HomeMy WebLinkAbout3318 185th Pl Ne Bldg K_BLD1857_2025 ADHESIVE ANCHOR INSPECTION REPORT
PROJECT: The Villas at Arlington JOB #: 18-0760
ADDRESS: 18506 Smokey Point Boulevard, Arlington, WA REPORT #: AA014
PERMIT #: 1857, 1858, 1863, 1862 DATE: 5/30/2019
CLIENT: Villas at Arlington Partners LLLP PAGE #: 1 of 1
CONTRACTOR: Exxel Pacific INSPECTOR: Tim Martin
Item(s) Inspected Location
Interior Wall Footing Reinforcing Steel Dowels Building K and L at Perimeter Foundation Intersections
Holdown Anchor Bolts (5/8" X 14" w/9" Embed) Building Q and P, Center Party Wall (Non-Entry Side of Wall)
Reference Drawing(s): RFI #7, Structural Drawings
Item(s) Inspected Comments
Base Material Condition Satisfactory , Dry Concrete. 57º
Drill Bit Type Carbide Tip, Rotor Hammer w/Vacuum
Hole Diameter/Depth 3/4" X 4"
Hole Cleanliness Clean - Flushed with Water Until Clear/Brushed/Flushed
Anchor Spacing/Edge Distance Per Plan
Anchor Type Grade 60 Deformed Reinforcing Steel
Anchor Diameter/Length 5/8", 44"
Anchor Embedment 4"
Adhesive Type Hilti HY200 R
Adhesive Expiration Date 9/2019
Adhesive ICC-ES Report 3187
Other
The above items were conforming Nonconforming Items (see below)
Comments: GeoTest was on site as requested to inspect the epoxied dowels.
The above dowels were found to conform with the project structural drawings and RFI #7. The dowels were
installed as recommended by the manufacturer’s published instructions.
COPIES: brian.j.anderson7@gmail.com, charliesr@cmaarch.com, chumphrey@safebuilt.com, cobyj@exxelpacific.com, Reviewed by
davidb@exxelpacific.com, davidh@exxelpacific.com, dennist@cgengineering.com, dspencer@safebuilt.com, jaredu@cg
engineering.com, jkim@avscommunities.com, jonr@exxelpacific.com ...and 5 more.
This report shall not be reproduced except in full, without the written approval of GeoTest Services, Inc.
ADHESIVE ANCHOR INSPECTION REPORT
PROJECT: The Villas at Arlington JOB #: 18-0760
ADDRESS: 18506 Smokey Point Boulevard, Arlington, WA REPORT #: AA020
PERMIT #: H-1855, L-1857, K-1858, M-1859 DATE: 9/13/2019
CLIENT: Villas at Arlington Partners LLLP PAGE #: 1 of 3
CONTRACTOR: Exxel Pacific INSPECTOR: Tim Martin
Item(s) Inspected Location
Anchor Bolts for HDU2 Holdowns at Interior Shear Walls (4) Bolts at Building H, K, & L (6) at Building M
Reference Drawing(s): Structural Drawings and RFI #43
Item(s) Inspected Comments
Base Material Condition Fully Cured Concrete, Dry, 65º
Drill Bit Type Drilled Prior
Hole Diameter/Depth 3/4", 9"
Hole Cleanliness Blown, Brushed and Blown Clean
Anchor Spacing/Edge Distance Per Plan
Anchor Type Galvanized Threaded Rod
Anchor Diameter/Length 5/8", 14"
Anchor Embedment 9"
Adhesive Type Hilti Hit HY-200 R
Adhesive Expiration Date 6/2020
Adhesive ICC-ES Report 3187
Other
The above items were conforming Nonconforming Items (see below)
Comments: GeoTest was on site as requested to inspect the installation of the epoxied anchor
for the interior shear walls at the buildings mentioned above. The anchor bolts were found to
conform with the project drawings, RFI and the manufacturer’s published instructions.
COPIES: brian.j.anderson7@gmail.com, charliesr@cmaarch.com, chumphrey@safebuilt.com, cobyj@exxelpacific.com, Reviewed by
davidb@exxelpacific.com, davidh@exxelpacific.com, dennist@cgengineering.com, dspencer@safebuilt.com, jaredu@cg
engineering.com, jkim@avscommunities.com, jonr@exxelpacific.com ...and 5 more.
This report shall not be reproduced except in full, without the written approval of GeoTest Services, Inc.
ADHESIVE ANCHOR INSPECTION REPORT
PROJECT: The Villas at Arlington JOB #: 18-0760
CLIENT: Villas at Arlington Partners LLLP REPORT #: AA020
CONTRACTOR: Exxel Pacific PAGE #: 2 of 3
Photo showing the contractor
using compressed air to clean
one of the drilled holes at
Building L.
ADHESIVE ANCHOR INSPECTION REPORT
PROJECT: The Villas at Arlington JOB #: 18-0760
CLIENT: Villas at Arlington Partners LLLP REPORT #: AA020
CONTRACTOR: Exxel Pacific PAGE #: 3 of 3
The photo shows the contractor
injecting the epoxy into one of
the drilled holes at Building K.
Concrete Inspection & Compressive Strength Test Report
PROJECT: The Villas at Arlington JOB #: 18-0760
ADDRESS: 18506 Smokey Point Boulevard, Arlington, WA REPORT #: CB027
PERMIT #: 1856, 1857 DATE: 4/24/2019
CLIENT: Villas at Arlington Partners LLLP PAGE #: 1 of 2
CONTRACTOR: Exxel Pacific INSPECTOR: Tristan Coragiulo
Placement Location: Building J Stem Walls, Building K Stem Wall, and Plinth Footings
Sample Location: Second Truck, Mid-Pour, Directly From Chute, Southern Perimeter of Building J
Field Data: Eq. No.
Supplier Miles Sand and Gravel Company Slump, in. (C143) 6.00 9
Mix # 02550C Air Content, % (C231) NT
Mix Description 5.5 SK, 7/8" Agg, pea Agg, MB Poly 997, Hot Water Unit Weight, pcf (C138) NT
Truck/Ticket # C183 / 221304 Air/Mix Temp.,°F (C1064) 52 / 60 TC5
Strength Required 3000 psi at 28 days Field Cure Temperature, °F 53-83
Quantity Placed, cy 80 Cure Method - Initial / Final Container / Water Tank
Time Batched 8:41 AM Water Added on Job, gals 15
Time Sampled 9:15 AM Water Requested by Miles
Laboratory Data:
Lab Test Age Test Total Load Avg.D Area Compressive
No. (Days) Date (lbs) (in) (in²) Strength (psi)
94917 7 05-01 58730 4.00 12.57 4670 TYPE 3:
94918 28 05-22 78040 4.00 12.57 6210 TYPE 2:
94919 28 05-22 77070 4.00 12.57 6130 TYPE 2:
94920 28 05-22 75980 4.00 12.57 6040 TYPE 2:
94921 Hold 00-00 0 0.00 0.00 0
Reinforcement Inspection NT n/a: not applicable Specimen Size 4" X 8"
Reinforcement Conforms NT n/t: not tested Test Reference ASTM C31/C39/C1231
Comments: GeoTest was on site as requested to provide concrete placement observation as
well as concrete testing. Concrete was placed via pump truck, mechanically consolidated, and
was hand finished for both buildings pours. For reinforcement inspection, please refer to report
IR010. GeoTest will return for further inspection and observation as requested.
COPIES: brian.j.anderson7@gmail.com, charliesr@cmaarch.com, chumphrey@safebuilt.com, cobyj@exxelpacific.com, Reviewed by
davidb@exxelpacific.com, davidh@exxelpacific.com, dennist@cgengineering.com, dspencer@safebuilt.com, jaredu@cg
engineering.com, jkim@avscommunities.com, jonr@exxelpacific.com ...and 6 more.
This report shall not be reproduced except in full, without the written approval of GeoTest Services, Inc.
The above test results relate to the sample (or location) tested.
