HomeMy WebLinkAboutResolution No. 2024-029 A Resolution Replacing Resolution No. 2024-012, and Adopting a Revised Fee Schedule RESOLUTION NO. 2024-029
A RESOLUTION REPLACING RESOLUTION NO. 2024-012,
AND ADOPTING A REVISED FEE SCHEDULE
WHEREAS, the City Council,through ordinance, has adopted regulations requiring certain
actions and services; and,
WHEREAS, these various ordinances set forth that fees shall be set by resolution; and,
WHEREAS, the cost of providing these various services consistent with applicable codes,
regulations, and policies periodically increase and decrease, or certain services or practices are
discontinued, and fees are no longer needed; and,
WHEREAS, it is the intent of the City of Arlington to charge appropriate fees and charges
that are consistent with the services provided and to cover the public cost of providing these
various services so that the public is not subsidizing individual benefits derived therefrom; and,
WHEREAS, the City has reviewed the fees in relationship to estimated staff time to
complete various tasks, and believes some fees should be updated; and
WHEREAS,the City Council held a public hearing concerning the establishment of the fees;
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ARLINGTON AS
FOLLOWS:
The following rates, fees, and charges for various services provided, actions performed, or items
sold by the city and/or its contract service providers, and fines levied against code violators, are
hereby adopted:
Section 1. Fees and Charges—General
1.1 Fees. Fees are intended to cover the normal, recurring costs associated with
providing a given service. Fees are non-refundable.
1.2 Prices. In some instances, the City provides certain goods and merchandise for
sale. Prices for these goods may be included in this resolution.
1.3 Payment Due. Fees are due at the time the action is requested (e.g., at time of
application) or occurs (e.g., prior to a specific action). An applicant may pay all fees
of a multi-phased project in advance; however, doing so does not vest applicable
fees due. Fees due are those in effect at the time the specific action or phase of an
action is requested or occurs.
1.4 Waivers. Upon petition by the applicant, the City Council may waive any of the
fees, or portions thereof, for any non-profit organization or government agency.
Page 1
CITY OF ARLINGTON FEE SCHEDULE RESOLUTION NO. 2024-029
Section 2: Land Use Fees. Fees for various services, actions, and permits regarding land
use, as per AMC Title 20 Land Use Code, shall be as listed in Table 2.1: Land Use Fees.
Table 2: Land Use Fees
Action Fee($)
Land Use Permits
Zoning Permit 2,300.00
Special Use Permit 3,400.00 plus Hearing Examiner Fee,
if required
Conditional Use Permit 4,000.00 plus Hearing Examiner Fee
Administrative Conditional Use Permit
Temporary/Seasonal Event 180.00
Homeless Encampment 500.00
Mobile Sales and Deliveries 180.00
Development Agreement
Associated with Land Use Actions 1,100.00 plus additional costs if accrued
Not Associated with Land Use Actions 2,400.00 plus additional costs if accrued
Preliminary Plat
Conditional Use Permit for a Major Plat or Unit Lot 7,000.00 plus Hearing Examiner Fee
Subdivision >_ 10 Lots
Zoning Permit for a Minor Plat or Unit Lot
3,100.00
Subdivision <_9 Lots
Final Plats
Major Plat or Unit Lot Subdivision >_ 10 Lots 3,400.00 plus actual cost of consultant
Minor Plat or Unit Lot Subdivision <_9 Lots 2,000.00 plus actual cost of consultant
Binding Site Plan
Conditional Use Permit for Binding Site Plan >_ 10 7,000.00 plus Hearing Examiner Fee and
Lots actual cost of consultant
Zoning Permit for Binding Site Plans<_9 Lots 3,100.00 plus actual cost of consultant
Text and/or Design Deviation 750.00
Lot Line Adjustment or Changes to Number of Lots 1,400.00 plus actual cost of consultant
Subarea Plan
Subarea Plan (privately initiated) 12,500.00 plus actual cost of consultants
Design Review
Administrative with Building Permit(no land use
permit required): Residential Infill &Old Town 180.00
Residential District
Administrative 300.00
Design Review Board 450.00
Mixed-Use Development
Conditional Use Permit 4,000.00 plus Hearing Examiner Fee
Special Use Permit 3,400.00 plus Hearing Examiner Fee,
if required
Zoning Permit 2,300.00
Page 2
CITY OF ARLINGTON FEE SCHEDULE RESOLUTION NO.2024-029
[ Action Fee($)
Forest Practice Permit
Permit Review 450.00
Forest Practice Permit Application 125.00 plus 125.00 per acre
Review Fee for Conversion Option Harvest Plan
125.00 plus 125.00 per acre
Approval
Review Fee To Lift Moratorium 300.00
Inspection Fee 150.00 per hour plus 125.00 per acre
Tree Replacement Mitigation In-Lieu Fee with
Permit: Number of Trees Removed x 3 for 32.50 per replacement tree
Replacement Tree Total
Hearing Examiner
Single Family Residence or Duplex (1 Structure):
Variance, Special Use Permits, or Conditional Use 1,750.00
Permits
Commercial, Industrial, Multi-Family, Public Agency:
Variances, Special Use Permits, or Conditional Use 3,000.00
Permits,Shoreline Substantial Development Permits,
Rezone Recommendations
Multi-Permit Application (Consolidated Hearings, not
including Appeals) Mixed-Use Development Permits,
Preliminary Subdivision, Plats, or Binding Site Plans, 3,850.00
Shoreline Variances and Conditional Use Permits
Appeals of Administrative Decisions, Interpretations,
Enforcement Orders, Licensing Decisions, and SEPA
Threshold Determinations, as well as other 225.00 per hour
Regulatory, Enforcement, or Quasi-Judicial matters
not addressed in the flat-fee rate schedule
Appeals
To City Council 250.00
To Planning Commission 250.00
To Hearing Examiner 600.00 plus actual cost of Hearing Examiner
To Shoreline Hearings Board 600.00
Reconsideration of Decision By:
Community Development Director and/or Designee 180.00
Planning Commission 180.00
Hearing Examiner 250.00 plus actual cost of Hearing Examiner
City Council 180.00
Permit Extension
Extension 200.00
Resubmittal Extension 125.00
Amendment to or Modification of Permit
Insignificant Design Deviations 180.00
Minor Amendment 360.00
Major Amendment 1,100.00 plus actual cost of Hearing Examiner
Boundary Line Adjustment
Boundary Line Adjustment/Lot Line Elimination 1,700.00 plus actual cost of consultant
Page 3
CITY OF ARLINGTON FEE SCHEDULE RESOLUTION NO. 2024-029
Action Fee($)
Land Use Zoning Code Ordinance Amendment
Amendment to Text of Title 20 Zoning Ordinance 750.00
Amendment to Zoning Map (Rezone)
< 5 acres 1,200.00
>or= 5 acres 2,000.00
Comprehensive Plan Amendment
Minor Amendment (annual cycle) 750.00
Major Amendment(5-year cycle) 2,200.00
Annexations
Submission of 10% Petition 180.00
Submission of 60% Petition 1,100.00
Boundary Review Board Application Filing Fee 50.00 paid directly to Snohomish County
If it goes to Boundary Review Board Hearing 800.00
Shoreline Development Permit
Shoreline Development Exemption Letter 180.00
Shoreline Substantial Development Permit or
Shoreline Variance in conjunction with a Land Use 550.00
Permit
Shoreline Substantial Development Permit or
Shoreline Variance not in conjunction with a Land 1,100.00
_ Use Permit
Shoreline Conditional Use Permit 1,100.00 plus Hearing Examiner Fee
Significant Tree&Street Tree Removal
Significant Tree Removal requires replacement at a 150.00 per replacement tree x 3 =450.00
rate of 3:1 or pay mitigation in lieu fees per
r per tree removed
replacement tree
Street Tree Removal requires replacement at a rate
of 1:1 or pay mitigation in lieu fees per replacement 1,030.00 per tree removed
tree
Variance
Administrative (in addition to land use permit) 700.00
Hearing Examiner: With Land Use Permit or if 1,300.00 plus actual cost
Administrative Variance is recommended to Hearing of Hearing Examiner
Examiner(in addition to paid administrative fee)
General Information Meeting
First Two Meetings 0.00
Subsequent Meetings 350.00 per meeting
SEPA Review(note: review of checklist included with
Land Use Permit fee)
SEPA Only(no land use permit) 550.00
Environmental Impact Statement (EIS) 1,100.00 plus actual cost of consultant
Outside Consultants
Consultant Review for Land Use Permits Actual Cost of Review and/or Written Reports
Change of Use
Change of Use Land Use Site Plan Review 180.00
(additional Design Review Fees may apply)
Page 4
CITY OF ARLINGTON FEE SCHEDULE RESOLUTION NO. 2024-029
Action Fee($)
Critical Area Review
Critical Area Site Plan Review (no land use permit) 180.00
Floodplain Development
Flood Hazard Permit(in addition to permit) 180.00
Deferral of Impact Fee
Application 200.00
Request of Utility Services Outside City Limits
Utility Extension Agreement—Single-Family 225.00
Residence/Duplex
Utility Extension Agreement—Other Development 650.00
Property Tax Exemption Certificate
Processing Fee 500.00
Public Notice/ Publication
Public Notice Preparation and Posting 180.00
Newspaper Publication Actual cost of publication per
The Everett Herald fees
Postage for Mailings Actual cost of postage per USPS fees
Recording
Recording Fees/Conformed Copies Actual Cost paid directly to the
Snohomish County Auditor
Miscellaneous Staff Time
Administrative Staff 55.00 per Hour
Processing/Technology Fee
Added to all Land Use, Civil, Utility, & Building 25.00
Permits
Credit Card Processing Surcharge/Service Fee 3%of actual cost
Electronic Funds Transfer Fee 0.50 per transaction
Section 3: Public Works Fees. Fees for various services, actions, and permits shall be
listed in Tables 3-1: Review Fees, 3-2: Grading Plan Review Fees, 3-3: Grading Plan Fees,
and 3-4: Public Works Labor and Equipment Charges.
Table 3-1: Review Fees
Action Fee($)
Civil Review 6%of Engineer's Estimated Cost of Construction
with a minimum charge of 1,600.00
Administrative Review Fee 250.00 each
Miscellaneous Engineering Fee 550.00 each
As-Built Review Fee Included in the Civil Review Fee
Final Plat Review Fee Included in the Civil Review Fee
Inspection Fee 150.00 per hour,% hour minimum
Outside Consultant Review Fee Actual Costs
Simple Site Plan Review:
(Single Family Residence with maximum 2 lots 275.00 per Lot
and no water or sewer extensions)
Page 5
CITY OF ARLINGTON FEE SCHEDULE RESOLUTION NO. 2024-029
Action Fee($)
6%of Engineer's Estimated Cost of Construction
Right of Way or maximum 1,100.00 with a minimum charge of
125.00 plus inspection fees
Right of Way Vacation 1,100.00
Miscellaneous
Staff Time 150.00 her hour per person, % hour minimum
Engineering Meetings—After 2 Hours 350.00 per meeting
Permit Extension 200.00
Recovery Contract 1,100.00 plus actual cost
Permit for Non-Construction Use of Right of Way
per AMC Chapter 12.50
Application Fee 65.00
Lease Rate or Charge _ Charge per square foot(annual)
Commercial Zones including, but not limited
0.45
to, GC, HC, and INC
Business Zones including, but not limited to, 0.40
OTBD-1, OTBD-2, and OTBD-3
Appeals Fee per AMC 12.50.130 600.00 plus actual cost of Hearing Examiner
Leasehold Tax 12.84%
Table 3-2: Grading Plan Review Fees
Action Fee($)
50 cubic yards or Less i 100.00
51 to 100 cubic yards 120.00
101 to 1,000 cubic yards 160.00
1,001 to 10,000 cubic yards
First 1,000 cubic yards 200.00
Plus—for each additional 1,000 cubic yards or fraction thereof 20.00
10,001 to 100,000 cubic yards
For the First 10,000 cubic yards 300.00
Plus—for each additional 10,000 cubic yards or fraction thereof 40.00
100,001 to 200,000 cubic yards
For the first 100,000 cubic yards 400.00
Plus—for each additional 10,000 cubic yards or fraction thereof 60.00
200,001 cubic yards or More
For the first 200,000 cubic yards 500.00
Plus—for each additional 10,000 cubic yards or fraction thereof 100.00
Other Fees: additional plan review required by changes, additions, or New Plan Review Fee
revisions to approved plans. 1
Page 6
CITY OF ARLINGTON FEE SCHEDULE RESOLUTION NO. 2024-029
Table 3-3: Grading Permit Fees
F Action Fee($)
Base Permit Fee 100.00
50 cubic yards or less 120.00
51 to 100 cubic yards 160.00
101 to 1,000 cubic yards
First 100 cubic yards 200.00
Plus—for each additional 100 cubic yards or fraction thereof 20.00
1,001 to 10,000 cubic yards
First 1,000 cubic yards 300.00
Plus—for each additional 1,000 cubic yards or fraction thereof 40.00
10,001 to 100,000 cubic yards
For the First 10,000 cubic yards 500.00
Plus—for each additional 10,000 cubic yards or fraction thereof 60.00
100,001 cubic yards or more
For the first 100,000 Cubic Yards 600.00
Plus—for each additional 10,000 cubic yards or fraction thereof 50.00
Table 3-4: Public Works Labor and Equipment Charges
A. Services and work included in the below schedule will be charged a 15%
administrative/overhead fee for accounting, billing and general City administrative
costs.
B. All work or services not included in the below schedule must be mutually agreed
upon prior to the commencement of work.
C. Equipment and machinery that is not explicitly included in the below schedule will
be charged at the rate set forth in the most current Rental Rate Blue Book for
Construction Equipment ("Blue Book"). If the equipment or machinery rate is not
available in the Blue Book, the City will determine an appropriate fee or rate based
on the original cost of the asset plus operating and maintenance cost and/or
comparable rates charged by other organizations.
Item Fee($)
Labor Rate Cost
Lead Maintenance Worker Hourly 65.00
Senior Maintenance Worker Hourly 60.00
Maintenance Worker Hourly 55.00
Administrative Staff Hourly 55.00
Equipment Rate Cost
Pick-Up Truck Hourly 20.00
Dump Truck Hourly 80.00
Back-Hoe Hourly 60.00
Vactor-Jetter Truck Hourly 115.00
Snow Plow Hourly 80.00
Street Sweeper Hourly 60.00
Page 7
CITY OF ARLINGTON FEE SCHEDULE RESOLUTION NO. 2024-029
Section 4: Building, Plumbing, Mechanical, Fire Permit and Plan Review Fees.
For determining the value of a structure, the most current Building Valuation Data as
published by the International Code Council, is adopted by reference. Fees shall be as
listed in Tables 4-1: Building Permit Fees, 4-2: Building Plan Fees, 4-3: Miscellaneous
Building Permit Fees and 4-4: Miscellaneous Building Inspection & Plan Review Fees.
Table 4-1: Building Permit Fees
Total Valuation($) 2024 � Fee Calculation($)
1.00—500.00 35.50 0.00 to 500.00
35.50 For the first 500.00
501.00—2,000.00 4 57 PLUS for each additional 100.00,or fraction thereof,to
and including 2,000.00
104.05 For the first 2,000
2,001.00—25,000.00 21.03 PLUS for each additional 1,000.00, or fraction thereof,to
and including 25,000.00
587.74 For the first 25,000.00
25,001.00—50,000.00 15.24 PLUS for each additional 1,000.00, or fraction thereof, to
and including 50,000.00
967.24 For the first 50,000.00
50,001.00—100,000.00 10.61 PLUS for each additional 1,000.00, of fraction thereof,to
and including 100,000.00
1,497.74 For the first 100,000.00
100,001.00—500,000.00 8.41 PLUS for each additional 1,000.00, or fraction thereof,to
and including 500,000.00
4,861.74 For the first 500,000.00
500,001.00—1,000,000.00 7.19 PLUS for each additional 1,000.00, or fraction thereof, to
and including 1,000,000.00
1,000,001.00 and Up 8,456.74 For the first 1,000,000.00
5.49 PLUS for each additional 1,000.00 or fraction thereof
Table 4-2: Building Plan Review Fees
Total Valuation ($) Per Current ICC Building Valuation Data
All Valuations 65%of Building Permit Fee Based on Valuation Calculation per Table 4-1
Page 8
CITY OF ARLINGTON FEE SCHEDULE RESOLUTION NO. 2024-029
Table 4-3: Miscellaneous Building Permit Fees
Action Fee($) 1
Demolitions 100.00 plus Inspection Fee
Espresso Stands (portable and stand-alone) 250.00 plus Inspection Fee
Fences (over 7 Feet in Height) 100.00 plan review plus Inspection Fee
Fuel Tank Underground Installation 500.00
Fuel Tank Underground Removal 500.00
Fuel Tank LPG Installation 100.00
Marijuana Extraction Table 4-1 &4-2
Minimum Housing Inspection 75.00
Mobile Homes Installation 500.00
Modular Offices Installation 500.00
Moved Buildings 100.00
Re-Roof Permit—Residential 75.00
Re-Roof Permit—Commercial 100.00 plan review; permit fee,Table 4-1
Retaining Wall
(permit not required under 4 feet) 100.00 or IBC Valuation, whichever is greater
Sign Permit Table 4-1 &4-2; minimum 100.00
Solar Permits Table 4-1&4-2
Swimming Pool or Spa
Table 4-1&4-2
Fee for each pool or spa; private or public
Washington State Surcharge (RCW 19.27.085)
Commercial Building Permits 25.00
Residential Building Permits 6.50
Each Additional Residential Unit 2.00
Table 4-4: Building Permit Fees
Action Fee ($)
Inspections outside of normal business hours 150.00 per hour(minimum charge 1 hour)
Re-inspection fees(includes two inspections) 75.00 per hour
Inspection of which no fee is specifically indicated 75.00 per hour(minimum charge 1 hour)
For use of outside consultants for plan review and Actual costs
inspections, or both
Operating Permit Inspections 150.00 per hour
Stop Work Order(working without a valid permit) Double permit fees or 500.00,
whichever is less
Revise Site Plan after Plan Review is Completed 100.00
Permit Extension 2%of total building permit fees;
minimum 110.00 and maximum 500.00
Revise Building Plan During Plan Review
<50% Review Completion 75.00
>50% Review Completion New Plan Review Fee
Revised Building Plans after Issuance of Permit New Plan Review Fee
Page 9
CITY OF ARLINGTON FEE SCHEDULE RESOLUTION NO.2024-029
4.2 Plumbing Permit and Plan Fees. Plumbing fees shall be as listed in Table 4-5:
Plumbing Permit Fees and Table 4-6: Plumbing Plan Review Fees.
Table 4-5: Plumbing Permit Fees
PLUMBING PERMIT FEES(Per Unit)
Commercial plumbing permits are required to submit line drawings.A permit fee shall be calculated
per unit.A plan review fee of 65%per Table 4-6 for plumbing permits will be assessed at time of
submittal. Includes two(2)inspections with permit.
Residential plumbing permits will be assessed a Base Fee, Fee Per Unit,and Inspection Fee(plan
review per Table 4-6 may be required for certain permits).
Additional Plan Review Fees $ 75.00
Alteration/ Repair Piping $ 15.00
Backflow Assembly $ 25.00
Base Plumbing Fee $ 25.00
Bath/Shower Combo $ 15.00
Building Main Waste $ 25.00
Clothes Washer $ 15.00
Dishwasher $ 15.00
Drinking Fountain $ 15.00
Floor Drains $ 15.00
Grease Interceptor $ 75.00
Grease Trap $ 25.00
Hose Bibb $ 15.00
Icemaker/Refrigerator $ 15.00
Irrigation-per meter $ 25.00
Kitchen Sink& Disposal $ 15.00
Laundry Tray $ 15.00
Lavatory $ 15.00
Medical Gas Piping 15 5 Inlets/Outlets $ 60.00
Medical Gas Piping for each additional Inlet/Outlet>5 $ 5.00
Miscellaneous-Regulated by Plumbing Code (not otherwise specified) $ 15.00
Pretreatment Interceptor $ 15.00
Re-Inspection Fee (all) $ 75.00
Roof Drains $ 15.00
Shower(only) $ 15.00
Sink(Bar, Service, etc.) $ 15.00
Toilets $ 15.00
Urinal $ 15.00
Vacuum Breakers $ 25.00
Water Heater $ 25.00
Water Heater-Tankless $ 25.00
Table 4-6: Plumbing Plan Review Fees
PLUMBING PLAN REVIEW FEES l
Total Valuation($) Per Current ICC Building Valuation Data
All Valuations 65%of Building Permit Fee Based on Valuation Calculation per Table 4-1
Page 10
CITY OF ARLINGTON FEE SCHEDULE RESOLUTION NO. 2024-029
4.3 Mechanical Permit Fees. Mechanical permit fees shall be as listed in Table 4-7:
Mechanical Permit Fees and Table 4-8: Mechanical Plan Review Fees.
Table 4-7: Mechanical Permit Fees
MECHANICAL PERMIT FEES(Per Unit)
Commercial mechanical permits are required to submit line drawings.A permit fee shall be
calculated per unit.A plan review fee of 65% per Table 4-8 for mechanical permits will be assessed
at time of submittal. Includes two(2)inspections with permit.
Residential mechanical permits will be assessed a base fee,fee per unit, and inspection fee(plan
review per Table 4-8 maybe required for certain permits).
Additional Plan Review Fees $ 75.00
Air Conditioning Unit:5 100 Btu/h $ 15.00
Air Conditioning Unit> 100 Btu/h $ 25.00
Air Conditioning Unit>500 Btu/hp $ 50.00
Air Handling Units $ 15.00
Base Mechanical Fee $ 25.00
Boiler< 100 Btu/h >3 hp $ 15.00
Boiler> 1 million Btu/h < 50 hp $ 25.00
Boiler> 1.5 million Btu/h< 50 hp I $ 50.00
Boiler> 100 Btu/h 3-15 hp $ 15.00
Boiler>500 Btu/h 15-30 hp $ 25.00
Commercial Hoods-Type I/ II $ 25.00/50.00
Diffusers $ 15.00
Dryer Ducting $ 15.00
Ductwork(drawings required) $ 25.00
Evaporative Coolers $ 15.00
Exhaust/Ventilation Fans $ 15.00
Fireplace/ Insert/Stove $ 15.00
Forced Air Heat<_ 100 Btu/h $ 15.00
Forced Air Heat > 100 Btu/h $ 25.00
Gas Clothes Dryer $ 15.00
Gas Fired Air Conditioning Unit<_ 100 Btu/h $ 15.00
Gas Fired Air Conditioning Unit> 100 Btu/h $ 25.00
Gas Fired Air Conditioning Unit>500 Btu/hp $ 50.00
Gas Piping<_5 Units $ 15.00
Gas Piping for each additional unit>5 $ 2.00
Heat Exchangers $ 15.00
Heat Pump-Condensing Unit $ 25.00
Hot Water Heat Coils $ 15.00
Miscellaneous-Regulated by Mechanical Code (not otherwise specified) $ 15.00
Package Units<_ 100 Btu/> 100 Btu $ 25.00/50.00
Range/Cook Top-Gas Fired $ 15.00
Refrigeration Unit<_ 100 Btu/h $ 15.00
Refrigeration Unit> 100 Btu/h $ 25.00
Refrigeration Unit>500 Btu/h $ 50.00
Re-Inspection Fee (all) $ 75.00
Page 11
CITY OF ARLINGTON FEE SCHEDULE RESOLUTION NO.2024-029
MECHANICAL PERMIT FEES(Per Unit)
Commercial mechanical permits are required to submit line drawings.A permit fee shall be
calculated per unit.A plan review fee of 65%per Table 4-8 for mechanical permits will be assessed
at time of submittal. Includes two(2)inspections with permit.
Residential mechanical permits will be assessed a base fee,fee per unit,and inspection fee
Residential Range Hood $ 15.00
Unit Heaters<_ 100 Btu/h $ 15.00
Unit Heaters> 100 Btu/h $ 25.00
Variable Air Volume Boxes (part of Air Conditioning System) $ 10.00
Wall Heaters—Gas Fired $ 25.00
Water Heater—Gas Fired $ 25.00
Table 4-8: Mechanical Plan Review Fees
MECHANICAL PLAN REVIEW FEES
Total Valuation ($) Per Current ICC Building Valuation Data
All Valuations 65%of Building Permit Fee Based on Valuation Calculation per Table 4-1
4.4 Fire Permits and Plan Review Fees. Fire permit fees shall be as listed in Table 4-9:
Fire Permit Fees and Table 4-10: Fire Plan Review Fees.
Table 4-9: Fire Permit Fees
FIRE SPRINKLER SYSTEMS(105.7.1,105.7.4,105.7.11)
TENANT IMPROVEMENT OR SYSTEM MODIFICATION (NFPA 13/13R)
Number of Sprinklers or Devices" Fee ($)
1 to 2 75.00
3 to 5 125.00
6 to 10 175.00
11 to 20 225.00
21 to 40 300.00
41 to 100 375.00
101 to 200 475.00
201 to 300 575.00
>300 600.00 plus 50.00 per 100 additional devices
For Hydraulically designed systems multiply the fees above by 2
NEW COMMERCIAL SYSTEM (NFPA 13/13R)
Number of Sprinklers or Devices" Fee($)
1 to 100 375.00
101 to 200 475.00
201 to 300 600.00
> 300 625.00 plus 50.00 per 100 additional devices
Page 12
CITY OF ARLINGTON FEE SCHEDULE RESOLUTION NO. 2024-029
FIRE SPRINKLER SYSTEMS(105.7.1, 105.7.4, 105.7.11)
RESIDENTIAL(NFPA 13D)
Number of Sprinklers or Devices** Fee ($)
1 to 10 175.00
11 to 25 225.00
26+ 275.00
*FEE—NFPA 13D SYSTEM INSTALLED—NOT REQUIRED—FEE REDUCED 50%
HOOD SUPPRESSION SYSTEM
Type of System Fee ($)
Pre-Engineered 200.00
Custom Engineered 275.00
STANDPIPE SYSTEM
Type of Standpipe Fee ($)
Class I—New or Existing 150.00
Class II—New or Existing 150.00
Fire Pump 300.00 each
PHASED INSTALLATION
Additional Fee ($)
Additional Hydrostatic Pressure Test
150.00
(1 test included per permit)
Additional Cover Inspection
75.00
(1 cover inspection included per permit)
SPRAY BOOTHS(105.7)&INDUSTRIAL OVENS(105.7.7)
Spray Booths Fee ($)
Pre-Engineered w/Documents 150.00
Site-Built or used w/o Documents 250.00
Industrial Oven 250.00
NOTE.SEPARATE SPRINKLER SYSTEM REQUIRED
** Devices include separate individual portions of a Fire Sprinkler System such as:
Sprinklers, Risers, Valves, Pull Stations, Beam Detectors, and other such Devices
(Each piece is one device).
FIRE ALARM SYSTEM NFPA 72(105.7.3)
TENANT IMPROVEMENT OR SYSTEM MODIFICATION
Number of Sprinklers or Devices* Fee($)
1 to 2 75.00
3 to 5 125.00
6 to 10 175.00
11 to 20 225.00
21 to 40 300.00
41 to 100 375.00
101 to 200 475.00
> 200 500.00 plus 50.00 per 100 additional devices
Page 13
CITY OF ARLINGTON FEE SCHEDULE RESOLUTION NO.2024-029
FIRE ALARM SYSTEM NFPA 72(105.7.3)
NEW COMMERCIAL SYSTEM
Number of Sprinklers or Devices* Fee ($)
1 to 100 350.00
101 to 200 475.00
>200 500.00 plus 50.00 per 100 additional devices
NOTE: In additional to device*fees shown,the following fees also apply.
FACP AND/OR TRANSMITTER
New 200.00
Replace 125.00
NOTE:All Central Station Monitoring must be UL or FM Listed.
*Devices include separate individual portions of a Fire Alarm System such as:
Initiating Devices, Notification Appliances, Flow Switches, Supervisory Switches, Magnetic Door
Hold-Open Devices, Remote Annunciators, Pull Stations, Beam Detectors, and other such Devices
(Each piece is one device).
Table 4-10: Fire Plan Review Fees
Total Valuation($) Per Current ICC Building Valuation Data
< $12,000.00 200.00
$12,000.00 and Over 65%of Building Permit Fee Based on Valuation Calculation per Table 4-1
Section 5: Annual Fire Self-Inspection Program Fees. Fees for the annual fire self-
inspection program and re-inspections shall be as listed in Table 5: Annual Fire Self-
Inspection Fees.
Table 5:Annual Fire Self-Inspection Fees
Action Fee($)
Life-Safety Inspections of Businesses
Annual Base Fee 60.00
Initial Inspection 0.00
Satisfactory Re-Inspection 0.00
Unsatisfactory Re-Inspection for Corrections 100.00
Unsatisfactory Re-Inspection for Corrections 200.00
Second and Each Additional
Page 14
CITY OF ARLINGTON FEE SCHEDULE RESOLUTION NO.2024-029
Section 6: Fees for the Use of City Owned Facilities. Fees for various services, actions,
and permits regarding use of City owned facilities shall be as listed in Table 6: Fees for
the Use of City Owned Facilities.
Table 6: Fees for the Use of City Owned Facilities
Stillaguamish Conference Room at Public Works Administration(154 W.Cox). Room usage fees for
community youth related activities and Neighborhood Watch meetings may be waived
Use/Activity Fee($)
One to Three Hours 20.00 per hour
Over Three Hours 90.00
Pop-Up Shops at Innovation Center and Depot
One to Four Days 100.00 per rental
Athletic Fields
Ballfield Rental 10.00 per hour-2 hours minimum
Ballfield Lighting(Sept-Mar) 3.00 per 2 hours of use after 5:00 pm
Ballfield Lighting (Apr-Aug) 3.00 per 2 hours of use after 7:00 pm
Community Garden
4 X 20 Foot Bed 20.00 per season
4 X 8 Foot Bed 15.00 per season
2 X 8 Foot Bed 10.00 per season
Section 7: Fees for the Arlington Municipal Airport. Fees for various services and
actions regarding the Arlington Municipal Airport shall be as listed in Table 7: Fees for
the Arlington Municipal Airport.
Table 7: Fees for the Arlington Municipal Airport
Action/Service Rate/Fee($)
Rental Rates-Hangar
Single Hangar 281.22 monthly
Twin Hangar 446.19 monthly
Rental Rates—Tie Down
Tie-Down Aircraft 50.00 monthly
Transient Aircraft Parking 5.00 per night
Large Aircraft Parking 50.00 per night
Auto Parking Rates
Short Term Parking 5.00 per night
Long Term Parking 50.00 monthly
Land Lease Rates
Aviation Land 0.32 per square foot
Industrial Land 0.40 per square foot
Commercial Land 0.89 per square foot
Ultralight Area 0.27 per square foot
T-Hangar Development 0.29 per square foot
Mill Site 0.24 per square foot
Page 15
CITY OF ARLINGTON FEE SCHEDULE RESOLUTION NO. 2024-029
Action/Service Rate/Fee($)
Short Term Land Use—Special Events(Subject to Sales Tax)
Emergency Vehicle Operator Course(EVOC)
Triangle Area 178.14 per day
Use Agreement
Aviation Land 0.32 per square foot
Industrial Land 0.40 per square foot
Mill Site 0.24 per square foot
Administrative Fee 100.00
Power Panels 200.00 per day
Landside Parking 100.00 monthly
Proximity Cards
New Card 15t card free
Additional Cards 10.00 each
Card Renewal—Biennial 10.00 each
Lost or Stolen 40.00 each
Putnam Hall Meeting Room
Deposit 50.00
Hourly Rate 15.00
Daily Rate 75.00
Miscellaneous Fees
Fuel Fees 0.05 per gallon
Waiting List Fee 25.00
Annual Waiting List Renewal Fee 5.00
Late Charge on all Billed Accounts Past 20 Days 5%of outstanding balance
Section 8: Appeal Fees for Violations and Abatement. Fees for various services and
actions regarding violations and abatement as per Chapter 11.01 of the Arlington
Municipal Code shall be as listed in Table 8: Appeal Fees for Violations and Abatement.
Table 8:Appeal Fees for Violations and Abatement
Action Fee($)
Appeals
To Hearing Examiner 582.00 plus actual cost of Hearing Examiner
Fines
Forest Practice Violation Fine 317.00
Page 16
CITY OF ARLINGTON FEE SCHEDULE RESOLUTION NO. 2024-029
Section 9: Licensing Fees. Licensing fees for various licenses issued under various
sections of the Arlington Municipal Code shall be as listed in Table 9: Licensing Fees.
Table 9: Licensing Fees
License/Activity Fee($)
New Application/ Renewal Business License under AMC Chapter 5.28 60.00
Peddlers&Solicitors License under AMC Chapter 5.04 25.00
Vehicles for Hire License under AMC Chapter 5.12
- First Vehicle 35.00
- Each Vehicle thereafter 15.00
Sexually Oriented Adult Entertainment under AMC S.36
Annual License for License of Manager and Entertainers Required 100.00
Annual License for the Adult Entertainment Business is Required 500.00
Section 10: Doe Licensing Fees.
10.1 Fees for dog licenses as called for in Arlington Municipal Code Chapter 8.09 shall
be listed in Table 10: Dog Licensing Fees.
10.2 Per RCW 40.60.380, the City of Arlington shall honor a request by a blind person
or hearing-impaired person not to be charged a fee to license his or her guide
dog, or a request by a physically disabled person not to be charged a fee to
license his or her service animal.
10.3 All dogs require proof of current Rabies vaccination to be licensed.
Table 10: Dog Licensing Fees
License Annual Fee ($)
Dog—unaltered (annual tag) 40.00
Dog—altered (lifetime tag) 20.00
Dog—altered (senior citizen owner—lifetime tag) 10.00
Replacement Tag Fee 5.00
Page 17
CITY OF ARLINGTON FEE SCHEDULE RESOLUTION NO. 2024-029
Section 11: Fees for Police Services. Fees for various services, actions, and permits for
police services shall be as listed in Table 11: Fees for Police Services.
Table 11: Fees for Police Services
Action/Service/License Fee ($)
Fingerprinting 20.00
Concealed Weapons Permits: All charges per RCW 9.41.070, plus
1. New Permit 5.00 Permitium service fee, plus 0.30
2. Permit Renewal per transaction, plus 3.3%of total
transaction
3. Lost or Stolen Permit
4. Late Renewal of Permit
Anti-Harassment Order Service (Includes service, return of 80.00
service, mileage &fuel costs)
Fine for Parking:
1. Fine for parking as described in Arlington Municipal 50.00
Code 10.54.160, Prohibited Parking
2. Fine if paid within 24 hours of issuance 25.00
3. Fine if not paid within 30 days of issuance, or if notice
of infraction is mailed, 33 days from the date the 100.00
notice is mailed.
Section 12: Fees for Duplication and Redaction of Public Records.
12.1 Fees for various services and actions for duplication and redaction of public
records shall be consistent with the provisions of RCW 42.56.120 and listed in Table
12: Fees for Public Records Services.
12.2 The City of Arlington finds that calculating the actual costs of scanning per page
in order to fulfill a public records request would be unduly burdensome for the
following reasons:
(a) The City employs over 120 employees. Because all City employees contribute
to the production of public records requests and all employees earn different
salaries or rate of pay, the public records officer would have to be privy to
salaries of all employees in order to calculate the invoice;
(b) Employees supplying scanned records to the public records officer would be
required to track time spent, thereby creating a burden for those employees
without workstations as well as additional work not assigned in many
employees'job descriptions and or union contracts;
(c) The City's public records officer would be required to maintain a record of all
employees who contribute to each part of a public record request and
potentially charge different amounts for multiple scanned pages;
Page 18
CITY OF ARLINGTON FEE SCHEDULE RESOLUTION NO.2024-029
(d) The City uses more than seven document scanning machines with different
costs and lease agreement fees which change from time to time. The cost of
supplies for the City's various scanning machines is subject to change based
on current market rates. Calculating the portion of the machines and supplies
used toward scanning public records would require knowledge of the cost of
supplies and an in-depth analysis of timing and application multiplied by each
contributing employee's hourly rate of pay; and
(e) The response time to a public records request may be delayed in order to
calculate scanning costs and create an invoice with different rates of scanning
charges.
Table 12: Fees for Public Records Services
Action/Service Fee($)
In house copying of City documents for the public 0.15 per page
In house copying of City documents to PDF when original 0.10 per page
document is not in electronic format
Provision of files or attachments and provide by electronic 0.05 per 4 files or attachments
delivery
Electronic records transmission 0.10 per gigabyte (GB)
Storage media (USB or CD), container, envelope,and postage Actual cost
delivery charge
Duplication of documents and other media printed by outside Actual cost to produce
party
Staff redaction time for body-worn camera footage*
* The City will charge all requestor's requesting body-worn
camera footage except those listed in RCW 42.56.240(e)(i)for 0.94 per minute multiplied by the
the time it takes the City to redact the footage,see RCW duration in minutes of the portion of
42.56.240(14)(f)(1).These charges are based on the average the video which is redacted
per minute salaries of the City employees responsible for
video redaction
Section 13: Fees for Franchise Applications. Pursuant to AMC Title 21, fees for various
services and actions for franchise applications shall be listed in Table 13: Fees for
Franchise Applications.
Table 13: Fees for Franchise Applications
Action/Service Fee($)
Franchise Application Fee 1,000.00
Legal Review of Franchise Application Actual costs
Page 19
CITY OF ARLINGTON FEE SCHEDULE RESOLUTION NO. 2024-029
Section 14: Fees for GIS Products. Fees for various services and actions for GIS shall be
listed in Table 14: Fees for GIS Products.
Table 14: Fees for GIS Products
Action/Service Fee($)
Zoning and Land Use Maps T 14.00
11 x 17 8.00
2 x 3 15.00
3 x 3 22.00
3 x 4 28.00
Map CD 29.00
Data CDs/FTP 29.00 per client
Hourly Rate for Custom Work 140.00 per hour, %Z hour minimum
Laminating 4.00 per square foot
Shipping Actual Cost of container and postage
Section 15: Finance Department Services. Fees for various services, actions, and permits
for finance services shall be listed in Table 15: Fees for Finance Department Services.
Table 15: Fees for Finance Services
Action/Service Fee($) 11
Non-Sufficient Funds—Dishonored or disallowed draft or check 35.00
Establishing a new utility account 20.00
Reactivating an existing utility account 20.00
Shut off processing fee 50.00
Meter Tampering Fee 200.00
Section 16: Repeal of Previous Fee Resolution. Resolution 2024-012 is hereby repealed.
Section 17: Effective Date. This resolution will become effective immediately upon
passage.
Page 20
CITY OF ARLINGTON FEE SCHEDULE RESOLUTION NO.2024-029
PASSED by the City Council and Approved by the Mayor this 16th day of December, 2024.
CITY-OF ARLINGTON
Don E. Vanney, Mayor
ATTEST:
j
Wendy Van ber Meersche, City Clerk
APPROVED AS TO FORM:
�-
Steve64-15/ei , City Attorney
Page 21