Loading...
HomeMy WebLinkAbout17216 51st Ave Ne Ste114_BLD6100_2025COMMERCIAL BUILDING PERMIT APPLICATION Community and Economic Development City of Arlington • 18204 59th Ave NE • Arlington, WA 98223 • Phone (360) 403-3551 The following information is required for Commercial, Multi-Family, and Mixed-Use Building Permit Applications. Mark each box to designate that the information has been provided. Please submit this checklist as part of the submittal documents. See ASSISTANCE BULLETIN #30 for detailed design requirements. EACH BUILDING OR STRUCTURE REQUIRES A SEPARATE SUBMITTAL. SUBMIT ELECTRONIC FILES FOR EACH OF THE FOLLOWING; Incomplete applications will not be accepted. 1.Plan Review fee is due at time of submittal and remaining balance will be due at time of issuance. 2.The City of Arlington does not review or inspect electrical systems. Contact Labor and Industries at lni.wa.gov or 360-416-3000. A.DEFERRED SUBMITTALS If the project requires any of the following, a Deferred Submittal Request MUST be completed. Deferred submittals require separate applications, plans and plan review. 1.Mechanical Plans (if not included in the plan set) 2.Plumbing Plans (if not included in the plan set) 3.Fire Sprinkler 4.Fire Alarm 5.Signage B.SPECIAL INSPECTION AND TESTING AGREEMENT A Special Inspection Firm is required to perform special inspections for the following type of work. *The Special Inspection and Testing Agreement MUST be submitted with the Building Application. Reinforced Concrete Structural Steel and Welding Bolting in Concrete High-Strength Bolting Pre-stressed Concrete Spra -Applied Fireproofing Shotcrete Smoke-Control Systems Structural Masonr Other - Specify: ______________________________________ I acknowledge that all items designated as submittal requirements must accompany my Commercial Building Permit Application to be considered a complete submittal. REQUIRED DOCUMENTS Site Plan Architectural Plans Structural Plans Structural Calculations Mechanical System Modifications, (if applicable) Plumbing System Modifications, (if applicable) Project Specification Manuals, (if applicable) WSEC Compliance Forms, (if applicable) https://waenergycodes.com/ Special Inspection and Testing Agreement Deferred Submittal Request Airport Property Lease (if building is located within the Arlington Airport Property Boundary) COMMERCIAL BUILDING REV03.2022 Page 2 of 6 INSTALLATION, MODIFICATION OR REMOVAL MAY REQUIRE A SEPARATE PERMIT SUBMITAL *CHECK ALL THAT APPLY Automatic fire extinguishing systems Compressed gas systems Fire pumps Flammable and combustible liquids (tanks, piping etc.) Standpipe systems Hazardous materials Private fire hydrants Industrial ovens/furnace Fire alarm and detection systems Spraying or dipping operations High piled/rack storage Temporary membrane structure, tents (>200 sq. ft.) or canopies (>400 sq. ft.) Provide details on any of the above checked items: _________________________________________________________________________ _______________________________________________________________________________________ Type of Permit: Commercial Mulit-Family Mixed-Use Property Address: Project Valuation: Lot #: Parcel ID No.: Subdivision: Project Scope of Work: IBC Construction Type: IBC Occupancy Type: Building/Space Square Footage: Number of Stories: Square Footage Per Floor: 1st 2nd 3rd 4th 5th 6th Primary Contact: Owner Architect Engineer Contractor Owner Name: Office No.: Email Address: Cell No.: Mailing Address: City: State: Zip: Architect Name: Office No.: Email Address: Cell No.: Mailing Address: City: State: Zip: Professional License Number: Expiration Date: Engineer Name: Office No.: Email Address: Cell No.: Mailing Address: City: State: Zip: Professional License Number: Expiration Date: Primary Contractor: Office No.: Email Address: Cell No.: Mailing Address: City: State: Zip: L&I Contractor License Number: Expiration Date: COMMERCIAL BUILDING REV03.2022 Page 3 of 6 MECHANICAL SYSTEM INFORMATION  New gas piping requires a pressure test hooking to any appliance  Sediment traps (drips) are required on all gas lines  Gas lines are required to be supported/secured per IFGS, Section 415  Proper Combustion air and venting required for all appliances  A shut-off valve is required within 6 feet of each appliance MECHANICAL PERMIT FEES (per unit) Type of Fixture No. of Units Cost per Unit Subtotal Additional Plan Review fees x $ 75.00 = $ Air Cond. Unit ≤100Btu/h x $ 15.00 = $ Air Cond. Unit >100Btu/h x $ 25.00 = $ Air Cond. Unit >500Btu/hp x $ 50.00 = $ Air Handling Units x $ 15.00 = $ Base Mechanical Fee $ 25.00 $ 25.00 Boiler <100Btu/h >3hp x $ 15.00 = $ Boiler >1 million Btu/h<50hp x $ 25.00 = $ Boiler >1.5 million Btu/h<50hp x $ 50.00 = $ Boiler >100Btu/h 3-15hp x $ 15.00 = $ Boiler >500Btu/h 15-30hp x $ 25.00 = $ Diffusers x $ 15.00 = $ Dryer Ducting x $ 15.00 = $ Ductwork (drawings required) x $ 25.00 = $ Evaporative Coolers x $ 15.00 = $ Exhaust/Ventilation Fans x $ 15.00 = $ Fireplace/Insert/Stove x $ 15.00 = $ Forced Air Heat ≤100 Btu/h x $ 15.00 = $ Forced Air Heat >100 Btu/h x $ 25.00 = $ Gas Clothes Dryer x $ 15.00 = $ Gas Fired AC ≤100 Btu/h x $ 15.00 = $ Gas Fired AC >100 Btu/h x $ 25.00 = $ Gas Fired AC > 500 Btu/h x $ 50.00 = $ Gas Piping ≤ 5 units x $ 15.00 = $ Type of Permit:  New Installation  Gas Piping Mechanical Contractor: Office No.: Email Address: Cell No.: Mailing Address: City: State: Zip: L&I Contractor License Number: Expiration Date: Gas Piping Specification and complete Schematic PAGE 4  Not Applicable Proposed Piping Material:  CSST  Brass  Black Steel  Galvanized Steel  Other Proposed Piping Size:  ½”  ⅝”  ¾”  1”  1½”  2” Inlet Pressure: Pressure Drop: Specific Gravity: COMMERCIAL BUILDING REV03.2022 Page 4 of 6 MECHANICAL PERMIT FEES (per unit) Gas Piping > 5 units (plus <5 units) x $ 2.00 = $ Heat Exchangers x $ 15.00 = $ Heat Pump-Condensing Unit x $ 25.00 = $ Hot Water Heat Coils x $ 15.00 = $ Miscellaneous Appliance - regulated by mechanical code, not otherwise specified x $ 15.00 = $ Pkg. Units ≤100btu x $ 25.00 = $ Pkg. Units >100btu x $ 50.00 = $ Range/Cook top-Gas Fired x $ 15.00 = $ Refrigeration Unit ≤100Btu/h x $ 15.00 = $ Refrigeration Unit >100Btu/h x $ 25.00 = $ Refrigeration Unit >500Btu/h x $ 50.00 = $ Re-inspection fee (all) x $ 75.00 = $ Unit Heaters ≤ 100 Btu/h x $ 15.00 = $ Unit Heaters >100 Btu/h x $ 25.00 = $ VAV Boxes (Variable Air Volume, part of air conditioning system) x $ 10.00 = $ Wall Heaters - Gas Fired x $ 25.00 = $ Water Heater - Gas Fired x $ 25.00 = $ Permit Fee $ Table 4-8; Plan Review Fee $ Processing/Technology Fee $25.00 Total $ PRESSURE PIPING SCHEMATIC COMPLETE FOR GAS PIPING ONLY – USE A SEPARATE SHEET, IF NECESSARY SCHEMATIC IS TO SCALE SCHEMATIC NOT TO SCALE Show Pipe Size(s) and Length(s) from meter to all appliances NOTE: Any interior pressure regulators must be indicated COMMERCIAL BUILDING REV03.2022 Page 5 of 6 PLUMBING SYSTEM INFORMATION The following items need to be specified on the plans:  Fixture specifications and equipment with locations.  Location and type of all backflow assemblies for each fixture.  Calculations for Grease Interceptor.  Pipe size and location of sanitary and potable water systems.  Riser diagram of waste, vent, and rain water systems, including sizes.  Medical gas piping riser diagram, type of gas, storage room and size of piping. PLUMBING PERMIT FEES (per fixture) Commercial plumbing permits are required to submit line drawings. A plan review fee of 65% per Table 4-6 for plumbing permits will be assessed at time of submittal. Includes two (2) inspections with permit. Type of Fixture No. of Fixtures Cost per Fixture Subtotal Additional Plan Review fees x $ 75.00 = Alteration/repair piping x $ 15.00 = Backflow Assembly x $25.00 = Base Plumbing Fee $ 25.00 $25.00 Bath/Shower Combo x $ 15.00 = Building Main Waste x $ 25.00 = Clothes Washer x $ 15.00 = Dishwasher x $ 15.00 = Drinking Fountain x $ 15.00 = Floor Drains x $ 15.00 = Grease Interceptor x $ 75.00 = Grease Trap x $ 25.00 = Hose Bibb x $ 15.00 = Icemaker/Refrigerator x $ 15.00 = Irrigation – per meter x $ 25.00 = Kitchen Sink & Disposal x $ 15.00 = Laundry Tray x $ 15.00 = Lavatory x $ 15.00 = Med Gas Piping ≤ 5 inlets/outlets x $ 60.00 = Med Gas Piping > 5 inlets/outlets (plus ≤ 5 inlets/outlets) x $ 5.00 = Miscellaneous – regulated by plumbing code, not otherwise specified x $ 15.00 = Pretreatment Interceptor x $ 15.00 = Plumbing Contractor: Office No.: Email Address: Cell No.: Mailing Address: City: State: Zip: L&I Contractor License Number: Expiration Date: COMMERCIAL BUILDING REV03.2022 Page 6 of 6 PLUMBING PERMIT FEES (per fixture) Re-inspection Fee (all) x $ 75.00 = Roof Drains x $ 15.00 = Shower (only) x $ 15.00 = Sink (bar, service, etc.) x $ 15.00 = Toilets x $ 15.00 = Urinal x $ 15.00 = Vacuum Breakers x $ 25.00 = Water Heater x $ 25.00 = Water Heater - Tankless x $ 25.00 = Permit Fee Table 4-6; Plan Review Fee Processing/Technology Fee $25.00 Total PROPOSED BUILDING USE New Retail Medical Automotive Based  Industrial Office Restaurant Machine Shop  Other: ____________________________________ CROSS CONNECTION Please check all appliances that are proposed or permanently connected to the water supply. Ice Machine Dialysis Equip.Air washers Coffee Urn/Espresso Hydrotherapy Equip.Steam Generators Carbonated Bev.Dental Equip.Dye Vats Fume Hoods Laboratory Equip.Pressure Washers Degreasers Autoclave/Sterilizers Cooling Towers Hot Tub/Spa Decorative Fountain Fire Sprinkler Aquarium Swimming Pools Sprinkler w/chemicals Lawn Irrigation Well on property Other: ________________________ WASTEWATER DISCHARGE Does the plumbing system currently have a grease interceptor?  Yes No Don’t Know Does the plumbing system currently have an oil/water separator? Yes No Don’t Know Is water used in the business process (washing, rinsing, cooling)? Yes No Don’t Know Does your business require a NPDES permit? Yes No Don’t Know I hereby certify that the above information is correct and that the construction on, and the occupancy and the use of the above-described property will be in accordance with the laws, rules and regulation of the State of Washington. Signature Print Name Date           !42.+)7;'0+;;#;&#; !52.+)8;91(+4;;    ; '8+;; ;   $ !$"$ $ $$ $ $   $#$    $ #84++8;**4+66;  ; ;#$;%;; -7:#7'8+;"$ ;&; ; #)23+;2,;&24/;;#$ ";"; CITY OF ARLINGTON 18204 59th Avenue NE, Arlington, WA 98223 INSP ECTIONS: 360-403-3417 - Permit Center: 360-403-3551 B UILDING PERM IT 17216 51ST AVE NE, Suite 114 Parcel #: 31052100400100 Pe rmit #: 6100 PERMIT EXPIRES 180 DAYS AFTER DATE OF ISSUANCE. Scope of Work: INSTALL HIGH PILE STORAGE RACKS IN A WAREHOUSE AREA. Valuation: 26000.00 OWNER APPLICANT CONTRACTOR SMARTCAP ARLINGTON AIRP ORT INDUSTRIAL PARK QOZB, LLC DAISY ESTRADA Maudslien, LLC 8201 164TH AVE NW, SUITE 110 565 PORTER WAY 16923 32nd Ave SW REDMOND, WA 98052 P LACENITA, CA 92870 Burien, WA 98166 714-422-5893 206-200-1425 LIC: 602 398 429 EXP: 09/30/2025 LIC: MAUDSL*963NR EXP: 08/18/2026 MECHANICAL CONTRACTOR PLUM B ING CONTRACTOR LIC #:EXP:LIC #:EXP: JOB DESCRIPTION P ERMIT TYPE:COMMERCIAL RACKING CODE YEAR:2021 STORIES:1 CONST. TYP E:llB DWELLING UNITS:OCC GROUP :B; Business BUILDINGS:OCC LOAD: PERMIT APPROVAL The issuance or granting of this permit shall not be construed to be a permit for, or approval of, any violation of this Code or any other ordinance or order of the City, of any state or federal law, or of any order, proclamation, guidance advice or decision of the Governor of this State. To the extent the issuance or granting of this permit is interpreted to allow construction activity during any period of time when such construction is prohibited or restricted by any state or federal law, or order, proclamation, guidance advice or decision of the Governor of this State, this permit shall not authorize such work and shall not be valid. The building official is authorized to prevent occupancy or use of a structure where in violation of this Code, any other City ordinances of this jurisdiction or any other ordinance or executive order of the City, or of any state or federal law, or of any order, proclamation, guidance advice or decision of the Governor. The building official is authorized to suspend or revoke this permit if it is determined to be issued in error or on the basis of incorrect, inaccurate or incomplete information, or in violation of any City ordinance, regulation or order, state or federal law, or any order, proclamation, guidance or decision of the Governor. I AGREE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUCTION AND IN DOING THE WORK AUTHORIZED THEREBY; NO PERSON WILL BE EMPLOYED IN VIOLATION OF THE LABOR CODE OF THE STATE OF WASHINGTON RELATING TO WORKMEN'S COMPENSATION INSURANCE AND RCW 18.27. THIS APPLICATION IS NOT A PERMIT UNTIL SIGNED BY THE BUILDING OFFICIAL OR HIS/HER DEPUTY AND ALL FEES ARE PAID. IT IS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR A CERTIFICATE OF OCCUPANCY HAS BEEN GRANTED. IBC110/IRC110. SALES TAX NOTICE: Sales tax relating to construction and construction materials in the City of Arlington must be reported on your sales tax return form and coded City of Arlington #3101. 09/25/2024 Applicant Signature Date Building Official Date CONDITIONS ADHERE TO THE APPROVED PLANS. APPROVED JOB COPY SHALL BE ONSITE FOR INSPECTIONS. CALL FOR INSPECTIONS. The property owner shall ensure that the construction project complies with all applicable zoning codes and regulations. The property owner shall also ensure that the construction project does not cause any adverse impact on the surrounding environment or community. The property owner shall be responsible for obtaining all necessary permits and approvals from the relevant authorities before commencing construction. The property owner shall ensure that the construction project complies with all applicable design review requirements. THIS PERMIT AUTHORIZES ONLY THE WORK NOTED. THIS PERMIT COVERS WORK TO BE DONE ON PRIVATE PROPERTY ONLY. ANY CONSTRUCTION ON THE PUBLIC DOMAIN (CURBS, SIDEWALKS, DRIVEWAYS, MARQUEES, ETC.) WILL REQUIRE SEPARATE PERMISSION. PERMIT FEES Date Description Fee Amount 09/25/2024 Building Plan Review $390.96 09/25/2024 Credit Card Service $11.73 09/25/2024 Processing/Technology $25.00 09/25/2024 Building Permit $601.48 09/25/2024 Credit Card Service $18.79 Total Due:$1,047.96 Total Payment:$1,047.96 Balance Due:$0.00 09/25/2024 CALL FOR INSPECTIONS Call by 3:30 pm for ne xt day ins pe ction, allow 48 hours for Fire Ins pe ctions Whe n calling for an ins pe ction ple as e le ave the following information: Pe rmit Numbe r, Type of Ins pe ction be ing re que s te d, and whe the r you pre fe r morning or afte rnoon INSPECTION INFORM ATION Pas s /Fail       #$ %&%'*$ +%,%-+(..// 0 01-&,425 1-678 3!*# +%,%-+9!* 8 ::07;<) +=&'>%1-%?!@A!B %-' '1%- %&'>%C)D!*  ? DF 0 !@4!/ !* HHI#K!D ILIMNOPQNNR 3!. R//D. 70 <S/ ; 0  4D/ T1+/U*.! VONWOPXYNWQV]]VQNN Q^ZH+QN[VO_WOYP `PQVZaQ `PQV1bYPQ 8 0 %-d6%MOWQ 1-%-1 -1-+>%-1ecI6; 1+>%>WYV 1VOaZVfYPWZ[W 1bYPQ ]]VQNN YPWVZ[WYV-f_Q O[QPNQ  : : 0 7;;P]gQ %->-              !" #!$% &'!"!$%  ())*+    $ , /- 07-  /- 059:;<="   MNOPQORS TUVWOXYUZ [\VW ] MNOPQORS ^__PO`aXO\R. &    . ,    & f&. gh425528 425528 ,  "- f&. gh6488 6488 ,  "- ij;*;<eJkel m<=<eH)$   o   p7 p  o   p7 p g, 3 #  +  ,- 7 7 -           ,   / ,r  g 3 #  +  &#  + +- $,uuvwxyz{]uyuwy|x}~M€}xyy~^__Vuuvwxyz}]uyuwyzuv~M€}xyy~…‚‚ux|z{yyy]uyuwy|y}~M€}xyy~†ux|z{yyu]uyuwy|y}~M€}xyy~^