Concrete Inspection & Compressive Strength Test Report
PROJECT: The Villas at Arlington JOB #: 18-0760
CLIENT: Villas at Arlington Partners LLLP REPORT #: CB027
CONTRACTOR: Exxel Pacific PAGE #: 2 of 2
Figure 1. Building J stem wall
placement (looking north).
Figure 2. Building K stem wall
and plinth footing placement
(looking southeast).
Concrete Inspection & Compressive Strength Test Report
PROJECT: The Villas at Arlington JOB #: 18-0760
ADDRESS: 18506 Smokey Point Boulevard, Arlington, WA REPORT #: CB030
PERMIT #: 1857, 1858 DATE: 5/1/2019
CLIENT: Villas at Arlington Partners LLLP PAGE #: 1 of 2
CONTRACTOR: Exxel Pacific INSPECTOR: Tim Martin
Placement Location: Building K, Stem Walls, and Column Plinths, Building L, Continuous Footings & Plinth Spread Footings
Sample Location: 2nd Load, Placed at South Half of Building K Stem Walls
Field Data: Eq. No.
Supplier Miles Sand and Gravel Company Slump, in. (C143) 8.00 19
Mix # 02550C Air Content, % (C231) NT
Mix Description 5.5 sk. 7/8", Pea. WRA Unit Weight, pcf (C138) NT
Truck/Ticket # C143 / 615944 Air/Mix Temp.,°F (C1064) 53 / 61 TM07
Strength Required 3000 psi at 28 days Field Cure Temperature, °F
Quantity Placed, cy 78.5 Cure Method - Initial / Final Container / Water Tank
Time Batched 10:42 A.M Water Added on Job, gals 0
Time Sampled 11:38 A.M Water Requested by
Laboratory Data:
Lab Test Age Test Total Load Avg.D Area Compressive
No. (Days) Date (lbs) (in) (in²) Strength (psi)
95331 7 05-08 48640 4.00 12.57 3870 TYPE 2:
95332 28 05-29 59680 4.00 12.57 4750 TYPE 2:
95333 28 05-29 57980 4.00 12.57 4610 TYPE 2:
95334 28 05-29 62600 4.00 12.57 4980 TYPE 2:
95335 Hold 00-00 0 0.00 0.00 0
Reinforcement Inspection Yes n/a: not applicable Specimen Size 4" X 8"
Reinforcement Conforms Yes n/t: not tested Test Reference ASTM C31/C39/C1231
Comments: GeoTest was on site as requested to inspect the above items. Except for the
following item the reinforcing steel was in place and was found to conform with the project
structural drawings. The concrete was placed using a boom pump and was mechanically
consolidated.
COPIES: brian.j.anderson7@gmail.com, charliesr@cmaarch.com, chumphrey@safebuilt.com, cobyj@exxelpacific.com, Reviewed by
davidb@exxelpacific.com, davidh@exxelpacific.com, dennist@cgengineering.com, dspencer@safebuilt.com, jaredu@cg
engineering.com, jkim@avscommunities.com, jonr@exxelpacific.com ...and 6 more.
This report shall not be reproduced except in full, without the written approval of GeoTest Services, Inc.
The above test results relate to the sample (or location) tested.
Concrete Inspection & Compressive Strength Test Report
PROJECT: The Villas at Arlington JOB #: 18-0760
CLIENT: Villas at Arlington Partners LLLP REPORT #: CB030
CONTRACTOR: Exxel Pacific PAGE #: 2 of 2
The continuous stem wall reinforcement at building K was not continuous at the entry walls due
to a block-out being install for a large pipe. This needs approval from the project engineer.
AMENDED 5/31/19: GeoTest was provided with RFI 56 response accepting the discontinous
rebar. GeoTest will verify during framing inspections that sill anchorage is installed per RFI 56
and code minimums.
Plinth Footing Reinforcement
at Building L
Continuous Footing Reinforcement at Building L
Concrete Inspection & Compressive Strength Test Report
PROJECT: The Villas at Arlington JOB #: 18-0760
ADDRESS: 18506 Smokey Point Boulevard, Arlington, WA REPORT #: CB045
PERMIT #: BLDG - 1857 DATE: 5/31/2019
CLIENT: Villas at Arlington Partners LLLP PAGE #: 1 of 2
CONTRACTOR: Exxel Pacific INSPECTOR: Tristan Coragiulo
Placement Location: Building K Exterior Slabs on Grade
Sample Location: First Truck, Mid-Load, Directly From Truck Chute
Field Data: Eq. No.
Supplier Miles Sand and Gravel Company Slump, in. (C143) 6.00 9
Mix # 0260A6C Air Content, % (C231) 5.2 1
Mix Description 6 sk, 7/8" agg, Pea agg, MB Poly 997, MBAE 90, MB NC 534, Hot water Unit Weight, pcf (C138) NT
Truck/Ticket # C139 / 223505 Air/Mix Temp.,°F (C1064) 54 / 70 TC03
Strength Required 3000 psi at 28 days Field Cure Temperature, °F NA, 57-80
Quantity Placed, cy 30 Cure Method - Initial / Final Container / Water Tank
Time Batched 6:29 AM Water Added on Job, gals 10
Time Sampled 7:20 AM Water Requested by Miles
Laboratory Data:
Lab Test Age Test Total Load Avg.D Area Compressive
No. (Days) Date (lbs) (in) (in²) Strength (psi)
96849 7 06-07 54430 4.01 12.63 4310 TYPE 2: interior
96850 28 06-28 67280 4.00 12.57 5350 TYPE 5: interior
96851 28 06-28 66090 4.00 12.57 5260 TYPE 3: interior
96852 28 06-28 67920 4.00 12.57 5400 TYPE 2: interior
96853 Hold 00-00 0 0.00 0.00 0 interior
Reinforcement Inspection NT n/a: not applicable Specimen Size 4" X 8"
Reinforcement Conforms NT n/t: not tested Test Reference ASTM C31/C39/C1231
Comments: GeoTest was on site as requested to provide concrete placement and testing
inspection services. All locations are approximate and were provided by the contractor. All
concrete was placed via boom truck and hand finished. For our reinforcement inspection,
please refer to report IR017, dated 5/30/2019. GeoTest will return for further inspection and
observation as requested.
COPIES: brian.j.anderson7@gmail.com, charliesr@cmaarch.com, chumphrey@safebuilt.com, cobyj@exxelpacific.com, Reviewed by
davidb@exxelpacific.com, davidh@exxelpacific.com, dennist@cgengineering.com, dspencer@safebuilt.com, jaredu@cg
engineering.com, jkim@avscommunities.com, jonr@exxelpacific.com ...and 6 more.
This report shall not be reproduced except in full, without the written approval of GeoTest Services, Inc.
The above test results relate to the sample (or location) tested.
Concrete Inspection & Compressive Strength Test Report
PROJECT: The Villas at Arlington JOB #: 18-0760
CLIENT: Villas at Arlington Partners LLLP REPORT #: CB045
CONTRACTOR: Exxel Pacific PAGE #: 2 of 2
Figure 1. Placement and hand
finishing process of exterior
slabs on grade concrete
(looking southwest).
Concrete Inspection & Compressive Strength Test Report
PROJECT: The Villas at Arlington JOB #: 18-0760
ADDRESS: 18506 Smokey Point Boulevard, Arlington, WA REPORT #: CB046
PERMIT #: BLDG, 1857, 1877, 1878, 1879, 1880 DATE: 5/31/2019
CLIENT: Villas at Arlington Partners LLLP PAGE #: 1 of 2
CONTRACTOR: Exxel Pacific INSPECTOR: Tristan Coragiulo
Placement Location: Building K Interior Slab on Grade, Garage 13 & 14 Footings, Garage 15 & 16 Stem Walls
Sample Location: Second Truck, Mid-Load, Directly From Chute, Western Edge of Slab
Field Data: Eq. No.
Supplier Miles Sand and Gravel Company Slump, in. (C143) 6.50 9
Mix # 02550C Air Content, % (C231) NT
Mix Description 5.5 Sack, 7/8" Agg., Pea Agg., MB Poly 997, Hot Water Unit Weight, pcf (C138) NT
Truck/Ticket # C144 / 223518 Air/Mix Temp.,°F (C1064) 57 / 67 TC03
Strength Required 3000 psi at 28 days Field Cure Temperature, °F NA
Quantity Placed, cy 130 Cure Method - Initial / Final Container / Water Tank
Time Batched 7:38 AM Water Added on Job, gals 10
Time Sampled 8:41 AM Water Requested by Miles
Laboratory Data:
Lab Test Age Test Total Load Avg.D Area Compressive
No. (Days) Date (lbs) (in) (in²) Strength (psi)
96854 7 06-07 58940 4.01 12.63 4670 TYPE 2:
96855 28 06-28 69360 4.00 12.57 5520 TYPE 3:
96856 28 06-28 70500 4.00 12.57 5610 TYPE 2:
96857 28 06-28 69460 4.00 12.57 5530 TYPE 3:
96858 Hold 00-00 0 0.00 0.00 0
Reinforcement Inspection NT n/a: not applicable Specimen Size 4" X 8"
Reinforcement Conforms NT n/t: not tested Test Reference ASTM C31/C39/C1231
Comments: GeoTest was on site as requested to provide concrete placement, inspection, and
testing services. All locations are approximate and were provided by the contractor. All
concrete was placed via boom truck and hand finished. For our reinforcement inspections,
please refer to reports IR017 and IR018, dated May 30th and 31st, 2019. GeoTest will return
for further inspection and observation as requested.
COPIES: brian.j.anderson7@gmail.com, charliesr@cmaarch.com, chumphrey@safebuilt.com, cobyj@exxelpacific.com, Reviewed by
davidb@exxelpacific.com, davidh@exxelpacific.com, dennist@cgengineering.com, dspencer@safebuilt.com, jaredu@cg
engineering.com, jkim@avscommunities.com, jonr@exxelpacific.com ...and 6 more.
This report shall not be reproduced except in full, without the written approval of GeoTest Services, Inc.
The above test results relate to the sample (or location) tested.
Concrete Inspection & Compressive Strength Test Report
PROJECT: The Villas at Arlington JOB #: 18-0760
CLIENT: Villas at Arlington Partners LLLP REPORT #: CB046
CONTRACTOR: Exxel Pacific PAGE #: 2 of 2
Figure 1. The placement and
hand finishing process of
interior slab on grade concrete
(looking southwest).
FIELD DENSITY/MOISTURE REPORT
Nuclear Gauge * ASTM D6938
PROJECT: The Villas at Arlington JOB #: 18-0760
ADDRESS: 18506 Smokey Point Boulevard, Arlington, WA REPORT #: FD054
PERMIT #: 1857 DATE: 5/15/2019
CLIENT: Villas at Arlington Partners LLLP PAGE #: 1 of 4
CONTRACTOR: Exxel Pacific INSPECTOR: Anna Sigel
Compaction Of: Building K Slab-on-Grade
Field Data:
Depth/ DT/ Wet Field Dry Compaction
Test Location Elev BS Density Moisture Density Lab % Pass/
# (ft) (in) (pcf) (%) (pcf) # Attained Required Fail
1 See Figure 1 TOS DT/10 144.8 5.4 137.4 1 98 95 P
2 See Figure 1 TOS DT/10 151.7 7.9 140.6 1 100 95 P
3 See Figure 1 TOS DT/6 152.9 6.4 143.7 1 102 95 P
4 See Figure 1 TOS DT/12 148.3 8.3 136.9 1 97 95 P
5 See Figure 1 TOS DT/12 148.3 8.7 136.4 1 97 95 P
6 See Figure 1 TOS DT/6 143.7 7.9 133.2 1 95 95 P
Lab Max. Dry Optimum Retained
Sample Soil Type Source Density Moisture On #4 Test
# (pcf) (%) (%) Method
1-4264A Structural Fill East Valley S & G Pit (D-355) 140.8 7.0 36 ASTM D1557/D4718
2- 0.0 None
3- 0.0 None
Gauge Make/Model/Serial#: Instrotek/3500/2082 M/D Standard Count: 404/3175
Comments: See comments on page 2.
COPIES: brian.j.anderson7@gmail.com, charliesr@cmaarch.com, chumphrey@safebuilt.com, cobyj@exxelpacific.com, Reviewed by
davidb@exxelpacific.com, davidh@exxelpacific.com, dennist@cgengineering.com, dspencer@safebuilt.com, jaredu@cg
engineering.com, jkim@avscommunities.com, jonr@exxelpacific.com ...and 7 more.
This report shall not be reproduced except in full, without the written approval of GeoTest Services, Inc.
The above test results relate only to the sample (or location) tested.
FIELD DENSITY/MOISTURE REPORT
Nuclear Gauge * ASTM D6938
PROJECT: The Villas at Arlington JOB #: 18-0760
CLIENT: Villas at Arlington Partners LLLP REPORT #: FD054
CONTRACTOR: Exxel Pacific PAGE #: 2 of 4
TOS - Top of Subgrade
GeoTest was on-site as requested to provide in-place density testing for the slab-on-grade of
Building K. All locations are approximate. The fill was placed in lifts and compacted prior to
GeoTest’s arrival. All tests met compaction requirements. Due to local variations in the soils,
one test location attained over 100%. GeoTest was also onsite to inspect the curb subgrade at
the northwest corners of 31st Ave NE and 184th PL NE, and 31st Ave NE and 185th PL NE.
The soils exhibited 0.5 to 1.0-inch of penetration from a T-probe and were firm and unyielding.
See Figures 1 through 4.
Figure 1: Approximate
locations of the soil density
tests.
FIELD DENSITY/MOISTURE REPORT
Nuclear Gauge * ASTM D6938
PROJECT: The Villas at Arlington JOB #: 18-0760
CLIENT: Villas at Arlington Partners LLLP REPORT #: FD054
CONTRACTOR: Exxel Pacific PAGE #: 3 of 4
Figure 2: A photo of the
compacted subgrade for
Building K.
Figure 3: A photo of the
curb subgrade at the
intersection of 31st Ave.
NE and 184th PL NE. The
photo was taken facing
east.
FIELD DENSITY/MOISTURE REPORT
Nuclear Gauge * ASTM D6938
PROJECT: The Villas at Arlington JOB #: 18-0760
CLIENT: Villas at Arlington Partners LLLP REPORT #: FD054
CONTRACTOR: Exxel Pacific PAGE #: 4 of 4
Figure 4: A photo of the
curb subgrade at the
corner of 31st Ave. NE and
185th PL NE. The photo
was taken facing northeast.
Inspection Report
PROJECT: The Villas at Arlington JOB #: 18-0760
ADDRESS: 18506 Smokey Point Boulevard, Arlington, WA REPORT #: IR017
PERMIT #: 1857 DATE: 5/30/2019
CLIENT: Villas at Arlington Partners LLLP PAGE #: 1 of 1
CONTRACTOR: Exxel Pacific INSPECTOR: Tim Martin
INSPECTION OF:
Reinforcing Steel Placement
Comments: GeoTest was on site as requested to inspect the placement of the reinforcing steel at the following
locations.
Building K, interior wall footings, column pads, and slab on grade. The reinforcing steel was in place and
was found to be in conformance with RFI #34 and the project structural drawings.
COPIES: brian.j.anderson7@gmail.com, charliesr@cmaarch.com, chumphrey@safebuilt.com, cobyj@exxelpacific.com, Reviewed by
davidb@exxelpacific.com, davidh@exxelpacific.com, dennist@cgengineering.com, dspencer@safebuilt.com, jaredu@cg
engineering.com, jkim@avscommunities.com, jonr@exxelpacific.com ...and 5 more.
This report shall not be reproduced except in full, without the written approval of GeoTest Services, Inc.
LATERAL FRAMING INSPECTION REPORT
PROJECT: The Villas at Arlington JOB #: 18-0760
ADDRESS: 18506 Smokey Point Boulevard, Arlington, WA REPORT #: LF051
PERMIT #: 1851, 1853, 1855, 1857 DATE: 7/2/2019
CLIENT: Villas at Arlington Partners LLLP PAGE #: 1 of 1
CONTRACTOR: Exxel Pacific INSPECTOR: Tim Martin
Item(s) Inspected Location
Floor Diaphragm Sheathing Buildings H & K, 2nd Level
Roof Diaphragm Sheathing Buildings D & F
Reference Drawings: Structural Drawings
Items Inspected Comments
Lumber grade, species, size
Structural panel grade and thickness, glue Rated Sturd-i-Floor, 23/32" , T&G, Exp.1 . Roof Sheathing, 15/32" Exp.1
Shear wall/diaphragm length, location Per Plan
Panel edges bear on framing members Where Required
Diaphragm chord, drag strut, braces and related
Connection of blocking to wall top plates
Gypsum board with wood framing conforms
3" nom. framing in place, nails staggered where shown
Foundation plates or sills on concrete are treated
Base-plate bolting complies
Nail diameter, length, number of lines, spacing .148 X 2-1/4", Per Plan
Pneumatic or mechanically driven fasteners conform
Nail heads driven flush Roof Sheathing: Contractor Added Nails at Over-Driven Locations
Hold down, type, location
Lag bolts/proper hole size
Cold-formed framing-proper size, gage, spacing
Screw type, spacing, driven flush
Cold-formed welding conforms (AWS D1.1 and D1.3)
Other
The above items were conforming Nonconforming Items (see below)
Comments: GeoTest was on-site as requested to inspect the items mentioned above. All items found were
addressed prior to our leaving the project. The above items were found to be in conformance with the project
drawings.
COPIES: brian.j.anderson7@gmail.com, charliesr@cmaarch.com, chumphrey@safebuilt.com, cobyj@exxelpacific.com, Reviewed by
davidb@exxelpacific.com, davidh@exxelpacific.com, dennist@cgengineering.com, dspencer@safebuilt.com, jaredu@cg
engineering.com, jkim@avscommunities.com, jonr@exxelpacific.com ...and 5 more.
This report shall not be reproduced except in full, without the written approval of GeoTest Services, Inc.
LATERAL FRAMING INSPECTION REPORT
PROJECT: The Villas at Arlington JOB #: 18-0760
ADDRESS: 18506 Smokey Point Boulevard, Arlington, WA REPORT #: LF054
PERMIT #: 1857 DATE: 7/5/2019
CLIENT: Villas at Arlington Partners LLLP PAGE #: 1 of 2
CONTRACTOR: Exxel Pacific INSPECTOR: John Silk
Item(s) Inspected Location
Shear Wall Sheathing Building K, 2nd Floor Entry Walls
Reference Drawings: S2.3.1
Items Inspected Comments
Lumber grade, species, size
Structural panel grade and thickness, glue Rated Sheathing, 15/32", Exp.1
Shear wall/diaphragm length, location Per Structural Plan
Panel edges bear on framing members Yes
Diaphragm chord, drag strut, braces and related
Connection of blocking to wall top plates
Gypsum board with wood framing conforms
3" nom. framing in place, nails staggered where shown
Foundation plates or sills on concrete are treated
Base-plate bolting complies
Nail diameter, length, number of lines, spacing Per Shearwall Schedule
Pneumatic or mechanically driven fasteners conform Per Shearwall Schedule
Nail heads driven flush Acceptable
Hold down, type, location
Lag bolts/proper hole size
Cold-formed framing-proper size, gage, spacing
Screw type, spacing, driven flush
Cold-formed welding conforms (AWS D1.1 and D1.3)
Other
The above items were conforming Nonconforming Items (see below)
Comments: GeoTest was on-site as requested to inspect the above items.
Building K - 2nd-floor entry walls were assembled per plan.
COPIES: brian.j.anderson7@gmail.com, charliesr@cmaarch.com, chumphrey@safebuilt.com, cobyj@exxelpacific.com, Reviewed by
davidb@exxelpacific.com, davidh@exxelpacific.com, dennist@cgengineering.com, dspencer@safebuilt.com, jaredu@cg
engineering.com, jkim@avscommunities.com, jonr@exxelpacific.com ...and 5 more.
This report shall not be reproduced except in full, without the written approval of GeoTest Services, Inc.
LATERAL FRAMING INSPECTION REPORT
PROJECT: The Villas at Arlington JOB #: 18-0760
CLIENT: Villas at Arlington Partners LLLP REPORT #: LF054
CONTRACTOR: Exxel Pacific PAGE #: 2 of 2
LATERAL FRAMING INSPECTION REPORT
PROJECT: The Villas at Arlington JOB #: 18-0760
ADDRESS: 18506 Smokey Point Boulevard, Arlington, WA REPORT #: LF056
PERMIT #: D-1851, L-1857 DATE: 7/9/2019
CLIENT: Villas at Arlington Partners LLLP PAGE #: 1 of 2
CONTRACTOR: Exxel Pacific INSPECTOR: Tim Martin
Item(s) Inspected Location
Floor Diaphragm: Sheathing Building L, 2nd Level
Shear Wall Sheathing and HD Strapping Building D, Levels 1 to 3
Reference Drawings: Structural Drawings
Items Inspected Comments
Lumber grade, species, size
Structural panel grade and thickness, glue Rated Sturd-i-Floor, 23/32" (SW-15/32") , T&G, Exp.1
Shear wall/diaphragm length, location Per Plan
Panel edges bear on framing members Yes
Diaphragm chord, drag strut, braces and related
Connection of blocking to wall top plates
Gypsum board with wood framing conforms
3" nom. framing in place, nails staggered where shown
Foundation plates or sills on concrete are treated
Base-plate bolting complies
Nail diameter, length, number of lines, spacing .148 X 3", 3, 4 and 12" On center
Pneumatic or mechanically driven fasteners conform
Nail heads driven flush Satisfactory
Hold down, type, location MST37 and 48 HD Straps, CMST14 Perf. SW Straps
Lag bolts/proper hole size
Cold-formed framing-proper size, gage, spacing
Screw type, spacing, driven flush
Cold-formed welding conforms (AWS D1.1 and D1.3)
Other
The above items were conforming Nonconforming Items (see below)
Comments: GeoTest was on site as requested to inspect the items mentioned above.
COPIES: brian.j.anderson7@gmail.com, charliesr@cmaarch.com, chumphrey@safebuilt.com, cobyj@exxelpacific.com, Reviewed by
davidb@exxelpacific.com, davidh@exxelpacific.com, dennist@cgengineering.com, dspencer@safebuilt.com, jaredu@cg
engineering.com, jkim@avscommunities.com, jonr@exxelpacific.com ...and 5 more.
This report shall not be reproduced except in full, without the written approval of GeoTest Services, Inc.
LATERAL FRAMING INSPECTION REPORT
PROJECT: The Villas at Arlington JOB #: 18-0760
CLIENT: Villas at Arlington Partners LLLP REPORT #: LF056
CONTRACTOR: Exxel Pacific PAGE #: 2 of 2
Building L 2nd level floor sheathing was found to be in conformance with the project structural
drawings.
Building D exterior shear walls were in progress. All areas were marked at the location
describing the issue and correction.
