PROJECT: The Villas at Arlington JOB #: 18-0760
ADDRESS: 18506 Smokey Point Boulevard, Arlington, WA REPORT #: AA010
PERMIT #: 1853 DATE: 5/1/2019
CLIENT: Villas at Arlington Partners LLLP PAGE #: 1 of 2
CONTRACTOR: Exxel Pacific INSPECTOR: Tim Martin
Item(s) Inspected Location
Dowels at Intersections of Perimeter & Interior Footings Building F
Reference Drawing(s): RFI #7
Item(s) Inspected Comments
Base Material Condition Uncracked Concrete, Dry, 50º
Drill Bit Type Carbide Tip
Hole Diameter/Depth 3/4", 6"
Hole Cleanliness Clean
Anchor Spacing/Edge Distance 3 Bars Per Intersection
Anchor Type Deformed Reinforcing Steel
Anchor Diameter/Length 5/8", 44"
Anchor Embedment 6"
Adhesive Type Hilti HY 200 R
Adhesive Expiration Date 2/2020
Adhesive ICC-ES Report 3187
Other
The above items were conforming Nonconforming Items (see below)
Comments: GeoTest was on site as requested to inspect the installation of the above dowels.
The dowels were found to be in conformance with the project structural drawings, RFI #7, and
were installed as recommended by the manufacturer’s published instructions.
COPIES: brian.j.anderson7@gmail.com, charliesr@cmaarch.com, chumphrey@safebuilt.com, cobyj@exxelpacific.com, Reviewed by
davidb@exxelpacific.com, davidh@exxelpacific.com, dennist@cgengineering.com, dspencer@safebuilt.com, jaredu@cg
engineering.com, jkim@avscommunities.com, jonr@exxelpacific.com ...and 5 more.
This report shall not be reproduced except in full, without the written approval of GeoTest Services, Inc.
ADHESIVE ANCHOR INSPECTION REPORT
PROJECT: The Villas at Arlington JOB #: 18-0760
CLIENT: Villas at Arlington Partners LLLP REPORT #: AA010
CONTRACTOR: Exxel Pacific PAGE #: 2 of 2
The picture shows the
reinforcement at an interior
footing intersection with the
building's perimeter
foundation.
At a couple of locations, the
vapor barrier was removed
and the insulation was cut
back to better match the
footing dimensions and
provide additional clearance
below the reinforcement. The
vapor barrier was then
reinstalled.
At this intersection the vapor
barrier was loose. The
contractor pushed the taped
area shown at the left side of
the photo away from the
epoxied dowel and added tape
to the foundation
ADHESIVE ANCHOR INSPECTION REPORT
PROJECT: The Villas at Arlington JOB #: 18-0760
ADDRESS: 18506 Smokey Point Boulevard, Arlington, WA REPORT #: AA019
PERMIT #: 1851, 1852, 1853, 1854, 1856 DATE: 8/19/2019
CLIENT: Villas at Arlington Partners LLLP PAGE #: 1 of 1
CONTRACTOR: Exxel Pacific INSPECTOR: Tim Martin
Item(s) Inspected Location
Epoxied Anchor Bolts for Holdowns Building D, E, F, G, J (Each End of Entry Party Walls)
Reference Drawing(s): RFI #43, Structural Drawings
Item(s) Inspected Comments
Base Material Condition Fully Cured Concrete, 63º
Drill Bit Type Drilled Prior
Hole Diameter/Depth 3/4", 9"
Hole Cleanliness Blown, Brushed & Blown Clean
Anchor Spacing/Edge Distance NA
Anchor Type Threaded Rod
Anchor Diameter/Length 5/8", 14"
Anchor Embedment 9"
Adhesive Type Hilti Hit HY-200 R
Adhesive Expiration Date 2/2020
Adhesive ICC-ES Report 3187
Other
The above items were conforming Nonconforming Items (see below)
Comments: GeoTest was on site as requested to inspect the installation of the anchor bolts. The contractor
followed the manufacturer’s published instructions. The anchors were found to conform with the RFI and with
the project drawings.
COPIES: brian.j.anderson7@gmail.com, charliesr@cmaarch.com, chumphrey@safebuilt.com, cobyj@exxelpacific.com, Reviewed by
davidb@exxelpacific.com, davidh@exxelpacific.com, dennist@cgengineering.com, dspencer@safebuilt.com, jaredu@cg
engineering.com, jkim@avscommunities.com, jonr@exxelpacific.com ...and 5 more.
This report shall not be reproduced except in full, without the written approval of GeoTest Services, Inc.
Concrete Inspection & Compressive Strength Test Report
PROJECT: The Villas at Arlington JOB #: 18-0760
ADDRESS: 18506 Smokey Point Boulevard, Arlington, WA REPORT #: CB018
PERMIT #: 1851, 1853 DATE: 4/3/2019
CLIENT: Villas at Arlington Partners LLLP PAGE #: 1 of 2
CONTRACTOR: Exxel Pacific INSPECTOR: Joel Morder
Placement Location: Building D Stem Walls and Plinth Bases, Building F Perimeter and Plinth Footings
Sample Location: Building F Plinth Bases
Field Data: Eq. No.
Supplier Miles Sand and Gravel Company Slump, in. (C143) 5.00 15
Mix # 02550C Air Content, % (C231) NT
Mix Description 7/8" Aggregate Unit Weight, pcf (C138) NT
Truck/Ticket # C141 / 220086 Air/Mix Temp.,°F (C1064) 58 / 60 JM5
Strength Required 3000 psi at 28 days Field Cure Temperature, °F
Quantity Placed, cy 80 Cure Method - Initial / Final Container / Water Tank
Time Batched 9:20 AM Water Added on Job, gals 0
Time Sampled 9:40 AM Water Requested by
Laboratory Data:
Lab Test Age Test Total Load Avg.D Area Compressive
No. (Days) Date (lbs) (in) (in²) Strength (psi)
93984 7 04-10 59820 4.02 12.69 4710 TYPE 2:
93985 28 05-01 77500 4.00 12.57 6170 TYPE 2:
93986 28 05-01 77370 4.00 12.57 6160 TYPE 2:
93987 28 05-01 78730 4.00 12.57 6260 TYPE 2:
93988 30 05-03 73590 4.01 12.63 5830 TYPE 2:
Reinforcement Inspection Yes n/a: not applicable Specimen Size 4" X 8"
Reinforcement Conforms Yes n/t: not tested Test Reference ASTM C31/C39/C1231
Comments: GeoTest was on site for inspection of the items referenced above. Reinforcing
steel was reviewed per schedule on S3.1 for the footings, 7/S4.1 for the stem walls and
12/S4.1 for the plinths. Concrete was placed via pump and was consolidated through
mechanical vibration. All items inspected were in conformance with the approved plans and
drawings.
COPIES: brian.j.anderson7@gmail.com, charliesr@cmaarch.com, chumphrey@safebuilt.com, cobyj@exxelpacific.com, Reviewed by
davidb@exxelpacific.com, davidh@exxelpacific.com, dennist@cgengineering.com, dspencer@safebuilt.com, jaredu@cg
engineering.com, jkim@avscommunities.com, jonr@exxelpacific.com ...and 6 more.
This report shall not be reproduced except in full, without the written approval of GeoTest Services, Inc.
The above test results relate to the sample (or location) tested.
