Loading...
HomeMy WebLinkAbout17309 40th Ave NE_BLD3319_2025 Permit #: 3319 Permit Date: 07/23/20 Permit Type: FIRE ALARM Project Name: Cedar Pointe Apartments Applicant Name: Guardian Security Systems Applicant Address: 1743 1st Avenue S Applicant, City, State, Zip: Seattle, WA 98134 Contact: Elizabeth Fisher Phone: 206-945-8844 Email: efisher@guardiansecurity.com Scope of Work: AES installation Valuation: 500.00 Square Feet: 0 Number of Stories: 0 Construction Type: Occupancy Group: ID Code: Opportunity Zone Permit Issued: 09/28/2020 Permit Expires: 01/19/2021 Form Permit Type: Status: COMPLETE Assigned To: Property Parcel # Address Legal Description Owner Name Owner Phone Zoning CITY OF ARL BSP #418 REC AFN 201808215006 & AMWA CEDAR 110 Senior Citizen 31052100306900 17309 40TH AVENUE NE AMD BSP REC AFN POINTE FUND LP Exemption Residual 201811065001 Contractors Contractor Primary Contact Phone Address Contractor Type License License # CONSTRUCTION Guardian Security 206-622-6545 1743 1st Ave S. Labor & Industries GUARDSS233K5 CONTRACTOR Plan Reviews Date Review Type Description Assigned To Review Status 07/23/2020 FIRE ALARM BUILDING 1. Permit and set of approved plans to remain on site during installation. Installer(s) shall present NICET II certification upon request. 2. Trouble condition to be verified for signaling circuits. 07/23/2020 FIRE ALARM Mike Makela 3. Signal transmission to Central Station Monitoring Company to be verified. 4. Installation completion form shall be submitted prior to project close-out. Fees Fee Description Notes Amount FACP / Transmitter - New $125.00 Fire Alarm System Permit NFPA 72 - 105.7.3 $100.00 Processing/Technology $25.00 Credit Card Service $7.50 Total $257.50 Attached Letters Date Letter Description 07/23/2020 Building Permit Payments Date Paid By Description Payment Type Accepted By Amount Guardian Security Systems 09/24/2020 82457957 $250.00 Elizabeth Fisher 09/24/2020 82457957 Raelynn Jones $7.50 Outstanding Balance $0.00 Notes Date Note Created By: 08/12/2020 Contractor paid for out of city. Kristin Foster 1. Permit and set of approved plans to remain on site during installation. Installer(s) shall present NICET II certification upon request. 08/12/2020 2. Trouble condition to be verified for signaling circuits. Kristin Foster 3. Signal transmission to Central Station Monitoring Company to be verified. 4. Installation completion form shall be submitted prior to project close-out. 07/23/2020 Question of fees per the fee resolution. Kristin Foster 07/23/2020 Contractor COA license expired 6/30/2020. Emailed the link for payment to renew. Kristin Foster Uploaded Files Date File Name 09/27/2021 9771212-3319_IC 8.13.2020.pdf 09/28/2020 7423773-3319_Issued Permit.pdf 07/23/2020 7027392-3319_AES Specs.pdf 07/23/2020 7027293-3319_Application.pdf ✔ 17309 40th Avenue N.E 31052100306900 1 AES Radio AES install 500.00 AMWA Cedar Pointe Fund LP area 500- n/a 30141 Agoura Rd Suite 100 Agoura 1H0i0lls0 CA 91301 Elizabeth Fisher 2066226545 2069458844 efisher@guardiansecurity.com same as contractor same as same same as contractor contractor as Guardian Security Systems 206-945-8844 contrac 1743 1st Ave S Seattle WA 98134 tor GUARDSS233k5 09/30/2020 Elizabeth Fisher efisher@guardiansecuritysystems.com same as contractor same as contractor same as contractor same as same same as contractor same as contractor contractor as same as contractor contrac tor 07/14/2020 Elizabeth Fisher Letter of Provisional Authorization Authorization is granted to the Owner and/or Facility Manager as shown below, for the purpose of rebroadcasting the Snohomish County 911 public safety frequencies using class "A" bi-directional amplifiers (BDA’s) or Distributive Antenna Systems (DAS). Class "B" BDA/DAS systems will not be granted authorization to retransmit on the Snohomish County 911 radio system. Facility Name: BDA/DAS Manufacturer: Address: BDA/DAS Model: City: State: Zip Code: Buisness Phone: Latitude of Donor Antenna: Longitude of Donor Antenna: Owner/Contact Name: Address: Donor Antenna Height: City: State: Zip Code: TO BE FILLED OUT BY SNO911 Phone: Email: SNO911 Site Name: TO BE FILLED OUT BY SNO911 SERS System Donor Site Assignment: Site Distance: West Simulcast Darrington Index IR Donor Antenna Heading: East Simulcast Skykomish IR This form is authorization to rebroadcast on the Snohomish County 911 radio frequencies. This is not approval from the Fire Marshall or Authority having Jurisdiction that the system meets necessary codes or coverage requirements. Snohomish County 911 and the Fire Marshall reserve the right to make on-site inspections at any time. If problems are believed to exist, the Owner and/or Facility Manager shall power-off their DAS or BDA equipment at Snohomish County 911's request. Snohomish County 911 also reserves the right to suspend or terminate this agreement at its discretion. _______________________________ ______ Snohomish County 911 Representative Date _______________________________ Print or Type Name 1121 SE Everett Mall Way, Suite 200 www.sno911.org Office: (425) 407-3911 Emergency Responder Radio System Coverage Report Test Results Date Prepared: Jul 8, 2020 Test Location: Cedar Point Sr. Housing 17309 40th Ave. NE Arlington WA, 98223 Technician: Lance Stafford FCC#: PG00048282 Building: Cedar Point Sr. Housing Result: Pass Test Report Summary Channel/ Freq (MHz) Ph Type Mod NAC PCI Ant Cable Result Areas Critical Pts Ch Group gain loss passed (%) passed (%) 2 853.75000 0.00 0.00 Pass 96/96 (100%) 0/0 (0%) Test Details Number of Floors Tested: 4 Result Calculation: By area per floor Number of Areas Tested: 96 Area Pass Criteria: 95% Number of Critical Points Tested: 0 Critical Points Pass Criteria: 99% Equipment Configuration Vendor Application Device Calibrated Date Antenna info PCTEL SeeHawk Touch SeeGull IBflex Device rel 9-12-2019 rel 2.8.0.0 3.3.3.0 SN: 081908027 Provided by: Clearline Engineering Page 1 of 11 Threshold Settings DL Area UL Area DL Critical UL Critical Use for Measurement Point Point Point Point grading P25 Power (RSSI) -95.0 dBm -95.0 dBm -95.0 dBm -95.0 dBm Yes DAQ 3.0 Yes Floors Result 2 Floor Plan 853.75000 1 Pass 2 Pass 3 Pass 4 Pass Provided by: Clearline Engineering Page 2 of 11 Floor: 1 Channel: 2 Result: Pass Areas Tested: 24 Area Points Pass Criteria: 95 % Critical Points Tested: 0 Critical Points Pass Criteria: 99 % Total Grid Size: 61370.0 sq. ft Frequency (MHz): 853.75000 Provided by: Clearline Engineering Page 3 of 11 Floor: 1 Channel: 2 Area Report Grid Area DL DL UL UL Result DL Comment Power DAQ Power DAQ Loss (dBm) (dBm) (dB) 1 1 -68.78 Pass 1 2 -60.54 Pass 1 3 -79.31 Pass 1 4 -73.25 Pass 1 5 -78.91 Pass 1 6 -77.02 Pass 1 7 -59.66 Pass 1 8 -70.73 Pass 1 9 -75.49 Pass 1 10 -76.12 Pass 1 11 -72.84 Pass 1 12 -55.24 Pass 1 13 -57.38 Pass 1 14 -56.63 Pass 1 15 -58.27 Pass 1 16 -46.46 Pass 1 17 -48.73 Pass 1 18 -52.67 Pass 1 19 -51.70 Pass 1 20 -48.64 Pass 1 21 -43.07 Pass 1 22 -60.01 Pass 1 23 -46.34 Pass 1 24 -43.83 Pass Provided by: Clearline Engineering Page 4 of 11 Floor: 2 Channel: 2 Result: Pass Areas Tested: 24 Area Points Pass Criteria: 95 % Critical Points Tested: 0 Critical Points Pass Criteria: 99 % Total Grid Size: 56055.8 sq. ft Frequency (MHz): 853.75000 Provided by: Clearline Engineering Page 5 of 11 Floor: 2 Channel: 2 Area Report Grid Area DL DL UL UL Result DL Comment Power DAQ Power DAQ Loss (dBm) (dBm) (dB) 1 1 -64.61 Pass 1 2 -57.25 Pass 1 3 -68.40 Pass 1 4 -63.77 Pass 1 5 -77.14 Pass 1 6 -79.00 Pass 1 7 -50.41 Pass 1 8 -53.27 Pass 1 9 -60.00 Pass 1 10 -73.22 Pass 1 11 -82.49 Pass 1 12 -58.82 Pass 1 13 -46.97 Pass 1 14 -37.12 Pass 1 15 -52.03 Pass 1 16 -42.84 Pass 1 17 -53.31 Pass 1 18 -64.63 Pass 1 19 -49.79 Pass 1 20 -45.40 Pass 1 21 -54.34 Pass 1 22 -47.12 Pass 1 23 -60.94 Pass 1 24 -60.33 Pass Provided by: Clearline Engineering Page 6 of 11 Floor: 3 Channel: 2 Result: Pass Areas Tested: 24 Area Points Pass Criteria: 95 % Critical Points Tested: 0 Critical Points Pass Criteria: 99 % Total Grid Size: 57718.4 sq. ft Frequency (MHz): 853.75000 Provided by: Clearline Engineering Page 7 of 11 Floor: 3 Channel: 2 Area Report Grid Area DL DL UL UL Result DL Comment Power DAQ Power DAQ Loss (dBm) (dBm) (dB) 1 1 -54.27 Pass 1 2 -65.11 Pass 1 3 -71.72 Pass 1 4 -78.95 Pass 1 5 -68.74 Pass 1 6 -69.82 Pass 1 7 -52.23 Pass 1 8 -52.59 Pass 1 9 -80.85 Pass 1 10 -82.34 Pass 1 11 -82.02 Pass 1 12 -73.41 Pass 1 13 -67.33 Pass 1 14 -55.57 Pass 1 15 -77.83 Pass 1 16 -58.29 Pass 1 17 -59.47 Pass 1 18 -66.39 Pass 1 19 -47.41 Pass 1 20 -53.89 Pass 1 21 -69.11 Pass 1 22 -59.77 Pass 1 23 -58.43 Pass 1 24 -67.42 Pass Provided by: Clearline Engineering Page 8 of 11 Floor: 4 Channel: 2 Result: Pass Areas Tested: 24 Area Points Pass Criteria: 95 % Critical Points Tested: 0 Critical Points Pass Criteria: 99 % Total Grid Size: 62254.5 sq. ft Frequency (MHz): 853.75000 Provided by: Clearline Engineering Page 9 of 11 Floor: 4 Channel: 2 Area Report Grid Area DL DL UL UL Result DL Comment Power DAQ Power DAQ Loss (dBm) (dBm) (dB) 1 1 -62.72 Pass 1 2 -75.15 Pass 1 3 -81.23 Pass 1 4 -76.74 Pass 1 5 -82.59 Pass 1 6 -79.51 Pass 1 7 -68.19 Pass 1 8 -77.13 Pass 1 9 -74.58 Pass 1 10 -72.71 Pass 1 11 -79.65 Pass 1 12 -74.43 Pass 1 13 -56.37 Pass 1 14 -56.45 Pass 1 15 -75.10 Pass 1 16 -61.62 Pass 1 17 -62.80 Pass 1 18 -76.71 Pass 1 19 -62.11 Pass 1 20 -54.75 Pass 1 21 -61.57 Pass 1 22 -62.95 Pass 1 23 -64.06 Pass 1 24 -76.26 Pass Provided by: Clearline Engineering Page 10 of 11 Additional Info Provided by: Clearline Engineering Page 11 of 11