2018 Fidelity National Title check #26379 Launa Black $893.78
Outstanding Balance $0.00
Uploaded Files
Date File Name
03/06/2020 6358423-Villas Garage 8 C of O.pdf
03/06/2020 6328329-Garage 8 Final Inspection Report.pdf
11/01/2018 4145130-1872_Villas Building Permit.pdf
03/09/2018 3142047-Commercial Application - Garage 8.pdf