Concrete Inspection & Compressive Strength Test Report
PROJECT: The Villas at Arlington JOB #: 18-0760
CLIENT: Villas at Arlington Partners LLLP REPORT #: CB018
CONTRACTOR: Exxel Pacific PAGE #: 2 of 2
Concrete Placement and
Consolidation in Progress
Concrete Inspection & Compressive Strength Test Report
PROJECT: The Villas at Arlington JOB #: 18-0760
ADDRESS: 18506 Smokey Point Boulevard, Arlington, WA REPORT #: CB021
PERMIT #: 1854, 1853 DATE: 4/10/2019
CLIENT: Villas at Arlington Partners LLLP PAGE #: 1 of 2
CONTRACTOR: Exxel Pacific INSPECTOR: Joel Morder
Placement Location: Building F Stem Walls and Plinth Bases, Building G Perimeter and Plinth Footings
Sample Location: Building F Stem Walls, First Load, Middle of the Batch
Field Data: Eq. No.
Supplier Miles Sand and Gravel Company Slump, in. (C143) 6.00 15
Mix # 02550C Air Content, % (C231) NT
Mix Description 7/8" Aggregate Unit Weight, pcf (C138) NT
Truck/Ticket # C143 / 615720 Air/Mix Temp.,°F (C1064) 57 / 61 JM1
Strength Required 3000 psi at 28 days Field Cure Temperature, °F
Quantity Placed, cy 70 Cure Method - Initial / Final Container / Moist Room
Time Batched 8:15 AM Water Added on Job, gals 10
Time Sampled 9:10 AM Water Requested by Pump operator
Laboratory Data:
Lab Test Age Test Total Load Avg.D Area Compressive
No. (Days) Date (lbs) (in) (in²) Strength (psi)
94297 7 04-17 49250 4.01 12.63 3900 TYPE 2:
94298 28 05-08 60410 4.01 12.63 4780 TYPE 3:
94299 28 05-08 66620 4.01 12.63 5270 TYPE 5:
94300 28 05-08 67470 4.01 12.63 5340 TYPE 2:
94301 Hold 00-00 0 0.00 0.00 0
Reinforcement Inspection Yes n/a: not applicable Specimen Size 4" X 8"
Reinforcement Conforms Yes n/t: not tested Test Reference ASTM C31/C39/C1231
Comments: GeoTest on site for inspection of the above-referenced items. Reviewed
reinforcing steel per structural drawings. Concrete was placed by pump and consolidated
through mechanical vibration. All items were in conformance with approved plans and
drawings.
COPIES: brian.j.anderson7@gmail.com, charliesr@cmaarch.com, chumphrey@safebuilt.com, cobyj@exxelpacific.com, Reviewed by
davidb@exxelpacific.com, davidh@exxelpacific.com, dennist@cgengineering.com, dspencer@safebuilt.com, jaredu@cg
engineering.com, jkim@avscommunities.com, jonr@exxelpacific.com ...and 6 more.
This report shall not be reproduced except in full, without the written approval of GeoTest Services, Inc.
The above test results relate to the sample (or location) tested.
Concrete Inspection & Compressive Strength Test Report
PROJECT: The Villas at Arlington JOB #: 18-0760
CLIENT: Villas at Arlington Partners LLLP REPORT #: CB021
CONTRACTOR: Exxel Pacific PAGE #: 2 of 2
Cconcrete Placement and
Consolidation in Progress
Concrete Inspection & Compressive Strength Test Report
PROJECT: The Villas at Arlington JOB #: 18-0760
ADDRESS: 18506 Smokey Point Boulevard, Arlington, WA REPORT #: CB031
PERMIT #: 1853 DATE: 5/3/2019
CLIENT: Villas at Arlington Partners LLLP PAGE #: 1 of 1
CONTRACTOR: Exxel Pacific INSPECTOR: Joel Morder
Placement Location: Building F Exterior Patios and Entrances
Sample Location: SW Patios, First Load, Middle of the Batch
Field Data: Eq. No.
Supplier Miles Sand and Gravel Company Slump, in. (C143) 5.00 15
Mix # 0260A6C Air Content, % (C231) 4.6 8
Mix Description 7/8" Aggregate, 5.8 Sack Unit Weight, pcf (C138) NT
Truck/Ticket # C116 / 615977 Air/Mix Temp.,°F (C1064) 49 / 61 JM1
Strength Required 3000 psi at 28 days Field Cure Temperature, °F 48 / 78
Quantity Placed, cy 30 Cure Method - Initial / Final Container / Water Tank
Time Batched 7:14 AM Water Added on Job, gals 0
Time Sampled 8:05 AM Water Requested by
Laboratory Data:
Lab Test Age Test Total Load Avg.D Area Compressive
No. (Days) Date (lbs) (in) (in²) Strength (psi)
95497 7 05-10 67230 4.01 12.63 5320 TYPE 3:
95498 28 05-31 76390 4.01 12.63 6050 TYPE 2:
95499 28 05-31 75940 4.01 12.63 6010 TYPE 2:
95500 28 05-31 75450 4.01 12.63 5970 TYPE 2:
95501 Hold 00-00 0 0.00 0.00 0
Reinforcement Inspection Yes n/a: not applicable Specimen Size 4" X 8"
Reinforcement Conforms Yes n/t: not tested Test Reference ASTM C31/C39/C1231
Comments: GeoTest on site for inspection of concrete placed for the locations referenced above. Concrete was
placed by pump and consolidated through mechanical vibration.
COPIES: brian.j.anderson7@gmail.com, charliesr@cmaarch.com, chumphrey@safebuilt.com, cobyj@exxelpacific.com, Reviewed by
davidb@exxelpacific.com, davidh@exxelpacific.com, dennist@cgengineering.com, dspencer@safebuilt.com, jaredu@cg
engineering.com, jkim@avscommunities.com, jonr@exxelpacific.com ...and 6 more.
This report shall not be reproduced except in full, without the written approval of GeoTest Services, Inc.
The above test results relate to the sample (or location) tested.
Concrete Inspection & Compressive Strength Test Report
PROJECT: The Villas at Arlington JOB #: 18-0760
ADDRESS: 18506 Smokey Point Boulevard, Arlington, WA REPORT #: CB032
PERMIT #: 1853 DATE: 5/3/2019
CLIENT: Villas at Arlington Partners LLLP PAGE #: 1 of 2
CONTRACTOR: Exxel Pacific INSPECTOR: Joel Morder
Placement Location: Building F Slab on Grade
Sample Location: West Half of Slab, First Load, Middle of the Batch
Field Data: Eq. No.
Supplier Miles Sand and Gravel Company Slump, in. (C143) 5.00 15
Mix # 02550C Air Content, % (C231) NT
Mix Description 7/8" Aggregate, 5.5 Sack Unit Weight, pcf (C138) NT
Truck/Ticket # C058 / 221867 Air/Mix Temp.,°F (C1064) 50 / 62 JM5
Strength Required 3000 psi at 28 days Field Cure Temperature, °F 48 / 78
Quantity Placed, cy 95 Cure Method - Initial / Final Container / Water Tank
Time Batched 8:08 AM Water Added on Job, gals 0
Time Sampled 8:55 AM Water Requested by
Laboratory Data:
Lab Test Age Test Total Load Avg.D Area Compressive
No. (Days) Date (lbs) (in) (in²) Strength (psi)
95502 7 05-10 58000 4.01 12.63 4590 TYPE 3:
95503 28 05-31 67900 4.01 12.63 5380 TYPE 3:
95504 28 05-31 70090 4.01 12.63 5550 TYPE 2:
95505 28 05-31 68630 4.01 12.63 5430 TYPE 2:
95506 Hold 00-00 0 0.00 0.00 0
Reinforcement Inspection Yes n/a: not applicable Specimen Size 4" X 8"
Reinforcement Conforms Yes n/t: not tested Test Reference ASTM C31/C39/C1231
Comments: GeoTest on site for inspection of the slab referenced above. Reviewed reinforcing
steel in accordance with RFI 34. Concrete was placed by pump and consolidated through
mechanical vibration. All elements inspected were in conformance with approved plans and
drawings.
COPIES: brian.j.anderson7@gmail.com, charliesr@cmaarch.com, chumphrey@safebuilt.com, cobyj@exxelpacific.com, Reviewed by
davidb@exxelpacific.com, davidh@exxelpacific.com, dennist@cgengineering.com, dspencer@safebuilt.com, jaredu@cg
engineering.com, jkim@avscommunities.com, jonr@exxelpacific.com ...and 6 more.
This report shall not be reproduced except in full, without the written approval of GeoTest Services, Inc.
The above test results relate to the sample (or location) tested.
Concrete Inspection & Compressive Strength Test Report
PROJECT: The Villas at Arlington JOB #: 18-0760
CLIENT: Villas at Arlington Partners LLLP REPORT #: CB032
CONTRACTOR: Exxel Pacific PAGE #: 2 of 2
Concrete Placement and
Consolidation in Progress
Concrete Inspection & Compressive Strength Test Report
PROJECT: The Villas at Arlington JOB #: 18-0760
ADDRESS: 18506 Smokey Point Boulevard, Arlington, WA REPORT #: CB056
PERMIT #: 1853, 1851, 1883 DATE: 7/12/2019
CLIENT: Villas at Arlington Partners LLLP PAGE #: 1 of 1
CONTRACTOR: Exxel Pacific INSPECTOR: Joel Morder
Placement Location: Garage 6, Garage 4, and Bus Stop Stem Walls
Sample Location: Garage 6, First Load, Middle of the Batch
Field Data: Eq. No.
Supplier Miles Sand and Gravel Company Slump, in. (C143) 6.00 15
Mix # 02550C Air Content, % (C231) NT
Mix Description 7/8" Agg, 5.5 Sack Unit Weight, pcf (C138) NT
Truck/Ticket # C011 / 124192 Air/Mix Temp.,°F (C1064) 73 / 74 JM3
Strength Required 4000 psi at 28 days Field Cure Temperature, °F NT
Quantity Placed, cy 20 Cure Method - Initial / Final Container / Water Tank
Time Batched 1:13 PM Water Added on Job, gals 10
Time Sampled 2:10 PM Water Requested by Contractor
Laboratory Data:
Lab Test Age Test Total Load Avg.D Area Compressive
No. (Days) Date (lbs) (in) (in²) Strength (psi)
98840 7 07-19 52380 4.00 12.57 4170 TYPE 2:
98841 28 08-09 65540 4.00 12.57 5210 TYPE 2:
98842 28 08-09 64680 4.00 12.57 5150 TYPE 2:
98843 28 08-09 62660 4.00 12.57 4980 TYPE 2:
98844 Hold 00-00 0 0.00 0.00 0
Reinforcement Inspection Yes n/a: not applicable Specimen Size 4" X 8"
Reinforcement Conforms Yes n/t: not tested Test Reference ASTM C31/C39/C1231
Comments: GeoTest on-site for inspection of the stem walls referenced above. Reinforcing steel was inspected
per detail 8/S4.1. Concrete was placed by pump and consolidated through vibration. All elements inspected
were in conformance with approved plans and drawings.
COPIES: brian.j.anderson7@gmail.com, charliesr@cmaarch.com, chumphrey@safebuilt.com, cobyj@exxelpacific.com, Reviewed by
davidb@exxelpacific.com, davidh@exxelpacific.com, dennist@cgengineering.com, dspencer@safebuilt.com, jaredu@cg
engineering.com, jkim@avscommunities.com, jonr@exxelpacific.com ...and 6 more.
This report shall not be reproduced except in full, without the written approval of GeoTest Services, Inc.
The above test results relate to the sample (or location) tested.
741 Marine Drive, Bellingham, WA 98225 www.geotest-inc.com
20611 67th Ave. NE. Unit A. Arlington, WA 98223
phone: (360) 733.7318 toll free: (888) 251.5276 fax: (360) 733.7418
FIELD DENSITY/MOISTURE REPORT
Nuclear Gauge * ASTM D6938
PROJECT: The Villas at Arlington JOB #: 18-0760
ADDRESS: 18506 Smokey Point Boulevard, Arlington, WA REPORT #: FD031
PERMIT #: Building D 1851, Building F 1853 DATE: 2/25/2019
CLIENT: Villas at Arlington Partners LLLP PAGE #: 1 of 2
CONTRACTOR: Exxel Pacific INSPECTOR: Harrison Simons
Compaction Of: Structural Fill Within Building Pads D and F
Field Data:
Depth/ DT/ Wet Field Dry Compaction
Test Location Elev BS Density Moisture Density Lab % Pass/
# (ft) (in) (pcf) (%) (pcf) # Attained Required Fail
1 Building D Footprint - East TOG DT/8 134.4 13.6 118.3 1 89 95 F
2 Building D Footprint - Central TOG DT/8 130.1 8.0 120.5 1 91 95 F
3 Building D Footprint - West TOG DT/12 139.0 11.2 125.0 1 94 95 F
4 Building F Footprint - Central TOG DT/12 132.5 8.1 122.6 2 96 95 P
5 Building F Footprint - Central TOG DT/12 131.9 9.0 121.0 2 95 95 P
6 Building F Footprint - Central TOG DT/12 132.5 8.5 122.1 2 96 95 P
Lab Max. Dry Optimum Retained
Sample Soil Type Source Density Moisture On #4 Test
# (pcf) (%) (%) Method
1-4330A Select Borrow Imported from Vienna 132.8 7.9 13 ASTM D1557/D4718
2-4332A Structural Fill Lenz Enterprises (D-255) 127.2 9.6 ASTM D1557/D4718
3- 0.0 None
Gauge Make/Model/Serial#: Instrotek / 3500 / 1505 M/D Standard Count: 722/2362
Comments: See comments on page 2.
COPIES: brian.j.anderson7@gmail.com, charliesr@cmaarch.com, chumphrey@safebuilt.com, cobyj@exxelpacific.com, Reviewed by
daveb@exxelpacific.com, dennist@cgengineering.com, dspencer@safebuilt.com, jaredu@cgengineering.com, jkim@avsc
ommunities.com, jonr@exxelpacific.com, kolander@arlingtonwa.gov ...and 5 more.
This report shall not be reproduced except in full, without the written approval of GeoTest Services, Inc.
The above test results relate only to the sample (or location) tested.
741 Marine Drive, Bellingham, WA 98225 www.geotest-inc.com
20611 67th Ave. NE. Unit A. Arlington, WA 98223
phone: (360) 733.7318 toll free: (888) 251.5276 fax: (360) 733.7418
FIELD DENSITY/MOISTURE REPORT
Nuclear Gauge * ASTM D6938
PROJECT: The Villas at Arlington JOB #: 18-0760
CLIENT: Villas at Arlington Partners LLLP REPORT #: FD031
CONTRACTOR: Exxel Pacific PAGE #: 2 of 2
TOG - Top of Existing Grade.
Tests for Building D were conducted near the proposed subgrade elevation for the building.
Tests for Building F were conducted at approximately -2.5’ from proposed subgrade elevation
(according to the contractor)
GeoTest Services was on-site to provide in-place soil density and moisture testing on structural
fill that had been placed and compacted within the building footprint for Buildings D and F.
Compaction tests had attained the required compaction within the Building F footprint but had
not attained the required compaction within the Building D footprint. Structural fill within
Building Pad D was generally over the optimum moisture contents.
This test report has been marked discrepant because structural fill placed within the Building D
footprint had failed to attain the required compaction.
741 Marine Drive, Bellingham, WA 98225 www.geotest-inc.com
20611 67th Ave. NE. Unit A. Arlington, WA 98223
phone: (360) 733.7318 toll free: (888) 251.5276 fax: (360) 733.7418
FIELD DENSITY/MOISTURE REPORT
Nuclear Gauge * ASTM D6938
PROJECT: The Villas at Arlington JOB #: 18-0760
ADDRESS: 18506 Smokey Point Boulevard, Arlington, WA REPORT #: FD032
PERMIT #: 1851, 1853 DATE: 2/26/2019
CLIENT: Villas at Arlington Partners LLLP PAGE #: 1 of 2
CONTRACTOR: Exxel Pacific INSPECTOR: Joel Morder
Compaction Of: Building D and F Pad Base
Field Data:
Depth/ DT/ Wet Field Dry Compaction
Test Location Elev BS Density Moisture Density Lab % Pass/
# (ft) (in) (pcf) (%) (pcf) # Attained Required Fail
1 BLDG F, East Half 1’6" 12 133.8 7.2 124.8 1 98 95
P
2 BLDG F, West Half -3 12 134.6 8.0 124.6 1 98 95 P
3 BLDG D, NW Quadrant -3 12 139.1 11.3 124.9 2 94 95 F
4 BLDG D, NE Quadrant FSG 12 118.9 5.5 112.7 2 85 95 F
Lab Max. Dry Optimum Retained
Sample Soil Type Source Density Moisture On #4 Test
# (pcf) (%) (%) Method
1-4332A Select Borrow Lenz Enterprises 127.2 9.6 17 ASTM D1557
2-4330A Gravel Borrow Vienna 132.8 7.5 13 ASTM D1557
3- 0.0 None
Gauge Make/Model/Serial#: InstroTek/ 3500/BG164 M/D Standard Count: 430/3124
Comments: GeoTest on site for nuclear density testing of the building pads for buildings D and
F. Soils were compacted with a vibratory roller. AMENDED 3/1/19: Please see FD033 for
passing retest results.
COPIES: brian.j.anderson7@gmail.com, charliesr@cmaarch.com, chumphrey@safebuilt.com, cobyj@exxelpacific.com, Reviewed by
davidb@exxelpacific.com, davidh@exxelpacific.com, dennist@cgengineering.com, dspencer@safebuilt.com, jaredu@cg
engineering.com, jkim@avscommunities.com, jonr@exxelpacific.com ...and 6 more.
This report shall not be reproduced except in full, without the written approval of GeoTest Services, Inc.
The above test results relate only to the sample (or location) tested.
741 Marine Drive, Bellingham, WA 98225 www.geotest-inc.com
20611 67th Ave. NE. Unit A. Arlington, WA 98223
phone: (360) 733.7318 toll free: (888) 251.5276 fax: (360) 733.7418
FIELD DENSITY/MOISTURE REPORT
Nuclear Gauge * ASTM D6938
PROJECT: The Villas at Arlington JOB #: 18-0760
CLIENT: Villas at Arlington Partners LLLP REPORT #: FD032
CONTRACTOR: Exxel Pacific PAGE #: 2 of 2
Compaction of Subgrade for
Building D Pad
741 Marine Drive, Bellingham, WA 98225 www.geotest-inc.com
20611 67th Ave. NE. Unit A. Arlington, WA 98223
phone: (360) 733.7318 toll free: (888) 251.5276 fax: (360) 733.7418
FIELD DENSITY/MOISTURE REPORT
Nuclear Gauge * ASTM D6938
PROJECT: The Villas at Arlington JOB #: 18-0760
ADDRESS: 18506 Smokey Point Boulevard, Arlington, WA REPORT #: FD034
PERMIT #: BLDG Permit #1851 and BLDG Permit #1853 DATE: 2/28/2019
CLIENT: Villas at Arlington Partners LLLP PAGE #: 1 of 2
CONTRACTOR: Exxel Pacific INSPECTOR: Suzie Miller
Compaction Of: Subgrade of Building D and Building F
Field Data:
Depth/ DT/ Wet Field Dry Compaction
Test Location Elev BS Density Moisture Density Lab % Pass/
# (ft) (in) (pcf) (%) (pcf) # Attained Required Fail
1 West Side of Pad D -1.5 DT/12 131.5 8.0 121.7 1 96 95 P
2 East Side of Pad F -0.5 DT/6 131.0 8.3 120.9 1 95 95 P
3 Middle of Pad F -2.0 DT/12 131.7 7.3 122.7 1 96 95 P
4 West Side of Pad F -3.0 DT/8 134.3 8.0 124.4 1 98 95 P
Lab Max. Dry Optimum Retained
Sample Soil Type Source Density Moisture On #4 Test
# (pcf) (%) (%) Method
1-4332A Select Borrow Lenz Enterprises (D-255) 127.2 9.6 17 ASTM D1557/D4718
2- 0.0 None
3- 0.0 None
Gauge Make/Model/Serial#: Instrotek/3500/2082 M/D Standard Count: 403/3142
Comments: See comments on page 2.
COPIES: brian.j.anderson7@gmail.com, charliesr@cmaarch.com, chumphrey@safebuilt.com, cobyj@exxelpacific.com, Reviewed by
davidb@exxelpacific.com, davidh@exxelpacific.com, dennist@cgengineering.com, dspencer@safebuilt.com, jaredu@cg
engineering.com, jkim@avscommunities.com, jonr@exxelpacific.com ...and 6 more.
This report shall not be reproduced except in full, without the written approval of GeoTest Services, Inc.
The above test results relate only to the sample (or location) tested.
741 Marine Drive, Bellingham, WA 98225 www.geotest-inc.com
20611 67th Ave. NE. Unit A. Arlington, WA 98223
phone: (360) 733.7318 toll free: (888) 251.5276 fax: (360) 733.7418
FIELD DENSITY/MOISTURE REPORT
Nuclear Gauge * ASTM D6938
PROJECT: The Villas at Arlington JOB #: 18-0760
CLIENT: Villas at Arlington Partners LLLP REPORT #: FD034
CONTRACTOR: Exxel Pacific PAGE #: 2 of 2
All locations and elevations are approximate and provided by the contractor.
GeoTest was onsite, as requested to provide in-place density testing on the structural fill of the
building pads for buildings D and F.
Prior to GeoTest’s arrival, the structural fill had been placed and partially compacted. While
GeoTest was on site, the structural fill of building F was compacted with an Ingersollrand
SD-70D single drum vibrating roller. All tests met compaction requirements.
GeoTest noted that pumping underfoot was felt on the western section of building pad D.
Pumping was observed with light foot traffic.
Figure 1 - Compaction of
Building Pad F
741 Marine Drive, Bellingham, WA 98225 www.geotest-inc.com
20611 67th Ave. NE. Unit A. Arlington, WA 98223
phone: (360) 733.7318 toll free: (888) 251.5276 fax: (360) 733.7418
FIELD DENSITY/MOISTURE REPORT
Nuclear Gauge * ASTM D6938
PROJECT: The Villas at Arlington JOB #: 18-0760
ADDRESS: 18506 Smokey Point Boulevard, Arlington, WA REPORT #: FD036
PERMIT #: 1853, 1854, 1862 DATE: 3/4/2019
CLIENT: Villas at Arlington Partners LLLP PAGE #: 1 of 2
CONTRACTOR: Exxel Pacific INSPECTOR: Tristan Coragiulo
Compaction Of: Building Pads F, G, and P
Field Data:
Depth/ DT/ Wet Field Dry Compaction
Test Location Elev BS Density Moisture Density Lab % Pass/
# (ft) (in) (pcf) (%) (pcf) # Attained Required Fail
1 See Figure 1 TOG DT/12 127.3 10.8 114.9 1 102 95 P
2 See Figure 1 TOG DT/12 117.9 9.1 108.1 1 96 95 P
3 See Figure 1 TOG DT/12 126.8 12.4 112.8 1 100 95 P
4 See Figure 1 TOG DT/12 120.9 9.6 110.3 1 98 95 P
5 Building F, Eastern Third TOG DT/12 135.2 6.7 126.6 2 100 95 P
6 Building F, Middle Third -.5 DT/12 132.2 8.1 122.2 2 96 95 P
7 Building G, NW Quadrant -2 DT/12 132.6 5.9 125.2 2 98 95 P
8 Building G, NE Quadrant -2 DT/12 131.3 6.7 123.1 2 97 95 P
9 Building G, SE Quadrant -2.5 DT/12 129.9 6.9 121.5 2 96 95 P
10 Building G, SW Quadrant -2.5 DT/12 131.0 7.1 122.3 2 96 95 P
Lab Max. Dry Optimum Retained
Sample Soil Type Source Density Moisture On #4 Test
# (pcf) (%) (%) Method
1-4282A SP Native 112.6 13.9 5 ASTM D1557/D4718
2-4332A SP with Gravel Lenz Enterprises Pit (D-255) 127.2 9.6 17 ASTM D1557/D4718
3- 0.0 None
Gauge Make/Model/Serial#: Instro/3500/2082 M/D Standard Count: 403/3174
Comments: Please see page 2 for comments.
COPIES: brian.j.anderson7@gmail.com, charliesr@cmaarch.com, chumphrey@safebuilt.com, cobyj@exxelpacific.com, Reviewed by
davidb@exxelpacific.com, davidh@exxelpacific.com, dennist@cgengineering.com, dspencer@safebuilt.com, jaredu@cg
engineering.com, jkim@avscommunities.com, jonr@exxelpacific.com ...and 6 more.
This report shall not be reproduced except in full, without the written approval of GeoTest Services, Inc.
The above test results relate only to the sample (or location) tested.
741 Marine Drive, Bellingham, WA 98225 www.geotest-inc.com
20611 67th Ave. NE. Unit A. Arlington, WA 98223
phone: (360) 733.7318 toll free: (888) 251.5276 fax: (360) 733.7418
FIELD DENSITY/MOISTURE REPORT
Nuclear Gauge * ASTM D6938
PROJECT: The Villas at Arlington JOB #: 18-0760
CLIENT: Villas at Arlington Partners LLLP REPORT #: FD036
CONTRACTOR: Exxel Pacific PAGE #: 2 of 2
TOG -Top of Grade
GeoTest was on-site as requested to provide in-place density testing at the above locations. All
locations and elevations are approximate and were provided by the contractor.
Tests 1 - 4 were taken at the request of the contractor on Building Pad P (Figure1). Prior to our
arrival, the soil in these areas had been re-worked and compacted with a plate compactor, per
the contractor. The material that was tested was comprised of mostly native fill. Tests 5-10
were taken on imported, graded, and compacted structural fill for Building Pads F and G.
Compaction was achieved in these areas with a single-drum vibratory roller.
All tests taken on this date met compaction requirements. These compacted soils exhibited
firm and unyielding conditions with optimum moisture contents.
GeoTest will return for further inspection and observation as requested.
Figure 1. In-place density
testing locations of re-worked
structural fill for Building P.
Inspection Report
PROJECT: The Villas at Arlington JOB #: 18-0760
ADDRESS: 18506 Smokey Point Boulevard, Arlington, WA REPORT #: IR012
PERMIT #: 1853 DATE: 5/1/2019
CLIENT: Villas at Arlington Partners LLLP PAGE #: 1 of 1
CONTRACTOR: Exxel Pacific INSPECTOR: Tim Martin
INSPECTION OF:
Reinforcing Steel Placement - Building F
Comments: GeoTest was on site as requested to inspect the placement of the reinforcing steel at the following
location.
Building F: Slab on grade with interior wall footings and interior column pads.
The steel reinforcement was in place and except for the following item was found to be in conformance with
the project structural drawings.
At some edge locations, the first bar running adjacent with the stem wall is 10 to 16 inches off the wall.
The first bar off the stem wall needs to be within a few inches of the edge of the wall. The contractor was
notified of this issue.
Drawings referenced:
S1.1, Structural Notes, and Reinforcement Schedules
S2.5.1, Foundation Notes, Holdown Types
S3.1, Footing, Shear Wall and Holdown Schedules
S4.1, Details
RFI #34, #3 Bar vs. WWM
See GeoTests Adhesive Anchor report AA010 for reinforcement at the interior footing to perimeter foundation
wall intersections.
AMENDED 5/6/19: Please see CB032 for conforming reinspection.
COPIES: brian.j.anderson7@gmail.com, charliesr@cmaarch.com, chumphrey@safebuilt.com, cobyj@exxelpacific.com, Reviewed by
davidb@exxelpacific.com, davidh@exxelpacific.com, dennist@cgengineering.com, dspencer@safebuilt.com, jaredu@cg
engineering.com, jkim@avscommunities.com, jonr@exxelpacific.com ...and 5 more.
This report shall not be reproduced except in full, without the written approval of GeoTest Services, Inc.
LATERAL FRAMING INSPECTION REPORT
PROJECT: The Villas at Arlington JOB #: 18-0760
ADDRESS: 18506 Smokey Point Boulevard, Arlington, WA REPORT #: LF026
PERMIT #: B-1849, D-1851, E-1852, F-1853 DATE: 5/21/2019
CLIENT: Villas at Arlington Partners LLLP PAGE #: 1 of 1
CONTRACTOR: Exxel Pacific INSPECTOR: Tim Martin
Item(s) Inspected Location
Floor Diaphragm, Sheathing Buildings B, D and F 3rd Floor
Shear Wall Sheathing Building E, 2nd Level Entry Wall
Reference Drawings: Structural Drawing
Items Inspected Comments
Lumber grade, species, size
Structural panel grade and thickness, glue Sturdi-Floor, 23/32", Exp.1 (Walls Rated Sheathing 15/32" Exp.1)
Shear wall/diaphragm length, location Per Plan at Above Locations
Panel edges bear on framing members Where Required
Diaphragm chord, drag strut, braces and related
Connection of blocking to wall top plates
Gypsum board with wood framing conforms
3" nom. framing in place, nails staggered where shown
Foundation plates or sills on concrete are treated
Base-plate bolting complies
Nail diameter, length, number of lines, spacing .148" X 2-1/4", 6 & 10"
Pneumatic or mechanically driven fasteners conform
Nail heads driven flush Satisfactory
Hold down, type, location
Lag bolts/proper hole size
Cold-formed framing-proper size, gage, spacing
Screw type, spacing, driven flush
Cold-formed welding conforms (AWS D1.1 and D1.3)
Other
The above items were conforming Nonconforming Items (see below)
Comments: Geotest was on site as requested to inspect the above items. The sheathing at the locations was
found to be in conformance with the project structural drawings.
COPIES: brian.j.anderson7@gmail.com, charliesr@cmaarch.com, chumphrey@safebuilt.com, cobyj@exxelpacific.com, Reviewed by
davidb@exxelpacific.com, davidh@exxelpacific.com, dennist@cgengineering.com, dspencer@safebuilt.com, jaredu@cg
engineering.com, jkim@avscommunities.com, jonr@exxelpacific.com ...and 5 more.
This report shall not be reproduced except in full, without the written approval of GeoTest Services, Inc.
LATERAL FRAMING INSPECTION REPORT
PROJECT: The Villas at Arlington JOB #: 18-0760
ADDRESS: 18506 Smokey Point Boulevard, Arlington, WA REPORT #: LF028
PERMIT #: 1853 DATE: 5/24/2019
CLIENT: Villas at Arlington Partners LLLP PAGE #: 1 of 1
CONTRACTOR: Exxel Pacific INSPECTOR: Tim Martin
Item(s) Inspected Location
Shear Wall Sheathing Building F, Second Level Entry Walls
Reference Drawings: Structural Drawings
Items Inspected Comments
Lumber grade, species, size
Structural panel grade and thickness, glue Rated Sheathing, 15/32" . EXP.1
Shear wall/diaphragm length, location
Panel edges bear on framing members
Diaphragm chord, drag strut, braces and related
Connection of blocking to wall top plates
Gypsum board with wood framing conforms
3" nom. framing in place, nails staggered where shown
Foundation plates or sills on concrete are treated
Base-plate bolting complies
Nail diameter, length, number of lines, spacing .148 X 2-1/4", Per Plan
Pneumatic or mechanically driven fasteners conform
Nail heads driven flush Satisfactory
Hold down, type, location
Lag bolts/proper hole size
Cold-formed framing-proper size, gage, spacing
Screw type, spacing, driven flush
Cold-formed welding conforms (AWS D1.1 and D1.3)
Other
The above items were conforming Nonconforming Items (see below)
Comments: GeoTest was on site as requested to inspect the above items.
The sheathing and fasteners at the above shear walls were found to be in conformance with the project
structural drawings.
COPIES: brian.j.anderson7@gmail.com, charliesr@cmaarch.com, chumphrey@safebuilt.com, cobyj@exxelpacific.com, Reviewed by
davidb@exxelpacific.com, davidh@exxelpacific.com, dennist@cgengineering.com, dspencer@safebuilt.com, jaredu@cg
engineering.com, jkim@avscommunities.com, jonr@exxelpacific.com ...and 5 more.
This report shall not be reproduced except in full, without the written approval of GeoTest Services, Inc.
LATERAL FRAMING INSPECTION REPORT
PROJECT: The Villas at Arlington JOB #: 18-0760
ADDRESS: 18506 Smokey Point Boulevard, Arlington, WA REPORT #: LF037
PERMIT #: 1852, 1853, 1863 DATE: 6/7/2019
CLIENT: Villas at Arlington Partners LLLP PAGE #: 1 of 1
CONTRACTOR: Exxel Pacific INSPECTOR: Tim Martin
Item(s) Inspected Location
Floor Diaphragm: Sheathing Building F, 3rd Level
Shear Walls: Sheathing Building E, 1st Level Entry Walls
Final Framing (In Progress Inspection) Building Q, 1st, 2nd & 3rd Levels
Reference Drawings: Structural Drawings
Items Inspected Comments
Lumber grade, species, size D-Fir #2
Structural panel grade and thickness, glue Per Plan
Shear wall/diaphragm length, location Per Plan
Panel edges bear on framing members Where Required
Diaphragm chord, drag strut, braces and related
Connection of blocking to wall top plates
Gypsum board with wood framing conforms
3" nom. framing in place, nails staggered where shown
Foundation plates or sills on concrete are treated
Base-plate bolting complies
Nail diameter, length, number of lines, spacing Per Framing Notes and SW Schedule
Pneumatic or mechanically driven fasteners conform
Nail heads driven flush Satisfactory
Hold down, type, location
Lag bolts/proper hole size
Cold-formed framing-proper size, gage, spacing
Screw type, spacing, driven flush
Cold-formed welding conforms (AWS D1.1 and D1.3)
Other
The above items were conforming Nonconforming Items (see below)
Comments: GeoTest was on site as requested to inspect the above items.
The items listed on this report were found to be in conformance with the project drawings. Building Q is in
progress. A follow-up inspection is required.
COPIES: brian.j.anderson7@gmail.com, charliesr@cmaarch.com, chumphrey@safebuilt.com, cobyj@exxelpacific.com, Reviewed by
davidb@exxelpacific.com, davidh@exxelpacific.com, dennist@cgengineering.com, dspencer@safebuilt.com, jaredu@cg
engineering.com, jkim@avscommunities.com, jonr@exxelpacific.com ...and 5 more.
This report shall not be reproduced except in full, without the written approval of GeoTest Services, Inc.
LATERAL FRAMING INSPECTION REPORT
PROJECT: The Villas at Arlington JOB #: 18-0760
ADDRESS: 18506 Smokey Point Boulevard, Arlington, WA REPORT #: LF038
PERMIT #: 1851, 1853. 1862, 1863 DATE: 6/10/2019
CLIENT: Villas at Arlington Partners LLLP PAGE #: 1 of 3
CONTRACTOR: Exxel Pacific INSPECTOR: Tim Martin
Item(s) Inspected Location
Shear Wall Sheathing Buildings D and F, 3rd Floor Entry Walls
Final Framing (In Progress Inspection) Building P, 1st Floor and Building Q all Levels
Reference Drawings: Structural Drawings
Items Inspected Comments
Lumber grade, species, size Per Plan
Structural panel grade and thickness, glue Per SW Schedule
Shear wall/diaphragm length, location As Detailed
Panel edges bear on framing members Where Required
Diaphragm chord, drag strut, braces and related As Detailed
Connection of blocking to wall top plates A35 and LTP4 Clips Were in Place
Gypsum board with wood framing conforms
3" nom. framing in place, nails staggered where shown Yes and Yes
Foundation plates or sills on concrete are treated Yes
Base-plate bolting complies Per SW Schedule
Nail diameter, length, number of lines, spacing Per SW Schedule
Pneumatic or mechanically driven fasteners conform
Nail heads driven flush Satisfactory
Hold down, type, location HDU, Per Plan
Lag bolts/proper hole size At Stair Stringer to Landing Connections
Cold-formed framing-proper size, gage, spacing
Screw type, spacing, driven flush
Cold-formed welding conforms (AWS D1.1 and D1.3)
Other
The above items were conforming Nonconforming Items (see below)
Comments: GeoTest was on site as requested to inspect the above items. See below for
additional comments.
COPIES: brian.j.anderson7@gmail.com, charliesr@cmaarch.com, chumphrey@safebuilt.com, cobyj@exxelpacific.com, Reviewed by
davidb@exxelpacific.com, davidh@exxelpacific.com, dennist@cgengineering.com, dspencer@safebuilt.com, jaredu@cg
engineering.com, jkim@avscommunities.com, jonr@exxelpacific.com ...and 5 more.
This report shall not be reproduced except in full, without the written approval of GeoTest Services, Inc.
LATERAL FRAMING INSPECTION REPORT
PROJECT: The Villas at Arlington JOB #: 18-0760
CLIENT: Villas at Arlington Partners LLLP REPORT #: LF038
CONTRACTOR: Exxel Pacific PAGE #: 2 of 3
Many of the stud packs, which
the holdown straps are
connected to, were not nailed
together per detail 3 on sheet
S5.1
Some of the blocks connecting to the first joist were
toenailed but the drawings require three 131 X 3" nails
through the joist and into the end of the blocking.
The contractor is in the process of adding the nails in
accordance with detail 3 on sheet S5.2 of the project
drawings.
LATERAL FRAMING INSPECTION REPORT
PROJECT: The Villas at Arlington JOB #: 18-0760
CLIENT: Villas at Arlington Partners LLLP REPORT #: LF038
CONTRACTOR: Exxel Pacific PAGE #: 3 of 3
Building Q: West End Wall
Plate Damage:
The top and bottom plates
were damaged with drilled
holes. The contractor has
added CS16 strap at these
damaged locations as per the
project engineer directions.
Along with the above three
items, the floor joists adjacent
to the center entry were
installed at 16" on center, but
the drawings require the joist
at these locations to be
spaced at 12" on center.
The contractor will address
this item.
LATERAL FRAMING INSPECTION REPORT
PROJECT: The Villas at Arlington JOB #: 18-0760
ADDRESS: 18506 Smokey Point Boulevard, Arlington, WA REPORT #: LF051
PERMIT #: 1851, 1853, 1855, 1857 DATE: 7/2/2019
CLIENT: Villas at Arlington Partners LLLP PAGE #: 1 of 1
CONTRACTOR: Exxel Pacific INSPECTOR: Tim Martin
Item(s) Inspected Location
Floor Diaphragm Sheathing Buildings H & K, 2nd Level
Roof Diaphragm Sheathing Buildings D & F
Reference Drawings: Structural Drawings
Items Inspected Comments
Lumber grade, species, size
Structural panel grade and thickness, glue Rated Sturd-i-Floor, 23/32" , T&G, Exp.1 . Roof Sheathing, 15/32" Exp.1
Shear wall/diaphragm length, location Per Plan
Panel edges bear on framing members Where Required
Diaphragm chord, drag strut, braces and related
Connection of blocking to wall top plates
Gypsum board with wood framing conforms
3" nom. framing in place, nails staggered where shown
Foundation plates or sills on concrete are treated
Base-plate bolting complies
Nail diameter, length, number of lines, spacing .148 X 2-1/4", Per Plan
Pneumatic or mechanically driven fasteners conform
Nail heads driven flush Roof Sheathing: Contractor Added Nails at Over-Driven Locations
Hold down, type, location
Lag bolts/proper hole size
Cold-formed framing-proper size, gage, spacing
Screw type, spacing, driven flush
Cold-formed welding conforms (AWS D1.1 and D1.3)
Other
The above items were conforming Nonconforming Items (see below)
Comments: GeoTest was on-site as requested to inspect the items mentioned above. All items found were
addressed prior to our leaving the project. The above items were found to be in conformance with the project
drawings.
COPIES: brian.j.anderson7@gmail.com, charliesr@cmaarch.com, chumphrey@safebuilt.com, cobyj@exxelpacific.com, Reviewed by
davidb@exxelpacific.com, davidh@exxelpacific.com, dennist@cgengineering.com, dspencer@safebuilt.com, jaredu@cg
engineering.com, jkim@avscommunities.com, jonr@exxelpacific.com ...and 5 more.
This report shall not be reproduced except in full, without the written approval of GeoTest Services, Inc.
LATERAL FRAMING INSPECTION REPORT
PROJECT: The Villas at Arlington JOB #: 18-0760
ADDRESS: 18506 Smokey Point Boulevard, Arlington, WA REPORT #: LF055
PERMIT #: 1853 DATE: 7/8/2019
CLIENT: Villas at Arlington Partners LLLP PAGE #: 1 of 1
CONTRACTOR: Exxel Pacific INSPECTOR: Tim Martin
Item(s) Inspected Location
Shear Wall Sheathing and HD Strapping Building F: Levels 1, 2 & 3 Exterior Walls
Reference Drawings: Structural Drawings
Items Inspected Comments
Lumber grade, species, size
Structural panel grade and thickness, glue Rated Sheathing, 15/32", Exp.1
Shear wall/diaphragm length, location
Panel edges bear on framing members SW Fully Blocked
Diaphragm chord, drag strut, braces and related CSMT14 Straps at Perf. SW
Connection of blocking to wall top plates
Gypsum board with wood framing conforms
3" nom. framing in place, nails staggered where shown Yes and Yes
Foundation plates or sills on concrete are treated
Base-plate bolting complies
Nail diameter, length, number of lines, spacing .148 X 2-1/4", Per Plan
Pneumatic or mechanically driven fasteners conform
Nail heads driven flush Satisfactory
Hold down, type, location MST37 & 48 Floor to Floor Straps
Lag bolts/proper hole size
Cold-formed framing-proper size, gage, spacing
Screw type, spacing, driven flush
Cold-formed welding conforms (AWS D1.1 and D1.3)
Other
The above items were conforming Nonconforming Items (see below)
Comments: GeoTest was on site as requested to inspect the above items. All items were marked at the location
and contractor was informed of the issues.
COPIES: brian.j.anderson7@gmail.com, charliesr@cmaarch.com, chumphrey@safebuilt.com, cobyj@exxelpacific.com, Reviewed by
davidb@exxelpacific.com, davidh@exxelpacific.com, dennist@cgengineering.com, dspencer@safebuilt.com, jaredu@cg
engineering.com, jkim@avscommunities.com, jonr@exxelpacific.com ...and 5 more.
This report shall not be reproduced except in full, without the written approval of GeoTest Services, Inc.
LATERAL FRAMING INSPECTION REPORT
PROJECT: The Villas at Arlington JOB #: 18-0760
ADDRESS: 18506 Smokey Point Boulevard, Arlington, WA REPORT #: LF084
PERMIT #: 1853 DATE: 9/16/2019
CLIENT: Villas at Arlington Partners LLLP PAGE #: 1 of 1
CONTRACTOR: Exxel Pacific INSPECTOR: Tim Martin
Item(s) Inspected Location
Final Framing & Interior Shear Walls Building F
Truss Reinforcement at Tie-Off Anchors Building F
Reference Drawings: Structural Drawings and RFI for Truss Reinforcement
Items Inspected Comments
Lumber grade, species, size D.Fir #2, Hem. Fir
Structural panel grade and thickness, glue Rated Sheathing, 15/32", Exp.1
Shear wall/diaphragm length, location Per Plan
Panel edges bear on framing members SW’s are Fully Blocked
Diaphragm chord, drag strut, braces and related Per Plan
Connection of blocking to wall top plates Per SW Schedule
Gypsum board with wood framing conforms
3" nom. framing in place, nails staggered where shown Yes and Yes
Foundation plates or sills on concrete are treated Yes
Base-plate bolting complies Per SW Schedule
Nail diameter, length, number of lines, spacing .148 X 2-1/4", Per Plan
Pneumatic or mechanically driven fasteners conform
Nail heads driven flush Satisfactory
Hold down, type, location Per HD Schedule
Lag bolts/proper hole size
Cold-formed framing-proper size, gage, spacing
Screw type, spacing, driven flush
Cold-formed welding conforms (AWS D1.1 and D1.3)
Other
The above items were conforming Nonconforming Items (see below)
Comments: GeoTest was on site as requested to conduct a final framing inspection at the interior side of all
perimeter shear walls and the interior shear walls. The still outstanding items
were marked.
COPIES: brian.j.anderson7@gmail.com, charliesr@cmaarch.com, chumphrey@safebuilt.com, cobyj@exxelpacific.com, Reviewed by
davidb@exxelpacific.com, davidh@exxelpacific.com, dennist@cgengineering.com, dspencer@safebuilt.com, jaredu@cg
engineering.com, jkim@avscommunities.com, jonr@exxelpacific.com ...and 5 more.
This report shall not be reproduced except in full, without the written approval of GeoTest Services, Inc.
LATERAL FRAMING INSPECTION REPORT
PROJECT: The Villas at Arlington JOB #: 18-0760
ADDRESS: 18506 Smokey Point Boulevard, Arlington, WA REPORT #: LF092
PERMIT #: 1853, 1875, 1876 DATE: 10/7/2019
CLIENT: Villas at Arlington Partners LLLP PAGE #: 1 of 1
CONTRACTOR: Exxel Pacific INSPECTOR: Tim Martin
Item(s) Inspected Location
Final Framing Reinspection & Interior Shear Wall Sheathing Building F
Wall Sheathing Garage 11 and 12
Reference Drawings: Structural Drawings
Items Inspected Comments
Lumber grade, species, size D.Fir #1 and 2
Structural panel grade and thickness, glue Rated Sheathing, 15/32", Exp.1
Shear wall/diaphragm length, location
Panel edges bear on framing members Where Required
Diaphragm chord, drag strut, braces and related
Connection of blocking to wall top plates Per Plan/ SW Schedule
Gypsum board with wood framing conforms
3" nom. framing in place, nails staggered where shown Yes and Yes
Foundation plates or sills on concrete are treated Yes
Base-plate bolting complies Yes
Nail diameter, length, number of lines, spacing Per Plan
Pneumatic or mechanically driven fasteners conform
Nail heads driven flush Satisfactory
Hold down, type, location HDU Holdowns Were Per Plan
Lag bolts/proper hole size
Cold-formed framing-proper size, gage, spacing
Screw type, spacing, driven flush
Cold-formed welding conforms (AWS D1.1 and D1.3)
Other
The above items were conforming Nonconforming Items (see below)
Comments: GeoTest was on site as requested to inspect the items mentioned above. All above items were in
conformance with the project’s drawings. The contractor was informed of today’s inspection results.
COPIES: brian.j.anderson7@gmail.com, charliesr@cmaarch.com, chumphrey@safebuilt.com, cobyj@exxelpacific.com, Reviewed by
davidb@exxelpacific.com, davidh@exxelpacific.com, dennist@cgengineering.com, dspencer@safebuilt.com, jaredu@cg
engineering.com, jkim@avscommunities.com, jonr@exxelpacific.com ...and 5 more.
This report shall not be reproduced except in full, without the written approval of GeoTest Services, Inc.
SPECIAL INSPECTION SUMMARY
PROJECT: The Villas at Arlington â€Â BLD F JOB #: 18â€0760
ADDRESS: 18506 Smokey Point Blvd, Arlington, WA 98223 DATE: 10â€22â€2019
CLIENT: Villas at Arlington Partners LLLP PERMIT #: 1853
CONTRACTOR: Exxel Pacific PAGE: 1 of 1
This letter summarizes our special inspection and testing efforts for The Villas at Arlington – BLD F
project located in Arlington, Washington. GeoTest’s services took place from October 9, 2018
through October 22, 2019. Our testing and inspections included the following scope of work:
TEST/INSPECTION ITEM REFERENCE
Field Density Moisture Reports FD031 –
ï‚· Earthwork
FD034, FD036 & FD049
Concrete Break Reports CB018, CB021, CB031
ï‚· Reinforced Concrete
& CB032 and Inspection Report IR012
Lateral Framing Inspection Reports LF026,
ï‚· Lateral Framing LF028, LF037, LF038, LF051, LF055, LF084 &
LF092
Adhesive Anchor Inspection Reports AA010 &
ï‚· Proprietary Anchors
AA019
All work requiring special inspection for the project to date has been completed. To the best of
our knowledge the inspected work is in conformance with the approved project plans and
specifications and the applicable workmanship provisions of the International Building Code. All
related laboratory tests performed by GeoTest have met or exceeded the minimum test
requirements.
This is GeoTest’s final special inspection and testing submittal for The Villas at Arlington â€Â BLD F
project. If we can be of further assistance, please contact the undersigned.
Copies: Villas at Arlington Partners LLLP Safe Built
Charles Morgan and Associates LLC The Alliant Company
City of Arlington Anderson, Brian
Exxel Pacific Charles Morgan and Associates LLC Logan Senrud
CG Engineering Technical Director
This report shall not be reproduced except in full, without the written approval of GeoTest Services, Inc.
Permit #: 1853
Permit Date: 03/09/18
Permit Type: MULTI-FAMILY
Project Name: Villas at Arlington
Applicant Name: Villas at Arlington, LLLP
Applicant Address: 105 Cresent Bay Drive, Suite D
Applicant, City, State, Zip: Laguna Beach, CA 92651
Contact: Carmel Gregory
Phone: 425-778-8500
Email: carmelg@cgengineering.com
Scope of Work: New Multi-Family Development
Valuation: 1991907.40
Square Feet: 18340
Number of Stories: 3
Construction Type:
Occupancy Group:
ID Code:
Permit Issued: 11/01/2018
Permit Expires:
Form Permit Type:
Status: COMPLETE
Assigned To: Kristin Foster
Property
Parcel # Address Legal Description Owner Name Owner Phone Zoning
VILLAS AT 137 Multiple Family
31052000100800 3318 185TH PLACE NE
ARLINGTON 101 - 200 Units
Contractors
Contractor Primary Contact Phone Address Contractor Type License License #
323A CONSTRUCTION
EXXEL PACIFIC INC 360-734-2872 UBI 601 175 198
TELEGRAPH RD CONTRACTOR
323A CONSTRUCTION Labor and
EXXEL PACIFIC INC 360-734-2872 EXXELPI073KN
TELEGRAPH RD CONTRACTOR Industries
Plan Reviews
Date Review Type Description Assigned To Review Status
COMMERCIAL
03/09/2018 BUILDING
BUILDING
Fees
Fee Description Notes Amount
Building Plan Review Table 4-2 $8,536.05
Building Plan Review Table 4-2 $134.34
Building Plan Review Table 4-2 $9.57
Building Permit Table 4-1 $13,353.78
Park - Community MF Multi-family $26,946.00
Processing/Technology $25.00
State Surcharge - Commercial Commercial Only $25.00
State Surcharge - add'l DU Residential Additional Units $36.00
Traffic Mitigation - C/MF Commercial/Multi-family $23,420.52
Total $72,486.26
Attached Letters
Date Letter Description
09/19/2018 Building Permit
Payments
Date Paid By Description Payment Type Accepted By Amount
03/08/2018 Alliant Capital Ltd. 18506 Bldg. F Check #104500 Kristin Foster $8,536.05
03/08/2018 Alliant Capital Ltd. Bldg. F Check #104500 Kristin Foster $134.34
10/11/2018 Fidelity National Title check #26379 Launa Black $63,815.87
Outstanding Balance $0.00
Uploaded Files
Date File Name
03/17/2020 6395626-Villas Bldg F C of O.pdf
11/01/2018 4145050-1853_Villas Building Permit.pdf
03/09/2018 3141558-Commercial Application - Building F.pdf