Loading...
HomeMy WebLinkAbout114 Gifford Ave_BLD6389_2025 ACCESSORY DWELLING UNIT RESIDENTIAL ZONING VERIFICATION Community and Economic Development City of Arlington • 18204 59th Ave NE • Arlington, WA 98223 • Phone (360) 403-3551 Required Submittals: Accessory Dwelling Unit Zoning Verification Application Detailed Site Plan Site Information 114 N Gifford Ave Arlington, WA 98223 600,000 Property Address: Project Valuation: 00455400701400 Parcel ID No.: Preferred Contact: Owner Contractor Abraham Hernandez Owner Name: Home No.: abe1@cascadescleanup.com 425-754-7169 Email Address: Cell No.: 12916 12th Ave NW Marysville WA 98271 Mailing Address: City: State: Zip: Patrick Hernandez Contractor Name: Office No.: Email Address: patrick@nex-ivo.com Cell No.: 425-350-0381 Septic Tank on Property? Yes No Private Well on Property? Yes No If so, please provide Snohomish County Health Department approval and indicate on site plan. 3321.97 4356 .76 SF of all Structures: ÷ (Total Lot Size) = % This square footage includes the footprint area of all existing and proposed structures on the property including house, garages, sheds, covered patios, and decks permitted by the building code. Project Details Project Description: I would like to build two detached ADU’s on the backyard of the existing lot. I plan on keeping the exisiting SFR on the property 1. Proposed Accessory Dwelling Unit: W: 27’6” L: 24 Total SF: 1320 2. Additional Proposed Structure: (If applicable) W: 27’6” L: 23’6” Total SF: 1081.97 The maximum gross floor area for each ADU is 1,000 square feet. 4356 1,524.6 3. Allowed Lot Coverage: Total Lot Size: SF x 35% = SF Lot Size can be found on the Plat Map or Snohomish County Assessor Property Information 4. Height of primary residence: 24 ft Height of proposed structure: 22 ft The roof height of an ADU is required to meet the underlying zone height limitation, unless the height of the principal unit is less than 24 feet, in which case, the maximum height of an ADU shall be 24 feet. Location of Accessory Dwelling Unit: Attached (within existing primary residence) Detached (separate from existing structure) Located in Detached Structure ACCESSORY DWELLING UNIT RESIDENTIAL ZONING VERIFICATION Community and Economic Development City of Arlington • 18204 59th Ave NE • Arlington, WA 98223 • Phone (360) 403-3551 Site Plan Details: Any major exterior additions or alterations for an Parking spaces: attached ADU shall be located to the side or rear of the a. Lots < 6,000sf = 1 additional parking space principal residence. b. Lots ≥ 6,000sf = 2 additional parking spaces Detached ADU shall be subordinate to the primary structure. All accessory structures shall be placed to the side or rear of the primary structure and a minimum of 8 feet behind the face of the primary structure Please ensure to include the following details on your site plan: x Property dimensions (length/ width) x All existing structures with dimensions (length/ width) x Proposed structure with dimensions (length/ width) x Well/ septic/ drainfield location (if applicable) x Distance between proposed structure and property lines/ existing structures/ septic/ etc. x Ponds, streams, existing trees, hillsides, fences, etc. x Any trees greater than 12” diameter to be removed Additional Information: 1. An ADU is required to be consistent with the 3. An ADU is required to connect to both city water architectural character of the principal residence and and wastewater systems. The ADU shall meet the comply with the Development Design Standards for utility connection criteria of AMC Title 13. the zone in which the ADU is located. Materials, roof forms, and window proportions shall match that of the 4. An ADU shall pay fifty percent (50%) of the city principal unit/building. The review of the design will transportation impact fee and community park impact be conducted administratively with the building fee for a single-family dwelling unit. Fees are regulated permit. by AMC Chapter 20.90. 2. A detached ADU is allowed to be sold separately 5. An ADU is exempt from city transportation impact through the conveyance of a condominium unit of the fees, park impact fees, and off-street parking principal residence. To complete the conveyance of a requirements (only if parking is available on an condominium unit the detached ADU shall meet the abutting public street), but only if a restrictive utility connection regulations of AMC Chapter 13.04 covenant is recorded on the property stating the ADU and 13.08. The declaration of condominium documents shall be rented at an affordable rate of 60% AMI or are required to be submitted to the city for review and less for a duration of 50 years. The restrictive approval. Once approved by the city the document covenant shall be reviewed and approved by the city, shall be recorded with the Snohomish County Auditor’s recorded with the Snohomish County Auditor’s Office, Office and a conformed copy returned to the and a conformed copy returned to the Community and Community and Economic Development Department. Economic Development Department. Abraham Hernandez Abraham Hernandez 2/25/2025 Applicant Signature: Print Name: Date: REV06.2024 Scale 1/4”=1’-0”West Elevation Scale 1/4”=1’-0”North Elevation Scale 1/4”=1’-0”East Elevation Scale 1/4”=1’-0”South Elevation A2.0 DRAWN BY Dustin F Howard Drawing Date: CLIENT PROJECT 02–01-2025 Abraham Hernandez Revision Date: 114 N Gifford Ave. HDC DESCRIPTION HERNANDEZ DADU 2 N/A Arlington, WA, 98223 N-S-W-E Elevations Parcel # 00455400701400 Scale 1/4”=1’-0”West Elevation Scale 1/4”=1’-0”North Elevation Scale 1/4”=1’-0”East Elevation Scale 1/4”=1’-0”South Elevation A2.0 DRAWN BY Dustin F Howard Drawing Date: CLIENT PROJECT 02–01-2025 Abraham Hernandez Revision Date: 114 N Gifford Ave. HDC DESCRIPTION HERNANDEZ DADU 2 N/A Arlington, WA, 98223 N-S-W-E Elevations Parcel # 00455400701400 Scale 1/4”=1’-0”Main Floor Plan 24'-0" 5 1/2" 3'-0" 1'-0" STAIRS TO SECOND LEVEL 2'-8" WH 1 CAR GARAGE 9'-0" UNDER STAIRSSTORAGE 14'-5" 11'-5 1/2" 10 1/2" U P 4'-4 1/2" 3'-0" 27'-6" 27'-6" 3 1/2" ENTRY 3'-0" LIVING AREA 3'-11" 3'-0" FRIDGE LANDING STOOLS BATHROOMT 2'-6" KITCHEN2'-0" 10'-1 1/2" DINING AREA 10'-1" SINK RANGE SINK BELOW DW W/DSTACK 3'-0" 2'-11 1/2" 3'-0" 4'-2 3/4" 3'-0" 3'-0" 6'-9 3/4" 1'-0" 24'-0" Scale 1/4”=1’-0”Upper Floor Plan 24'-0" 8'-8 1/2" 8'-2 11/16" 4'-0" 1'-8 1/4" C C LANDING T T 3'-0" SINK DBL SINK SHOWERSHOWER 7'-3/4" BATHROOM PRIMARY BATHROOM 6'-9" 12'-5 3/4" 3 1/2" C 2'-6" 2'-6" 3 1/2" DOWN 11'-5 1/2" 2'-8" PRIMARY BEDROOM 2'-8" 10 1/2" 3 1/2" 27'-6" 27'-6" TOTAL SQ FT.= 1,320.00 SQ. FT.TOTAL CONDITIONED AREA LIVING SPACE= 991.00 SQ. FT.TOTAL GARAGE SQ FT. = 329.0 SQ. FT. 6'-0" BEDROOM 2 3 1/2" CLOSET 6'-0" 9'-1/4" 6'-0" CLOSET 3'-0" 3'-0" 12'-4 1/4" 6'-0" 5'-7 3/4" 24'-0" A1.0 DRAWN BY Dustin F Howard Drawing Date: CLIENT PROJECT 02–01-2025 Abraham Hernandez 114 N Gifford Ave. DESCRIPTION Revision Date: HDC MAIN FLOOR PLAN & HERNANDEZ DADU 2 N/A Arlington, WA, 98223 UPPER FLOOR PLAN Parcel # 00455400701400 Scale 1/4”=1’-0”Main Floor Plan 23'-6" 5 1/2" 6X6 POST 11'-6 1/4" 11'-6 1/4" ACCESSDRIVEWAY COVERED 9'-6" 9'-6" 5 1/2" 1 CAR GARAGE 27'-6" 27'-6" 10'-5 1/2" 9'-0" 11'-0" 18'-0" 3 1/2" 3'-0" 3'-0" CLOSET W/DSTACK AREASTORAGE 3'-0" MUDROOM ENTRY/ 3'-0" WH 3'-6" 3'-0" 7'-6 1/2" 4'-0" 3'-0" U P 3'-0" 4'-0" 5 1/2" STORAGE UNDER STAIRS 10 1/2" BENCH 6'-11" 13'-1 1/2" STAIRS TO 2ND LEVEL 23'-6" TOTAL SQ FT.= TOTAL CONDITIONED AREA LIVING SPACE= TOTAL GARAGE SQ FT. = Scale 1/4”=1’-0”Upper Floor Plan 23'-6" 1,081.97 5'-0" 258.5 SQ.FT. 11'-4 7/16" 3'-0" 3'-1 11/16" 3'-0" 2'-11 7/8" 4'-3/8" 2'-0" CLOSET 4'-0" BAR TOP BEDROOM 2 SINK KITCHEN D.W. BELOW RANGE FRIDGE DADU 2- 5’-0” BUFFER 823.47 SQ. FT. 13'-9" 6'-0" STOOLS DINING AREA3'-3 5/8" 20'-6" LIVING AREA 2'-8" 3 1/2" 7'-5 1/4" 27'-6" 27'-6" 2'-8" BEDROOM 1 2'-6" CLOSET 6'-0" 13'-9" 4'-0" SHOWER T BATHROOM 5'-0" SINKDBL. 2'-6"ENTRY 6'-0" 4'-3/8" DO WN 1'-0" 10 1/2" 11'-2 1/2" 3'-0" STAIRS TO LOWER LEVEL LANDING 23'-6" A1.0 DRAWN BY Dustin F Howard Drawing Date: CLIENT PROJECT 02–01-2025 Abraham Hernandez 114 N Gifford Ave. DESCRIPTION Revision Date: HDC Main Floor Plan & HERNANDEZ DADU 1 N/A Arlington, WA, 98223 Upper Floor Plan Parcel # 00455400701400 Scale 1/2”=1’-0”Section Plan 21'-6 9/16" 2X6 DF#2 FRAMING @ 16” O.C. 2'-0" 2X6 DF#2 FRAMING @ 16” O.C. GRADE R-21 INSULATION RAFTER TAIL 8" FILL 2'-0" METAL ROOFING 1'-4" 8" 5 1/2" 5 1/2" ENGINEERED TRUSSES BY OTHERS 9'-1 1/8" 8'-1 1/8" ICE/WATER SHIELD 1 CAR GARAGE9 1/2" @ 24” O.C. 4” CONCRETE SLAB W/ #4 BARS @ 48” O.C. FILL 14'-0" OPENING IN FLOOR 5/8” OSB SHEATHING 11'-5 1/2" STAIRS UPSTAIRS LIVING AREA 8” FOUNDATION 4" 8" 5 1/2" 3" 27'-6" 8" PEAK 2X6 INTERIOR BEARING WALL (2) TOP PLATE 16”X 8” CONCRETE FOOTING 2X12 LEDGER KITCHEN/LIVING9.5” BCI 5000 1.7 SERIES @ 16” O.C.R-30 INSULATION CRAWL SPACE 12'-10" 12 3/4” OSB T&G SHEATHING 2X6 DF#2 FRAMING @ 16” O.C. 2.5 3" FILL 2'-0" SST HURRICANE TIE 4” PERF. PIPE @ 16” O.C.2X12 DF#2 FLOOR JOIST 2X10 P.T PLATE RIPPED TO 8” EXACTLY GRADE FACIA 3'-0" 17'-7 3/16" To be done after Engineering To be done after Engineering To be done after Engineering To be done after Engineering S2.0DRAWN BY Dustin F Howard Drawing Date: CLIENT PROJECT 02–01-2025 Abraham Hernandez Revision Date: 114 N Gifford Ave. HDC DESCRIPTION HERNANDEZ DADU 2 N/A Arlington, WA, 98223 Section Plan- Details Parcel # 00455400701400 Scale 1/2”=1’-0”Section Plan 21'-6 9/16" 2X6 DF#2 FRAMING @ 16” O.C. 2'-0" 2X6 DF#2 FRAMING @ 16” O.C. GRADE R-21 INSULATION RAFTER TAIL 8" FILL 2'-0" METAL ROOFING 1'-4" 8" 5 1/2" 5 1/2" ENGINEERED TRUSSES BY OTHERS 9'-1 1/8" 8'-1 1/8" ICE/WATER SHIELD 1 CAR GARAGE9 1/2" @ 24” O.C. 4” CONCRETE SLAB W/ #4 BARS @ 48” O.C. FILL 14'-0" OPENING IN FLOOR 5/8” OSB SHEATHING 11'-5 1/2" STAIRS UPSTAIRS LIVING AREA 8” FOUNDATION 4" 8" 5 1/2" 3" 27'-6" 8" PEAK 2X6 INTERIOR BEARING WALL (2) TOP PLATE 16”X 8” CONCRETE FOOTING 2X12 LEDGER KITCHEN/LIVING9.5” BCI 5000 1.7 SERIES @ 16” O.C.R-30 INSULATION CRAWL SPACE 12'-10" 12 3/4” OSB T&G SHEATHING 2X6 DF#2 FRAMING @ 16” O.C. 2.5 3" FILL 2'-0" SST HURRICANE TIE 4” PERF. PIPE @ 16” O.C.2X12 DF#2 FLOOR JOIST 2X10 P.T PLATE RIPPED TO 8” EXACTLY GRADE FACIA 3'-0" 17'-7 3/16" To be done after Engineering To be done after Engineering To be done after Engineering To be done after Engineering S2.0DRAWN BY Dustin F Howard Drawing Date: CLIENT PROJECT 02–01-2025 Abraham Hernandez Revision Date: 114 N Gifford Ave. HDC DESCRIPTION HERNANDEZ DADU 2 N/A Arlington, WA, 98223 Section Plan- Details Parcel # 00455400701400 TOTAL LIVING SPACE PER UNITLIVING SPACE 2ND LEVELLIVING SPACE 1ST LEVEL1 CAR GARAGEScale 3/16”=1’-0”SITE ORIENTATION 37'-10 7/16" PROPERTY LINE = 240.0 SQ. FT. ALLEY TO DADU #2DRIVEWAY 16'-0" = = 668.0 SQ. FT.192.0 SQ. FT. 8'-0" = 860.0 SQ. FT. 8'-0" 5'-0" 5'-7/16" 1 CAR GARAGELOWER LEVEL LIVING AREA DRIVEWAY BELOW / LIVING ABOVE 10’ X 24’ 24'-0" 24'-0" POST 9'-10" 5'-0" 8'-0" 9'-10" 8'-0" OPEN BELOW/ LIVING ABOVE 1 CAR GARAGE LOWER LEVEL LIVING AREA POST 10’ X 24’ 24'-0" 24'-0" 5'-7/16" PROPERTY LINE 6'-6 5/16" 119'-11 1/4" 27'-10" 5'-0" 119'-11 1/4" PROPERTY LINE EXISTING HOUSE PROPERTY LINE 37'-10 7/16" A1.0 DRAWN BY Dustin F Howard Drawing Date: CLIENT PROJECT 10–01-2024 Patrick Hernandez Revision Date: 114 N Gifford Ave. HDC DESCRIPTION HERNANDEZ DADU’S Arlington, WA, 98223 Prelim. Main Floor Plan N/A Parcel # 00455400701400 18204 59th Avenue NE REVIEW COMMENT FORM Arlington, WA 98223 360-403-3551 Project Name: Hernandez ADU Revised Permit No.: BLD6389 Review Date: 3/24/2025 Contact: Patrick Hernandez Phone No.: 425-350-0381 Review Phase: 1 Report Date: Reviewing Dept.: CED Engineer Project #: Plan Stamp Date: # Rev. Dwg. or Add’l Ref. City Comment Response/Resolution Spec. Ref. Approved 1. AL General Please provide all setback dimensions between ADUs and between ADU and the alley 2. AL FYI Current design of the ADUs does not meet the standards. Design of the ADUs are required to be consistent with the principal residence and comply with the Developmental Design Standards. 3. AL FYI ADUs are required to connect to both city water and wastewater systems 4. AL FYI ADU shall be 50% of the city transportation impact fees and community park impact fees for a single family dwelling unit. 5. TN FYI Driveway's to be paved to alley pavement. 6. TN FYI Stormwater to be managed onsite per Ecology Guidelines. 7. KS FYI Will be required to upsize the water main service line to a 2", decommission the original service line at the main and pay and install 2 additional water meters. 8. KS FYI Will need to increase the side sewer line from 4" to 6" from the stub to the where it Y's off the connections for each SFR, line size will need to be verified. From the Y each line can be 4". Each unit will need a clean out within 5 feet of buildings. 9. KS FYI Will need to pay for 2 new water meters and 2 side sewer inspection fees and one side sewer repair fee. 10. Revised documents may be emailed to CED@arlingtonwa.gov for processing. 11. 12. 13. Page 1 of 2 18204 59th Avenue NE REVIEW COMMENT FORM Arlington, WA 98223 360-403-3551 Project Name: Hernandez ADU Revised Permit No.: BLD6389 Review Date: 3/24/2025 Contact: Patrick Hernandez Phone No.: 425-350-0381 Review Phase: 1 Report Date: Reviewing Dept.: CED Engineer Project #: Plan Stamp Date: # Rev. Dwg. or Add’l Ref. City Comment Response/Resolution Spec. Ref. Approved 14. 15. 16. 17. 18. 19. 20. Page 2 of 2 Date: 10/03/2025 Permit #: 6389 Permit Date: 02/25/2025 Review Date: 02/25/2025 Permit Type: RESIDENTIAL ZONING VERIFICATION Review Type: RESIDENTIAL ZONING VERIFICATION Target Date: 03/11/2025 Scheduled 00:00 Time: Completed 03/10/2025 Date: Description: Applicant will be required to upsize the main service line to a 2", decommission the original service line at the main and pay and install 2 additional water meters. GUS Review Approved with Conditions Status: Assigned To: PW-WAT-REV Time In: 00:00 Time Out: 00:00 Hours: 0.5 Property Information Parcel#: 00455400701400 HERNANDEZ ABRAHAM V & QUIKTCIA P HERNANDEZ ABRAHAM V & QUIKTCIA P 12916 12TH AVE NW 114 GIFFORD AVE MARYSVILLE, WA 98271-7041 Zoning: 100 SINGLE FAMILY RESIDENCELot: Block: Date: 10/03/2025 Permit #: 6389 Permit Date: 02/25/2025 Review Date: 02/25/2025 Permit Type: RESIDENTIAL ZONING VERIFICATION Review Type: RESIDENTIAL ZONING VERIFICATION Target Date: 03/11/2025 Scheduled 00:00 Time: Completed 03/10/2025 Date: Description: Applicant will need increase the side sewer line from 4" to 6" from the stub to the where it Y's off the connections for each SFR, line size will need to be verified. From the Y each line can be 4". Each unit will need a clean out within 5 feet of buildings. JW. Review Approved with Conditions Status: Assigned To: PW-SEW-REV Time In: 00:00 Time Out: 00:00 Hours: 0.0 Property Information Parcel#: 00455400701400 HERNANDEZ ABRAHAM V & QUIKTCIA P HERNANDEZ ABRAHAM V & QUIKTCIA P 12916 12TH AVE NW 114 GIFFORD AVE MARYSVILLE, WA 98271-7041 Zoning: 100 SINGLE FAMILY RESIDENCELot: Block: Permit #: 6389 Permit Date: 02/25/25 Permit Type: RESIDENTIAL ZONING VERIFICATION Project Name: Hernandez ADU Revised Applicant Name: Patrick Hernandez Applicant Address: 12916 12th Ave Nw Applicant, City, State, Zip: Marysville, Wa, 98271 Contact: Patrick Hernandez Phone: 4253500381 Email: patrick@nex-ivo.com Scope of Work: two detached ADU's Valuation: 600000.00 Square Feet: 2402 Number of Stories: 2 Construction Type: VB Occupancy Group: R-3; Residential ID Code: Permit Issued: Permit Expires: Form Permit Type: RESIDENTIAL ZONING VERIFICAITON Status: EXPIRED Assigned To: Hannah Hardwick Property Parcel # Address Legal Description Owner Name Owner Phone Zoning HERNANDEZ 100 SINGLE 00455400701400 114 GIFFORD AVE ABRAHAM V & FAMILY QUIKTCIA P RESIDENCE Plan Reviews Date Review Type Description Assigned To Review Status RESIDENTIAL ZONING 02/25/2025 AIRPORT Incomplete VERIFICATION RESIDENTIAL ZONING 02/25/2025 Planning comments to be addressed before approval BUILDING Pending Information VERIFICATION Driveway's to be paved to alley pavement. RESIDENTIAL ZONING Development Approved with 02/25/2025 VERIFICATION Services Manager Conditions Stormwater to be managed onsite per Ecology Guidelines. RESIDENTIAL ZONING 02/25/2025 See notes. PLANNING Pending Corrections VERIFICATION RESIDENTIAL ZONING Will need to pay for 2 new water meters and 2 side sewer 02/25/2025 PW-ADMIN-GIS Approved VERIFICATION inspection fees and one side sewer repair fee. KS & LT Applicant will need increase the side sewer line from 4" to 6" from the stub to the where it Y's off the connections for RESIDENTIAL ZONING Approved with 02/25/2025 each SFR, line size will need to be verified. From the Y PW-SEW-REV VERIFICATION Conditions each line can be 4". Each unit will need a clean out within 5 feet of buildings. JW. Applicant will be required to upsize the main service line RESIDENTIAL ZONING to a 2", decommission the original service line at the main Approved with 02/25/2025 PW-WAT-REV VERIFICATION and pay and install 2 additional water meters. Conditions GUS Notes Date Note Created By: 03/24/2025 sent review comment form to applicant Hannah Hardwick The original application was BLD6243, but the plans changed so much that it warranted a new 02/25/2025 Hannah Hardwick application. Uploaded Files Date File Name 03/24/2025 25022903-20250324_BLD6389_Review Comment Form.docx 02/25/2025 24674955-20250225_BLD6389_Site Plan.pdf 02/25/2025 24674956-20250225_BLD6389_Sections (2).pdf 02/25/2025 24674957-20250225_BLD6389_Elevations (1).pdf 02/25/2025 24674958-20250225_BLD6389_Floor Plans (1).pdf 02/25/2025 24674959-20250225_BLD6389_Elevations (2).pdf 02/25/2025 24674960-20250225_BLD6389_App.pdf 02/25/2025 24674961-20250225_BLD6389_Sections (1).pdf 02/25/2025 24674962-20250225_BLD6389_Floor Plans (2).pdf Date: 10/03/2025 Permit #: 6389 Permit Date: 02/25/2025 Review Date: 02/25/2025 Permit Type: RESIDENTIAL ZONING VERIFICATION Review Type: RESIDENTIAL ZONING VERIFICATION Target Date: 03/11/2025 Scheduled Time: 00:00 Completed Date: 03/10/2025 Description: See notes. Review Status: Pending Corrections Assigned To: PLANNING Time In: 00:00 Time Out: 00:00 Hours: 0.0 Notes Under Review - For applicant: 1. Please provide all setback dimensions between ADUs and between ADU and the alley FYI: Current design of the ADUs does not appear to meet the standards. Design of the ADUs are required to be consistent with the principal residence and comply with the Development 03/06/2025 Design Standards. FYI: ADUs are required to connect to both city water and wastewater systems. FYI: ADU shall pay 50% of the city transportation impact fees and community park impact fees for a single-family dwelling unit. For Staff: 1. Please provide Impact Fee sheet link as well as Water/Sewer Fee sheet link. 04/08/2025 Applicant requested additional information on how to meet code. Per AMC 20.44.042(c)(11) the designs must be consistent with the architectural character of the principal residence and comply with the Development Design Standards. Materials, roof forms, and window proportions shall match that of the principal unit/building. The designs as proposed to not match roof form or window proportions of the existing home, nor do they meet any of the five approved styles in the Old Town Residential Design Standards. Additionally, the drive through concept on the site plan is not reflected in the renderings, and we will need more information to evaluate for feasibility. Suggest he work with a qualified designer and have them review the Old Town Residential Design Standards and email us with any further questions to make this work. We will need a narrative outlining how the proposed design meets the elements of the Design Standards with resubmittal. Property Information Parcel#: 00455400701400 HERNANDEZ ABRAHAM V & QUIKTCIA P HERNANDEZ ABRAHAM V & QUIKTCIA P 12916 12TH AVE NW 114 GIFFORD AVE MARYSVILLE, WA 98271-7041 Zoning: 100 SINGLE FAMILY RESIDENCELot: Block: Date: 10/03/2025 Permit #: 6389 Permit Date: 02/25/2025 Review Date: 02/25/2025 Permit Type: RESIDENTIAL ZONING VERIFICATION Review Type: RESIDENTIAL ZONING VERIFICATION Target Date: 03/11/2025 Scheduled 00:00 Time: Completed 02/26/2025 Date: Description: Driveway's to be paved to alley pavement. Stormwater to be managed onsite per Ecology Guidelines. Review Status: Approved with Conditions Assigned To: Development Services Manager Time In: 00:00 Time Out: 00:00 Hours: 0.0 Property Information Parcel#: 00455400701400 HERNANDEZ ABRAHAM V & QUIKTCIA P HERNANDEZ ABRAHAM V & QUIKTCIA P 12916 12TH AVE NW 114 GIFFORD AVE MARYSVILLE, WA 98271-7041 Zoning: 100 SINGLE FAMILY RESIDENCELot: Block: Date: 10/03/2025 Permit #: 6389 Permit Date: 02/25/2025 Review Date: 02/25/2025 Permit Type: RESIDENTIAL ZONING VERIFICATION Review Type: RESIDENTIAL ZONING VERIFICATION Target Date: 03/11/2025 Scheduled Time: 00:00 Completed Date: 03/21/2025 Description: Planning comments to be addressed before approval Review Status: Pending Information Assigned To: BUILDING Time In: 00:00 Time Out: 00:00 Hours: 0.5 Property Information Parcel#: 00455400701400 HERNANDEZ ABRAHAM V & QUIKTCIA P HERNANDEZ ABRAHAM V & QUIKTCIA P 12916 12TH AVE NW 114 GIFFORD AVE MARYSVILLE, WA 98271-7041 Zoning: 100 SINGLE FAMILY RESIDENCELot: Block: