Loading...
HomeMy WebLinkAbout17309 40th Ave NE_BLD2018_2025 (3) Permit #: 2018 Permit Date: 06/20/18 Permit Type: MULTI-FAMILY Project Name: Cedar Pointe Apartments Applicant Name: Charles Morgan and Associates Applicant Address: 7301 Beverly Lane Applicant, City, State, Zip: Everett, WA 98203 Contact: Charles Morgan Jr Phone: 425-353-2888 Email: charliejr@cmaarch.com Scope of Work: New Multi-Family Valuation: 23554479.67 Square Feet: 0 Number of Stories: 4 Construction Type: Occupancy Group: ID Code: Permit Issued: 11/27/2018 Permit Expires: Form Permit Type: Status: COMPLETE Assigned To: Kristin Foster Property Parcel # Address Legal Description Owner Name Owner Phone Zoning AMWA CEDAR 31052100306900 17309 40TH AVENUE NE POINTE FUND LP Contractors Contractor Primary Contact Phone Address Contractor Type License License # AMWA Construction, 30141 Agoura CONSTRUCTION Labor & 818-706-0694 AMWACCI824QG Inc. Road, #100 CONTRACTOR Industries Inspections Date Inspection Type Description Scheduled Date Completed Date Inspector Status FS07. FIRE 04/04/2019 UG Fireline approved 04/04/2019 BUILDING Approved SPRINKLER FINAL Elevator pit walls / 1 & 2 Additional rebar added due C20. BUILDING to over spanning of layout 02/25/2019 02/25/2019 BUILDING Approved FINAL South & West walls both pits. Approved for pour 02/25/2019 R02. FOOTING Bar placement approved 02/25/2019 BUILDING Approved Infiltration Trench - West 01/16/2019 Inspection 01/16/2019 BUILDING Approved side Fees Fee Description Notes Amount Building Plan Review Table 4-2 $85,969.83 Processing/Technology $25.00 $25 base fee + $2 each for State Surcharge - 1st DU Residential - 1st Unit $535.00 255 units Building Permit Table 4-1 $132,261.28 Tree Mitigation $6,922.50 Park - Community MF Multi-family $42,876.24 Total $268,589.85 Attached Letters Date Letter Description 11/27/2018 Building Permit Payments Date Paid By Description Payment Type Accepted By Amount 07/20/2018 Luxmi Vaz 70895984 cc $86,529.83 11/29/2018 Luxmi Vaz 72824112 cc $182,060.02 Outstanding Balance $0.00 Notes Date Note Created By: Do not issue the CO until the city receives notification that the building has been signed off by 10/06/2020 Kristin Foster Green agency for compliance. Do not issue C of O until School Impact Fees form is recorded and return to our office. School 09/11/2019 Kristin Foster Impact fees not required per land use permit. 07/31/2019 Received approved truss shop drawings back from SafeBuilt. Routed to contractor for pickup Raelynn Jones 07/09/2019 Received truss shop drawings. Raelynn Jones 02/11/2019 Contractor revised. Launa Black The traffic mitigation is credited to Parcel E in the amount of $221,430 per Developer's 11/08/2018 Kristin Foster Agreement 20181016081, section 1.5 11/07/2018 Received Contractor's L&I license number. Kristin Foster 08/13/2018 Safebuilt picked up the second set of plans for final approval. Kristin Foster SAFEbuild has calculated the fees. Fees have been provided per SAFEbuilt. See attached 07/16/2018 Kristin Foster spreadsheets. Valuation Calculation: Construction type per plans - VA Occupancy R-2 192,703 sf @ 113.02 = 21,779,293. A-2 2,012 sf @ 143.88 = 289,486.56. A-3 07/10/2018 Kristin Foster 2,212 sf @ 131.00 = 289,772. B 5,371 @ 137.00 = 735,827.00. S-1 3,927 sf @ 66.08 = 259,496.16. Total Valuation 23,353.874.00 Building permit fee based on a valuation of 23,353,874 = 125,931.34. Plan Review Fee = 07/10/2018 Kristin Foster 81,855.37 07/10/2018 Park fees? Kristin Foster 06/20/2018 Contractor is not licensed with L&I Kristin Foster 06/20/2018 Need to calculate the valuations. Kristin Foster Uploaded Files Date File Name 12/21/2020 7873316-Cedar Pointe Apartments CO.pdf 08/01/2019 5399494-Truss_cedar_pointe-submittal#41-rev-2-truss_shop_drawings-201906281808.pdf 08/01/2019 5399495-Truss_Cedar Pointe Commercial_Application_Packet_1KKowUa9yhbkUQ.pdf 02/01/2019 4468661-2018_1-16-19 Inspection card.pdf 11/28/2018 4230895-11-27-18 Cedar Pointe Issued Permit.pdf 11/09/2018 4180067-Developer's Agreement 2018101060181.pdf 07/16/2018 3714560-SMOKEY POINT SQ FT plan photo.jpg 07/16/2018 3714561-Smokey Point Valuation.xlsx 07/16/2018 3714562-Smokey Point apartments 7-16-18.xlsx 06/20/2018 3631121-Smokey Point Senior Apartments Application.pdf INSPECTION CARD City of Arlington 18204 59th Avenue NE, Arlington, WA 98223 POST THIS CARD IN A SAFE CONSPICUOUS LOCATION. PLEASE DO NOT REMOVE THIS NOTICE UNTIL ALL REQUIRED INSPECTIONS ARE MADE AND SIGNED OFF BY THE APPROPRIATE AUTHORITY AND THE BUILDING IS APPROVED FOR OCCUPANCY. STAMPED APPROVED PLANS MUST BE AVAILABLE ON THE JOBSITE. PERMIT NO.: BLD-2018 PERMIT TYPE: New Commercial ISSUED DATE: 01/09/2019 EXPIRATION DATE: 10/25/2022 PROJECT ADDRESS: 17309 40th Ave NE, Arlington, WA 98223 PARCEL NO.: OWNER: OWNER PHONE: CONTRACTOR: CONTRACTOR PHONE: Cedar Point SR Apts (Elev #'s 3214- APPLICANT: 3216) APPLICANT PHONE: DESCRIPTION OF WORK: Multi-Family Aparments CONSTRUCTION TYPE: OCCUPANT LOAD: DATE DATE INSPECTION INSP PASSED COMMENTS INSPECTION INSP PASSED COMMENTS Final Building SD 11/4/2020 Consultation (Fire CH 2/19/2019 partitions) Footings FK 5/1/2019 See Notes Foundation Reinforcing CH 10/7/2020 See Notes Underground Plumbing FK 3/13/2019 Slab CH 10/7/2020 See Notes Gas Test SD 11/7/2019 Rough Plumbing CH 10/7/2020 See Notes Rough Frame CH 10/7/2020 See Notes (Consultation) Final Electrical L&I CH 10/7/2020 See Notes Drywall SD 7/18/2019 Approval Final Mechanical CH 10/7/2020 See Notes Final Plumbing CH 8/19/2020 Foundation Reinforcing CH 10/7/2020 See Notes Slab (cont. of partial CH 10/7/2020 See Notes (CMU wall rebar) inspections) Underground Plumbing SD 7/5/2019 See Notes 1st Floor Shear Wall SD 7/11/2019 See Notes (Cont. of partial (Exterior Shear walls) inspections) 2nd Floor Shear Wall SD 1/24/2020 1st Floor Shear Wall SD 3/20/2020 (Interior Shear) (Interior Shear) Underground Gas CH 10/7/2020 See Notes 3rd Floor Shear Wall SD 7/17/2019 See Notes Piping (Interior Shear) 3rd Floor Shear Wall CH 10/7/2020 See Notes 3rd Floor Shear Wall SD 7/17/2019 See Notes (Cont. interior shear) 4th Floor Drywall CH 10/7/2020 See Notes 4th Floor Fire Stopping SD 1/7/2020 4th Floor Insulation SD 12/18/2019 See Notes 4th Floor Rough Frame CH 10/7/2020 See Notes 4th Floor Rough CH 10/7/2020 See Notes 4th Floor Rough SD 11/13/2019 See Notes Mechanical Plumbing 4th Floor Shear Wall SD 9/19/2019 See Notes 3rd Floor Shear Wall SD 9/4/2019 4th Floor Shear Wall CH 8/21/2019 See Notes To request an inspection: Page 1 of 2 DATE DATE INSPECTION INSP PASSED COMMENTS INSPECTION INSP PASSED COMMENTS Drywall (Cont partial SD 10/2/2019 See Notes 4th Floor Shear Wall CH 8/21/2019 See Notes inspections) 3rd Floor Rough Frame SD 2/13/2020 1st Floor Rough Frame SD 2/24/2020 2nd Floor Shear Wall SD 1/24/2020 1st Floor Shear Wall SD 2/24/2020 1st Floor Rough SD 4/15/2020 1st Floor Footings SD 9/4/2019 See Notes Mechanical 1st Floor Rough SD 9/23/2019 See Notes 2nd Floor Rough SD 3/6/2020 Plumbing Mechanical 2nd Floor Rough SD 9/23/2019 See Notes 3rd Floor Rough CH 10/7/2020 See Notes Plumbing Mechanical 3rd Floor Rough SD 11/13/2019 See Notes Consultation (Fire SD 9/16/2019 Plumbing stopping) 1st Floor Shear Wall SD 9/16/2019 See Notes 2nd Floor Shear Wall SD 9/16/2019 3rd Floor Shear Wall SD 9/16/2019 See Notes 4th Floor Shear Wall SD 9/16/2019 Consultation (Egress) CH 9/30/2019 See Notes Rough Frame (Patio CH 10/7/2020 See Notes Deck Framing) 4th Floor Insulation SD 2/21/2020 See Notes 3rd Floor Insulation CH 10/7/2020 See Notes 2nd Floor Shear Wall SD 10/16/2019 See Notes 3rd Floor Shear Wall SD 10/16/2019 See Notes 4th Floor Shear Wall SD 10/16/2019 See Notes 4th Floor Pre-Rock CH 10/7/2020 See Notes 1st Floor Rough SD 4/15/2020 Plumbing (Cont. Partial Gas Test (cont.) CH 10/7/2020 See Notes Inspections) Rough Frame (Elevator CH 10/7/2020 See Notes 4th Floor Rough Frame CH 10/7/2020 Framing) Rough Frame (HVAC CH 10/7/2020 See Notes 2nd Floor Insulation CH 10/7/2020 See Notes Shafts) 1st Floor Drywall CH 10/7/2020 See Notes 3rd Floor Drywall CH 10/7/2020 See Notes (Partial cont) 1st Floor Fire Stopping CH 10/7/2020 See Notes 2nd Floor Rough CH 10/7/2020 See Notes (at Structural steel Frame wrap) 2nd Floor Drywall SD 3/3/2020 Consultation (Smoke CH 2/10/2020 See Notes (Partial Inspections) Doors) 1st Floor Insulation SD 3/6/2020 3rd Floor Insulation CH 10/7/2020 See Notes Consultation (Egress CH 10/7/2020 See Notes (Cont. Partial Signage) Inspections) 1st Floor Rough Frame SD 3/20/2020 1st Floor Fire Stopping SD 3/2/2020 (Cont. Partial (Cont. Partial Inspections) Inspections) 1st Floor Drywall SD 6/16/2020 See Notes 1st Floor Rough CH 10/7/2020 See Notes Mechanical (Commons Consultation (Phase CH 7/1/2020 See Notes High Ceiling) Finals) 1st Floor Insulation SD 4/15/2020 See Notes (Cont. Partial Inspections) 1st Floor Rough CH 10/7/2020 See Notes Mechanical Rebar SD 10/26/2020 Engineering Fire Approval: Date: Date: Approval: PW Approval: Date: Other ( ): Date: To request an inspection: Page 2 of 2