HomeMy WebLinkAbout3318 185th Pl Ne Bldg M_BLD1859_2025 ADHESIVE ANCHOR INSPECTION REPORT
PROJECT: The Villas at Arlington JOB #: 18-0760
ADDRESS: 18506 Smokey Point Boulevard, Arlington, WA REPORT #: AA007
PERMIT #: 1859 DATE: 4/8/2019
CLIENT: Villas at Arlington Partners LLLP PAGE #: 1 of 2
CONTRACTOR: Exxel Pacific INSPECTOR: Tim Martin
Item(s) Inspected Location
Continuous Footing Dowels Into Perimeter Foundation BLD B: At All Interior Footing/Perimeter Foundation Intersections
Reference Drawing(s): RFI #7
Item(s) Inspected Comments
Base Material Condition Satisfactory, Dry Concrete, 49º
Drill Bit Type Hilti Carbide Tip
Hole Diameter/Depth 3/4", 4"
Hole Cleanliness Clean/Drilled
Anchor Spacing/Edge Distance 3 Per Intersection
Anchor Type Grade 60 Deformed Reinforcing Steel
Anchor Diameter/Length 5/8", 44""
Anchor Embedment 4"
Adhesive Type Hilti HY-200 R
Adhesive Expiration Date 12/2019
Adhesive ICC-ES Report 3187
Other
The above items were conforming Nonconforming Items (see below)
Comments: GeoTest was on site as requested to inspect the installation of the above epoxied
reinforcing steel dowels. The dowels were found to conform with RFI #7, the project structural
drawings and with the manufacturer instructions.
COPIES: brian.j.anderson7@gmail.com, charliesr@cmaarch.com, chumphrey@safebuilt.com, cobyj@exxelpacific.com, Reviewed by
davidb@exxelpacific.com, davidh@exxelpacific.com, dennist@cgengineering.com, dspencer@safebuilt.com, jaredu@cg
engineering.com, jkim@avscommunities.com, jonr@exxelpacific.com ...and 5 more.
This report shall not be reproduced except in full, without the written approval of GeoTest Services, Inc.
ADHESIVE ANCHOR INSPECTION REPORT
PROJECT: The Villas at Arlington JOB #: 18-0760
CLIENT: Villas at Arlington Partners LLLP REPORT #: AA007
CONTRACTOR: Exxel Pacific PAGE #: 2 of 2
Photo of the contractor drilling
one of the holes with a
vacuum cleaning the hole as
it's being drilled.
ADHESIVE ANCHOR INSPECTION REPORT
PROJECT: The Villas at Arlington JOB #: 18-0760
ADDRESS: 18506 Smokey Point Boulevard, Arlington, WA REPORT #: AA017
PERMIT #: 1859 DATE: 6/14/2019
CLIENT: Villas at Arlington Partners LLLP PAGE #: 1 of 1
CONTRACTOR: Exxel Pacific INSPECTOR: Tim Martin
Item(s) Inspected Location
Reinforcing Steel Dowels Building M, Intersections of Interior Wall Footings & Perimeter Foundation
Reference Drawing(s): RFI #7
Item(s) Inspected Comments
Base Material Condition Satisfactory, Dry, 66º
Drill Bit Type Carbide Tip (Hollow w/ Vac.)
Hole Diameter/Depth 3/4", 4"
Hole Cleanliness Clean
Anchor Spacing/Edge Distance Per Plan
Anchor Type Grade 60 Deformed Reinforcing Steel
Anchor Diameter/Length 5/8", 50"
Anchor Embedment 4"
Adhesive Type Hilti Hit HY-200 R
Adhesive Expiration Date 9/19
Adhesive ICC-ES Report 3187
Other
The above items were conforming Nonconforming Items (see below)
Comments: GeoTest was on site to inspect the installation of the interior wall footing dowels at the building
perimeter foundation. The dowels were found to conform with the project drawings, RFI and the manufacturer’s
published instructions.
COPIES: brian.j.anderson7@gmail.com, charliesr@cmaarch.com, chumphrey@safebuilt.com, cobyj@exxelpacific.com, Reviewed by
davidb@exxelpacific.com, davidh@exxelpacific.com, dennist@cgengineering.com, dspencer@safebuilt.com, jaredu@cg
engineering.com, jkim@avscommunities.com, jonr@exxelpacific.com ...and 5 more.
This report shall not be reproduced except in full, without the written approval of GeoTest Services, Inc.
ADHESIVE ANCHOR INSPECTION REPORT
PROJECT: The Villas at Arlington JOB #: 18-0760
ADDRESS: 18506 Smokey Point Boulevard, Arlington, WA REPORT #: AA020
PERMIT #: H-1855, L-1857, K-1858, M-1859 DATE: 9/13/2019
CLIENT: Villas at Arlington Partners LLLP PAGE #: 1 of 3
CONTRACTOR: Exxel Pacific INSPECTOR: Tim Martin
Item(s) Inspected Location
Anchor Bolts for HDU2 Holdowns at Interior Shear Walls (4) Bolts at Building H, K, & L (6) at Building M
Reference Drawing(s): Structural Drawings and RFI #43
Item(s) Inspected Comments
Base Material Condition Fully Cured Concrete, Dry, 65º
Drill Bit Type Drilled Prior
Hole Diameter/Depth 3/4", 9"
Hole Cleanliness Blown, Brushed and Blown Clean
Anchor Spacing/Edge Distance Per Plan
Anchor Type Galvanized Threaded Rod
Anchor Diameter/Length 5/8", 14"
Anchor Embedment 9"
Adhesive Type Hilti Hit HY-200 R
Adhesive Expiration Date 6/2020
Adhesive ICC-ES Report 3187
Other
The above items were conforming Nonconforming Items (see below)
Comments: GeoTest was on site as requested to inspect the installation of the epoxied anchor
for the interior shear walls at the buildings mentioned above. The anchor bolts were found to
conform with the project drawings, RFI and the manufacturer’s published instructions.
COPIES: brian.j.anderson7@gmail.com, charliesr@cmaarch.com, chumphrey@safebuilt.com, cobyj@exxelpacific.com, Reviewed by
davidb@exxelpacific.com, davidh@exxelpacific.com, dennist@cgengineering.com, dspencer@safebuilt.com, jaredu@cg
engineering.com, jkim@avscommunities.com, jonr@exxelpacific.com ...and 5 more.
This report shall not be reproduced except in full, without the written approval of GeoTest Services, Inc.
ADHESIVE ANCHOR INSPECTION REPORT
PROJECT: The Villas at Arlington JOB #: 18-0760
CLIENT: Villas at Arlington Partners LLLP REPORT #: AA020
CONTRACTOR: Exxel Pacific PAGE #: 2 of 3
Photo showing the contractor
using compressed air to clean
one of the drilled holes at
Building L.
ADHESIVE ANCHOR INSPECTION REPORT
PROJECT: The Villas at Arlington JOB #: 18-0760
CLIENT: Villas at Arlington Partners LLLP REPORT #: AA020
CONTRACTOR: Exxel Pacific PAGE #: 3 of 3
The photo shows the contractor
injecting the epoxy into one of
the drilled holes at Building K.
LATERAL FRAMING INSPECTION REPORT
PROJECT: The Villas at Arlington JOB #: 18-0760
ADDRESS: 18506 Smokey Point Boulevard, Arlington, WA REPORT #: LF078
PERMIT #: 1849, 1850, 1851, 1852, 1859, 1877, 1878 DATE: 8/26/2019
CLIENT: Villas at Arlington Partners LLLP PAGE #: 1 of 1
CONTRACTOR: Exxel Pacific INSPECTOR: Tim Martin
Item(s) Inspected Location
Gable Truss Reinforcing Sheathing for Roof Anchors Building B, C, D, E
Shear Wall Sheathing (Sheathing in Progress) Building M, All Perimeter Shear Walls
Wall Sheathing Garage #13 and #14, all Wall Locations
Reference Drawings: Structural Drawings
Items Inspected Comments
Lumber grade, species, size
Structural panel grade and thickness, glue Rated Sheathing, 15/32", Exp.1
Shear wall/diaphragm length, location Per Plan
Panel edges bear on framing members All Walls Fully Blocked
Diaphragm chord, drag strut, braces and related
Connection of blocking to wall top plates
Gypsum board with wood framing conforms
3" nom. framing in place, nails staggered where shown Yes and Yes
Foundation plates or sills on concrete are treated
Base-plate bolting complies
Nail diameter, length, number of lines, spacing .148 X 2-1/4", Per Plan
Pneumatic or mechanically driven fasteners conform
Nail heads driven flush Satisfactory
Hold down, type, location
Lag bolts/proper hole size
Cold-formed framing-proper size, gage, spacing
Screw type, spacing, driven flush
Cold-formed welding conforms (AWS D1.1 and D1.3)
Other
The above items were conforming Nonconforming Items (see below)
Comments: GeoTest was on site as requested to inspect the above items.
The above items, (not in-progress) were found to be in conformance with the project drawings. A few locations
were marked at building M for correction.
COPIES: brian.j.anderson7@gmail.com, charliesr@cmaarch.com, chumphrey@safebuilt.com, cobyj@exxelpacific.com, Reviewed by
davidb@exxelpacific.com, davidh@exxelpacific.com, dennist@cgengineering.com, dspencer@safebuilt.com, jaredu@cg
engineering.com, jkim@avscommunities.com, jonr@exxelpacific.com ...and 5 more.
This report shall not be reproduced except in full, without the written approval of GeoTest Services, Inc.
Concrete Inspection & Compressive Strength Test Report
PROJECT: The Villas at Arlington JOB #: 18-0760
ADDRESS: 18506 Smokey Point Boulevard, Arlington, WA REPORT #: CB033
PERMIT #: 1858, 1859 DATE: 5/8/2019
CLIENT: Villas at Arlington Partners LLLP PAGE #: 1 of 2
CONTRACTOR: Exxel Pacific INSPECTOR: Tim Martin
Placement Location: Building L, Perimeter Stem Walls, and Entry Column Plinths
Building M, Perimeter Wall Footings and Column Plinth Footings
Sample Location: 1st Load, Building M, Placed at West End of the South Side of the Building
Field Data: Eq. No.
Supplier Miles Sand and Gravel Company Slump, in. (C143) 6.00 19
Mix # 02550C Air Content, % (C231) NT
Mix Description 5.5sk, 7/8", Pea, WRA Unit Weight, pcf (C138) NT
Truck/Ticket # C139 / 222121 Air/Mix Temp.,°F (C1064) 71 / 70 TM06
Strength Required 3000 psi at 28 days Field Cure Temperature, °F NT
Quantity Placed, cy 75 Cure Method - Initial / Final Container / Water Tank
Time Batched 11:39 A.M Water Added on Job, gals 20
Time Sampled 12:05 P.M Water Requested by Contractor
Laboratory Data:
Lab Test Age Test Total Load Avg.D Area Compressive
No. (Days) Date (lbs) (in) (in²) Strength (psi)
95764 7 05-15 51430 4.00 12.57 4090 TYPE 2:
95765 28 06-05 71960 4.01 12.63 5700 TYPE 2:
95766 28 06-05 68490 4.01 12.63 5420 TYPE 2:
95767 28 06-05 72560 4.01 12.63 5750 TYPE 2:
95768 Hold 00-00 0 0.00 0.00 0
Reinforcement Inspection Yes n/a: not applicable Specimen Size 4" X 8"
Reinforcement Conforms Yes n/t: not tested Test Reference ASTM C31/C39/C1231
Comments: GeoTest was on site as requested to inspect the concrete placement at the above
locations. The reinforcing steel was inspected and was found to be in conformance with the
project structural drawings. AMENDED 6/7/19: GeoTest was provided with email acceptance
of the HD’s below as-installed from CG engineering.
COPIES: brian.j.anderson7@gmail.com, charliesr@cmaarch.com, chumphrey@safebuilt.com, cobyj@exxelpacific.com, Reviewed by
davidb@exxelpacific.com, davidh@exxelpacific.com, dennist@cgengineering.com, dspencer@safebuilt.com, jaredu@cg
engineering.com, jkim@avscommunities.com, jonr@exxelpacific.com ...and 6 more.
This report shall not be reproduced except in full, without the written approval of GeoTest Services, Inc.
The above test results relate to the sample (or location) tested.
Concrete Inspection & Compressive Strength Test Report
PROJECT: The Villas at Arlington JOB #: 18-0760
CLIENT: Villas at Arlington Partners LLLP REPORT #: CB033
CONTRACTOR: Exxel Pacific PAGE #: 2 of 2
Note at Building L two
holdown anchor bolts at the
building west side were at the
wrong location. The contractor
added the two pictured 7/8"
anchor bolts. The drawings
call for the holdown anchor
bolts to be cast into both the
footing and the stem wall.
Engineer approval is required.
Concrete Inspection & Compressive Strength Test Report
PROJECT: The Villas at Arlington JOB #: 18-0760
ADDRESS: 18506 Smokey Point Boulevard, Arlington, WA REPORT #: CB037
PERMIT #: 1855, 1859 DATE: 5/14/2019
CLIENT: Villas at Arlington Partners LLLP PAGE #: 1 of 1
CONTRACTOR: Exxel Pacific INSPECTOR: Joel Morder
Placement Location: Building H Plinth and Perimeter Footings, Building M Stemwalls and Plinth Bases
Sample Location: Building H Footings, First Load, Middle of the Batch
Field Data: Eq. No.
Supplier Miles Sand and Gravel Company Slump, in. (C143) 5.00 15
Mix # 02550C Air Content, % (C231) NT
Mix Description 7/8" Aggregate, 5.5 Sack Unit Weight, pcf (C138) NT
Truck/Ticket # C055 / 222431 Air/Mix Temp.,°F (C1064) 54 / 65 JM5
Strength Required 3000 psi at 28 days Field Cure Temperature, °F NT
Quantity Placed, cy 70 Cure Method - Initial / Final Container / Water Tank
Time Batched 7:36 AM Water Added on Job, gals 0
Time Sampled 8:25 AM Water Requested by
Laboratory Data:
Lab Test Age Test Total Load Avg.D Area Compressive
No. (Days) Date (lbs) (in) (in²) Strength (psi)
96012 7 05-21 65530 4.00 12.57 5210 TYPE 2:
96013 28 06-11 0 0.00 0.00 0
96014 28 06-11 0 0.00 0.00 0
96015 28 06-11 0 0.00 0.00 0
96016 Hold 00-00 0 0.00 0.00 0
Reinforcement Inspection Yes n/a: not applicable Specimen Size 4" X 8"
Reinforcement Conforms Yes n/t: not tested Test Reference ASTM C31/C39/C1231
Comments: GeoTest on site for inspection of the items referenced above. Reinforcing steel was previously
inspected and in conformance with approved plans and drawings. Concrete was placed by pump and consolidated
by mechanical vibration. All elements inspected were in conformance with approved plans and drawings.
COPIES: brian.j.anderson7@gmail.com, charliesr@cmaarch.com, chumphrey@safebuilt.com, cobyj@exxelpacific.com, Reviewed by
davidb@exxelpacific.com, davidh@exxelpacific.com, dennist@cgengineering.com, dspencer@safebuilt.com, jaredu@cg
engineering.com, jkim@avscommunities.com, jonr@exxelpacific.com ...and 6 more.
This report shall not be reproduced except in full, without the written approval of GeoTest Services, Inc.
The above test results relate to the sample (or location) tested.
Concrete Inspection & Compressive Strength Test Report
PROJECT: The Villas at Arlington JOB #: 18-0760
ADDRESS: 18506 Smokey Point Boulevard, Arlington, WA REPORT #: CB051
PERMIT #: 1859 DATE: 6/18/2019
CLIENT: Villas at Arlington Partners LLLP PAGE #: 1 of 1
CONTRACTOR: Exxel Pacific INSPECTOR: Joel Morder
Placement Location: Building M Exterior Patios and Entrances
Sample Location: First Load, Middle of the Batch
Field Data: Eq. No.
Supplier Miles Sand and Gravel Company Slump, in. (C143) 5.00 15
Mix # 0260A6C Air Content, % (C231) 4.9 8
Mix Description 7/8" Agg., 6 Sack Unit Weight, pcf (C138) NT
Truck/Ticket # C143 / 616484 Air/Mix Temp.,°F (C1064) 56 / 67 JM2
Strength Required 3000 psi at 28 days Field Cure Temperature, °F NT
Quantity Placed, cy 30 Cure Method - Initial / Final Field Cure / Water Tank
Time Batched 6:16 AM Water Added on Job, gals 5
Time Sampled 7:10 AM Water Requested by Pump Operator
Laboratory Data:
Lab Test Age Test Total Load Avg.D Area Compressive
No. (Days) Date (lbs) (in) (in²) Strength (psi)
97630 7 06-25 45570 3.99 12.50 3650 TYPE 2:
97631 28 07-16 75060 3.99 12.50 6000 TYPE 2:
97632 28 07-16 66450 3.99 12.50 5320 TYPE 2:
97633 28 07-16 62910 3.99 12.50 5030 TYPE 2:
97634 Hold 00-00 0 0.00 0.00 0
Reinforcement Inspection NT n/a: not applicable Specimen Size 4" X 8"
Reinforcement Conforms NT n/t: not tested Test Reference ASTM C31/C39/C1231
Comments: GeoTest on site for inspection of the exterior slabs for building M. Concrete was placed by pump
and consolidated through rodding.
COPIES: brian.j.anderson7@gmail.com, charliesr@cmaarch.com, chumphrey@safebuilt.com, cobyj@exxelpacific.com, Reviewed by
davidb@exxelpacific.com, davidh@exxelpacific.com, dennist@cgengineering.com, dspencer@safebuilt.com, jaredu@cg
engineering.com, jkim@avscommunities.com, jonr@exxelpacific.com ...and 6 more.
This report shall not be reproduced except in full, without the written approval of GeoTest Services, Inc.
The above test results relate to the sample (or location) tested.
Concrete Inspection & Compressive Strength Test Report
PROJECT: The Villas at Arlington JOB #: 18-0760
ADDRESS: 18506 Smokey Point Boulevard, Arlington, WA REPORT #: CB052
PERMIT #: 1859 DATE: 6/18/2019
CLIENT: Villas at Arlington Partners LLLP PAGE #: 1 of 2
CONTRACTOR: Exxel Pacific INSPECTOR: Joel Morder
Placement Location: Building M Slab on Grade
Sample Location: East Half of the Slab, First Load, Middle of the Batch
Field Data: Eq. No.
Supplier Miles Sand and Gravel Company Slump, in. (C143) 5.00 15
Mix # 02550C Air Content, % (C231) NT
Mix Description 7/8" Agg, 5.5 Sack Unit Weight, pcf (C138) NT
Truck/Ticket # C060 / 616487 Air/Mix Temp.,°F (C1064) 57 / 71 JM2
Strength Required 3000 psi at 28 days Field Cure Temperature, °F NT
Quantity Placed, cy 120 Cure Method - Initial / Final Field Cure / Water Tank
Time Batched 7:05 AM Water Added on Job, gals 14
Time Sampled 7:55 AM Water Requested by Contractor
Laboratory Data:
Lab Test Age Test Total Load Avg.D Area Compressive
No. (Days) Date (lbs) (in) (in²) Strength (psi)
97635 7 06-25 51760 3.99 12.50 4140 TYPE 2:
97636 28 07-16 72610 3.99 12.50 5810 TYPE 2:
97637 28 07-16 70920 3.99 12.50 5670 TYPE 2:
97638 28 07-16 75920 3.99 12.50 6070 TYPE 2:
97639 Hold 00-00 0 0.00 0.00 0
Reinforcement Inspection Yes n/a: not applicable Specimen Size 4" X 8"
Reinforcement Conforms Yes n/t: not tested Test Reference ASTM C31/C39/C1231
Comments: GeoTest on site for inspection of the Building M slab on grade. Reviewed
reinforcing steel per RFI 34. Concrete was placed by a pump and was consolidated through
rodding. All elements inspected were in conformance with approved plans and drawings.
COPIES: brian.j.anderson7@gmail.com, charliesr@cmaarch.com, chumphrey@safebuilt.com, cobyj@exxelpacific.com, Reviewed by
davidb@exxelpacific.com, davidh@exxelpacific.com, dennist@cgengineering.com, dspencer@safebuilt.com, jaredu@cg
engineering.com, jkim@avscommunities.com, jonr@exxelpacific.com ...and 6 more.
This report shall not be reproduced except in full, without the written approval of GeoTest Services, Inc.
The above test results relate to the sample (or location) tested.
Concrete Inspection & Compressive Strength Test Report
PROJECT: The Villas at Arlington JOB #: 18-0760
CLIENT: Villas at Arlington Partners LLLP REPORT #: CB052
CONTRACTOR: Exxel Pacific PAGE #: 2 of 2
Concrete Placement in
Progress
Concrete Inspection & Compressive Strength Test Report
PROJECT: The Villas at Arlington JOB #: 18-0760
ADDRESS: 18506 Smokey Point Boulevard, Arlington, WA REPORT #: CB054
PERMIT #: 13-1877 14-1878 15-1879 16-1880 1859 DATE: 7/8/2019
CLIENT: Villas at Arlington Partners LLLP PAGE #: 1 of 1
CONTRACTOR: Exxel Pacific INSPECTOR: Zach Click
Placement Location: Garage 1, 13, 14, 15, 15 Slab on Grade
Sample Location: Mid Load of 2nd Truck
Field Data: Eq. No.
Supplier Miles Sand and Gravel Company Slump, in. (C143) 6.00 14
Mix # 02550C Air Content, % (C231) NT
Mix Description 5.5 Sack, 7/8" Agg., MBPOLY997 Unit Weight, pcf (C138) NT
Truck/Ticket # C115 / 225404 Air/Mix Temp.,°F (C1064) 57 / 68 Z02
Strength Required 3000 psi at 28 days Field Cure Temperature, °F 58-102
Quantity Placed, cy 68.75 Cure Method - Initial / Final Container / Water Tank
Time Batched 6:31 AM Water Added on Job, gals 10
Time Sampled 7:15 AM Water Requested by Pump Operator
Laboratory Data:
Lab Test Age Test Total Load Avg.D Area Compressive
No. (Days) Date (lbs) (in) (in²) Strength (psi)
98557 7 07-15 54120 4.00 12.57 4310 TYPE 2:
98558 28 08-05 64440 4.00 12.57 5130 TYPE 2:
98559 28 08-05 64940 4.00 12.57 5170 TYPE 2:
98560 28 08-05 66280 4.00 12.57 5270 TYPE 2:
98561 Hold 00-00 0 0.00 0.00 0
Reinforcement Inspection Yes n/a: not applicable Specimen Size 4" X 8"
Reinforcement Conforms Yes n/t: not tested Test Reference ASTM C31/C39/C1231
Comments: GeoTest was on site as requested to perform concrete testing and to inspect steel reinforcement for
the above-noted slab locations. Reinforcement was found to conform to project documents. Concrete was placed
via boom truck.
COPIES: brian.j.anderson7@gmail.com, charliesr@cmaarch.com, chumphrey@safebuilt.com, cobyj@exxelpacific.com, Reviewed by
davidb@exxelpacific.com, davidh@exxelpacific.com, dennist@cgengineering.com, dspencer@safebuilt.com, jaredu@cg
engineering.com, jkim@avscommunities.com, jonr@exxelpacific.com ...and 6 more.
This report shall not be reproduced except in full, without the written approval of GeoTest Services, Inc.
The above test results relate to the sample (or location) tested.
Inspection Report
PROJECT: The Villas at Arlington JOB #: 18-0760
ADDRESS: 18506 Smokey Point Boulevard, Arlington, WA REPORT #: IR014
PERMIT #: 1855, 1856, 1859 DATE: 5/13/2019
CLIENT: Villas at Arlington Partners LLLP PAGE #: 1 of 1
CONTRACTOR: Exxel Pacific INSPECTOR: Tim Martin
INSPECTION OF: Reinforcing Steel Placement
GeoTest was on site as requested to inspect the placement of the reinforcing steel at the
following locations.
Building H, Perimeter Wall Footing and Column Plinth Footings.
Building J, Slab on Grade with Interior Wall Footings and Column Pads.
Building M, Perimeter Stem Wall, and Column Plinths.
The reinforcing steel was in place at the above locations and was found to have been installed
as detailed on sheet S4.1, in accordance with the notes and schedules and notes on sheets
S1.1, S2.4.1 S2.5.1, S2.6.1, and S3.1.
This photo of the reinforcing steel at building J
was taken looking in a southwest direction
across the slab.
COPIES: brian.j.anderson7@gmail.com, charliesr@cmaarch.com, chumphrey@safebuilt.com, cobyj@exxelpacific.com, Reviewed by
davidb@exxelpacific.com, davidh@exxelpacific.com, dennist@cgengineering.com, dspencer@safebuilt.com, jaredu@cg
engineering.com, jkim@avscommunities.com, jonr@exxelpacific.com ...and 5 more.
This report shall not be reproduced except in full, without the written approval of GeoTest Services, Inc.
Inspection Report
PROJECT: The Villas at Arlington JOB #: 18-0760
ADDRESS: 18506 Smokey Point Boulevard, Arlington, WA REPORT #: IR022
PERMIT #: 1859 DATE: 6/17/2019
CLIENT: Villas at Arlington Partners LLLP PAGE #: 1 of 1
CONTRACTOR: Exxel Pacific INSPECTOR: Tim Martin
INSPECTION OF:
Reinforcing Steel Placement
Comments: GeoTest was on site as requested to inspect the placement of the reinforcing steel at the following
locations.
Building M - Slab on grade with interior wall footings and column pads.
The reinforcing steel was in place and was found to conform with RFI #34 and with the project structural
drawings.
COPIES: brian.j.anderson7@gmail.com, charliesr@cmaarch.com, chumphrey@safebuilt.com, cobyj@exxelpacific.com, Reviewed by
davidb@exxelpacific.com, davidh@exxelpacific.com, dennist@cgengineering.com, dspencer@safebuilt.com, jaredu@cg
engineering.com, jkim@avscommunities.com, jonr@exxelpacific.com ...and 5 more.
This report shall not be reproduced except in full, without the written approval of GeoTest Services, Inc.
LATERAL FRAMING INSPECTION REPORT
PROJECT: The Villas at Arlington JOB #: 18-0760
ADDRESS: 18506 Smokey Point Boulevard, Arlington, WA REPORT #: LF059
PERMIT #: 1855, 1859 DATE: 7/15/2019
CLIENT: Villas at Arlington Partners LLLP PAGE #: 1 of 1
CONTRACTOR: Exxel Pacific INSPECTOR: Tim Martin
Item(s) Inspected Location
Floor Diaphragm: Sheathing Building M, 2nd Level
Floor Diaphragm: Sheathing Building H, 3rd Level
Reference Drawings: Structural Drawings
Items Inspected Comments
Lumber grade, species, size
Structural panel grade and thickness, glue Strdi-Floor, 23/32", Exp.1
Shear wall/diaphragm length, location Per Plan
Panel edges bear on framing members Where Required
Diaphragm chord, drag strut, braces and related
Connection of blocking to wall top plates
Gypsum board with wood framing conforms
3" nom. framing in place, nails staggered where shown
Foundation plates or sills on concrete are treated
Base-plate bolting complies
Nail diameter, length, number of lines, spacing .148 X 2-1/2", Per Plan
Pneumatic or mechanically driven fasteners conform
Nail heads driven flush Satisfactory
Hold down, type, location
Lag bolts/proper hole size
Cold-formed framing-proper size, gage, spacing
Screw type, spacing, driven flush
Cold-formed welding conforms (AWS D1.1 and D1.3)
Other
The above items were conforming Nonconforming Items (see below)
Comments: GeoTest was on site as requested to inspect the items mentioned above. The items inspected today
and listed on this report were found to conform with the project drawings.
COPIES: brian.j.anderson7@gmail.com, charliesr@cmaarch.com, chumphrey@safebuilt.com, cobyj@exxelpacific.com, Reviewed by
davidb@exxelpacific.com, davidh@exxelpacific.com, dennist@cgengineering.com, dspencer@safebuilt.com, jaredu@cg
engineering.com, jkim@avscommunities.com, jonr@exxelpacific.com ...and 5 more.
This report shall not be reproduced except in full, without the written approval of GeoTest Services, Inc.
LATERAL FRAMING INSPECTION REPORT
PROJECT: The Villas at Arlington JOB #: 18-0760
ADDRESS: 18506 Smokey Point Boulevard, Arlington, WA REPORT #: LF064
PERMIT #: 1855, 1856, 1857, 1859, 1861 DATE: 7/22/2019
CLIENT: Villas at Arlington Partners LLLP PAGE #: 1 of 1
CONTRACTOR: Exxel Pacific INSPECTOR: Sean Rogerson
Item(s) Inspected Location
Shearwall Sheathing (Nailing, Sheathing) Building J & H Entry Walls, Level 1
Shearwall Sheathing (Nailing, Sheathing) Building K Entry Walls, Level 3
Shearwall Sheathing (Nailing, Sheathing) Building M Entry Walls, Level 2
Previously Noted Discrepancies Building O, Entire Building
Reference Drawings: Approved Structural Drawings
Items Inspected Comments
Lumber grade, species, size
Structural panel grade and thickness, glue 15/32" APA Rated OSB, Exposure 1
Shear wall/diaphragm length, location Per Plan
Panel edges bear on framing members Acceptable
Diaphragm chord, drag strut, braces and related
Connection of blocking to wall top plates
Gypsum board with wood framing conforms
3" nom. framing in place, nails staggered where shown
Foundation plates or sills on concrete are treated
Base-plate bolting complies
Nail diameter, length, number of lines, spacing Per SW Schedule
Pneumatic or mechanically driven fasteners conform
Nail heads driven flush Acceptable
Hold down, type, location
Lag bolts/proper hole size
Cold-formed framing-proper size, gage, spacing
Screw type, spacing, driven flush
Cold-formed welding conforms (AWS D1.1 and D1.3)
Other Previous GeoTest Reports/Ongoing Inspection Checklist
The above items were conforming Nonconforming Items (see below)
Comments: GeoTest was on site to provide special inspection of lateral framing items as noted above. All
items were found to be in conformance with the project plans. Building O had been previously inspected and at
this time all remaining checklist items are complete.
COPIES: brian.j.anderson7@gmail.com, charliesr@cmaarch.com, chumphrey@safebuilt.com, cobyj@exxelpacific.com, Reviewed by
davidb@exxelpacific.com, davidh@exxelpacific.com, dennist@cgengineering.com, dspencer@safebuilt.com, jaredu@cg
engineering.com, jkim@avscommunities.com, jonr@exxelpacific.com ...and 5 more.
This report shall not be reproduced except in full, without the written approval of GeoTest Services, Inc.
LATERAL FRAMING INSPECTION REPORT
PROJECT: The Villas at Arlington JOB #: 18-0760
ADDRESS: 18506 Smokey Point Boulevard, Arlington, WA REPORT #: LF069
PERMIT #: 1856, 1859 DATE: 7/31/2019
CLIENT: Villas at Arlington Partners LLLP PAGE #: 1 of 1
CONTRACTOR: Exxel Pacific INSPECTOR: Tim Martin
Item(s) Inspected Location
Floor Diaphragm Sheathing Building M, 3rd Level
Shear Wall Sheathing and HD Strapping Building J, Exterior All Levels
Shear Wall Sheathing Building M, 1st Level Entry Walls
Reference Drawings: Structural Drawings
Items Inspected Comments
Lumber grade, species, size
Structural panel grade and thickness, glue Rated Sturd-i-Floor, 23/32" (SW-15/32") , T&G, Exp.1
Shear wall/diaphragm length, location Per Plan
Panel edges bear on framing members Where Required
Diaphragm chord, drag strut, braces and related
Connection of blocking to wall top plates
Gypsum board with wood framing conforms
3" nom. framing in place, nails staggered where shown
Foundation plates or sills on concrete are treated
Base-plate bolting complies
Nail diameter, length, number of lines, spacing .148 X 2-1/4" (2-1/2" at Floor), Per Plan
Pneumatic or mechanically driven fasteners conform
Nail heads driven flush Satisfactory
Hold down, type, location
Lag bolts/proper hole size
Cold-formed framing-proper size, gage, spacing
Screw type, spacing, driven flush
Cold-formed welding conforms (AWS D1.1 and D1.3)
Other
The above items were conforming Nonconforming Items (see below)
Comments: GeoTest was on site as requested to inspect the items mentioned above. The floor and entry wall
sheathing was per plan. The sheathing at Building J was marked at locations
which will need to be addressed.
COPIES: brian.j.anderson7@gmail.com, charliesr@cmaarch.com, chumphrey@safebuilt.com, cobyj@exxelpacific.com, Reviewed by
davidb@exxelpacific.com, davidh@exxelpacific.com, dennist@cgengineering.com, dspencer@safebuilt.com, jaredu@cg
engineering.com, jkim@avscommunities.com, jonr@exxelpacific.com ...and 5 more.
This report shall not be reproduced except in full, without the written approval of GeoTest Services, Inc.
LATERAL FRAMING INSPECTION REPORT
PROJECT: The Villas at Arlington JOB #: 18-0760
ADDRESS: 18506 Smokey Point Boulevard, Arlington, WA REPORT #: LF070
PERMIT #: 1855, 1859 DATE: 8/2/2019
CLIENT: Villas at Arlington Partners LLLP PAGE #: 1 of 1
CONTRACTOR: Exxel Pacific INSPECTOR: Tim Martin
Item(s) Inspected Location
Diaphragm Sheathing and Fasteners Building H, Roof
Shear Wall Sheathing and HD Strapping Building H, All Exterior Shear Walls
Shear Wall Sheathing Building M, 3rd Level Entry Walls
Reference Drawings: Structural Drawings
Items Inspected Comments
Lumber grade, species, size
Structural panel grade and thickness, glue Rated Sheathing, 15/32", Exp.1
Shear wall/diaphragm length, location
Panel edges bear on framing members Where Required
Diaphragm chord, drag strut, braces and related
Connection of blocking to wall top plates
Gypsum board with wood framing conforms
3" nom. framing in place, nails staggered where shown
Foundation plates or sills on concrete are treated
Base-plate bolting complies
Nail diameter, length, number of lines, spacing .148 x 2-1/4", Per Plan
Pneumatic or mechanically driven fasteners conform
Nail heads driven flush Satisfactory
Hold down, type, location MST37 and 48 HD Straps, CMST14 Perf. SW Straps
Lag bolts/proper hole size
Cold-formed framing-proper size, gage, spacing
Screw type, spacing, driven flush
Cold-formed welding conforms (AWS D1.1 and D1.3)
Other
The above items were conforming Nonconforming Items (see below)
Comments: GeoTest was on site as requested to inspect the above items. The walls at Building M and the floor
sheathing at Building H were complete and per plan. Wall sheathing at Building H was in progress.
COPIES: brian.j.anderson7@gmail.com, charliesr@cmaarch.com, chumphrey@safebuilt.com, cobyj@exxelpacific.com, Reviewed by
davidb@exxelpacific.com, davidh@exxelpacific.com, dennist@cgengineering.com, dspencer@safebuilt.com, jaredu@cg
engineering.com, jkim@avscommunities.com, jonr@exxelpacific.com ...and 5 more.
This report shall not be reproduced except in full, without the written approval of GeoTest Services, Inc.
LATERAL FRAMING INSPECTION REPORT
PROJECT: The Villas at Arlington JOB #: 18-0760
ADDRESS: 18506 Smokey Point Boulevard, Arlington, WA REPORT #: LF079
PERMIT #: 1859, 1877, 1878, 1884 DATE: 8/29/2019
CLIENT: Villas at Arlington Partners LLLP PAGE #: 1 of 2
CONTRACTOR: Exxel Pacific INSPECTOR: Tim Martin
Item(s) Inspected Location
Shear Wall Sheathing - Reinspection Building M, All Exterior Locations
Roof Diaphragm Sheathing Building M, Garage 13 & 14
Roof and Wall Sheathing Mailbox Enclosure
Reference Drawings: Structural Drawings
Items Inspected Comments
Lumber grade, species, size D-Fir #2
Structural panel grade and thickness, glue Rated Sheathing, 15/32", Exp.1
Shear wall/diaphragm length, location Per Plan
Panel edges bear on framing members Where Required
Diaphragm chord, drag strut, braces and related
Connection of blocking to wall top plates
Gypsum board with wood framing conforms
3" nom. framing in place, nails staggered where shown Yes and Yes
Foundation plates or sills on concrete are treated
Base-plate bolting complies
Nail diameter, length, number of lines, spacing .148 X 2-1/4", Per Plan
Pneumatic or mechanically driven fasteners conform
Nail heads driven flush Satisfactory
Hold down, type, location
Lag bolts/proper hole size
Cold-formed framing-proper size, gage, spacing
Screw type, spacing, driven flush
Cold-formed welding conforms (AWS D1.1 and D1.3)
Other
The above items were conforming Nonconforming Items (see below)
Comments: GeoTest was on site as requested to inspect the items mentioned above. See the
following page for additional comments.
COPIES: brian.j.anderson7@gmail.com, charliesr@cmaarch.com, chumphrey@safebuilt.com, cobyj@exxelpacific.com, Reviewed by
davidb@exxelpacific.com, davidh@exxelpacific.com, dennist@cgengineering.com, dspencer@safebuilt.com, jaredu@cg
engineering.com, jkim@avscommunities.com, jonr@exxelpacific.com ...and 5 more.
This report shall not be reproduced except in full, without the written approval of GeoTest Services, Inc.
LATERAL FRAMING INSPECTION REPORT
PROJECT: The Villas at Arlington JOB #: 18-0760
CLIENT: Villas at Arlington Partners LLLP REPORT #: LF079
CONTRACTOR: Exxel Pacific PAGE #: 2 of 2
Exterior Sheathing Reinspection: Building M (exterior sheathing) was noted in report LF078
(dated 8/22/19) as in progress. The exterior sheathing and straps are now complete and are in
accordance with the project structural drawings. Items mentioned in our earlier report LF078
have been addressed and are now in conformance with the project drawings.
Wall and Roof Sheathing Inspection: The wall sheathing at garage 13 & 14, roof sheathing at
building M and the roof and wall sheathing at the mailbox enclosure were found to be in
conformance with the project drawings.
LATERAL FRAMING INSPECTION REPORT
PROJECT: The Villas at Arlington JOB #: 18-0760
ADDRESS: 18506 Smokey Point Boulevard, Arlington, WA REPORT #: LF093
PERMIT #: Permits Listed Below DATE: 10/8/2019
CLIENT: Villas at Arlington Partners LLLP PAGE #: 1 of 2
CONTRACTOR: Exxel Pacific INSPECTOR: Tim Martin
Item(s) Inspected Location
Final Framing and Interior Shear Walls - Reinspection Buildings G, H, J / Permits - 1854, 1855 & 1856
Final Framing and Interior Shear Walls Buildings K, L, M / Permits - 1857, 1858 & 1859
Wall and Roof Sheathing and Framing Garage 10, 11 & 12 / Permits - 1874, 1875, & 1876
BBQ Enclosure Framing - Reinspection BBQ Enclosures 1 & 2 / Permits - 1881 & 1882
Reference Drawings: Structural Drawings
Items Inspected Comments
Lumber grade, species, size Per Plan
Structural panel grade and thickness, glue APA Rated Sheathing, 15/32" (23/32") at Floors) Exp.1
Shear wall/diaphragm length, location Per Plan at Above Shear Walls
Panel edges bear on framing members Fully Blocked
Diaphragm chord, drag strut, braces and related Per Plan
Connection of blocking to wall top plates Per Plan SW Schedule
Gypsum board with wood framing conforms
3" nom. framing in place, nails staggered where shown Yes
Foundation plates or sills on concrete are treated Yes
Base-plate bolting complies Yes
Nail diameter, length, number of lines, spacing Per Plan
Pneumatic or mechanically driven fasteners conform
Nail heads driven flush Satisfactory
Hold down, type, location Per Plan
Lag bolts/proper hole size
Cold-formed framing-proper size, gage, spacing
Screw type, spacing, driven flush
Cold-formed welding conforms (AWS D1.1 and D1.3)
Other
The above items were conforming Nonconforming Items (see below)
Comments: GeoTest was on site to inspect the above items. See the following page for
comments.
COPIES: brian.j.anderson7@gmail.com, charliesr@cmaarch.com, chumphrey@safebuilt.com, cobyj@exxelpacific.com, Reviewed by
davidb@exxelpacific.com, davidh@exxelpacific.com, dennist@cgengineering.com, dspencer@safebuilt.com, jaredu@cg
engineering.com, jkim@avscommunities.com, jonr@exxelpacific.com ...and 5 more.
This report shall not be reproduced except in full, without the written approval of GeoTest Services, Inc.
LATERAL FRAMING INSPECTION REPORT
PROJECT: The Villas at Arlington JOB #: 18-0760
CLIENT: Villas at Arlington Partners LLLP REPORT #: LF093
CONTRACTOR: Exxel Pacific PAGE #: 2 of 2
The photo shows the now
installed flat blocking at the
BBQ enclosure. Both BBQ
enclosures are in
conformance with the project
drawings. This item was noted
in report LF091 (dated
10/2/19) as nonconforming.
The contractor has addressed all outstanding items found during GeoTest's previous
inspections and all items found this date during the final framing/interior shear wall inspection
of buildings K, L and M. At the locations on page one of this report; the lateral framing was
found to be in conformance with the project drawings.
Concrete Inspection & Compressive Strength Test Report
PROJECT: The Villas at Arlington JOB #: 18-0760
ADDRESS: 18506 Smokey Point Boulevard, Arlington, WA REPORT #: CB037
PERMIT #: 1855, 1859 DATE: 5/14/2019
CLIENT: Villas at Arlington Partners LLLP PAGE #: 1 of 1
CONTRACTOR: Exxel Pacific INSPECTOR: Joel Morder
Placement Location: Building H Plinth and Perimeter Footings, Building M Stemwalls and Plinth Bases
Sample Location: Building H Footings, First Load, Middle of the Batch
Field Data: Eq. No.
Supplier Miles Sand and Gravel Company Slump, in. (C143) 5.00 15
Mix # 02550C Air Content, % (C231) NT
Mix Description 7/8" Aggregate, 5.5 Sack Unit Weight, pcf (C138) NT
Truck/Ticket # C055 / 222431 Air/Mix Temp.,°F (C1064) 54 / 65 JM5
Strength Required 3000 psi at 28 days Field Cure Temperature, °F NT
Quantity Placed, cy 70 Cure Method - Initial / Final Container / Water Tank
Time Batched 7:36 AM Water Added on Job, gals 0
Time Sampled 8:25 AM Water Requested by
Laboratory Data:
Lab Test Age Test Total Load Avg.D Area Compressive
No. (Days) Date (lbs) (in) (in²) Strength (psi)
96012 7 05-21 65530 4.00 12.57 5210 TYPE 2:
96013 28 06-11 79710 4.01 12.63 6310 TYPE 2:
96014 28 06-11 77500 4.01 12.63 6140 TYPE 2:
96015 28 06-11 75100 4.01 12.63 5950 TYPE 2:
96016 Hold 00-00 0 0.00 0.00 0
Reinforcement Inspection Yes n/a: not applicable Specimen Size 4" X 8"
Reinforcement Conforms Yes n/t: not tested Test Reference ASTM C31/C39/C1231
Comments: GeoTest on site for inspection of the items referenced above. Reinforcing steel was previously
inspected and in conformance with approved plans and drawings. Concrete was placed by pump and consolidated
by mechanical vibration. All elements inspected were in conformance with approved plans and drawings.
COPIES: brian.j.anderson7@gmail.com, charliesr@cmaarch.com, chumphrey@safebuilt.com, cobyj@exxelpacific.com, Reviewed by
davidb@exxelpacific.com, davidh@exxelpacific.com, dennist@cgengineering.com, dspencer@safebuilt.com, jaredu@cg
engineering.com, jkim@avscommunities.com, jonr@exxelpacific.com ...and 6 more.
This report shall not be reproduced except in full, without the written approval of GeoTest Services, Inc.
The above test results relate to the sample (or location) tested.
SPECIAL INSPECTION SUMMARY
PROJECT: The Villas at Arlington â€Â BLD M JOB #: 18â€0760
ADDRESS: 18506 Smokey Point Blvd, Arlington, WA 98223 DATE: 10â€22â€2019
CLIENT: Villas at Arlington Partners LLLP PERMIT #: 1859
CONTRACTOR: Exxel Pacific PAGE: 1 of 1
This letter summarizes our special inspection and testing efforts for The Villas at Arlington – BLD
M project located in Arlington, Washington. GeoTest’s services took place from October 9, 2018
through October 22, 2019. Our testing and inspections included the following scope of work:
TEST/INSPECTION ITEM REFERENCE
Concrete Break Reports CB033, CB037, CB051
ï‚· Reinforced Concrete & CB052 and Inspection Reports IR014 &
IR022
Lateral Framing Inspection Reports LF059,
ï‚· Lateral Framing
LF064, LF069, LF070, LF079 & LF093
Adhesive Anchor Inspection Reports AA017 &
ï‚· Proprietary Anchors
AA020
All work requiring special inspection for the project to date has been completed. To the best of
our knowledge the inspected work is in conformance with the approved project plans and
specifications and the applicable workmanship provisions of the International Building Code. All
related laboratory tests performed by GeoTest have met or exceeded the minimum test
requirements.
This is GeoTest’s final special inspection and testing submittal for The Villas at Arlington â€Â BLD M
project. If we can be of further assistance, please contact the undersigned.
Copies: Villas at Arlington Partners LLLP Safe Built
Charles Morgan and Associates LLC The Alliant Company
City of Arlington Anderson, Brian
Exxel Pacific Charles Morgan and Associates LLC Logan Senrud
CG Engineering Technical Director
This report shall not be reproduced except in full, without the written approval of GeoTest Services, Inc.
Permit #: 1859
Permit Date: 03/09/18
Permit Type: MULTI-FAMILY
Project Name: Villas at Arlington
Applicant Name: Villas at Arlington, LLLP
Applicant Address: 105 Cresent Bay Drive, Suite D
Applicant, City, State, Zip: Laguna Beach, CA 92651
Contact: Carmel Gregory
Phone: 425-778-8500
Email: carmelg@cgengineering.com
Scope of Work: New Multi-Family Development
Valuation: 2071084.09
Square Feet: 19069
Number of Stories: 3
Construction Type:
Occupancy Group:
ID Code:
Permit Issued: 11/01/2018
Permit Expires:
Form Permit Type:
Status: COMPLETE
Assigned To: Kristin Foster
Property
Parcel # Address Legal Description Owner Name Owner Phone Zoning
VILLAS AT 137 Multiple Family
31052000100800 3318 185TH PLACE NE
ARLINGTON 101 - 200 Units
Contractors
Contractor Primary Contact Phone Address Contractor Type License License #
323A CONSTRUCTION
EXXEL PACIFIC INC 360-734-2872 UBI 601 175 198
TELEGRAPH RD CONTRACTOR
323A CONSTRUCTION Labor and
EXXEL PACIFIC INC 360-734-2872 EXXELPI073KN
TELEGRAPH RD CONTRACTOR Industries
Plan Reviews
Date Review Type Description Assigned To Review Status
COMMERCIAL
03/09/2018 BUILDING
BUILDING
Fees
Fee Description Notes Amount
Building Plan Review Table 4-2 $8,802.10
Building Plan Review Table 4-2 $149.08
Building Permit Table 4-1 $13,771.04
Park - Community MF Multi-family $26,946.00
Processing/Technology $25.00
State Surcharge - Commercial Commercial Only $25.00
State Surcharge - add'l DU Residential Additional Units $36.00
Traffic Mitigation - C/MF Commercial/Multi-family $23,420.52
Total $73,174.74
Attached Letters
Date Letter Description
09/19/2018 Building Permit
Payments
Date Paid By Description Payment Type Accepted By Amount
03/08/2018 Check #104500 18506 Bldg. M Check #104500 Kristin Foster $8,802.10
10/11/2018 Fidelity National Title check #26379 Launa Black $64,372.64
Outstanding Balance $0.00
Notes
Date Note Created By:
05/05/2020 Issued a conditioned Temp CO Kristin Foster
Uploaded Files
Date File Name
05/06/2020 6621829-Villas Bldg. M Temp. C of O IBC 2015.pdf
11/01/2018 4145076-1859_Villas Building Permit.pdf
03/09/2018 3141652-Commercial Application - Building M.pdf
SUBMITTAL REVIEW
â–¡ NO EXCEPTION TAKEN
□✔ MAKE CORRECTION NOTED
â–¡ REJECTED
â–¡ REVISE AND RESUBMIT
â–¡ SUBMIT SPECIFIED ITEM
THIS REVIEW IS ONLY FOR GENERAL CONFORMANCE
WITH THE DESIGN CONCEPT OF THE PROJECT AND
GENERAL COMPLIANCE WITH THE INFORMATION
GIVEN IN THE CONTRACT DOCUMENTS. CONTRACTOR
REMAINS RESPONSIBLE FOR FULL COMPLIANCE WITH
THE PLANS AND SPECIFICATIONS. DIMENSIONS AND
QUANTITIES WERE NOT REVIEWED AND ARE THE
RESPONSIBILITY OF THE CONTRACTOR.
BY Morgan Kruse DATE 12/07/18