HomeMy WebLinkAbout17309 40th Ave NE_BLD2018_2025 (3) Permit #: 2018
Permit Date: 06/20/18
Permit Type: MULTI-FAMILY
Project Name: Cedar Pointe Apartments
Applicant Name: Charles Morgan and Associates
Applicant Address: 7301 Beverly Lane
Applicant, City, State, Zip: Everett, WA 98203
Contact: Charles Morgan Jr
Phone: 425-353-2888
Email: charliejr@cmaarch.com
Scope of Work: New Multi-Family
Valuation: 23554479.67
Square Feet: 0
Number of Stories: 4
Construction Type:
Occupancy Group:
ID Code:
Permit Issued: 11/27/2018
Permit Expires:
Form Permit Type:
Status: COMPLETE
Assigned To: Kristin Foster
Property
Parcel # Address Legal Description Owner Name Owner Phone Zoning
AMWA CEDAR
31052100306900 17309 40TH AVENUE NE
POINTE FUND LP
Contractors
Contractor Primary Contact Phone Address Contractor Type License License #
AMWA Construction, 30141 Agoura CONSTRUCTION Labor &
818-706-0694 AMWACCI824QG
Inc. Road, #100 CONTRACTOR Industries
Inspections
Date Inspection Type Description Scheduled Date Completed Date Inspector Status
FS07. FIRE
04/04/2019 UG Fireline approved 04/04/2019 BUILDING Approved
SPRINKLER FINAL
Elevator pit walls / 1 & 2
Additional rebar added due
C20. BUILDING to over spanning of layout
02/25/2019 02/25/2019 BUILDING Approved
FINAL South & West walls both
pits.
Approved for pour
02/25/2019 R02. FOOTING Bar placement approved 02/25/2019 BUILDING Approved
Infiltration Trench - West
01/16/2019 Inspection 01/16/2019 BUILDING Approved
side
Fees
Fee Description Notes Amount
Building Plan Review Table 4-2 $85,969.83
Processing/Technology $25.00
$25 base fee + $2 each for
State Surcharge - 1st DU Residential - 1st Unit $535.00
255 units
Building Permit Table 4-1 $132,261.28
Tree Mitigation $6,922.50
Park - Community MF Multi-family $42,876.24
Total $268,589.85
Attached Letters
Date Letter Description
11/27/2018 Building Permit
Payments
Date Paid By Description Payment Type Accepted By Amount
07/20/2018 Luxmi Vaz 70895984 cc $86,529.83
11/29/2018 Luxmi Vaz 72824112 cc $182,060.02
Outstanding Balance $0.00
Notes
Date Note Created By:
Do not issue the CO until the city receives notification that the building has been signed off by
10/06/2020 Kristin Foster
Green agency for compliance.
Do not issue C of O until School Impact Fees form is recorded and return to our office. School
09/11/2019 Kristin Foster
Impact fees not required per land use permit.
07/31/2019 Received approved truss shop drawings back from SafeBuilt. Routed to contractor for pickup Raelynn Jones
07/09/2019 Received truss shop drawings. Raelynn Jones
02/11/2019 Contractor revised. Launa Black
The traffic mitigation is credited to Parcel E in the amount of $221,430 per Developer's
11/08/2018 Kristin Foster
Agreement 20181016081, section 1.5
11/07/2018 Received Contractor's L&I license number. Kristin Foster
08/13/2018 Safebuilt picked up the second set of plans for final approval. Kristin Foster
SAFEbuild has calculated the fees. Fees have been provided per SAFEbuilt. See attached
07/16/2018 Kristin Foster
spreadsheets.
Valuation Calculation: Construction type per plans - VA
Occupancy R-2 192,703 sf @ 113.02 = 21,779,293. A-2 2,012 sf @ 143.88 = 289,486.56. A-3
07/10/2018 Kristin Foster
2,212 sf @ 131.00 = 289,772. B 5,371 @ 137.00 = 735,827.00. S-1 3,927 sf @ 66.08 =
259,496.16. Total Valuation 23,353.874.00
Building permit fee based on a valuation of 23,353,874 = 125,931.34. Plan Review Fee =
07/10/2018 Kristin Foster
81,855.37
07/10/2018 Park fees? Kristin Foster
06/20/2018 Contractor is not licensed with L&I Kristin Foster
06/20/2018 Need to calculate the valuations. Kristin Foster
Uploaded Files
Date File Name
12/21/2020 7873316-Cedar Pointe Apartments CO.pdf
08/01/2019 5399494-Truss_cedar_pointe-submittal#41-rev-2-truss_shop_drawings-201906281808.pdf
08/01/2019 5399495-Truss_Cedar Pointe Commercial_Application_Packet_1KKowUa9yhbkUQ.pdf
02/01/2019 4468661-2018_1-16-19 Inspection card.pdf
11/28/2018 4230895-11-27-18 Cedar Pointe Issued Permit.pdf
11/09/2018 4180067-Developer's Agreement 2018101060181.pdf
07/16/2018 3714560-SMOKEY POINT SQ FT plan photo.jpg
07/16/2018 3714561-Smokey Point Valuation.xlsx
07/16/2018 3714562-Smokey Point apartments 7-16-18.xlsx
06/20/2018 3631121-Smokey Point Senior Apartments Application.pdf
INSPECTION CARD
City of Arlington
18204 59th Avenue NE, Arlington, WA 98223
POST THIS CARD IN A SAFE CONSPICUOUS LOCATION. PLEASE DO NOT REMOVE THIS NOTICE UNTIL ALL REQUIRED INSPECTIONS ARE MADE AND SIGNED OFF BY THE APPROPRIATE
AUTHORITY AND THE BUILDING IS APPROVED FOR OCCUPANCY. STAMPED APPROVED PLANS MUST BE AVAILABLE ON THE JOBSITE.
PERMIT NO.: BLD-2018 PERMIT TYPE: New Commercial ISSUED DATE: 01/09/2019 EXPIRATION DATE: 10/25/2022
PROJECT ADDRESS: 17309 40th Ave NE, Arlington, WA 98223 PARCEL NO.:
OWNER: OWNER PHONE:
CONTRACTOR: CONTRACTOR PHONE:
Cedar Point SR Apts (Elev #'s 3214-
APPLICANT: 3216) APPLICANT PHONE:
DESCRIPTION OF WORK: Multi-Family Aparments
CONSTRUCTION TYPE: OCCUPANT LOAD:
DATE DATE
INSPECTION INSP PASSED COMMENTS INSPECTION INSP PASSED COMMENTS
Final Building SD 11/4/2020 Consultation (Fire CH 2/19/2019
partitions)
Footings FK 5/1/2019 See Notes
Foundation Reinforcing CH 10/7/2020 See Notes
Underground Plumbing FK 3/13/2019
Slab CH 10/7/2020 See Notes
Gas Test SD 11/7/2019
Rough Plumbing CH 10/7/2020 See Notes
Rough Frame CH 10/7/2020 See Notes
(Consultation)
Final Electrical L&I CH 10/7/2020 See Notes Drywall SD 7/18/2019
Approval
Final Mechanical CH 10/7/2020 See Notes
Final Plumbing CH 8/19/2020
Foundation Reinforcing CH 10/7/2020 See Notes
Slab (cont. of partial CH 10/7/2020 See Notes
(CMU wall rebar)
inspections)
Underground Plumbing SD 7/5/2019 See Notes
1st Floor Shear Wall SD 7/11/2019 See Notes
(Cont. of partial
(Exterior Shear walls)
inspections)
2nd Floor Shear Wall SD 1/24/2020
1st Floor Shear Wall SD 3/20/2020
(Interior Shear)
(Interior Shear)
Underground Gas CH 10/7/2020 See Notes
3rd Floor Shear Wall SD 7/17/2019 See Notes
Piping
(Interior Shear)
3rd Floor Shear Wall CH 10/7/2020 See Notes
3rd Floor Shear Wall SD 7/17/2019 See Notes
(Cont. interior shear)
4th Floor Drywall CH 10/7/2020 See Notes
4th Floor Fire Stopping SD 1/7/2020
4th Floor Insulation SD 12/18/2019 See Notes
4th Floor Rough Frame CH 10/7/2020 See Notes
4th Floor Rough CH 10/7/2020 See Notes
4th Floor Rough SD 11/13/2019 See Notes
Mechanical
Plumbing
4th Floor Shear Wall SD 9/19/2019 See Notes
3rd Floor Shear Wall SD 9/4/2019
4th Floor Shear Wall CH 8/21/2019 See Notes
To request an inspection:
Page 1 of 2
DATE DATE
INSPECTION INSP PASSED COMMENTS INSPECTION INSP PASSED COMMENTS
Drywall (Cont partial SD 10/2/2019 See Notes 4th Floor Shear Wall CH 8/21/2019 See Notes
inspections)
3rd Floor Rough Frame SD 2/13/2020
1st Floor Rough Frame SD 2/24/2020
2nd Floor Shear Wall SD 1/24/2020
1st Floor Shear Wall SD 2/24/2020
1st Floor Rough SD 4/15/2020
1st Floor Footings SD 9/4/2019 See Notes Mechanical
1st Floor Rough SD 9/23/2019 See Notes 2nd Floor Rough SD 3/6/2020
Plumbing Mechanical
2nd Floor Rough SD 9/23/2019 See Notes 3rd Floor Rough CH 10/7/2020 See Notes
Plumbing Mechanical
3rd Floor Rough SD 11/13/2019 See Notes Consultation (Fire SD 9/16/2019
Plumbing stopping)
1st Floor Shear Wall SD 9/16/2019 See Notes 2nd Floor Shear Wall SD 9/16/2019
3rd Floor Shear Wall SD 9/16/2019 See Notes 4th Floor Shear Wall SD 9/16/2019
Consultation (Egress) CH 9/30/2019 See Notes Rough Frame (Patio CH 10/7/2020 See Notes
Deck Framing)
4th Floor Insulation SD 2/21/2020 See Notes
3rd Floor Insulation CH 10/7/2020 See Notes
2nd Floor Shear Wall SD 10/16/2019 See Notes
3rd Floor Shear Wall SD 10/16/2019 See Notes
4th Floor Shear Wall SD 10/16/2019 See Notes
4th Floor Pre-Rock CH 10/7/2020 See Notes
1st Floor Rough SD 4/15/2020
Plumbing (Cont. Partial Gas Test (cont.) CH 10/7/2020 See Notes
Inspections)
Rough Frame (Elevator CH 10/7/2020 See Notes
4th Floor Rough Frame CH 10/7/2020 Framing)
Rough Frame (HVAC CH 10/7/2020 See Notes 2nd Floor Insulation CH 10/7/2020 See Notes
Shafts)
1st Floor Drywall CH 10/7/2020 See Notes
3rd Floor Drywall CH 10/7/2020 See Notes (Partial cont)
1st Floor Fire Stopping CH 10/7/2020 See Notes 2nd Floor Rough CH 10/7/2020 See Notes
(at Structural steel Frame
wrap) 2nd Floor Drywall SD 3/3/2020
Consultation (Smoke CH 2/10/2020 See Notes (Partial Inspections)
Doors) 1st Floor Insulation SD 3/6/2020
3rd Floor Insulation CH 10/7/2020 See Notes
Consultation (Egress CH 10/7/2020 See Notes
(Cont. Partial
Signage)
Inspections)
1st Floor Rough Frame SD 3/20/2020
1st Floor Fire Stopping SD 3/2/2020
(Cont. Partial
(Cont. Partial
Inspections)
Inspections)
1st Floor Drywall SD 6/16/2020 See Notes
1st Floor Rough CH 10/7/2020 See Notes
Mechanical (Commons Consultation (Phase CH 7/1/2020 See Notes
High Ceiling) Finals)
1st Floor Insulation SD 4/15/2020 See Notes
(Cont. Partial
Inspections)
1st Floor Rough CH 10/7/2020 See Notes
Mechanical
Rebar SD 10/26/2020
Engineering
Fire Approval: Date: Date:
Approval:
PW Approval: Date: Other ( ): Date:
To request an inspection: