Loading...
HomeMy WebLinkAbout4820 Longhouse Trail Lane Ne Ste 106_BLD6561_2025 Docusign Envelope ID: FA089952-4BF7-45C6-87BB-2D9B860B21E0 CITY OF ARLINGTON 18204 59th Avenue NE, Arlington, WA 98223 INSPECTIONS: 360-403-3417 - Permit Center: 360-403-3551 BUILDING PERMIT 4820 LONGHOUSE TRAIL LANE NE STE 106 Permit #: 6561 PERMIT EXPIRES 180 DAYS AFTER Parcel #: 31052800102400 DATE OF ISSUANCE. Scope of Work: Hair Salon Valuation: 178000.00 OWNER APPLICANT CONTRACTOR ARLINGTON 51ST ST LLC BYK Construction, Inc. BYK Construction PO BOX 619 PO Box 619 PO Box 619 SEDRO WOOLLEY, WA 98284 Sedro Woolley, WA 98284 Sedro Woolley, WA 98284 425-610-5059 360-661-5325 LIC: 603187914 EXP: 03/31/2026 LIC: BYKCOCI886JB EXP: 04/02/2026 MECHANICAL CONTRACTOR PLUMBING CONTRACTOR LIC #: EXP: LIC #: EXP: JOB DESCRIPTION PERMIT TYPE: COMMERCIAL ALTERATION CODE YEAR: 2021 STORIES: 1 CONST. TYPE: VA DWELLING UNITS: OCC GROUP: B; Business BUILDINGS: OCC LOAD: PERMIT APPROVAL The issuance or granting of this permit shall not be construed to be a permit for, or approval of, any violation of this Code or any other ordinance or order of the City, of any state or federal law, or of any order, proclamation, guidance advice or decision of the Governor of this State. To the extent the issuance or granting of this permit is interpreted to allow construction activity during any period of time when such construction is prohibited or restricted by any state or federal law, or order, proclamation, guidance advice or decision of the Governor of this State, this permit shall not authorize such work and shall not be valid. The building official is authorized to prevent occupancy or use of a structure where in violation of this Code, any other City ordinances of this jurisdiction or any other ordinance or executive order of the City, or of any state or federal law, or of any order, proclamation, guidance advice or decision of the Governor. The building official is authorized to suspend or revoke this permit if it is determined to be issued in error or on the basis of incorrect, inaccurate or incomplete information, or in violation of any City ordinance, regulation or order, state or federal law, or any order, proclamation, guidance or decision of the Governor. I AGREE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUCTION AND IN DOING THE WORK AUTHORIZED THEREBY; NO PERSON WILL BE EMPLOYED IN VIOLATION OF THE LABOR CODE OF THE STATE OF WASHINGTON RELATING TO WORKMEN'S COMPENSATION INSURANCE AND RCW 18.27. THIS APPLICATION IS NOT A PERMIT UNTIL SIGNED BY THE BUILDING OFFICIAL OR HIS/HER DEPUTY AND ALL FEES ARE PAID. IT IS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR A CERTIFICATE OF OCCUPANCY HAS BEEN GRANTED. IBC110/IRC110. SALES TAX NOTICE: Sales tax relating to construction and construction materials in the City of Arlington must be reported on your sales tax return form and coded City of Arlington #3101. 07/01/2025 Applicant Signature Date Building Official Date Docusign Envelope ID: FA089952-4BF7-45C6-87BB-2D9B860B21E0 CONDITIONS Must provide Backflow protection before any branch lines from main line water. Adhere to approved plans. Permit shall be onsite for inspections. Call for inspections. The property owner shall ensure that the construction project complies with all applicable zoning codes and regulations. The property owner shall also ensure that the construction project does not cause any adverse impact on the surrounding environment or community. The property owner shall be responsible for obtaining all necessary permits and approvals from the relevant authorities before commencing construction. The property owner shall