Loading...
HomeMy WebLinkAbout4617 191st St Ne_BLD6093_2025 Permit Packet Coversheet Community and Economic Development City of Arlington • 18204 59th Avenue NE • Arlington, WA 98223 • Phone (360) 403-3551 Page 1 of 1 Permit Number: Permit Type: Address/Parcel: Completed (Month/Year): Land Use ˆ Notice of Decision ˆ Staff Report ˆ Application ˆ Narrative ˆ Legal Description ˆ Vicinity Map ˆ Site Plan ˆ Landscape Plan ˆ Complete Streets Checklist ˆ Traffic Impact Analysis ˆ Snohomish County Traffic Mitigation Offer ˆ WSDOT Traffic Offer Form ˆ Tree Survey ˆ Stormwater Drainage Report ˆ Geotech Report ˆ Critical Area Evaluation Form ˆ SEPA Checklist ˆ Public Notice Material ˆ Noticing and Related Documents ˆ Water / Sewer Availability Certificate ˆ Unanticipated Discovery Plan Form ˆ Aerial Photo of Site ˆ Proposed Building Materials ˆ Lighting Plans and Lighting Cut Sheets ˆ Color Elevations ˆ Design Matrix ˆ Plat Map ˆ Title Report ˆ Lot Closures ˆ Preliminary Civil Plans ˆ Archaeological Survey o Confidential Documents. Contact the City to obtain. ˆ Topography (Existing Conditions) ˆ CC&R’s ˆ Deeds / Easements / Conveyances /Dedications ˆ Developer’s Agreement ˆ Recorded Copies ˆ Bonding or Assignment of Funds o Confidential Documents. Contact the City to obtain. ˆ Letters and Project Documents ˆ Other: Civil ˆ Issued Permit ˆ Application ˆ Other Applications ˆ Construction Calculation Worksheet ˆ Approved Plans ˆ Review Comment Form ˆ Letters and Project Documents ˆ Other Agency Permits ˆ Reports: o Drainage Report Pg: o Stormwater Pg: o Geotech Pg: o All Other Reports ˆ SEPA and Noticing Materials ˆ Inspections ˆ As-Builts ˆ Other: Building ˆ Issued Permit ˆ Application ˆ Additional Applications ˆ Approved Plans ˆ Site Plan ˆ Letters and Project Documents ˆ Calculations ˆ Project Specification Manuals ˆ Reports ˆ Certificate of Occupancy ˆ Inspections ˆ Other: BLD6093 Solar Installation 4617 191st St Ne March 2025 ✔ ✔ ✔ ✔ CITY OF ARLINGTON 18204 59th Avenue NE, Arlington, WA 98223 INSPECTIONS: 360-403-3417 - Permit Center: 360-403-3551 BUILDING PERMIT 4617 191ST ST NE Parcel #: 00955700005100 Permit #: 6093 PERMIT EXPIRES 180 DAYS AFTER DATE OF ISSUANCE. Scope of Work: 5.88 kW PV Solar Panel Installation on Roof Valuation: 36763.00 OWNER APPLICANT CONTRACTOR MANZANO CECIL & PATRICIA BRS Field Ops, LLC BRS Field Ops, LLC dba Blue Raven Solar 4617 191ST ST NE 1403 N Research Way 1403 N Research Way ARLINGTON, WA 98223-4788 Orem , Utah 84097 Orem, UT 87097 3854820045 385-482-0045 LIC: 604 276 519 EXP: 07/31/2025 LIC: BRSFIFO820N3 EXP: 08/23/2024 MECHANICAL CONTRACTOR PLUMBING CONTRACTOR LIC #:EXP:LIC #:EXP: JOB DESCRIPTION PERMIT TYPE:SOLAR INSTALLATION CODE YEAR:2021 STORIES:2 CONST. TYPE:VB DWELLING UNITS:OCC GROUP:R-3; Residential BUILDINGS:OCC LOAD: PERMIT APPROVAL The issuance or granting of this permit shall not be construed to be a permit for, or approval of, any violation of this Code or any other ordinance or order of the City, of any state or federal law, or of any order, proclamation, guidance advice or decision of the Governor of this State. To the extent the issuance or granting of this permit is interpreted to allow construction activity during any period of time when such construction is prohibited or restricted by any state or federal law, or order, proclamation, guidance advice or decision of the Governor of this State, this permit shall not authorize such work and shall not be valid. The building official is authorized to prevent occupancy or use of a structure where in violation of this Code, any other City ordinances of this jurisdiction or any other ordinance or executive order of the City, or of any state or federal law, or of any order, proclamation, guidance advice or decision of the Governor. The building official is authorized to suspend or revoke this permit if it is determined to be issued in error or on the basis of incorrect, inaccurate or incomplete information, or in violation of any City ordinance, regulation or order, state or federal law, or any order, proclamation, guidance or decision of the Governor. I AGREE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUCTION AND IN DOING THE WORK AUTHORIZED THEREBY; NO PERSON WILL BE EMPLOYED IN VIOLATION OF THE LABOR CODE OF THE STATE OF WASHINGTON RELATING TO WORKMEN'S COMPENSATION INSURANCE AND RCW 18.27. THIS APPLICATION IS NOT A PERMIT UNTIL SIGNED BY THE BUILDING OFFICIAL OR HIS/HER DEPUTY AND ALL FEES ARE PAID. IT IS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR A CERTIFICATE OF OCCUPANCY HAS BEEN GRANTED. IBC110/IRC110. SALES TAX NOTICE: Sales tax relating to construction and construction materials in the City of Arlington must be reported on your sales tax return form and coded City of Arlington #3101. 09/12/2024 Applicant Signature Date Building Official Date 9/13/2024 CONDITIONS ADHERE TO THE AP PROVED PLANS. AP PROVED P LANS AND SIGNED PERMIT SHALL BE ONSITE FOR INSPECTIONS. CALL FOR INSP ECTIONS. The property owner shall ensure that the construction project complies with all applicable zoning codes and regulations. The property owner shall also ensure that the construction project does not cause any adverse impact on the surrounding environment or community. The property owner shall be responsible for obtaining all necessary permits and approvals from the relevant authorities before commencing construction. The property owner shall ensure that the construction project complies with all applicable design review requirements. THIS P ERMIT AUTHORIZES ONLY THE WORK NOTED. THIS P ERMIT COVERS WORK TO BE DONE ON P RIVATE PROPERTY ONLY. ANY CONSTRUCTION ON THE P UBLIC DOMAIN (CURBS, SIDEWALKS, DRIVEWAYS, MARQUEES, ETC.) WILL REQUIRE SEP ARATE PERMISSION. PERM IT FEES Date De s cription Fe e Amount 09/12/2024 Building Plan Review $499.93 09/12/2024 Credit Card Service $15.00 09/12/2024 Processing/Technology $25.00 09/12/2024 Building Permit $765.51 Total Due :$1,305.44 Total Payme nt:$1,305.44 B alance Due :$0.00 CALL FOR INSPECTIONS Call by 3:30 pm for ne xt day ins pe ction, allow 48 hours for Fire Ins pe ctions Whe n calling for an ins pe ction ple as e le ave the following information: Pe rmit Numbe r, Type of Ins pe ction be ing re que s te d, and whe the r you pre fe r morning or afte rnoon INSPECTION INFORM ATION Pas s /Fail RESIDENTIAL PHOTOVOLTAIC SOLAR PANEL Community and Economic Development City of Arlington • 18204 59th Ave NE • Arlington, WA 98223 • Phone (360) 403-3551 The City of Arlington requires a building permit to install Photovoltaic (PV) Solar Panel(s) for residential and commercial uses. This policy governs Residential uses only. Other permits may be required per Washington State Labor and Industries or Utility Providers. SUBMIT ELECTRONIC FILES FOR EACH OF THE FOLLOWING: Existing Roof Structure: Existing Roof Material: Building Square Footage: Number of Stories: I hereby certify that I am the Owner Contractor and authorized to sign this application and that the above information is correct and construction on, and the occupancy and the use of the above-described property will be in accordance with the laws, rules and regulation of the State of Washington, and the City of Arlington. Signature Print Name Date Type of Permit: New Installation Addition Replacement Property Address: Project Valuation: Lot #: Parcel ID No.: Subdivision: Project Scope of Work: Primary Contact: Owner Contractor Owner Name: Home No.: Email Address: Cell No.: Mailing Address: City: State: Zip: Contractor Name: Office No.: Email Address: Cell No.: Mailing Address: City: State: Zip: L&I Contractor License Number: Expiration Date: REQUIRED DOCUMENTS City of Arlington Solar Panel Application Roof Plan and Construction Documents Manufacturer’s installation specifications Engineering, (if required) INSPECTION REQUIREMENTS Roof mount panels require two (2) inspections minimum 1.The first inspection is for the roof mount racking hardware to verify compliance and attachment. (You may schedule this inspection for the day the panels are being installed. You may begin mounting panels over the racking prior to inspection but there must be enough racking exposed for the inspector to verify compliance.)2.The final inspection shall be scheduled when the project is complete and after Labor and Industries has approved the electrical. SAVE PRINT 4617 191st St NE, Arlington, Washington, 98223 51 00955700005100 Cecil Manzano cecil.manzano@gmail.com BRS Field Ops, LLC permitting.department@blueravensolar.com BRSFIFO820N3 Diana Sanchez 36763 Quarter SE SKY-BLUE ESTATES 1403 N Research Way Orem UT 84097 4617 191st St NE Arlington WA 98223 3602814028 385-482-0045 08/23/24 Shingle 293.99 2 07 / 30 / 2024 Permitting Coordinator kW PV Solar Panel Installation on Roof 5.88 ___________________________________________________________________________________________ Domus Structural Engineering, LLC P.O. Box 560 Broomfield, CO 80038 530-864-7055 projects@domusstruc.com To: Blue Raven Solar 1403 North Research Way, Building J Orem, UT. 84097 Subject: Certification Lette Manzano Residence 4617 191st St NE Arlington, WA. 98223 To Whom It May Concern, The scope of this report is strictly limited to an evaluation of the fastener attachment, underlying framing and supporting structure only. The attachments to the existing structure are required to be in a staggered pattern to ensure proper distribution of loading. All panels, racking and hardware shall be installed per manufacturer specifications and within specified design limitations. All waterproofing shall be provided by the manufacturer. Domus Structural Engineering assumes no responsibility for misuse or improper installation of the solar PV panels or racking. July 29, 2024 The roof structures of (MP1&2) consist of composition shingle on roof plywood that is supported by pre-manufactured trusses that are spaced at @ 24"o.c.. The top chords, sloped at 27 degrees, are 2x4 sections, the bottom chords are 2x4 sections and the web members are 2x4 sections. The truss members are connected by steel gusset plates. The max unsupported projected horizontal top chord span is approximately 7'-0''. The roof structure of (MP3) consists of composition shingle on roof plywood that is supported by 2x6 rafters @ 24"o.c. with ceiling joists acting as rafter ties. The rafters have a max projected horizontal span of 8'-0", with a slope of 27 degrees. The rafters are connected at the ridge to a load bearing wall and are supported at the eave by a load bearing wall. The existing roof framing systems of (MP1&2) are judged to be adequate to withstand the loading imposed by the installation of the solar panels. No reinforcement is necessary. The existing roof framing system of (MP3) is judged to be adequate to withstand the loading imposed by the installation of the solar panels. No reinforcement is necessary. The spacing of the solar standoffs should be kept at 72" o.c. for landscape and 48" o.c. for portrait orientation, with a staggered pattern to ensure proper distribution of loads. A jobsite observation of the condition of the existing framing system was performed by an audit team of Blue Raven Solar as a request from Domus Structural Engineering. All review is based on these observations and the design criteria listed below and only deemed valid if provided information is true and accurate. On the above referenced project, the roof structural framing has been reviewed for additional loading due to the installation of the solar PV addition to the roof. The structural review only applies to the section of the roof that is directly supporting the solar PV system and its supporting elements. The observed roof framing is described below. If field conditions differ, contractor to notify engineer prior to starting construction. Manzano Arlington WA 1 ___________________________________________________________________________________________ Domus Structural Engineering, LLC P.O. Box 560 Broomfield, CO 80038 530-864-7055 projects@domusstruc.com Design Criteria: ●Applicable Codes = 2021 IBC/IRC, ASCE 7-16 ●Roof Dead Load = 7 psf (MP1&2) -- 8 psf (MP3) ●Roof Live Load = 20 psf ●Wind Speed = 110 mph (Vult), Exposure C ● ● Sincerely, John Calvert, P.E. Project Engineer Please contact me with any further questions or concerns regarding this project. Attachment: 1 - 5/16 dia. lag screw with 2.5 inch min. embedment depth, at spacing shown above. Roof Snow Load = 25 psf Manzano Arlington WA 2 Digitally signed by John A. Calvert Date: 2024.07.29 16:33:22 -06'00' ___________________________________________________________________________________________ Domus Structural Engineering, LLC P.O. Box 560 Broomfield, CO 80038 530-864-7055 projects@domusstruc.com 25.0 psf (ASCE7 - Eq 7-1) 1 (ASCE7 - Table 7-2) 1 (ASCE7 - Table 7-3) 1 25.0 psf (ASCE7 - Eq 7-2) 1.00 25.0 psf 3.37 ps 3.0 ps 4.00 f 6.08 f 24.33 sf 73 lb 4.00 psf 2.00 psf 0.73 psf 0.00 ps (Ceiling Not Vaulted) 0.27 ps 7.0 psf 7.9 ps 4.00 2.00 1.15 0.00 (Ceiling Not Vaulted) 0.85 8.0 psf 8.98 PV Dead Load = 3 psf (Per Blue Raven Solar) DL Adjusted to 27 Degree Slop Point Loads of Standoffs DL Adjusted to 27 Degree Slop Miscellaneou Vaulted Ceiling Miscellaneou Total Roof DL (MP3) Total Roof DL (MP1&2) Roof Dead Load (MP3) Composition Shingle Roof Live Load = 20 psf Roof Plywood Roof Dead Load (MP1&2) Composition Shingle Note: Roof live load is removed in area's covered by PV array Roof Snow Load Calculations pg = Ground Snow Load = Ce = Exposure Factor = pf = 0.7 Ce Ct I pg Ct = Thermal Factor = I = Importance Factor = Cs = Slope Factor = Standoff Tributary Area = ps = Cspf ps = Sloped Roof Snow Load = pf = Flat Roof Snow Load = DL Adjusted to 27 Degree Slop Gravity Loading PV System Weight Weight of PV System (Per Blue Raven Solar) X Standoff Spacing = Y Standoff Spacing = Note: PV standoffs are staggered to ensure proper distribution of loadin Roof Plywood Vaulted Ceiling 2x4 Top Chords @ 24"o.c. 2x6 Rafters @ 24"o.c. Manzano Arlington WA 3 ___________________________________________________________________________________________ Domus Structural Engineering, LLC P.O. Box 560 Broomfield, CO 80038 530-864-7055 projects@domusstruc.com 110 mph C Gable Roof 27 degrees 20 ft 21.3 ft 0 ft (Eq. 26.10-1) 0.90 (Table 30.3-1) 1.00 (Fig. 26.8-1) 0.85 (Table 26.6-1) 1.00 110 mph (Fig. 26.5-1A) II (Table 1.5-1) qh = 23.75 psf Zone 1 Zone 2 Zone 3 Positive ya =0.67 0.77 0.80 0.67 GCp =-1.45 -2.41 -3.10 0.44 (Fig. 30.3) Uplift Pressure =-23.1 psf -44.1 psf -58.8 psf 7.1 psf (Eq. 29.4-7) ASD Uplift Pressure =-13.8 psf -26.4 psf -35.3 psf 9.6 psf X Standoff Spacing = 4.00 ft 4.00 ft 2.67 ft Y Standoff Spacing = 6.08 ft 3.04 ft 3.04 ft Tributary Area = 24.33 sqft 12.17 sqft 8.11 sqft Dead Load on attachment = 73 lb 37 lb 24 lb Footing Uplift (0.6D+0.6W) = -293 lb -300 lb -272 lb Zone 1 Zone 2 Zone 3 Positive ya =0.69 0.79 0.80 0.69 GCp =-1.49 -2.48 -3.20 0.46 (Fig. 30.3) Uplift Pressure =-24.4 psf -46.6 psf -60.8 psf 7.6 psf (Eq. 29.4-7) ASD Uplift Pressure (0.6W)=-14.7 psf -28.0 psf -36.5 psf 9.6 psf X Standoff Spacing = 6.00 ft 6.00 ft 4.00 ft Y Standoff Spacing = 3.50 ft 1.75 ft 1.75 ft Tributary Area = 21.00 sqft 10.50 sqft 7.00 sqft Dead Load on attachment = 63 lb 32 lb 21 lb Footing Uplift (0.6D+0.6W) = -270 lb -275 lb -243 lb -300 lb 450 lb Therefore, OK Fastener =1 - 5/16" dia. lag Number of Fasteners = 1 Embedment Depth = 2.5 in. Pullout Capacity Per Inch = 250 lb Fastener Capacity = 625 lb w/ F.S. of 1.5 & DOL of 1.6= 667 lb Therefore, OK Wind Calculations Maximum Design Uplift = Design Wind Pressure Calculations qh = 0.00256 * Kz * Kzt * Kd * Ke * V^2 Kz (Exposure Coefficient) = Kzt (Topographic Factor) = Wind Speed Exposure Category Roof Shape Roof Slope Effective Wind Area Per ASCE 7-16 Components and Cladding Input Variables Fastener Capacity Check Mean Roof Height Ground Elevation Kd (Wind Directionality Factor) = 667.2 lb capacity > 300 lb demand Ke (Ground Elevation Factor) = V (Design Wind Speed) = Risk Category = Standoff Uplift Calculations-Portrait Standoff Uplift Calculations-Landscape Standoff Uplift Check Standoff Uplift Capacity = 450 lb capacity > 300 lb demand Manzano Arlington WA 4 ___________________________________________________________________________________________ Domus Structural Engineering, LLC P.O. Box 560 Broomfield, CO 80038 530-864-7055 projects@domusstruc.com (MP1&2)PASS Dead Load 7.9 ps PV Load 3.4 ps Snow Load 25.0 ps Governing Load Combo = DL + S Total Load 36.2 psf Fb (psi) = f'b x Cd x C x Cr (NDS Table 4.3.1) 900 x 1.15 x 1.5 x 1.15 llowed Bending Stress = 1785.3 psi (wL^2) / 8 = 443.73 ft# = 5324.82 in# ctual Bending Stress = (Maximum Moment) / S = 1738.8 psi L/180 (E = 1600000 psi Per NDS) = 0.466 in Deflection Criteria Based on = (w*L^4) / (185*E*I) = = L/443 > L/180 Therefore OK Allowed Deflection (Live Load) =L/240 0.35 in (w*L^4) / (185*E*I) L/642 > L/240 Therefore OK Member Area = Fv (psi) = 180 psi (NDS Table 4A) llowed Shear = Fv * A = Max Shear (V) = w * L / 2 = 254 lb Check Bending Stress (True Dimensions) Continuous Span 0.190 in 0.131 in Member Properties Member Size 2x4 S (in^3) 3.06 DF#2 Member Spacing @ 24"o.c. Maximum Momen = Check Deflection I (in^4) 5.36 Lumber Sp/G ctual Deflection (Live Load) = llowed Deflection (Total Load) = ctual Deflection (Total Load) = Allowed > Actual -- 97.4% Stressed -- Therefore, OK 945 lb Allowed > Actual -- 26.9% Stressed -- Therefore, OK 5.3 in^2 Check Shea w = 72 pl 2x4 Top Chords @ 24"o.c. Member Span = 7' - 0" Framing Check Manzano Arlington WA 5 ___________________________________________________________________________________________ Domus Structural Engineering, LLC P.O. Box 560 Broomfield, CO 80038 530-864-7055 projects@domusstruc.com (MP3)PASS Dead Load 9.0 ps PV Load 3.4 ps Snow Load 25.0 ps Governing Load Combo = DL + S Total Load 37.3 psf Fb (psi) = f'b x Cd x C x Cr (NDS Table 4.3.1) 900 x 1.15 x 1.3 x 1.15 llowed Bending Stress = 1547.3 psi (wL^2) / 8 = 597.529 ft# = 7170.353 in# ctual Bending Stress = (Maximum Moment) / S = 948.2 psi L/180 (E = 1600000 psi Per NDS) = 0.533 in Deflection Criteria Based on = (5*w*L^4) / (384*E*I) = = L/464 > L/180 Therefore OK Allowed Deflection (Live Load) =L/240 0.4 in (5*w*L^4) / (384*E*I) L/691 > L/240 Therefore OK Member Area = Fv (psi) = 180 psi (NDS Table 4A) llowed Shear = Fv * A = Max Shear (V) = w * L / 2 = 299 lb Framing Check Simple Span 0.139 in 0.207 in (True Dimensions) 1485 lb Allowed > Actual -- 20.2% Stressed -- Therefore, OK Check Bending Stress Maximum Momen = Allowed > Actual - 61.3% Stressed -- Therefore, OK Check Deflection Allowed Deflection (Total Load) = ctual Deflection (Total Load) = ctual Deflection (Live Load) = w = 75 pl 2x6 Rafters @ 24"o.c. Member Span = 8' - 0" Member Properties Member Size S (in^3) I (in^4) Lumber Sp/G Member Spacing 2x6 7.56 20.80 DF#2 @ 24"o.c. Check Shea 8.3 in^2 Manzano Arlington WA 6 ___________________________________________________________________________________________ Domus Structural Engineering, LLC P.O. Box 560 Broomfield, CO 80038 530-864-7055 projects@domusstruc.com Level Area Weight (psf) Weight (lb) Roof 2338 sf 7.9 psf 18368 lb Ceiling 2338 sf 6.0 psf 14028 lb Wood Siding 100 ft 5.0 psf 2000 lb (8'-0" Wall Height) Int. Walls 100 ft 6.4 psf 2560 lb 36956 lb 3.0 psf 299 sf 897 lb 3696 lb 897 lb 2.4% Lateral Check 3696 lb > 897 lb, Therefore OK Existing Weight of Effected Building Existing Weight of Effected Building Proposed Weight of PV System Weight of PV System (Per Blue Raven Solar) Approx. Area of Proposed PV System Approximate Total Weight of PV System 10% Comparison 10% of Existing Building Weight (Allowed) Approximate Weight of PV System (Actual) Percent Increase Manzano Arlington WA 7 ___________________________________________________________________________________________ Domus Structural Engineering, LLC P.O. Box 560 Broomfield, CO 80038 530-864-7055 projects@domusstruc.com Appendix A: General Notes GENERAL ●The contractor shall verify all dimensions, property setbacks, AHJ/HOA CC&R's, elevations and site conditions before starting work and shall notify Domus Structural Engineering, LLC of any discrepancies. ●All report conclusions represent Domus Structural Engineering, LLC's best professional judgment based upon industry standards. ●Resolve any conflicts on the drawings with Domus Structural Engineering, LLC before proceeding with construction. ●The design criteria used for this project & listed on the first page of the report is based on the engineers best judgement and/or provided by the ATC council. AHJ specific requests may differ. Please contact our team if the design criteria needs to be modified. ●A site visit was not physically conducted by Domus Structural Engineering, LLC. The accompanying calculations and certification are provided with the understanding that the site building and construction standards meet an acceptable level of industry standards. It shall be the contractors responsibility to identify any irregularities such as inconsistent framing conditions, water damage, fire damage, cracked, split or noticeably deflecting framing members. ●Domus Structural Engineering, LLC is not responsible for enforcing safety measures or regulations. The contractor shall design, construct, and maintain all safety devices including shoring and bracing, and shall be solely responsible for conforming to all local, state and federal safety and health standards, laws and regulations. The contractor shall take necessary precautions to maintain and insure the integrity of the structure during construction. If a lawsuit is filed by one of the contractor's or subcontractor's employees, or any one else, the contractor will indemnify, defend and hold the owner and Domus Structural En ineerin , LLC harmless of an and all such claims. ●Any and all waterproofing shall be provided by the contractor. Domus Structural Engineering, LLC is not responsible for waterproofing. ●All hardware shall be installed per manufacturer specifications and within specified design limitations. Domus Structural Engineering, LLC assumes no responsibility for incorrectly installed hardware or hardware installed outside of the manfacturer specifications. USER RELIANCE ●Domus Structural Engineering, LLC was engaged by Blue Raven Solar (Client) to perform this assessment. This report and the information therein, are for the exclusive use of the Client. This report has no other purpose and shall not be relied upon, or used, by any other person or entity without the written consent of Domus Structural Engineering, LLC. Third parties that obtain this report, or the information within shall have no rights of recourse or recovery against Domus Structural Engineering, LLC, its officers or employees. ROOF MOUNTED ARRAYS ●If an analysis of a supporting stucture is included in our scope of work, the structural assessment only applies to the section of the roof that is directly supporting the proposed solar PV system. ●No structural members can be cut for conduit, etc., unless specifically shown. Obtain prior written approval for installation of any additional conduit, etc. ●It is assumed that a standard quality of construction care was used to construct the original building. It shall be the contractors responsibility to field verify any and all framing members supporting the proposed PV array are in adequate condition. The contractor shall field inspect for sub-standard construction means, signs of dry rot, mold, fire damage, etc. and notify engineer if any compromised material is found on site prior to starting construction. ●It is assumed that there have been no additional loads (HVAC or MEP equipment, additional layers of roofing, etc) added to the building over the course of the structure's histroy. The contractor and/or client shall verify this with the property owner and notify Domus Structural Engineering, LLC if additional load has been added to the structure already. ●Flexible utility connections must be used at any building seismic joint. ●Care should be taken to ensure that PV arrays do not preclude drainage of rain water. ●Unless otherwise noted, construction material shall be evenly distributed if placed on framed floors or roofs. Loads shall not exceed the allowable loading for the supporting members and their connections. ●All lags or wood screws at the roof shall be stainless steel and installed withing the middle 1/3 of the dimensional width of the framing members. ●All fasteners shall be a minimum of 6" away from any truss panel or hinge joints, truss plates and/or member ends. Field verify location of fasteners prior to starting construction. All fasteners shall be pre-drilled to avoid splitting existing lumber. ●Domus Structural Engineering, LLC is not responsible for downslope effects of snow shedding or sliding off of the PV array nor any damage to downslope decks, roofs, walkways, landscaping, automobiles, pets, people, etc.. If snow guards are requested by the customer, notify Domus Structural Engineering, LLC. Manzano Arlington WA 8     !" #$%&'()*+)*,-.1" 23&$'4567#/8899 : $6$);%<=)>A?B ;$C7DE)<F @1! 2-$;C&EE&*GH1 FIF IJ0 5$;C&EE&*GK4$5);EC$*ELM'N$;)O$*6,');K%,CPQR IKFFS=-.,');-)*$'*6E)'')E&,*,*,,TU0V1  K VX  PA9 1 .2![V \ ]$6&4$*E&)'^@8 ^99V8 :  J_9 : I AV9 #(-``9a18 b;&6E&*3,6E$;44;$66 $G)'d$6%;&5E&,* e*$;)C$ e*$;-<,*$  :: :`(f#`#g-#: 3(`dE,; -;&C);>#,*E)%E -<,*$ 44;$66 #,*E;)%E,;>5$ &%$*6$7#,');#);6,*#)C5M$'' FI\F\ I : $6$);%<=)>#D###D27##);6,*#)C5M$'' FI\F\ I : $6$);%<#D#g2           !"#$"%&'()* + ,-)(). ,,)/.          ,-)(). (, 5)* '86 39)-=.6/+( '86 39)->?@ (( ,-)().OPQRSQTU VWXYQZ[W\ ]^XY _ OPQRSQTU `aaRQbcZQ^T7') + ,-)(). 7'+5.( + --( + f7 <.gh2;2; 75)(()./ 2;2;f7 <.gh;133;133 5,)' '*6),ij@&@ L$ k l J"( <'(,.( o)'(). .()- p'..'= p'*,.( o)'(). .()- p'..'= p'*-) =' -), r),(). ,(s5')6 g =' -), r),(). ,()6 '5vvwxyvyz_vxvwx{xz|O}~zx{y|`aaXvvwxyvyw_vxvwx{ƒy|O}~zx{y|„€€vƒ…ƒƒywƒ_vxvwx†yx|O}~zx{y|`vƒ…ƒƒywv_vxvwx†yx|O}~zx{y|‡TUQTW