Loading...
HomeMy WebLinkAbout3906 172nd St Ne_BLD6311_2025 & A S S O C I A T E S, I N C. G E O T E C H N I C A L E N G I N E E R I N G  E N V I R O N M E N T A L E N G I N E E R I N G C O N S T R U C T I O N T E S T I N G & I N S P E C T I O N August 8, 2025 Krazan No. 096-25135 Permit No. 6311 Commercial Inspections CITY OF ARLINGTON 238 North Olympic Avenue Arlington, WA 98223-1337 RE: FINAL LETTER Arlington DSHS Tucson EV 3906 172nd Street NE Arlington, Washington To whom it may concern: In accordance with your request and authorization, we have performed periodic special testing and inspection services for the above referenced project. The special inspections for this project were:  Soil Compaction Testing  Concrete Placement Observation and Materials Testing To the best of our knowledge, the above referenced items have been found to be in general accordance with the approved plans and specifications, at locations represented within Krazan reports only. If you have any questions, or if we can be of further assistance, please do not hesitate to contact our office at (425) 485-5519. Respectfully submitted, KRAZAN & ASSOCIATES OF WASHINGTON, INC. DBA KRAZAN & ASSOCIATES, INC. Ryman L. Mercer Reviewer: Jeffrey S. Mercer Project Manager Technical Director Pacific Northwest Division CC: CORSTONE CONTRACTORS, LLC 4303 198th Street SW, Lynnwood, Washington 98036 • (425) 485-5519 • FAX (425) 485-6837 With Offices Serving the Western United States CITY OF ARLINGTON 18204 59th Avenue NE, Arlington, WA 98223 INSPECTIONS: 360-403-3417 - Permit Center: 360-403-3551 BUILDING PERMIT 3906 172ND ST NE Permit #: 6311 PERMIT EXPIRES 180 DAYS AFTER Parcel #: 00930300002200 DATE OF ISSUANCE. Scope of Work: PUD installing new transformer in parking lot, contractor installing Valuation: 50000.00 EV chargers and striping EV stalls OWNER APPLICANT CONTRACTOR TRIPLE CREEK INVESTMENTS LLC Transwestern Real Estate Corstone Contractors, LLC PO BOX 430 PO Box 430 PO Box 2280 ARLINGTON, WA 98223 Arlington, WA, 98223 Snohomish, WA 98291 360-790-7419 360-862-8316 LIC: 602 202 840 EXP: 01/31/2026 LIC: CORSTCL984KZ EXP: 05/09/2026 MECHANICAL CONTRACTOR PLUMBING CONTRACTOR LIC #: EXP: LIC #: EXP: JOB DESCRIPTION PERMIT TYPE: COMMERCIAL BUILDING CODE YEAR: 2021 STORIES: 2 CONST. TYPE: lllA DWELLING UNITS: OCC GROUP: B; Business BUILDINGS: OCC LOAD: PERMIT APPROVAL The issuance or granting of this permit shall not be construed to be a permit for, or approval of, any violation of this Code or any other ordinance or order of the City, of any state or federal law, or of any order, proclamation, guidance advice or decision of the Governor of this State. To the extent the issuance or granting of this permit is interpreted to allow construction activity during any period of time when such construction is prohibited or restricted by any state or federal law, or order, proclamation, guidance advice or decision of the Governor of this State, this permit shall not authorize such work and shall not be valid. The building official is authorized to prevent occupancy or use of a structure where in violation of this Code, any other City ordinances of this jurisdiction or any other ordinance or executive order of the City, or of any state or federal law, or of any order, proclamation, guidance advice or decision of the Governor. The building official is authorized to suspend or revoke this permit if it is determined to be issued in error or on the basis of incorrect, inaccurate or incomplete information, or in violation of any City ordinance, regulation or order, state or federal law, or any order, proclamation, guidance or decision of the Governor. I AGREE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUCTION AND IN DOING THE WORK AUTHORIZED THEREBY; NO PERSON WILL BE EMPLOYED IN VIOLATION OF THE LABOR CODE OF THE STATE OF WASHINGTON RELATING TO WORKMEN'S COMPENSATION INSURANCE AND RCW 18.27. THIS APPLICATION IS NOT A PERMIT UNTIL SIGNED BY THE BUILDING OFFICIAL OR HIS/HER DEPUTY AND ALL FEES ARE PAID. IT IS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR A CERTIFICATE OF OCCUPANCY HAS BEEN GRANTED. IBC110/IRC110. SALES TAX NOTICE: Sales tax relating to construction and construction materials in the City of Arlington must be reported on your sales tax return form and coded City of Arlington #3101. 