ensure that the construction project complies with all applicable design review requirements. THIS PERMIT AUTHORIZES ONLY THE WORK NOTED. THIS PERMIT COVERS WORK TO BE DONE ON PRIVATE PROPERTY ONLY. ANY CONSTRUCTION ON THE PUBLIC DOMAIN (CURBS, SIDEWALKS, DRIVEWAYS, MARQUEES, ETC.) WILL REQUIRE SEPARATE PERMISSION. PERMIT FEES Date Description Fee Amount 07/01/2025 Building Plan Review $1,399.92 07/01/2025 Processing/Technology $25.00 07/01/2025 Building Permit $2,153.72 07/01/2025 State Surcharge - Commercial $25.00 Total Due: $3,603.64 Total Payment: $3,603.64 Balance Due: $0.00 CALL FOR INSPECTIONS Call by 3:30 pm for next day inspection, allow 48 hours for Fire Inspections When calling for an inspection please leave the following information: Permit Number, Type of Inspection being requested, and whether you prefer morning or afternoon INSPECTION INFORMATION Pass/Fail Certificate Of Completion Envelope Id: FA089952-4BF7-45C6-87BB-2D9B860B21E0 Status: Completed Subject: Complete with Docusign: Building+Permit29910460.pdf Source Envelope: Document Pages: 2 Signatures: 1 Envelope Originator: Certificate Pages: 2 Initials: 0 Anna Holleman AutoNav: Enabled PO BOX 619 EnvelopeId Stamping: Enabled Sedro Woolley, WA 98284-1447 Time Zone: (UTC-08:00) Pacific Time (US & Canada) annah@bykconstruction.com IP Address: 50.46.13.128 Record Tracking Status: Original Holder: Anna Holleman Location: DocuSign 7/1/2025 4:25:20 PM annah@bykconstruction.com Signer Events Signature Timestamp Anna Holleman Sent: 7/1/2025 4:27:19 PM annah@bykconstruction.com Viewed: 7/1/2025 4:27:27 PM Project Engineer Signed: 7/1/2025 4:27:33 PM BYK Construction, Inc. Signature Adoption: Pre-selected Style Security Level: Email, Account Authentication (None) Using IP Address: 50.46.13.128 Electronic Record and Signature Disclosure: Not Offered via Docusign In Person Signer Events Signature Timestamp Editor Delivery Events Status Timestamp Agent Delivery Events Status Timestamp Intermediary Delivery Events Status Timestamp Certified Delivery Events Status Timestamp Carbon Copy Events Status Timestamp City Of Arlington Permitting Sent: 7/1/2025 4:27:20 PM wo@iworq.net Security Level: Email, Account Authentication (None) Electronic Record and Signature Disclosure: Not Offered via Docusign Hannah Hardwick Sent: 7/1/2025 4:27:19 PM HHardwick@arlingtonwa.gov Viewed: 7/1/2025 4:27:42 PM Security Level: Email, Account Authentication (None) Electronic Record and Signature Disclosure: Not Offered via Docusign Witness Events Signature Timestamp Notary Events Signature Timestamp Envelope Summary Events Status Timestamps Envelope Sent Hashed/Encrypted 7/1/2025 4:27:20 PM Envelope Summary Events Status Timestamps Certified Delivered Security Checked 7/1/2025 4:27:27 PM Signing Complete Security Checked 7/1/2025 4:27:33 PM Completed Security Checked 7/1/2025 4:27:33 PM Payment Events Status Timestamps COMMERCIAL TENANT IMPROVEMENT PERMIT APPLICATION Community and Economic Development City of Arlington • 18204 59th Ave NE • Arlington, WA 98223 • Phone (360) 403-3551 The following information is required for Commercial, Multi-Family, and Mixed-Use Building Permit Applications. Mark each box to designate that the information has been provided. Please submit this checklist as part of the submittal documents. See ASSISTANCE BULLETIN #30 for detailed design requirements. EACH BUILDING OR STRUCTURE REQUIRES A SEPARATE SUBMITTAL. SUBMIT ELECTRONIC FILES FOR EACH OF THE FOLLOWING; Incomplete applications will not be accepted. REQUIRED DOCUMENTS City of Arlington Commercial Tenant Improvement Permit Application Site Plan Architectural Plans Structural Plans Structural Calculations Mechanical System Modifications, (if applicable) Plumbing System Modifications, (if applicable) Project Specification Manuals, (if applicable) WSEC Compliance Forms, (if applicable) https://waenergycodes.com/ Special Inspection and Testing Agreement Deferred Submittal Request Airport Property Lease (if building is located within the Arlington Airport Property Boundary) 1. Plan Review fee is due at time of submittal and remaining balance will be due at time of issuance. 2. The City of Arlington does not review or inspect electrical systems. Contact Labor and Industries at lni.wa.gov or 360-416-3000. A. DEFERRED SUBMITTALS If the project requires any of the following, a Deferred Submittal Request MUST be completed. Deferred submittals require separate applications, plans and plan review. 1. Mechanical Plans (if not included in the plan set) 2. Plumbing Plans (if not included in the plan set) 3. Fire Sprinkler 4. Fire Alarm 5. Signage B. SPECIAL INSPECTION AND TESTING AGREEMENT A Special Inspection Firm is required to perform special inspections for the following type of work. *The Special Inspection and Testing Agreement MUST be submitted with the Building Application. Reinforced Concrete Structural Steel and Welding Bolting in Concrete High-Strength Bolting Pre-stressed Concrete Spray-Applied Fireproofing Shotcrete Smoke-Control Systems Structural Masonry Other - Specify: ______________________________________ I acknowledge that all items designated as submittal requirements must accompany my Tenant Improvement Permit Application to be considered a complete submittal. COMMERCIAL TENANT IMPROVEMENT INSTALLATION, MODIFICATION OR REMOVAL MAY REQUIRE A SEPARATE PERMIT SUBMITAL *CHECK ALL THAT APPLY Automatic fire extinguishing systems Compressed gas systems Fire pumps Flammable and combustible liquids (tanks, piping etc.) Standpipe systems Hazardous materials Private fire hydrants Industrial ovens/furnace Fire alarm and detection systems Spraying or dipping operations High piled/rack storage Temporary membrane structure, tents (>200 sq. ft.) or canopies (>400 sq. ft.) Provide details on any of the above checked items: _________________________________________________________________________ ________________________________________________________________________________________ Type of Permit: New Space Addition Alteration Property Address: Project Valuation: Lot #: Parcel ID No.: Subdivision: Project Scope of Work: Description of New Tenant Business Operations: IBC Construction Type: IBC Occupancy Type: Building/Space Square Footage: Number of Stories: Square Footage Per Floor: 1st 2nd 3rd 4th 5th 6th Primary Contact: Owner Architect Engineer Contractor Owner Name: Office No.: Email Address: Cell No.: Mailing Address: City: State: Zip: Architect Name: Office No.: Email Address: Cell No.: Mailing Address: City: State: Zip: Professional License Number: Expiration Date: Engineer Name: Office No.: Email Address: Cell No.: Mailing Address: City: State: Zip: Professional License Number: Expiration Date: Primary Contractor: Office No.: Email Address: Cell No.: Mailing Address: City: State: Zip: L&I Contractor License Number: Expiration Date: REV03.2022 Page 2 of 7 COMMERCIAL TENANT IMPROVEMENT MECHANICAL SYSTEM INFORMATION Type of Permit:  New Installation  Addition  Alteration  Replaced  Gas Piping Mechanical Contractor: Office No.: Email Address: Cell No.: Mailing Address: City: State: Zip: L&I Contractor License Number: Expiration Date: • New gas piping requires a pressure test hooking to any appliance • Sediment traps (drips) are required on all gas lines • Gas lines are required to be supported/secured per IFGS, Section 415 • Proper Combustion air and venting required for all appliances • A shut-off valve is required within 6 feet of each appliance Gas Piping Specification and complete Schematic PAGE 4  Not Applicable Proposed Piping Material:  CSST  Brass  Black Steel  Galvanized Steel  Other Proposed Piping Size:  ½”  ⅝”  ¾”  1”  1½”  2” Inlet Pressure: Pressure Drop: Specific Gravity: MECHANICAL PERMIT FEES (per unit) Type of Fixture No. of Units Cost per Unit Subtotal Additional Plan Review fees x $ 75.00 = $ Air Cond. Unit ≤100Btu/h x $ 15.00 = $ Air Cond. Unit >100Btu/h x $ 25.00 = $ Air Cond. Unit >500Btu/hp x $ 50.00 = $ Air Handling Units x $ 15.00 = $ Base Mechanical Fee $ 25.00 $ 25.00 Boiler <100Btu/h >3hp x $ 15.00 = $ Boiler >1 million Btu/h<50hp x $ 25.00 = $ Boiler >1.5 million Btu/h<50hp x $ 50.00 = $ Boiler >100Btu/h 3-15hp x $ 15.00 = $ Boiler >500Btu/h 15-30hp x $ 25.00 = $ Commercial Hoods -Type I x $ 25.00 = $ Commercial Hoods -Type II x $ 50.00 = $ Diffusers x $ 15.00 = $ Dryer Ducting x $ 15.00 = $ Ductwork (drawings required) x $ 25.00 = $ Evaporative Coolers x $ 15.00 = $ Exhaust/Ventilation Fans x $ 15.00 = $ Fireplace/Insert/Stove x $ 15.00 = $ Forced Air Heat ≤100 Btu/h x $ 15.00 = $ Forced Air Heat >100 Btu/h x $ 25.00 = $ Gas Clothes Dryer x $ 15.00 = $ Gas Fired AC ≤100 Btu/h x $ 15.00 = $ REV03.2022 Page 3 of 7 COMMERCIAL TENANT IMPROVEMENT MECHANICAL PERMIT FEES (per unit) Gas Fired AC >100 Btu/h x $ 25.00 = $ Gas Fired AC > 500 Btu/h x $ 50.00 = $ Gas Piping ≤ 5 units x $ 15.00 = $ Gas Piping > 5 units (plus <5 units) x $ 2.00 = $ Heat Exchangers x $ 15.00 = $ Heat Pump-Condensing Unit x $ 25.00 = $ Hot Water Heat Coils x $ 15.00 = $ Miscellaneous Appliance - regulated by $ 15.00 $ x = mechanical code, not otherwise specified Pkg. Units ≤100btu x $ 25.00 = $ Pkg. Units >100btu x $ 50.00 = $ Range/Cook top-Gas Fired x $ 15.00 = $ Refrigeration Unit ≤100Btu/h x $ 15.00 = $ Refrigeration Unit >100Btu/h x $ 25.00 = $ Refrigeration Unit >500Btu/h x $ 50.00 = $ Re-inspection fee (all) x $ 75.00 = $ Unit Heaters ≤ 100 Btu/h x $ 15.00 = $ Unit Heaters >100 Btu/h x $ 25.00 = $ VAV Boxes (Variable Air Volume, part of air $ 10.00 $ x = conditioning system) Wall Heaters - Gas Fired x $ 25.00 = $ Water Heater - Gas Fired x $ 25.00 = $ Permit Fee $ Table 4-8; Plan Review Fee $ Processing/Technology Fee $25.00 Total $ PRESSURE PIPING SCHEMATIC COMPLETE FOR GAS PIPING ONLY – USE A SEPARATE SHEET, IF NECESSARY  SCHEMATIC IS TO SCALE  SCHEMATIC NOT TO SCALE Show Pipe Size(s) and Length(s) from meter to all appliances NOTE: Any interior pressure regulators must be indicated REV03.2022 Page 4 of 7 COMMERCIAL TENANT IMPROVEMENT PLUMBING SYSTEM INFORMATION Type of Permit:  New Installation  Addition  Alteration  Replaced  Industrial Plumbing Contractor: Office No.: Email Address: Cell No.: Mailing Address: City: State: Zip: L&I Contractor License Number: Expiration Date: The following items need to be specified on the plans:  Fixture specifications and equipment with locations.  Location and type of all backflow assemblies for each fixture.  Calculations for Grease Interceptor.  Pipe size and location of sanitary and potable water systems.  Riser diagram of waste, vent, and rain water systems, including sizes.  Medical gas piping riser diagram, type of gas, storage room and size of piping. PLUMBING PERMIT FEES (per fixture) Commercial plumbing permits are required to submit line drawings. A plan review fee of 65% per Table 4-6 for plumbing permits will be assessed at time of submittal. Includes two (2) inspections with permit. Type of Fixture No. of Fixtures Cost per Fixture Subtotal Additional Plan Review fees x $ 75.00 = Alteration/repair piping x $ 15.00 = Backflow Assembly x $25.00 = Base Plumbing Fee $ 25.00 $25.00 Bath/Shower Combo x $ 15.00 = Building Main Waste x $ 25.00 = Clothes Washer x $ 15.00 = Dishwasher x $ 15.00 = Drinking Fountain x $ 15.00 = Floor Drains x $ 15.00 = REV03.2022 Page 5 of 7 COMMERCIAL TENANT IMPROVEMENT PLUMBING PERMIT FEES (per fixture) Grease Interceptor x $ 75.00 = Grease Trap x $ 25.00 = Hose Bibb x $ 15.00 = Icemaker/Refrigerator x $ 15.00 = Irrigation – per meter x $ 25.00 = Kitchen Sink & Disposal x $ 15.00 = Laundry Tray x $ 15.00 = Lavatory x $ 15.00 = Med Gas Piping ≤ 5 inlets/outlets x $ 60.00 = Med Gas Piping > 5 inlets/outlets (plus ≤ 5 x $ 5.00 = inlets/outlets) Miscellaneous – regulated by plumbing x $ 15.00 = code, not otherwise specified Pretreatment Interceptor x $ 15.00 = Re-inspection Fee (all) x $ 75.00 = Roof Drains x $ 15.00 = Shower (only) x $ 15.00 = Sink (bar, service, etc.) x $ 15.00 = Toilets x $ 15.00 = Urinal x $ 15.00 = Vacuum Breakers x $ 25.00 = Water Heater x $ 25.00 = Water Heater - Tankless x $ 25.00 = Permit Fee Table 4-6; Plan Review Fee Processing/Technology Fee $25.00 Total PROPOSED BUILDING USE  New  Addition/Alteration  Medical  Automotive Based  Industrial  Office  Restaurant  Machine Shop  Other: ____________________________________ CROSS CONNECTION Please check all appliances that are proposed or permanently connected to the water supply.  Ice Machine  Dialysis Equip.  Air washers  Coffee Urn/Espresso  Hydrotherapy Equip.  Steam Generators  Carbonated Bev.  Dental Equip.  Dye Vats  Fume Hoods  Laboratory Equip.  Pressure Washers  Degreasers  Autoclave/Sterilizers  Cooling Towers  Hot Tub/Spa  Decorative Fountain  Fire Sprinkler  Aquarium  Swimming Pools  Sprinkler w/chemicals  Lawn Irrigation  Well on property  Other: ________________________ WASTEWATER DISCHARGE Does the plumbing system currently have a grease interceptor?  Yes  No  Don’t Know Does the plumbing system currently have an oil/water  Yes  No  Don’t Know separator? REV03.2022 Page 6 of 7 COMMERCIAL TENANT IMPROVEMENT Is water used in the business process (washing, rinsing,  Yes  No  Don’t Know cooling)? Does your business require a NPDES permit?  Yes  No  Don’t Know I hereby certify that the above information is correct and that the construction on, and the occupancy and the use of the above-described property will be in accordance with the laws, rules and regulation of the State of Washington. Signature Print Name Date REV03.2022 Page 7 of 7 ACCESSORY MOUNTING SCHEDULE TOILET PAPER TOWEL TOILET PAPER SANITARY NAPKIN 36" GRAB BAR 42" GRAB BAR 30" x 48" MIRROR VERTICAL GRAB URINAL DISPENSER DISPENSER DISPOSAL BAR 39"- 41" 13½ min ENSURE FLUSH VALVE 345 FACES "WIDE-SIDE" OF ROOM 18" 7"- 9" 17 max CL 40" 430 48" MAX. CL 30" 39"- 41" 40" MAX. TO DISP. SLOT 15" MIN. 33" MIN. 36" MAX. 17" MAX. TO TOP OF SEAT TO BOTTOM EDGE OF REFLECTIVE SURFACE TYP. REACH RANGES PER ICC A117.1 20 max >20-25 max 510 510-635 380 380 1220 1220 1170 1220 1220 15 min 48 max 48 max 1120 15 min 48 max 865 48 max 865 46 max 44 max 34 max 34 max 10 max 10 max > 10-24 max 255 255-610 255 TYP. KITCHEN DETAILS PER ICC A117.1 CASEWORK SECTION/ WORK SPACE @ COUNTER @ SINKS COUNTER @ 34" COUNTER @ 36" STORAGE RANGES Date: 12/03/2025 Permit #: 6561 Permit Date: 06/16/2025 Review Date: 06/17/2025 Permit Type: COMMERCIAL ALTERATION Review Type: COMMERCIAL ALTERATION Target Date: 07/15/2025 Scheduled Time: 00:00 Completed Date: 06/25/2025 Description: Must provide Backflow protection before any branch lines from main line water. Review Status: Approved with Conditions Assigned To: BUILDING Time In: 00:00 Time Out: 00:00 Hours: 0.5 Notes 06/25/2025 Must provide Backflow protection before any branch lines from main line water. Property Information Parcel#: 31052800102400 ARLINGTON 51ST ST LLC ARLINGTON 51ST ST LLC PO BOX 619 4820 LONGHOUSE TRAIL LANE NE STE 106 SEDRO WOOLLEY, WA 98284 Zoning: 126 MULTI-FAMILY MKTLot: 6Block: Permit #: 6561 Permit Date: 06/16/25 Permit Type: COMMERCIAL ALTERATION Project Name: Laine Salon Applicant Name: BYK Construction, Inc. Applicant Address: PO Box 619 Applicant, City, State, Zip: Sedro Woolley, WA 98284 Contact: Anna Holleman Phone: 425-610-5059 Email: Annah@bykconstruction.com Scope of Work: Hair Salon Valuation: 178000.00 Square Feet: 1155 Number of Stories: 1 Construction Type: VA Occupancy Group: B; Business ID Code: Permit Issued: 07/01/2025 Permit Expires: 03/10/2026 Form Permit Type: COMMERCIAL ALTERATION Status: COMPLETE Assigned To: Hannah Hardwick Property Parcel # Address Legal Description Owner Name Owner Phone Zoning 4820 LONGHOUSE TRAIL ARLINGTON 51ST 126 MULTI- 31052800102400 BSP LANE NE STE 106 ST LLC FAMILY MKT Contractors Contractor Primary Contact Phone Address Contractor Type License License # CONSTRUCTION BYK Construction Paul Woodmansee 360-661-5325 PO Box 619 COA 603187914 CONTRACTOR CONSTRUCTION BYK Construction Paul Woodmansee 360-661-5325 PO Box 619 L&I BYKCOCI886JB CONTRACTOR Inspections Date Inspection Type Description Scheduled Date Completed Date Inspector Status C20. BUILDING 11/07/2025 11/12/2025 11/12/2025 BUILDING Approved FINAL Hawken is the contact 360- 09/10/2025 C07. WALLBOARD 09/12/2025 09/12/2025 BUILDING Completed 466-8147 09/09/2025 C11. INSULATION 09/10/2025 09/10/2025 BUILDING Completed Framing and mechanical rough in 09/08/2025 C09. FRAMING 09/08/2025 09/08/2025 BUILDING Completed Hawken is the contact, 360- 466-8147 C08. PLUMBING 08/25/2025 08/26/2025 08/26/2025 BUILDING Approved ROUGH-IN C04. PLUMBING 07/22/2025 07/23/2025 07/23/2025 BUILDING Approved GROUNDWORK Plan Reviews Date Review Type Description Assigned To Review Status COMMERCIAL No Comment 06/17/2025 AIRPORT ALTERATION Received COMMERCIAL Development 06/17/2025 No civil concerns Approved ALTERATION Services Manager COMMERCIAL 06/17/2025 No land use concerns. PLANNING Approved ALTERATION COMMERCIAL 06/17/2025 No comments, KS & LT PW-ADMIN-GIS Approved ALTERATION COMMERCIAL 06/17/2025 No comments, JW PW-SEW-REV Approved ALTERATION COMMERCIAL An RPBA for Premise Isolation is already installed for the 06/17/2025 PW-WAT-REV Approved ALTERATION commercial portion of this building, Gus COMMERCIAL Must provide Backflow protection before any branch lines Approved with 06/17/2025 BUILDING ALTERATION from main line water. Conditions Fees Fee Description Notes Amount Building Plan Review Table 4-2 $1,399.92 Processing/Technology $25.00 Building Permit Table 4-1 $2,153.72 State Surcharge - Commercial Commercial Only $25.00 Total $3,603.64 Attached Letters Date Letter Description 07/01/2025 Building Permit 06/16/2025 Web Form - Building Application Payments Date Paid By Description Payment Type Accepted By Amount XBP Conf: 06/17/2025 $1,399.92 234455048 XBP Conf: 07/01/2025 $2,203.72 235879561 Outstanding Balance $0.00 Notes Date Note Created By: Applicant says they wish to pause on issuing this permit until the lease is finalized with the 06/25/2025 Hannah Hardwick tenant. Uploaded Files Date File Name 06/16/2025 f7bb6d3e99fc78c85c25b36e95c6c7c6_20814775-commercial_tenant_improvement_application.pdf 06/16/2025 f457108301a62a1fe8495ac037b3e544_outpost_site_plan_signed.pdf 06/16/2025 82749f0a8571f26aef1cd03e3cf39999_laine_salon_bldg_6_-_6-3-25_permit_set.pdf