LATERAL FRAMING INSPECTION REPORT
PROJECT: The Villas at Arlington JOB #: 18-0760
ADDRESS: 18506 Smokey Point Boulevard, Arlington, WA REPORT #: LF058
PERMIT #: 1857 DATE: 7/12/2019
CLIENT: Villas at Arlington Partners LLLP PAGE #: 1 of 1
CONTRACTOR: Exxel Pacific INSPECTOR: Tim Martin
Item(s) Inspected Location
Shear Wall Sheathing Building L: 2nd Level Entry Walls
Reference Drawings: Structural Drawings
Items Inspected Comments
Lumber grade, species, size
Structural panel grade and thickness, glue Rated Sheathing, 15/32", Exp.1
Shear wall/diaphragm length, location Inspected Prior
Panel edges bear on framing members Yes
Diaphragm chord, drag strut, braces and related
Connection of blocking to wall top plates
Gypsum board with wood framing conforms
3" nom. framing in place, nails staggered where shown
Foundation plates or sills on concrete are treated
Base-plate bolting complies
Nail diameter, length, number of lines, spacing .148 X 2-1/4", 6" & 12"
Pneumatic or mechanically driven fasteners conform
Nail heads driven flush Yes
Hold down, type, location
Lag bolts/proper hole size
Cold-formed framing-proper size, gage, spacing
Screw type, spacing, driven flush
Cold-formed welding conforms (AWS D1.1 and D1.3)
Other
The above items were conforming Nonconforming Items (see below)
Comments: GeoTest was on site as requested to inspect sheathing at the above shear walls. The sheathing and
fasteners were found to conform to the project drawings.
COPIES: brian.j.anderson7@gmail.com, charliesr@cmaarch.com, chumphrey@safebuilt.com, cobyj@exxelpacific.com, Reviewed by
davidb@exxelpacific.com, davidh@exxelpacific.com, dennist@cgengineering.com, dspencer@safebuilt.com, jaredu@cg
engineering.com, jkim@avscommunities.com, jonr@exxelpacific.com ...and 5 more.
This report shall not be reproduced except in full, without the written approval of GeoTest Services, Inc.
LATERAL FRAMING INSPECTION REPORT
PROJECT: The Villas at Arlington JOB #: 18-0760
ADDRESS: 18506 Smokey Point Boulevard, Arlington, WA REPORT #: LF061
PERMIT #: 1857 DATE: 7/17/2019
CLIENT: Villas at Arlington Partners LLLP PAGE #: 1 of 1
CONTRACTOR: Exxel Pacific INSPECTOR: Tim Martin
Item(s) Inspected Location
Floor Diaphragm Sheathing Building L, 3rd Level
Reference Drawings: Structural Drawings
Items Inspected Comments
Lumber grade, species, size
Structural panel grade and thickness, glue Strdi-Floor, 23/32", Exp.1
Shear wall/diaphragm length, location Per Plan
Panel edges bear on framing members Where Required
Diaphragm chord, drag strut, braces and related
Connection of blocking to wall top plates
Gypsum board with wood framing conforms
3" nom. framing in place, nails staggered where shown
Foundation plates or sills on concrete are treated
Base-plate bolting complies
Nail diameter, length, number of lines, spacing .148 X 2-1/2", Per Plan
Pneumatic or mechanically driven fasteners conform
Nail heads driven flush Satisfactory
Hold down, type, location
Lag bolts/proper hole size
Cold-formed framing-proper size, gage, spacing
Screw type, spacing, driven flush
Cold-formed welding conforms (AWS D1.1 and D1.3)
Other
The above items were conforming Nonconforming Items (see below)
Comments: GeoTest was on site as requested to inspect the items listed above. The sheathing and fasteners at
the above locations were found to conform with the project structural drawings.
COPIES: brian.j.anderson7@gmail.com, charliesr@cmaarch.com, chumphrey@safebuilt.com, cobyj@exxelpacific.com, Reviewed by
davidb@exxelpacific.com, davidh@exxelpacific.com, dennist@cgengineering.com, dspencer@safebuilt.com, jaredu@cg
engineering.com, jkim@avscommunities.com, jonr@exxelpacific.com ...and 5 more.
This report shall not be reproduced except in full, without the written approval of GeoTest Services, Inc.
LATERAL FRAMING INSPECTION REPORT
PROJECT: The Villas at Arlington JOB #: 18-0760
ADDRESS: 18506 Smokey Point Boulevard, Arlington, WA REPORT #: LF062
PERMIT #: G-1854, H-1855, J-1856, K-1857 DATE: 7/18/2019
CLIENT: Villas at Arlington Partners LLLP PAGE #: 1 of 1
CONTRACTOR: Exxel Pacific INSPECTOR: Tim Martin
Item(s) Inspected Location
Shear Wall Sheathing Buildings, G, H, J, 1st Level
Floor Diaphragm Sheathing Building K, 3rd Level
Reference Drawings: Structural Drawings
Items Inspected Comments
Lumber grade, species, size
Structural panel grade and thickness, glue Per Plan
Shear wall/diaphragm length, location Per Plan
Panel edges bear on framing members Where Required
Diaphragm chord, drag strut, braces and related
Connection of blocking to wall top plates
Gypsum board with wood framing conforms
3" nom. framing in place, nails staggered where shown
Foundation plates or sills on concrete are treated
Base-plate bolting complies
Nail diameter, length, number of lines, spacing .148" X 2-1/4" (2-1/2" at Diaphragm), Per Plan/SW Schedule
Pneumatic or mechanically driven fasteners conform
Nail heads driven flush Satisfactory
Hold down, type, location
Lag bolts/proper hole size
Cold-formed framing-proper size, gage, spacing
Screw type, spacing, driven flush
Cold-formed welding conforms (AWS D1.1 and D1.3)
Other
The above items were conforming Nonconforming Items (see below)
Comments: GeoTest was on site as requested to inspect the above items.
The above items were found to be in conformance with the project drawings.
COPIES: brian.j.anderson7@gmail.com, charliesr@cmaarch.com, chumphrey@safebuilt.com, cobyj@exxelpacific.com, Reviewed by
davidb@exxelpacific.com, davidh@exxelpacific.com, dennist@cgengineering.com, dspencer@safebuilt.com, jaredu@cg
engineering.com, jkim@avscommunities.com, jonr@exxelpacific.com ...and 5 more.
This report shall not be reproduced except in full, without the written approval of GeoTest Services, Inc.
LATERAL FRAMING INSPECTION REPORT
PROJECT: The Villas at Arlington JOB #: 18-0760
ADDRESS: 18506 Smokey Point Boulevard, Arlington, WA REPORT #: LF063
PERMIT #: 1857 DATE: 7/19/2019
CLIENT: Villas at Arlington Partners LLLP PAGE #: 1 of 1
CONTRACTOR: Exxel Pacific INSPECTOR: Tim Martin
Item(s) Inspected Location
Shear Walls Sheathing Building L, 1st Level Entry Walls
Reference Drawings: Structural Drawings
Items Inspected Comments
Lumber grade, species, size
Structural panel grade and thickness, glue Rated Sheathing, 15/32", Exp.1
Shear wall/diaphragm length, location
Panel edges bear on framing members Yes
Diaphragm chord, drag strut, braces and related
Connection of blocking to wall top plates
Gypsum board with wood framing conforms
3" nom. framing in place, nails staggered where shown
Foundation plates or sills on concrete are treated
Base-plate bolting complies
Nail diameter, length, number of lines, spacing .148 X 2-1/4", 6 and 12" On Center
Pneumatic or mechanically driven fasteners conform
Nail heads driven flush Satisfactory
Hold down, type, location
Lag bolts/proper hole size
Cold-formed framing-proper size, gage, spacing
Screw type, spacing, driven flush
Cold-formed welding conforms (AWS D1.1 and D1.3)
Other
The above items were conforming Nonconforming Items (see below)
Comments: GeoTest was on site as requested to inspect the above item. The contractor addressed all items
found prior to our leaving the project. Above items were in accordance with the project drawings.
COPIES: brian.j.anderson7@gmail.com, charliesr@cmaarch.com, chumphrey@safebuilt.com, cobyj@exxelpacific.com, Reviewed by
davidb@exxelpacific.com, davidh@exxelpacific.com, dennist@cgengineering.com, dspencer@safebuilt.com, jaredu@cg
engineering.com, jkim@avscommunities.com, jonr@exxelpacific.com ...and 5 more.
This report shall not be reproduced except in full, without the written approval of GeoTest Services, Inc.
LATERAL FRAMING INSPECTION REPORT
PROJECT: The Villas at Arlington JOB #: 18-0760
ADDRESS: 18506 Smokey Point Boulevard, Arlington, WA REPORT #: LF064
PERMIT #: 1855, 1856, 1857, 1859, 1861 DATE: 7/22/2019
CLIENT: Villas at Arlington Partners LLLP PAGE #: 1 of 1
CONTRACTOR: Exxel Pacific INSPECTOR: Sean Rogerson
Item(s) Inspected Location
Shearwall Sheathing (Nailing, Sheathing) Building J & H Entry Walls, Level 1
Shearwall Sheathing (Nailing, Sheathing) Building K Entry Walls, Level 3
Shearwall Sheathing (Nailing, Sheathing) Building M Entry Walls, Level 2
Previously Noted Discrepancies Building O, Entire Building
Reference Drawings: Approved Structural Drawings
Items Inspected Comments
Lumber grade, species, size
Structural panel grade and thickness, glue 15/32" APA Rated OSB, Exposure 1
Shear wall/diaphragm length, location Per Plan
Panel edges bear on framing members Acceptable
Diaphragm chord, drag strut, braces and related
Connection of blocking to wall top plates
Gypsum board with wood framing conforms
3" nom. framing in place, nails staggered where shown
Foundation plates or sills on concrete are treated
Base-plate bolting complies
Nail diameter, length, number of lines, spacing Per SW Schedule
Pneumatic or mechanically driven fasteners conform
Nail heads driven flush Acceptable
Hold down, type, location
Lag bolts/proper hole size
Cold-formed framing-proper size, gage, spacing
Screw type, spacing, driven flush
Cold-formed welding conforms (AWS D1.1 and D1.3)
Other Previous GeoTest Reports/Ongoing Inspection Checklist
The above items were conforming Nonconforming Items (see below)
Comments: GeoTest was on site to provide special inspection of lateral framing items as noted above. All
items were found to be in conformance with the project plans. Building O had been previously inspected and at
this time all remaining checklist items are complete.
COPIES: brian.j.anderson7@gmail.com, charliesr@cmaarch.com, chumphrey@safebuilt.com, cobyj@exxelpacific.com, Reviewed by
davidb@exxelpacific.com, davidh@exxelpacific.com, dennist@cgengineering.com, dspencer@safebuilt.com, jaredu@cg
engineering.com, jkim@avscommunities.com, jonr@exxelpacific.com ...and 5 more.
This report shall not be reproduced except in full, without the written approval of GeoTest Services, Inc.
LATERAL FRAMING INSPECTION REPORT
PROJECT: The Villas at Arlington JOB #: 18-0760
ADDRESS: 18506 Smokey Point Boulevard, Arlington, WA REPORT #: LF065
PERMIT #: 1856, 1857, 1858 DATE: 7/23/2019
CLIENT: Villas at Arlington Partners LLLP PAGE #: 1 of 4
CONTRACTOR: Exxel Pacific INSPECTOR: John Silk
Item(s) Inspected Location
Shear Walls Buildings L & K
Roof Sheathing Building J
Reference Drawings: Approved Structural Drawings
Items Inspected Comments
Lumber grade, species, size
Structural panel grade and thickness, glue Rated Sheathing, 15/32", Exp.1
Shear wall/diaphragm length, location Per Structural Plan
Panel edges bear on framing members Yes
Diaphragm chord, drag strut, braces and related
Connection of blocking to wall top plates
Gypsum board with wood framing conforms
3" nom. framing in place, nails staggered where shown
Foundation plates or sills on concrete are treated
Base-plate bolting complies
Nail diameter, length, number of lines, spacing Per Shearwall Schedule
Pneumatic or mechanically driven fasteners conform Per General Notes
Nail heads driven flush Acceptable
Hold down, type, location
Lag bolts/proper hole size
Cold-formed framing-proper size, gage, spacing
Screw type, spacing, driven flush
Cold-formed welding conforms (AWS D1.1 and D1.3)
Other
The above items were conforming Nonconforming Items (see below)
Comments: GeoTest was on site as requested to inspect the above item. The contractor
addressed all items found prior to our leaving the project. Above items were in accordance with
the project drawings.
COPIES: brian.j.anderson7@gmail.com, charliesr@cmaarch.com, chumphrey@safebuilt.com, cobyj@exxelpacific.com, Reviewed by
davidb@exxelpacific.com, davidh@exxelpacific.com, dennist@cgengineering.com, dspencer@safebuilt.com, jaredu@cg
engineering.com, jkim@avscommunities.com, jonr@exxelpacific.com ...and 5 more.
This report shall not be reproduced except in full, without the written approval of GeoTest Services, Inc.
LATERAL FRAMING INSPECTION REPORT
PROJECT: The Villas at Arlington JOB #: 18-0760
CLIENT: Villas at Arlington Partners LLLP REPORT #: LF065
CONTRACTOR: Exxel Pacific PAGE #: 2 of 4
LATERAL FRAMING INSPECTION REPORT
PROJECT: The Villas at Arlington JOB #: 18-0760
CLIENT: Villas at Arlington Partners LLLP REPORT #: LF065
CONTRACTOR: Exxel Pacific PAGE #: 3 of 4
LATERAL FRAMING INSPECTION REPORT
PROJECT: The Villas at Arlington JOB #: 18-0760
CLIENT: Villas at Arlington Partners LLLP REPORT #: LF065
CONTRACTOR: Exxel Pacific PAGE #: 4 of 4
LATERAL FRAMING INSPECTION REPORT
PROJECT: The Villas at Arlington JOB #: 18-0760
ADDRESS: 18506 Smokey Point Boulevard, Arlington, WA REPORT #: LF066
PERMIT #: 1857 DATE: 7/24/2019
CLIENT: Villas at Arlington Partners LLLP PAGE #: 1 of 1
CONTRACTOR: Exxel Pacific INSPECTOR: Tim Martin
Item(s) Inspected Location
Diaphragm Sheathing and Fasteners Building L, 3rd Level
Reference Drawings: Structural Drawings
Items Inspected Comments
Lumber grade, species, size
Structural panel grade and thickness, glue Strdi-Floor, 23/32", Exp.1
Shear wall/diaphragm length, location Per Plan
Panel edges bear on framing members Where Required
Diaphragm chord, drag strut, braces and related
Connection of blocking to wall top plates
Gypsum board with wood framing conforms
3" nom. framing in place, nails staggered where shown
Foundation plates or sills on concrete are treated
Base-plate bolting complies
Nail diameter, length, number of lines, spacing .148 X 2-1/2", Per Plan
Pneumatic or mechanically driven fasteners conform
Nail heads driven flush Satisfactory
Hold down, type, location
Lag bolts/proper hole size
Cold-formed framing-proper size, gage, spacing
Screw type, spacing, driven flush
Cold-formed welding conforms (AWS D1.1 and D1.3)
Other
The above items were conforming Nonconforming Items (see below)
Comments: GeoTest was on site as requested to inspect the above mentioned items. The sheathing and fasteners
at the above floor diaphragm were in accordance with the project’s drawings.
COPIES: brian.j.anderson7@gmail.com, charliesr@cmaarch.com, chumphrey@safebuilt.com, cobyj@exxelpacific.com, Reviewed by
davidb@exxelpacific.com, davidh@exxelpacific.com, dennist@cgengineering.com, dspencer@safebuilt.com, jaredu@cg
engineering.com, jkim@avscommunities.com, jonr@exxelpacific.com ...and 5 more.
This report shall not be reproduced except in full, without the written approval of GeoTest Services, Inc.
LATERAL FRAMING INSPECTION REPORT
PROJECT: The Villas at Arlington JOB #: 18-0760
ADDRESS: 18506 Smokey Point Boulevard, Arlington, WA REPORT #: LF067
PERMIT #: 1848, 1854, 1855, 1857 DATE: 7/26/2019
CLIENT: Villas at Arlington Partners LLLP PAGE #: 1 of 2
CONTRACTOR: Exxel Pacific INSPECTOR: Tim Martin
Item(s) Inspected Location
Shear Wall Sheathing and HD Strapping Building G, All Exterior Locations
Shear Wall Sheathing Building L, 3rd Level Entry Walls
Column Connections to the Foundation Building G and H East Side of the Building at Entry
Interior Framing Building A
Reference Drawings: Structural Drawings
Items Inspected Comments
Lumber grade, species, size D.Fir #2
Structural panel grade and thickness, glue Rated Sheathing, 15/32", Exp.1
Shear wall/diaphragm length, location Per Plan
Panel edges bear on framing members Where Required
Diaphragm chord, drag strut, braces and related Per Plan
Connection of blocking to wall top plates Clips are in Per SW Schedule
Gypsum board with wood framing conforms
3" nom. framing in place, nails staggered where shown Yes and Yes
Foundation plates or sills on concrete are treated Yes
Base-plate bolting complies Yes
Nail diameter, length, number of lines, spacing Per Framing Notes and SW Schedule
Pneumatic or mechanically driven fasteners conform
Nail heads driven flush Satisfactory
Hold down, type, location Per Plan
Lag bolts/proper hole size
Cold-formed framing-proper size, gage, spacing
Screw type, spacing, driven flush
Cold-formed welding conforms (AWS D1.1 and D1.3)
Other
The above items were conforming Nonconforming Items (see below)
Comments: See comments on Page 2.
COPIES: brian.j.anderson7@gmail.com, charliesr@cmaarch.com, chumphrey@safebuilt.com, cobyj@exxelpacific.com, Reviewed by
davidb@exxelpacific.com, davidh@exxelpacific.com, dennist@cgengineering.com, dspencer@safebuilt.com, jaredu@cg
engineering.com, jkim@avscommunities.com, jonr@exxelpacific.com ...and 5 more.
This report shall not be reproduced except in full, without the written approval of GeoTest Services, Inc.
LATERAL FRAMING INSPECTION REPORT
PROJECT: The Villas at Arlington JOB #: 18-0760
CLIENT: Villas at Arlington Partners LLLP REPORT #: LF067
CONTRACTOR: Exxel Pacific PAGE #: 2 of 2
GeoTest was on site as requested to inspect the above items. The column connections at
Building G & H and walls at Building L were found to conform with the project drawings.
Building G - Exterior Shear Wall Sheathing: The items inspected will require corrections and
marked at the location.
Building A - Interior Framing: Items still requiring corrections, are as follows; holes in the shear
wall top plates, plumbing, and electrical and oversized holes require strapping.
LATERAL FRAMING INSPECTION REPORT
PROJECT: The Villas at Arlington JOB #: 18-0760
ADDRESS: 18506 Smokey Point Boulevard, Arlington, WA REPORT #: LF073
PERMIT #: 1857, 1886 DATE: 8/13/2019
CLIENT: Villas at Arlington Partners LLLP PAGE #: 1 of 1
CONTRACTOR: Exxel Pacific INSPECTOR: Tim Martin
Item(s) Inspected Location
Roof Diaphragm Sheathing Building K
Roof Diaphragm and Wall Sheathing Storage Building
Reference Drawings: Structural Drawings
Items Inspected Comments
Lumber grade, species, size
Structural panel grade and thickness, glue Rated Sheathing, 15/32", Exp.1
Shear wall/diaphragm length, location Per Plan
Panel edges bear on framing members
Diaphragm chord, drag strut, braces and related
Connection of blocking to wall top plates
Gypsum board with wood framing conforms
3" nom. framing in place, nails staggered where shown
Foundation plates or sills on concrete are treated
Base-plate bolting complies
Nail diameter, length, number of lines, spacing .148 X 2-1/4", Per Plan
Pneumatic or mechanically driven fasteners conform
Nail heads driven flush Satisfactory
Hold down, type, location
Lag bolts/proper hole size
Cold-formed framing-proper size, gage, spacing
Screw type, spacing, driven flush
Cold-formed welding conforms (AWS D1.1 and D1.3)
Other
The above items were conforming Nonconforming Items (see below)
Comments: GeoTest was on site as requested to inspect the above items. The above sheathing was found to be in
conformance with the project drawings.
COPIES: brian.j.anderson7@gmail.com, charliesr@cmaarch.com, chumphrey@safebuilt.com, cobyj@exxelpacific.com, Reviewed by
davidb@exxelpacific.com, davidh@exxelpacific.com, dennist@cgengineering.com, dspencer@safebuilt.com, jaredu@cg
engineering.com, jkim@avscommunities.com, jonr@exxelpacific.com ...and 5 more.
This report shall not be reproduced except in full, without the written approval of GeoTest Services, Inc.
LATERAL FRAMING INSPECTION REPORT
PROJECT: The Villas at Arlington JOB #: 18-0760
ADDRESS: 18506 Smokey Point Boulevard, Arlington, WA REPORT #: LF074
PERMIT #: J-1856, K-1858, L-1857 DATE: 8/15/2019
CLIENT: Villas at Arlington Partners LLLP PAGE #: 1 of 1
CONTRACTOR: Exxel Pacific INSPECTOR: Tim Martin
Item(s) Inspected Location
Roof Diaphragm Sheathing Building L
Shear Wall Sheathing & Floor- Floor Straps, Final Inspection Building J, K
Reference Drawings: Structural Drawings
Items Inspected Comments
Lumber grade, species, size
Structural panel grade and thickness, glue Rated Sheathing, 15/32", Exp.1
Shear wall/diaphragm length, location Per Drawings
Panel edges bear on framing members Where Required
Diaphragm chord, drag strut, braces and related
Connection of blocking to wall top plates
Gypsum board with wood framing conforms
3" nom. framing in place, nails staggered where shown Yes and Yes
Foundation plates or sills on concrete are treated
Base-plate bolting complies
Nail diameter, length, number of lines, spacing .148" x 2-1/4", Per Plan
Pneumatic or mechanically driven fasteners conform
Nail heads driven flush Over-Driven Nails Were Corrected
Hold down, type, location Floor to Floor and Perf. SW Straps Per Plan
Lag bolts/proper hole size
Cold-formed framing-proper size, gage, spacing
Screw type, spacing, driven flush
Cold-formed welding conforms (AWS D1.1 and D1.3)
Other
The above items were conforming Nonconforming Items (see below)
Comments: GeoTest was on site as requested to inspect the above items. All nonconforming items were addressed
prior to our leaving the job site. Above items were in conformance.
COPIES: brian.j.anderson7@gmail.com, charliesr@cmaarch.com, chumphrey@safebuilt.com, cobyj@exxelpacific.com, Reviewed by
davidb@exxelpacific.com, davidh@exxelpacific.com, dennist@cgengineering.com, dspencer@safebuilt.com, jaredu@cg
engineering.com, jkim@avscommunities.com, jonr@exxelpacific.com ...and 5 more.
This report shall not be reproduced except in full, without the written approval of GeoTest Services, Inc.
LATERAL FRAMING INSPECTION REPORT
PROJECT: The Villas at Arlington JOB #: 18-0760
ADDRESS: 18506 Smokey Point Boulevard, Arlington, WA REPORT #: LF093
PERMIT #: Permits Listed Below DATE: 10/8/2019
CLIENT: Villas at Arlington Partners LLLP PAGE #: 1 of 2
CONTRACTOR: Exxel Pacific INSPECTOR: Tim Martin
Item(s) Inspected Location
Final Framing and Interior Shear Walls - Reinspection Buildings G, H, J / Permits - 1854, 1855 & 1856
Final Framing and Interior Shear Walls Buildings K, L, M / Permits - 1857, 1858 & 1859
Wall and Roof Sheathing and Framing Garage 10, 11 & 12 / Permits - 1874, 1875, & 1876
BBQ Enclosure Framing - Reinspection BBQ Enclosures 1 & 2 / Permits - 1881 & 1882
Reference Drawings: Structural Drawings
Items Inspected Comments
Lumber grade, species, size Per Plan
Structural panel grade and thickness, glue APA Rated Sheathing, 15/32" (23/32") at Floors) Exp.1
Shear wall/diaphragm length, location Per Plan at Above Shear Walls
Panel edges bear on framing members Fully Blocked
Diaphragm chord, drag strut, braces and related Per Plan
Connection of blocking to wall top plates Per Plan SW Schedule
Gypsum board with wood framing conforms
3" nom. framing in place, nails staggered where shown Yes
Foundation plates or sills on concrete are treated Yes
Base-plate bolting complies Yes
Nail diameter, length, number of lines, spacing Per Plan
Pneumatic or mechanically driven fasteners conform
Nail heads driven flush Satisfactory
Hold down, type, location Per Plan
Lag bolts/proper hole size
Cold-formed framing-proper size, gage, spacing
Screw type, spacing, driven flush
Cold-formed welding conforms (AWS D1.1 and D1.3)
Other
The above items were conforming Nonconforming Items (see below)
Comments: GeoTest was on site to inspect the above items. See the following page for
comments.
COPIES: brian.j.anderson7@gmail.com, charliesr@cmaarch.com, chumphrey@safebuilt.com, cobyj@exxelpacific.com, Reviewed by
davidb@exxelpacific.com, davidh@exxelpacific.com, dennist@cgengineering.com, dspencer@safebuilt.com, jaredu@cg
engineering.com, jkim@avscommunities.com, jonr@exxelpacific.com ...and 5 more.
This report shall not be reproduced except in full, without the written approval of GeoTest Services, Inc.
LATERAL FRAMING INSPECTION REPORT
PROJECT: The Villas at Arlington JOB #: 18-0760
CLIENT: Villas at Arlington Partners LLLP REPORT #: LF093
CONTRACTOR: Exxel Pacific PAGE #: 2 of 2
The photo shows the now
installed flat blocking at the
BBQ enclosure. Both BBQ
enclosures are in
conformance with the project
drawings. This item was noted
in report LF091 (dated
10/2/19) as nonconforming.
The contractor has addressed all outstanding items found during GeoTest's previous
inspections and all items found this date during the final framing/interior shear wall inspection
of buildings K, L and M. At the locations on page one of this report; the lateral framing was
found to be in conformance with the project drawings.
SPECIAL INSPECTION SUMMARY
PROJECT: The Villas at Arlington â€Â BLD K JOB #: 18â€0760
ADDRESS: 18506 Smokey Point Blvd, Arlington, WA 98223 DATE: 10â€22â€2019
CLIENT: Villas at Arlington Partners LLLP PERMIT #: 1857
CONTRACTOR: Exxel Pacific PAGE: 1 of 1
This letter summarizes our special inspection and testing efforts for The Villas at Arlington – BLD K
project located in Arlington, Washington. GeoTest’s services took place from October 9, 2018
through October 22, 2019. Our testing and inspections included the following scope of work:
TEST/INSPECTION ITEM REFERENCE
Field Density Moisture Report FD054 and Soil
ï‚· Earthwork
Observation Report SO003
Concrete Break Reports CB027, CB030, CB045
ï‚· Reinforced Concrete & CB046 and Inspection Reports IR010 &
IR017
Lateral Framing Inspection Reports LF051,
ï‚· Lateral Framing LF054, LF062, LF064, LF065, LF073, LF074 &
LF093
Adhesive Anchor Inspection Reports AA014 &
ï‚· Proprietary Anchors
AA020
All work requiring special inspection for the project to date has been completed. To the best of
our knowledge the inspected work is in conformance with the approved project plans and
specifications and the applicable workmanship provisions of the International Building Code. All
related laboratory tests performed by GeoTest have met or exceeded the minimum test
requirements.
This is GeoTest’s final special inspection and testing submittal for The Villas at Arlington â€Â BLD K
project. If we can be of further assistance, please contact the undersigned.
Copies: Villas at Arlington Partners LLLP Safe Built
Charles Morgan and Associates LLC The Alliant Company
City of Arlington Anderson, Brian
Exxel Pacific Charles Morgan and Associates LLC Logan Senrud
CG Engineering Technical Director
This report shall not be reproduced except in full, without the written approval of GeoTest Services, Inc.
Permit #: 1857
Permit Date: 03/09/18
Permit Type: MULTI-FAMILY
Project Name: Villas at Arlington
Applicant Name: Villas at Arlington, LLLP
Applicant Address: 105 Cresent Bay Drive, Suite D
Applicant, City, State, Zip: Laguna Beach, CA 92651
Contact: Carmel Gregory
Phone: 425-778-8500
Email: carmelg@cgengineering.com
Scope of Work: New Multi-Family Development
Valuation: 253351.89
Square Feet: 23049
Number of Stories: 3
Construction Type:
Occupancy Group:
ID Code:
Permit Issued: 11/01/2018
Permit Expires:
Form Permit Type:
Status: COMPLETE
Assigned To: Kristin Foster
Property
Parcel # Address Legal Description Owner Name Owner Phone Zoning
VILLAS AT 137 Multiple Family
31052000100800 3318 185TH PLACE NE
ARLINGTON 101 - 200 Units
Contractors
Contractor Primary Contact Phone Address Contractor Type License License #
323A CONSTRUCTION
EXXEL PACIFIC INC 360-734-2872 UBI 601 175 198
TELEGRAPH RD CONTRACTOR
323A CONSTRUCTION Labor and
EXXEL PACIFIC INC 360-734-2872 EXXELPI073KN
TELEGRAPH RD CONTRACTOR Industries
Plan Reviews
Date Review Type Description Assigned To Review Status
COMMERCIAL
03/09/2018 BUILDING
BUILDING
Fees
Fee Description Notes Amount
Building Plan Review Table 4-2 $10,254.61
Building Plan Review Table 4-2 $177.30
Building Permit Table 4-1 $16,049.09
Park - Community MF Multi-family $35,928.00
Processing/Technology $25.00
State Surcharge - Commercial Commercial Only $25.00
State Surcharge - add'l DU Residential Additional Units $48.00
Traffic Mitigation - C/MF Commercial/Multi-family $31,227.36
Total $93,734.36
Attached Letters
Date Letter Description
09/19/2018 Building Permit
Payments
Date Paid By Description Payment Type Accepted By Amount
03/08/2018 Alliant Capital Ltd. 18506 Bldg. K Check #104500 Kristin Foster $10,254.61
10/11/2018 Fidelity National Title check #26379 Launa Black $83,479.75
Outstanding Balance $0.00
Uploaded Files
Date File Name
10/13/2021 9884947-1857_IC 4.2.2020.pdf
04/15/2020 6521229-Villas Bldg K C of O Signed.pdf
11/01/2018 4145054-1857_Villas Building Permit.pdf
03/09/2018 3141592-Commercial Application - Building K.pdf
SUBMITTAL PACKAGE Page 1
DATE: 1/14/2019
Your Logo Here FOR APPROVAL PACKAGE NUM: 35
PACKAGE REV: 0
Exxel Pacific, Inc. SPEC #: 061753
201808. - Villas at Arlington
To: Dennis Titus From: Nick Santini
CG Engineering PLLC Exxel Pacific, Inc.
250 4th Ave South #200 323 Telegraph Road
Edmonds, WA 98020 Bellingham, WA 98226
We are transmitting the following Submittal Package Number: “35â€, Revision: “0†Description:
“Prefabricated Wood Trusses - Buildings C, D, K & L†for your review, intended to be compliant with
contract Specification Number: “061753â€.
Please review and respond to: Nick Santini, by: 1/28/2019 in accordance with the contract documents.
Additional Notes:
Spec Number Submittal Description Submittal Details
1. 061753 Prefabricated Wood Trusses - Buildings C, Shop Drawings
D, K & L
Sincerely,
Nick Santini
EXXEL PACIFIC, INC.
323 TELEGRAPH RD.
BELLINGHAM, WA
98226
✔
REVIEWED
BY Nick Santini DATE 1/14/2019
SUBMITTAL# 35 SPEC 061753