4-11-25 04/11/2025 Applicant Signature Date Building Official Date CONDITIONS Install and maintain erosion control measures per City of Arlington Standards and per the direction of the City Inspectors. Remove upon completion of the project prior to final approval of the permit. Must adhere to all land use conditions. Approved copy and permit shall be onsite for inspection. Adhere to approved plans. Call for inspections. The property owner shall ensure that the construction project complies with all applicable zoning codes and regulations. The property owner shall also ensure that the construction project does not cause any adverse impact on the surrounding environment or community. The property owner shall be responsible for obtaining all necessary permits and approvals from the relevant authorities before commencing construction. The property owner shall ensure that the construction project complies with all applicable design review requirements. THIS PERMIT AUTHORIZES ONLY THE WORK NOTED. THIS PERMIT COVERS WORK TO BE DONE ON PRIVATE PROPERTY ONLY. ANY CONSTRUCTION ON THE PUBLIC DOMAIN (CURBS, SIDEWALKS, DRIVEWAYS, MARQUEES, ETC.) WILL REQUIRE SEPARATE PERMISSION. PERMIT FEES Date Description Fee Amount 04/11/2025 Building Plan Review $628.71 04/11/2025 Credit Card Service $18.86 04/11/2025 Processing/Technology $25.00 04/11/2025 Building Permit $967.24 Total Due: $1,639.81 Total Payment: $1,639.81 Balance Due: $0.00 CALL FOR INSPECTIONS Call by 3:30 pm for next day inspection, allow 48 hours for Fire Inspections When calling for an inspection please leave the following information: Permit Number, Type of Inspection being requested, and whether you prefer morning or afternoon INSPECTION INFORMATION Pass/Fail COMMERCIAL BUILDING PERMIT APPLICATION Community and Economic Development City of Arlington • 18204 59th Ave NE • Arlington, WA 98223 • Phone (360) 403-3551 The following information is required for Commercial, Multi-Family, and Mixed-Use Building Permit Applications. Mark each box to designate that the information has been provided. Please submit this checklist as part of the submittal documents. See ASSISTANCE BULLETIN #30 for detailed design requirements. EACH BUILDING OR STRUCTURE REQUIRES A SEPARATE SUBMITTAL. SUBMIT ELECTRONIC FILES FOR EACH OF THE FOLLOWING; Incomplete applications will not be accepted. REQUIRED DOCUMENTS Site Plan Architectural Plans Structural Plans N/A, no Structural modifications Structural Calculations Mechanical System Modifications, (if applicable) Plumbing System Modifications, (if applicable) Project Specification Manuals, (if applicable) WSEC Compliance Forms, (if applicable) https://waenergycodes.com/ Special Inspection and Testing Agreement Deferred Submittal Request Airport Property Lease (if building is located within the Arlington Airport Property Boundary) 1. Plan Review fee is due at time of submittal and remaining balance will be due at time of issuance. 2. The City of Arlington does not review or inspect electrical systems. Contact Labor and Industries at lni.wa.gov or 360-416-3000. A. DEFERRED SUBMITTALS N/A If the project requires any of the following, a Deferred Submittal Request MUST be completed. Deferred submittals require separate applications, plans and plan review. 1. Mechanical Plans (if not included in the plan set) 2. Plumbing Plans (if not included in the plan set) 3. Fire Sprinkler 4. Fire Alarm 5. Signage B. SPECIAL INSPECTION AND TESTING AGREEMENT N/A A Special Inspection Firm is required to perform special inspections for the following type of work. *The Special Inspection and Testing Agreement MUST be submitted with the Building Application. Reinforced Concrete Structural Steel and Welding Bolting in Concrete High-Strength Bolting Pre-stressed Concrete Spray-Applied Fireproofing Shotcrete Smoke-Control Systems Structural Masonry Other - Specify: ______________________________________ I acknowledge that all items designated as submittal requirements must accompany my Commercial Building Permit Application to be considered a complete submittal. COMMERCIAL BUILDING INSTALLATION, MODIFICATION OR REMOVAL MAY REQUIRE A SEPARATE PERMIT SUBMITAL *CHECK ALL THAT APPLY Automatic fire extinguishing systems Compressed gas systems Fire pumps Flammable and combustible liquids (tanks, piping etc.) Standpipe systems Hazardous materials Private fire hydrants Industrial ovens/furnace Fire alarm and detection systems Spraying or dipping operations High piled/rack storage Temporary membrane structure, tents (>200 sq. ft.) or canopies (>400 sq. ft.) Provide details on any of the above checked items: _________________________________________________________________________ ________________________________________________________________________________________ Type of Permit: Commercial Mulit-Family Mixed-Use Property Address: Project Valuation: Lot #: Parcel ID No.: Subdivision: Project Scope of Work: IBC Construction Type: IBC Occupancy Type: Building/Space Square Footage: Number of Stories: Square Footage Per Floor: 1st 2nd 3rd 4th 5th 6th Primary Contact: Owner Architect Engineer Contractor Owner Name: Office No.: Email Address: Cell No.: Mailing Address: City: State: Zip: Architect Name: Office No.: Email Address: Cell No.: Mailing Address: City: State: Zip: Professional License Number: Expiration Date: Engineer Name: Office No.: Email Address: Cell No.: Mailing Address: City: State: Zip: Professional License Number: Expiration Date: Primary Contractor: Office No.: Email Address: Cell No.: Mailing Address: City: State: Zip: L&I Contractor License Number: Expiration Date: REV03.2022 Page 2 of 6 COMMERCIAL BUILDING MECHANICAL SYSTEM INFORMATION N/A Type of Permit:  New Installation Gas Piping Mechanical Contractor: Office No.: Email Address: Cell No.: Mailing Address: City: State: Zip: L&I Contractor License Number: Expiration Date:  New gas piping requires a pressure test hooking to any appliance  Sediment traps (drips) are required on all gas lines  Gas lines are required to be supported/secured per IFGS, Section 415  Proper Combustion air and venting required for all appliances  A shut-off valve is required within 6 feet of each appliance Gas Piping Specification and complete Schematic PAGE 4  Not Applicable Proposed Piping Material:  CSST  Brass  Black Steel  Galvanized Steel  Other Proposed Piping Size:  ½”  ⅝”  ¾”  1”  1½”  2” Inlet Pressure: Pressure Drop: Specific Gravity: MECHANICAL PERMIT FEES (per unit) Type of Fixture No. of Units Cost per Unit Subtotal Additional Plan Review fees x $ 75.00 = $ Air Cond. Unit ≤100Btu/h x $ 15.00 = $ Air Cond. Unit >100Btu/h x $ 25.00 = $ Air Cond. Unit >500Btu/hp x $ 50.00 = $ Air Handling Units x $ 15.00 = $ Base Mechanical Fee $ 25.00 $ 25.00 Boiler <100Btu/h >3hp x $ 15.00 = $ Boiler >1 million Btu/h<50hp x $ 25.00 = $ Boiler >1.5 million Btu/h<50hp x $ 50.00 = $ Boiler >100Btu/h 3-15hp x $ 15.00 = $ Boiler >500Btu/h 15-30hp x $ 25.00 = $ Diffusers x $ 15.00 = $ Dryer Ducting x $ 15.00 = $ Ductwork (drawings required) x $ 25.00 = $ Evaporative Coolers x $ 15.00 = $ Exhaust/Ventilation Fans x $ 15.00 = $ Fireplace/Insert/Stove x $ 15.00 = $ Forced Air Heat ≤100 Btu/h x $ 15.00 = $ Forced Air Heat >100 Btu/h x $ 25.00 = $ Gas Clothes Dryer x $ 15.00 = $ Gas Fired AC ≤100 Btu/h x $ 15.00 = $ Gas Fired AC >100 Btu/h x $ 25.00 = $ Gas Fired AC > 500 Btu/h x $ 50.00 = $ Gas Piping ≤ 5 units x $ 15.00 = $ REV03.2022 Page 3 of 6 COMMERCIAL BUILDING MECHANICAL PERMIT FEES (per unit) Gas Piping > 5 units (plus <5 units) x $ 2.00 = $ Heat Exchangers x $ 15.00 = $ Heat Pump-Condensing Unit x $ 25.00 = $ Hot Water Heat Coils x $ 15.00 = $ Miscellaneous Appliance - regulated by $ 15.00 $ x = mechanical code, not otherwise specified Pkg. Units ≤100btu x $ 25.00 = $ Pkg. Units >100btu x $ 50.00 = $ Range/Cook top-Gas Fired x $ 15.00 = $ Refrigeration Unit ≤100Btu/h x $ 15.00 = $ Refrigeration Unit >100Btu/h x $ 25.00 = $ Refrigeration Unit >500Btu/h x $ 50.00 = $ Re-inspection fee (all) x $ 75.00 = $ Unit Heaters ≤ 100 Btu/h x $ 15.00 = $ Unit Heaters >100 Btu/h x $ 25.00 = $ VAV Boxes (Variable Air Volume, part of air $ 10.00 $ x = conditioning system) Wall Heaters - Gas Fired x $ 25.00 = $ Water Heater - Gas Fired x $ 25.00 = $ Permit Fee $ Table 4-8; Plan Review Fee $ Processing/Technology Fee $25.00 Total $ PRESSURE PIPING SCHEMATIC COMPLETE FOR GAS PIPING ONLY – USE A SEPARATE SHEET, IF NECESSARY  SCHEMATIC IS TO SCALE  SCHEMATIC NOT TO SCALE Show Pipe Size(s) and Length(s) from meter to all appliances NOTE: Any interior pressure regulators must be indicated REV03.2022 Page 4 of 6 COMMERCIAL BUILDING PLUMBING SYSTEM INFORMATION N/A Plumbing Contractor: Office No.: Email Address: Cell No.: Mailing Address: City: State: Zip: L&I Contractor License Number: Expiration Date: The following items need to be specified on the plans:  Fixture specifications and equipment with locations.  Location and type of all backflow assemblies for each fixture.  Calculations for Grease Interceptor.  Pipe size and location of sanitary and potable water systems.  Riser diagram of waste, vent, and rain water systems, including sizes.  Medical gas piping riser diagram, type of gas, storage room and size of piping. PLUMBING PERMIT FEES (per fixture) Commercial plumbing permits are required to submit line drawings. A plan review fee of 65% per Table 4-6 for plumbing permits will be assessed at time of submittal. Includes two (2) inspections with permit. Type of Fixture No. of Fixtures Cost per Fixture Subtotal Additional Plan Review fees x $ 75.00 = Alteration/repair piping x $ 15.00 = Backflow Assembly x $25.00 = Base Plumbing Fee $ 25.00 $25.00 Bath/Shower Combo x $ 15.00 = Building Main Waste x $ 25.00 = Clothes Washer x $ 15.00 = Dishwasher x $ 15.00 = Drinking Fountain x $ 15.00 = Floor Drains x $ 15.00 = Grease Interceptor x $ 75.00 = Grease Trap x $ 25.00 = Hose Bibb x $ 15.00 = Icemaker/Refrigerator x $ 15.00 = Irrigation – per meter x $ 25.00 = Kitchen Sink & Disposal x $ 15.00 = Laundry Tray x $ 15.00 = Lavatory x $ 15.00 = Med Gas Piping ≤ 5 inlets/outlets x $ 60.00 = Med Gas Piping > 5 inlets/outlets (plus ≤ 5 x $ 5.00 = inlets/outlets) Miscellaneous – regulated by plumbing x $ 15.00 = code, not otherwise specified Pretreatment Interceptor x $ 15.00 = REV03.2022 Page 5 of 6 COMMERCIAL BUILDING PLUMBING PERMIT FEES (per fixture) Re-inspection Fee (all) x $ 75.00 = Roof Drains x $ 15.00 = Shower (only) x $ 15.00 = Sink (bar, service, etc.) x $ 15.00 = Toilets x $ 15.00 = Urinal x $ 15.00 = Vacuum Breakers x $ 25.00 = Water Heater x $ 25.00 = Water Heater - Tankless x $ 25.00 = Permit Fee Table 4-6; Plan Review Fee Processing/Technology Fee $25.00 Total PROPOSED BUILDING USE  New  Retail  Medical  Automotive Based  Industrial  Office  Restaurant  Machine Shop  Other: ____________________________________ CROSS CONNECTION Please check all appliances that are proposed or permanently connected to the water supply.  Ice Machine  Dialysis Equip.  Air washers  Coffee Urn/Espresso  Hydrotherapy Equip.  Steam Generators  Carbonated Bev.  Dental Equip.  Dye Vats  Fume Hoods  Laboratory Equip.  Pressure Washers  Degreasers  Autoclave/Sterilizers  Cooling Towers  Hot Tub/Spa  Decorative Fountain  Fire Sprinkler  Aquarium  Swimming Pools  Sprinkler w/chemicals  Lawn Irrigation  Well on property  Other: ________________________ WASTEWATER DISCHARGE Does the plumbing system currently have a grease interceptor?  Yes  No  Don’t Know Does the plumbing system currently have an oil/water  Yes  No  Don’t Know separator? Is water used in the business process (washing, rinsing,  Yes  No  Don’t Know cooling)? Does your business require a NPDES permit?  Yes  No  Don’t Know I hereby certify that the above information is correct and that the construction on, and the occupancy and the use of the above-described property will be in accordance with the laws, rules and regulation of the State of Washington. Signature Print Name Date REV03.2022 Page 6 of 6 1 ELECTRICAL SCOPE OF WORK GENERAL NOTES 1. INSTALL THE DESIGNATED NUMBER OF LEVEL 2 DUAL HEAD EV CHARGERS SUPPLIED BY 1. IT IS THE RESPONSIBILITY OF THE LESSOR/OWNER OR THEIR CONTRACTOR TO VERIFY AND THE TENANT(CONTRACTOR INSTALLED). INCORPORATE ALL CODE-RELATED REQUIREMENTS INTO THIS PROJECT. (E) SIDEWALK 2. PROVIDE ALL REMAINING INFRASTRUCTURE ELEMENTS AS SHOWN NECESSARY TO 2. THE LESSOR SHALL REPORT ALL DISCREPANCIES BETWEEN EXISTING FIELD CONDITIONS ENERGIZE THE CHARGING HEADS. AND THE PROJECT DESIGN TO THE RES PROJECT DESIGN PROFESSIONAL PRIOR TO PROCEEDING WITH THE WORK. 3. AS SOON AS THE HEADS ARE POWERED UP AND BEFORE FINAL COMPLETION THE TENANT WILL PROVIDE COMMISSIONING. CONDITIONS REQUIRED PRIOR TO COMMISSIONING 3. THIS PROJECT SHALL COMPLY WITH THE REQUIREMENTS FOR PREVAILING WAGE. THE ADDED PARKING LOT 3.1 CHARGERS ENERGIZED WASHINGTON STATE DEPARTMENT OF LABOR AND INDUSTRIES DETERMINES THE LIGHTING (TYP OF 4) 3.2 CHARGER SCREENS ARE ON (IF APPLICABLE) PREVAILING WAGE RATES AND WHICH PROJECTS MAY BE EXEMPT FROM THIS LAW. FOR 3.2 CHARGER LIGHTS ARE ON (IF APPLICABLE) MORE INFORMATION, CONTACT THE DEPARTMENT OF LABOR AND INDUSTRIES. 3.4 ENSURE VOLTAGE AT CHARGER TERMINATIONS EQUAL TO RATED VOLTAGE OF EQPT. (E) PAVEMENT MARKINGS 3.5 CHARGER DOES NOT SHOW ANY FAULTS 4. DIMENSIONS SHOWN ARE FROM FINISH FACE TO FINISH FACE UNLESS NOTED OTHERWISE. 4. DUE 'TO FUNDING REQUIREMENTS BY THE DEPT OF COMMERCE THERE WILL BE AN 5. PATCH AND REPAIR OR REPLACE EXISTING MATERIALS AND FINISHES AS REQUIRED TO ELECTRICAL APPRENTICE REQUIREMENT OF 15% THE LANDLORD SHALL SUBMIT WITH PAY MATCH ADJACENT FINISH SURFACES TO ACHIEVE A UNIFORM, LIKE NEW APPEARANCE REQUEST: THROUGHOUT THIS PROJECT. REVISIONS:1 8/8/24 5.1 TOTAL LABOR HOURS BY EACH ELECTRICAL WORKER 5.2 TOTAL LABOR OURS BY EACH ELECTRICAL APPRENTICE 6. IN ALL LOCATIONS THROUGHOUT THIS PLAN SET THE TERM "EV" SHALL MEAN ELECTRIC 5.3 ELECTRICAL IDENTIFICATION FOR EACH APPRENTICE VEHICLE, WHERE USED. DIRECTIONAL ARROW 36" WIDE CROSS WALK 5.4 TOTAL HOURS WORKED BY ELECTRICAL APPRENTICE3S SHALL BE A MINIMUM OF 15% OF WHITE TRAFFIC PAINT ACCESSIBLE PATH SIGNAGE NOTES: THE TOTAL HOURS WORKED BY ALL ELECTRICAL WORKERS. 7. LESSOR TO PROVIDE AND SUBMIT AN ALL INCLUSIVE COST PROPOSAL TO THE (TYP.) DEPARTMENT OF ENTERPRISE SERVICES (DES), REAL ESTATE SERVICES (RES), ON THE 1. PROVIDE AND INSTALL PROJECT COST PROPOSAL (PCP) FORM. COSTS SHALL INCLUDE ALL ELECTRICAL WORK, NA SIGNAGE ( DISPLAYED BELOW) CURB CUTS, CONCRETE WORK, ASPHALT WORK, STRIPING, SIGNAGE & INSTALLATION, SITE S.R.#A.R.#LEASE # 3'-2" AT ALL (4) LOCATIONS INDICATED PAINTING REQUIRED TO COMPLETE THE PROPOSED SCOPE OF WORK AND INSTALLATION 6' TALL BLACK 3'x6' BLACK VINYL COATED BASE BID: ON SITE PLAN THROUGHOUT OF EV CHARGING STATIONS PER MANUFACTURER INSTALLATION REQUIREMENTS. THE CARD READER VINYL COATED CYCLONE GATE WITH CARD ALL INFRASTRUCTURE AND IMPROVEMENTS SHOWN ON DRAWINGS, WITH ELECTRICAL SERVICE SIZED TO THE PROJECT. COMPLETED PCP FORM SHALL BE SUBMITTED TO THE RES DESIGN PROFESSIONAL FOR CYCLONE READER ON EXTERIOR SIDE PROVIDE POWER FOR THE EV CHARGERS BEING INSTALLED AS A PART OF THIS PROJECT EXCEPT: REVIEW AND APPROVAL. NO WORK SHALL PROCEED WITHOUT WRITTEN APPROVAL FROM FENCE 10' MIN. THE RES DESIGN PROFESSIONAL. AUTOMATIC 1. ALTERNATE BID #1 - PROVIDE ELECTRICAL SERVICE SIZED FOR FUTURE CAPACITY. EXAMPLE: OF SIGNAGE INSTALLATION 2. ALTERNATE BID #2 - PROVIDE FENCING AND AUTOMATIC GATE OPERATORS AS SHOWN ON DRAWINGS ROLLING GATE 6' TALL BLACK VINYL COATED 10'-0" 3. ALTERNATE BID #3 - PROVIDE SITE LIGHTING AS INDICATED ON DRAWINGS 8. THIS INSTALLATION SHALL COMPLY WITH, BUT NOT LIMITED TO, THE FOLLOWING CL CYCLONE FENCE CL 1 WASHINGTON STATE LAWS, CODES, AND REQUIREMENTS: RCW 46.08.185 CL SAZ 03/29/2307/05/23 EV EV EV1 EV EV 4. ALTERNATE BID #4 - PROVIDE LEVEL 3 DUAL HEAD EV CHARGING PEDESTAL PROVIDED BY AGENCY AND (1) AN ELECTRIC VEHICLE CHARGING STATION MUST BE INDICATED BY VERTICAL SIGNAGE DRAWN BY:PRELIM DATE:FINAL DATE: 1'-10" 19'-6" ALTERNATE #4: LEVEL 3, DUAL HEAD EV CHARGING PEDESTALL INSTALLED BY GC DCFC 75KW 480V/3PH/125A DEDICATED CIRCUIT (1 ONLY), LOCATION SHOWN ON IDENTIFYING THE STATION AS AN ELECTRIC VEHICLE CHARGING STATION AND GATE OPERATOR 12" DRAWING INDICATING THAT IT IS ONLY FOR ELECTRIC VEHICLE CHARGING. THE SIGNAGE MUST BE 12'-0" CONSISTENT WITH THE MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES, AS ADOPTED BY THE DEPARTMENT OF TRANSPORTATION UNDER RCW 47.36.030. ADDITIONALLY, THE ELECTRIC VEHICLE CHARGING STATION MUST BE INDICATED BY GREEN PAVEMENT 6' TALL BLACK 13'-3 1/2" (2) FUTURE EV STALLS MARKINGS. SUPPLEMENTARY SIGNAGE MAY BE POSTED TO PROVIDE ADDITIONAL VINYL COATED GATE OPERATOR 12'-0" P INFORMATION INCLUDING, BUT NOT LIMITED TO, THE AMOUNT OF THE MONETARY (1) @ EA LOCATION - 4" DIA. CROSS HATCH CYCLONE 5 EXCEPT FOR PENALTY UNDER SUBSECTION (2) OF THIS SECTION FOR PARKING IN THE STATION ELEC. CONDUIT BURIED 12" 6 101 LAST STALL AUTOMATIC ELECTRIC FENCE WHILE NOT CONNECTED TO THE CHARGING EQUIPMENT. BELOW GRADE & CAPPED 101 ROLLING GATE VEHICLE (2) IT IS A PARKING INFRACTION, WITH A MONETARY PENALTY OF ONE HUNDRED W/ PULL STRING W/ #4 CHARGING P TWENTY-FOUR DOLLARS, FOR ANY PERSON TO PARK A VEHICLE IN AN ELECTRIC 12'-0" REBAR TO SURFACE FOR VEHICLE CHARGING STATION PROVIDED ON PUBLIC OR PRIVATE PROPERTY IF THE FUTURE DUAL HEAD LEVEL Violators are subject 18" EXCEPT FOR to a $124.00 fine VEHICLE IS NOT CONNECTED TO THE CHARGING EQUIPMENT. THE PARKING INFRACTION PO BOX 41468(360) 902 7373 2 EV CHARGER (TYP. OF 7 LOCATION OF TRANSFORMER RCW 46.08.185 ELECTRIC MUST BE PROCESSED AS PRESCRIBED UNDER RCW 3.50.100, 35.20.220, 46.16A.120, AND * (E ) FENCE AROUND LOCATIONS) VEHICLE 46.20.270(3). R.E.S. INFORMATION EXTERIOR PANEL GEAR BOXES 1500 JEFFERSON ST SE STORAGE FACILITY CHARGING (3) FOR PURPOSES OF THIS SECTION, "ELECTRIC VEHICLE CHARGING STATION" MEANS A OLYMPIA, WA 98504-1468 PUBLIC OR PRIVATE PARKING SPACE THAT IS SERVED BY CHARGING EQUIPMENT THAT HAS AS ITS PRIMARY PURPOSE THE TRANSFER OF ELECTRIC ENERGY TO A BATTERY OR OTHER ENERGY STORAGE DEVICE IN AN ELECTRIC VEHICLE. 2'-0" 6' TALL BLACK VINYL COATED 9'-0" 9'-0" 18'-0" 19'-6" 13'-6" 15'-0" 18'-0" 9'-0" CYCLONE FENCE Violators are subject 1 6" to a $124.00 fine 9. PROVIDE DEDICATED SUBPANEL FOR EVSE EQUIPMENT. ALL ELECTRICAL PANELS TO BE RCW 46.08.185 PROVIDED WITH KEY-CONTROLLED LOCKING COVERS OR LOCATED IN A LOCKED PROPERTY CORNER 36" (2) FUTURE EV STALLS (5) FUTURE EV STALLS (4) FUTURE EV STALLS ELECTRICAL ROOM. PROPERTY LINE MINIMUM (E ) FENCE AROUND STORM 10. ELECTRIC VEHICLE INFRASTRUCTURE SALES TAX EXEMPT (DOR FORM 27 0032) THRU JULY DETENTION POIND 1, 2025 N GRADE PARTIAL SITE PLAN EV PARKING STALL REQUIRED SIGNAGE 2 1 1" = 20'-0" 1 1/2" = 1'-0" ELECTRICAL LEGEND LEVEL 2 DUAL HEAD EV CHARGING PEDESTAL EV PROVIDED BY AGENCY INSTALLED BY GC. 1 SITE LIGHTING - (2) 300 WATT 50,000 LUMEN BASIS OF DESIGN: LED SHOEBOX LIGHT W/ MOTION SENSOR PEDESTAL MOUNTED ON A 208/240V/60A DUAL-POLE COMMON TRIP ON 20FT. POLE (TYP. OF 4) DEDICATED CIRCUIT. (TYP OF 3) LEVEL 2 SINGLE HEAD EV CHARGING PEDESTAL PROVIDED AGENCY Washington State Department ofReal Estate Services EV1 INSTALLED BY GC BASIS OF DESIGN: 30A, PEDESTAL MOUNTED ON A 208/240V/40A DUAL-POLE COMMON TRIP DEDICATED CIRCUIT. (1 ONLY) LEVEL 3 DUAL HEAD EV CHARGING PEDESTAL EV3 PROVIDED BY AGENCY INSTALLED BY GC. BASIS OF DESIGN: DCFC 75KW ON A 480V/3PH/125A DEDICATED CIRCUIT (1 ONLY) (E) CURB @ FLUSH 4" CONC SLAB W/ WWF AND 8" LANDSCAPE DEEP EXPANDED EDGE. VERIFY PAD ISLAND 3'-0" X 6'-0" VINYL COATED SIZE, EV CHARGER BASE PLATE WHEEL STOP BLACK GATE W/ CARD ANCHORAGE, BLOCK OUTS, AND (TYP OF 8) READER ON EXTERIOR CONDUIT ROUGH-IN FOR POWER AND AND PUSH BAR ON DATA WITH EV PEDESTAL MFG. (TYP.) SIGNAGE ATTACHED TO INTERIOR 21'-0" 21'-0" FENCE, PER DTL. ABV. 21'-0" 9'-0" (TYP. OF 8) CL 1'-6" 1'-6" EQ EQ EQ 1'-6" 1'-6" EQ 1'-6" 1'-6" EQ EQ EQ EQ 1'-6" 1'-6" EQ EQ EQ EQ 1'-6" 1'-6" EQ EQ CL CL CL CL ARLINGTON, WASHINGTON CL C CL CL CL CL C CL CL L L 2'-0" EV EV EV1 EV EV 1'-3" AGENCY APPROVAL: LEVEL 2, DUAL HEAD EV Kelly Lerner ALTERNATE #4: LEVEL 3, 1 LEVEL 2, SINGLE HEAD CHARGING PEDESTAL DUAL HEAD EV CHARGING Kelly Lerner (Aug 22, 2024 12:26 PDT) EV CHARGING PEDESTALL (TYP OF 3) DSHS PEDESTALL 1'-6" 1'-6" EV CHARGERINSTALLATION DATE:08/22/2024 4" DIA. STEEL PIPE BOLLARD, 42" A.F.G, OF PARKING LOT, RES DESIGN PROFESSIONAL: CONCRETE FILLED, PAINTED GREEN CROSS SAFETY YELLOW, HATCH PAINT EMBEDDED 36" DEEP IN 12" 19'-0" DIA. CONC. FOOTING, TYP. (16) DATE:08/22/2024 RES LEASING APPROVAL: ALL LINES AND SYMBOLS SHOWN FOR EV PARKING SPACES SHALL BE Geri Scott (Aug 22, 2024 12:28 PDT) PAINTED WITH GREEN PAINT UNLESS NOTED DATE:08/22/2024 OTHERWISE. DEPT. OF ENTERPRISE SERVICES COLOR: DIRECT GREEN REAL ESTATE SERVICES SW 6924 3906 172nd Street NE PAINT DESIGN MANAGER INTERIOR DATE:08/30/2024 WHITE 3'-0" 9'-0" 9'-0" 3'-0" 9'-0" 6'-6 1/2" +/- 11'-0" 9'-0" 3'-0" 9'-0" 9'-0" 3'-0" 9'-0" BUILDING DATA PAINT OVER (E) WHITE N/A SQ. FT. BOMA "OCCUPANT AREA" (THIS FIGURE IS VERIFIED BY RES) (2) FUTURE EV STALLS PAVEMENT STRIPES WITH FLAT BLACK TO MATCH N/A SQ. FT. BOMA "RENTABLE AREA" N N (THIS FIGURE IS BASED ON THE RESULTS OF THE BOMA CALCULATION WORK ASPHALT.(TYP) SHEET EVEN THOUGH ITS ACCURACY CANNOT BE VERIFIED BY RES) 101 ENLARGED SITE PLAN ENLARGED SITE PLAN 6 5 N/A SQ. FT. BOMA "EXTERIOR GROSS AREA" 23-02-055 1/4" = 1'-0" 1/4" = 1'-0" (THE ENTIRE BUILDING IS LEASED TO THE STATE) PROJECT #SHEET NUMBER: 23-02-055 DSHS Arlington - EV Charger 8-7-24- Layout1 Final Audit Report 2024-08-30 Created: 2024-08-22 By: Stanley Zielinski (Stanley.Zielinski@des.wa.gov) Status: Signed Transaction ID: CBJCHBCAABAAqQ9ByWyGk7t52cCO1sohm2Dq2MnEFRdh "23-02-055 DSHS Arlington - EV Charger 8-7-24-Layout1" Histor y Document created by Stanley Zielinski (Stanley.Zielinski@des.wa.gov) 2024-08-22 - 5:20:23 PM GMT Document e-signed by Stanley Zielinski (Stanley.Zielinski@des.wa.gov) Signature Date: 2024-08-22 - 5:20:52 PM GMT - Time Source: server Document emailed to Kelly Lerner (kelly.lerner@dshs.wa.gov) for signature 2024-08-22 - 5:20:54 PM GMT Email viewed by Kelly Lerner (kelly.lerner@dshs.wa.gov) 2024-08-22 - 7:25:11 PM GMT Document e-signed by Kelly Lerner (kelly.lerner@dshs.wa.gov) Signature Date: 2024-08-22 - 7:26:34 PM GMT - Time Source: server Document emailed to Geri Scott (geri.scott@des.wa.gov) for signature 2024-08-22 - 7:26:36 PM GMT Email viewed by Geri Scott (geri.scott@des.wa.gov) 2024-08-22 - 7:27:51 PM GMT Document e-signed by Geri Scott (geri.scott@des.wa.gov) Signature Date: 2024-08-22 - 7:28:20 PM GMT - Time Source: server Document emailed to Regina Leccese (regina.leccese@des.wa.gov) for signature 2024-08-22 - 7:28:23 PM GMT Email viewed by Regina Leccese (regina.leccese@des.wa.gov) 2024-08-23 - 2:52:25 PM GMT Email viewed by Regina Leccese (regina.leccese@des.wa.gov) 2024-08-30 - 4:55:17 PM GMT Document e-signed by Regina Leccese (regina.leccese@des.wa.gov) Signature Date: 2024-08-30 - 4:55:31 PM GMT - Time Source: server Agreement completed. 2024-08-30 - 4:55:31 PM GMT ___ sa~ ALTA/ACSM -t-,-,- 154$.J7' -J);:---------~7_:,34'14"£ ~ ij ,.,,,.. - -II ~ NW SECTION COl!NCR LAND TITLE SURVEY FNO. 2-1 /2" BRASS CN' N1/4 COflNER 5-1977 I \ \, FHO. 4" BRASS CN' 1H I 1, i ~ CON. MON. - 5-1977 ___________ , ' bl I ~------------ ~ II SMOl<£Y POINT .., ------------ 171st stREE~ _ --~-~/ l>4 f ~ ~- - ..:------- I ; LIHE TABLE LINE LENGTH BEARING ~ ~ ~ PROPDn'Y 2000·-<'C: ~;:;=+:::-=~~1 -" ,": I I I L-l J0.66 S87'27'42'£ ::::::::t: .;. r ~ 50.00' I L-2 27.42 N77'51'02'E SO,OO' WIDE L-3 194.60 S01'24'43'._, - - - - ,~oo• - - - ~rl\i( ¢R\l'<P WATERLINE l Li-tlv•"" I I 1 i EASEMENT llr.& 1c W I ~,200108200G39 VICINITY JIAP -90: 71' • I I I I r) ~1'; ! ~ PARCEL 22 I j 2 Z I CUR'vl: TAlllE 3905 170TH Al,(. NC. I ""W 117014 40TH A'vl:. NC. I > I CURVE LENGTH RADIUS DELTA 3906 171ST ST. NE. I< I Cl 101.26 395.00 14'41'16' 51,191 SO.FT. I /' I C2 61.47 355.00 9'55'18' I C3 40.86 25.00 93'38'23' I ·1)< I I ! C4 39.76 25.00 91•07•35' cs 38.78 25.00 88'52'25' I I GRAPHIC SCALE I ,.,I< Q I I I EXISTING BUILDING I ~ 0 W ~ ~ ~~~~ ,- , 29.68' HIGH I I('.~ :,,/0 ll:: I ~er• ~ ! ~~~• I 15,515 so.n. I ~W I I l z E-< I liQit FOR ADDITIONAL SUBOl\<ISION INFORMATION, -- llDch• ~n. I~ SE£ PLAT Of TUCSON RECOR0£0 UNDER AUDITOR'S BASIS~ BEAA1NCS: RECORD Pl.AT 25.00' 8Ul..OING S£raACIC UN£ I FILE No. 200111215014, RECORDS Of - SUR'vl:Y JNSlRUMENT USE0:5•.i.vz S£T4 - I SNOHOMISH COUNTY, WASHINGTON. - SUR'vl:Y PROCEDURE: Q.OSED lRAVERS£ ll:: I - SUR~ PR£CISl(Jj: EXCErOS 1:10,000 T f J 11 1..1.__L_J . IJ.. 25.00' BUILDING SETBACK LINE 1 I ::J I ,.. --10' P.U.0. EASEMENT THIS IS TO CERTIFY THAT TIIS MAP OR Pl.AT .L£GU12, A.F,f200012060302 ANO THE SURVEY ON WHIOI IT IS BASED \IIERE MADE (1) IN ACCOROANC[ YilTH "MINIMUM 0 --- DENOTES 1/2" X z4• REBAA & CAP fLSl9631 '!!] 1 '? I STANDARD DCTAJL REQUIREMENTS FOIi AL TA/ACSM SET THIS ~y UNl.ESS OT~RWISE NOTED 199.53 I LANO TITLE SUR\.tYS", JOINTLY ESTABUSHCO ANO DENOTES LEA() W/TACK & WASHER #LSI963I ~ 8~~~-wSTRE~T) NE _ . __ _ I ADOPTED BY ALTA. ACSM ANO NSPS IN 1999, . . --- SET THIS SUNEY UNLESS OTHERWISE NOTED 2 .., 24003 ANO INCLUDES ITEMS 1,2,3.4.6,7(0) 8, 9, 10 , I ANO 11 Of T ASI.E A THERE Of, ANO (II) --- DENOTES l'OUC) PLAT MONLMENT I PURSUANT TO THE ACCURACY STANDARDS (AS I ADOPTED BY ALTA. NSPS, AND ACSM ANO IN ~ "-' DENOTES WHEELOiA IR RNIP I EFFECT ON THE DA TE Of THIS CERTIFICATION) UNDERSIGNED FURTHER CERTIFIES THAT THIS 181 "-' DENOTES ELECTRIC VAULT {TYP) I SURVEY EXCEEDS THE REQUIREMENTS Of e "-' 0£NOTES TELEPHONE PEDESTAL I WA.C.332-130-090, MATHMATICAL ANO FIELD CLOSURES EXCEED 1; 10,000, ANO THAT ALL ~ "-' DENOTES SEWER t.WH)LE ENCUMBRANCES, IF ANY ARE SHO',W,1 HEREON. ~ JD "-' DENOTES CATCH 8AS IN DATE: ____ , I w I I 1XJ "-' DENOTES WATER VALVE I G+H / 1 I l'I I I I I I I I IJ LS. NO. 19631 ~ "-' DENOTES HYDRANT I I ¢ "-' DENOTES LIGHT POLE I ■ PARKIHG CASEMENT I C- "-' DENOTES HANOICAPPED PARKING H.#200009250842 ■ I CV <;t' l><J ,..._, DENOTES GAS VLAVE I I I , L tr.> I ~ ,..._, DENOTES WATER METER ~> .... I -o- ,..._, DENOTES 6' HIGH CYCLONE f'ENCE -1,).. r.>~ ·o.'r.>. ... , .. j N87"27'42"W I ~:;; ... .._ =-- ~ • i,;.:·.:._ :__ .l =-t ;J - 3 WATER VAL\tS --- E --- ,..._, DENOTES U/C ELECTRIC LINE ·.>. ~-r.> .t ·- 50.00' -· 10.00' 1110£ --- G -- ,..._, DENOTES U/C GAS L I NE ' PV8UC WATER LINE EASEMENT ··- 18.56' - H.#200106200639 I SE£ DCTAJL A "'~Tr --- T ---,..._, DENOTES U/C TELEPHONE LINE IJ!TAIL>. 6' HIGH CHAIN LINK FENCE --- 1,1 ---,..._, DENOTES U/C WATER LINE AUDITOR'S FILE I. PAGE 2 OF 2 I Survey For /PORrN NE1/4. NWl/4, scc.28. ~.J1N, RGE.5£. w.1.1. SURVEYOR'S CERTIFICATE SCM.l: 1 INCH • 40 EL I BECORDtiQ CEATflCATE RID,Ofl~IY• THIS MAP CORRECTLY REPRESENTS A SURVEY MADE BY ME OIIAWN IIY: ..,,C .. JRu....,. ___ _ VICTORIA HEIGHTS, LLC CA8CAD1 ~ I INGINDfNI. INC. OR UNDER MY DIRECTION IN CONFORMANCE 1fITH THE Clt(Cl([O IY: _.J~AT.,__ __ _ ~DAY Of.----• 2001 A.I>. Af __ REQUIREMENTS OF THE SURVEY RECORDING ACT, AT THE MMIT!e PAlf--,O'OLOCK-M. ANO AICOADED REQUEST OF \1CTOftJA HEJGHJS LLC THIS .... z ... 1s.._T -- Oo\Tt: ] 2-03-0] UNDIA ~-,UNO,----• RICOR08 o, Survey By I (360)-435-5551 DAY OFNOytMBER , 2001. ~ O()IMTY, WAH«)TON. ': ,n- - A ~ JOI,,~ V Cascade Surveying & Engineering, Inc. ........... r.1.,,~ DIPtlTY_ AUOITOA LS. NO 19631 '68 18204 59th Avenue NE REVIEW COMMENT FORM Arlington, WA 98223 360-403-3551 Project Name: DSHS EV Charger Permit No.: BLD6311 Review Date: 3/5/2025 Contact: Tyler Woolf Phone No.: 360-790-7419 Review Phase: 1 Report Date: Reviewing Dept.: CED Engineer Project #: Plan Stamp Date: # Rev. Dwg. or Add’l Ref. City Comment Response/Resolution Spec. Ref. Approved 1. KO Please provide construction detail information for all Note added on site plan. charging station installation requirements and bollard installation. 2. TN Provide plans showing limits of trenching/paving for Note added on site plan showing trenching path. conduit and charger installation. Plans should also Trench to meet min electrical requirements. include any changes to parking lot striping and Proposed fencing has been removed. proposed fencing. 3. AL FYI Pending Zoning Permit issuance prior to review. 4. Please submit revised documents to ced@arlingtonwa.gov for processing. 5. 6. 7. 8. 9. 10. 11. 12. Page 1 of 1 Date: 08/22/2025 Permit #: 6311 Permit Date: 01/13/2025 Review Date: 03/12/2025 Permit Type: COMMERCIAL BUILDING Review Type: COMMERCIAL BUILDING Target Date: 03/26/2025 Scheduled 00:00 Time: Completed 03/12/2025 Date: Description: Install and maintain erosion control measures per City of Arlington Standards and per the direction of the City Inspectors. Remove upon completion of the project prior to final approval of the permit. Review Approved with Conditions Status: Assigned To: Development Services Manager Time In: 00:00 Time Out: 00:00 Hours: 0.0 Notes Thad's Comments: Provide plans showing limits of trenching/paving for conduit and charger 01/27/2025 installation. Plans should also include any changes to parking lot striping and proposed fencing. 03/12/2025 Resubmittal Property Information Parcel#: 00930300002200 TRIPLE CREEK INVESTMENTS LLC TRIPLE CREEK INVESTMENTS LLC PO BOX 430 3906 172ND ST NE ARLINGTON, WA 98223 Zoning: 659 Other Professional Services NECLot: Block: Permit #: 6311 Permit Date: 01/13/25 Permit Type: COMMERCIAL BUILDING Project Name: 3906 172nd St DSHS Install of EV Chargers Applicant Name: Transwestern Real Estate Applicant Address: PO Box 430 Applicant, City, State, Arlington, WA, 98223 Zip: Contact: Tyler Woolf Phone: 360-790-7419 Email: tyler@vinestreetgroup.com Scope of Work: PUD installing new transformer in parking lot, contractor installing EV chargers and striping EV stalls Valuation: 50000.00 Square Feet: 31394 Number of Stories: 2 Construction Type: lllA Occupancy Group: B; Business ID Code: Permit Issued: 04/11/2025 Permit Expires: 10/10/2025 Form Permit Type: COMMERCIAL BUILDING Status: COMPLETE Assigned To: Hannah Hardwick Property Parcel # Address Legal Description Owner Name Owner Phone Zoning TRIPLE CREEK 659 Other 00930300002200 3906 172ND ST NE INVESTMENTS Professional Services LLC NEC Contractors Contractor Primary Contact Phone Address Contractor Type License License # Corstone Contractors, CONSTRUCTION 360-862-8316 PO Box 2280 UBI 602 202 840 LLC CONTRACTOR Corstone Contractors, CONSTRUCTION Labor & 360-862-8316 PO Box 2280 CORSTCL984KZ LLC CONTRACTOR Industries Inspections Date Inspection Type Description Scheduled Date Completed Date Inspector Status C20. BUILDING 08/19/2025 08/20/2025 08/20/2025 BUILDING Approved FINAL Plan Reviews Date Review Type Description Assigned To Review Status COMMERCIAL 03/12/2025 BUILDING Approved BUILDING COMMERCIAL 01/14/2025 AIRPORT In Review BUILDING Install and maintain erosion control measures per City of COMMERCIAL Arlington Standards and per the direction of the City Development Approved with 03/12/2025 BUILDING Inspectors. Remove upon completion of the project prior Services Manager Conditions to final approval of the permit. COMMERCIAL Approved with 03/12/2025 See Notes PLANNING BUILDING Conditions COMMERCIAL 01/14/2025 Not required - TN PW-ADMIN-GIS Approved BUILDING COMMERCIAL 01/14/2025 Not required - TN PW-SEW-REV Approved BUILDING COMMERCIAL 01/14/2025 Not required - TN PW-WAT-REV Approved BUILDING COMMERCIAL 08/12/2025 This is for the review of the special inspections. BUILDING Approved BUILDING Fees Fee Description Notes Amount Building Plan Review Table 4-2 $628.71 Credit Card Service $18.86 Processing/Technology $25.00 Building Permit Table 4-1 $967.24 Credit Card Service $29.77 Total $1,669.58 Attached Letters Date Letter Description 04/11/2025 Building Permit 01/13/2025 Web Form - Building Application Payments Date Paid By Description Payment Type Accepted By Amount XBP Conf: 01/14/2025 $628.71 220195993 01/14/2025 Andrew Woolf 220195993 $18.86 04/11/2025 Andrew Woolf 228338271 Hannah Hardwick $29.77 XBP Conf: 04/11/2025 $992.24 228338271 Outstanding Balance $0.00 Notes Date Note Created By: 03/05/2025 sent review comments to applicant Hannah Hardwick Emailed that a zoning permit application is required and that the building permit submittal will 02/21/2025 Kristin Foster be put on hold until that is submitted. 01/13/2025 Contractor needs to add COA to UBI Hannah Hardwick Uploaded Files Date File Name 04/11/2025 25320886-2025_BLD6311_IssuedPermit.pdf 04/11/2025 25320877-20250311_BLD6311_Approved Plans.pdf 03/12/2025 24873886-20250311_BLD6311_Revised Plans.pdf 03/12/2025 24873887-20250311_BLD6311_Applicant Responses.docx 01/13/2025 7340041d85ae93eda70bd491e60a5d18_20803073-commercial_building_permit_application_-_copy.pdf 01/13/2025 04d828aba290cc10c7bc4ea074b74acf_tuscon_building_site_survey.pdf 01/13/2025 32c75d9c6a68e36a8de835d329761ec2_sketch_of_pud_work_and_transformer_location.pdf 01/13/2025 c80a34d6d97851fedb898881addf599e_sketch_from_pud_of_work.pdf 01/13/2025 892debd9f3437a38db5b69bdd1a67338_23-02-055_dshs_arlington_-_ev_charger_8-7-24-layout1_-_signed.pdf Date: 08/22/2025 Permit #: 6311 Permit Date: 01/13/2025 Review Date: 03/12/2025 Permit Type: COMMERCIAL BUILDING Review Type: COMMERCIAL BUILDING Target Date: 03/26/2025 Scheduled Time: 00:00 Completed Date: 03/20/2025 Description: See Notes Review Status: Approved with Conditions Assigned To: PLANNING Time In: 00:00 Time Out: 00:00 Hours: 0.0 Notes 01/15/2025 Ameresia's Comment: Pending Zoning Permit issuance prior to review. 03/12/2025 Resubmittal 03/17/2025 Plans match, approved Land Use. 03/20/2025 Must adhere to all land use conditions. Property Information Parcel#: 00930300002200 TRIPLE CREEK INVESTMENTS LLC TRIPLE CREEK INVESTMENTS LLC PO BOX 430 3906 172ND ST NE ARLINGTON, WA 98223 Zoning: 659 Other Professional Services NECLot: Block: