Loading...
HomeMy WebLinkAbout08-09-10 Council Workshop SPECIAL ACCOMMODATIONS: The City of Arlington strives to provide accessible meetings for people with disabilities. Please contact the ADA coordinator at (360) 403-3441 or 1-800-833-8388 (TDD only) prior to the meeting date if special accommodations are required. CALL TO ORDER / PLEDGE OF ALLEGIANCE/ROLL CALL APPROVAL OF THE AGENDA WORKSHOP ITEMS ~ NO ACTION WILL BE TAKEN 1. (15 min)Waste Management Contract Renewal ATTACHMENT A 2. (5 min) Gifford Sidewalks) ATTACHMENT B 3. (5 min) Acceptance of Utility Easements from ATTACHMENT C Stillaguamish Behavioral Health 4. (5 min) DOE Stormwater Grant for $115K ATTACHMENT D 5. (10 min) AMC Title 10 Handout 6. (15 min) Comprehensive Emergency Management Plan ATTACHMENT E 7. (10 min) Revision to the City Council Rules of Procedure ATTACHMENT F for the terms of Mayor Pro Tem and Alternate Mayor Pro Tem and participation in Council meetings by phone 8. (5 min) Development Agreement between Enviro Propane ATTACHMENT G and the City of Arlington 9. (5 min) Authority to Advertise for Bid proposals ATTACHMENT H for on Station #46 10. (10 min) SR9 Coalition Discussion 11. Miscellaneous Council items ADJOURNMENT To download all attachments, click here Arlington City Council Workshop August 9, 2010 – 7 PM City Council Chambers ~ 110 E. Third City of Arlington Council Agenda Bill AGENDA ITEM: ATTACHMENT A COUNCIL WORKSHOP DATE: August 9, 2010 SUBJECT: Waste Management Northwest Agreement for Solid Waste, Recycling, Collection and Disposal (Contract Renewal). DEPARTMENT OF ORIGIN: Public Works – James Kelly ATTACHMENTS: No attachments. The following items will be handed out at the Council Workshop: -Draft Contract Agreement (2010) -Attachment B – Rates (2010) EXPENDITURES REQUESTED: N/A BUDGET CATEGORY: N/A LEGAL REVIEW: Pending final review by City Attorney DESCRIPTION: Contract Renewal with Waste Management for continued garbage and recycle collection and disposal service. HISTORY: City of Arlington entered into contract with Waste Management Northwest in 2002 for collection and disposal of garbage within the City. The contract was extended and modified in 2004 for continued collection of both solid waste and recyclables through August 31, 2010. The City has been negotiating a new contract with Waste Management since February 2010. The contract has been revised to address comments Council brought up during the July 26, 2010 Council Workshop – an updated version of the contract will be handed out during the August 9, 2010 Council Workshop. ALTERNATIVES: - Reject contract and renegotiate - Reject contract and enter into negotiations with other waste hauler (Rubintino, Allied Waste, Sound Disposal, other) RECOMMENDED ACTION: - Discussion only – no action is being requested. City of Arlington Council Agenda Bill AGENDA ITEM: ATTACHMENT B COUNCIL WORKSHOP DATE: August 9, 2010 SUBJECT: Gifford Sidewalk Status DEPARTMENT OF ORIGIN: Public Works Administration ATTACHMENTS: • None EXPENDITURES REQUESTED: Engineer’s Estimate $103,500 BUDGET CATEGORY: Transportation Improvement Fund – ARRA Grant Funding LEGAL REVIEW: DESCRIPTION: Council will be updated on the status of the Gifford Sidewalk Project. HISTORY:. The Gifford Sidewalk Project consists of the installation of approximately 1600 linear feet of 5 foot wide concrete sidewalks, curb, gutter, ADA ramps, and driveways. This project is funded with a $92,000.00 ARRA Grant and Traffic Mitigation, the remaining funding will come from the Transportation Improvement Fund. ALTERNATIVES: • No action at this time RECOMMENDED ACTION: No action at this time – Council will be requested to take action at the August 2, 2010 Council Meeting. City of Arlington Council Agenda Bill AGENDA ITEM: ATTACHMENT C COUNCIL WORKSHOP DATE: August 9, 2010 SUBJECT: Acceptance of Utility Easements from Stillaguamish Behavioral Health DEPARTMENT OF ORIGIN: Public Works – Engineering ATTACHMENTS: • Exhibit Maps of Utility Easements EXPENDITURES REQUESTED: N/A BUDGET CATEGORY: N/A LEGAL REVIEW: Legal description has been reviewed by staff, upon approval of acceptance by Council; the City Attorney will draft the appropriate easement document for signature by the property owner. DESCRIPTION: Stillaguamish Behavioral Health is dedicating a utility easement as shown on the attached map. HISTORY: As a condition of further site development and the installation of additional utility services to this site, the property owner is required to dedicate easements for the City’s access to maintain and service these lines. ALTERNATIVES: • Remand to staff for additional information • Table pending additional discussion RECOMMENDED MOTION: No action at this time – Council will be asked to approve at the August 16th Council Meeting. SR 531 59TH AVE NE 172ND ST NE "Legend ROW Easem ents County Parcels Scale: Date : File N ame: Carto graphe r: StilliBehavioralH_Utility_easement_10.mxd 07/21/2010 lb Exhibit :Stillaguamish Behavioral HealthWater Utility Easement City of Arlington 1 inch = 1 00 fe et SR 531 59TH AVE NE 172ND ST NE "Legend ROW Easem ents County Parcels Scale: Date : File N ame: Carto graphe r: StilliBehavioralH_Utility_easement_10.mxd 07/21/2010 lb Exhibit :Stillaguamish Behavioral HealthSewer Utility Easement City of Arlington 1 inch = 1 00 fe et City of Arlington Council Agenda Bill AGENDA ITEM: ATTACHMENT D COUNCIL WORKSHOP DATE: August 9 , 2010 SUBJECT: Pass-through Grant Agreement from the Department of Ecology for Stormwater Phase II Permitees DEPARTMENT OF ORIGIN: Public Works – Utilities Division James Kelly ATTACHMENTS: • DRAFT Grant Agreement • Letter from WA State Department of Ecology summarizing grant offer EXPENDITURES REQUESTED: None - $115,678.00 Grant – no city match required BUDGET CATEGORY: Stormwater Capital Budget – 409 Stormwater Operating Budget - 412 LEGAL REVIEW: Pending Review by City Attorney DESCRIPTION – This is a Grant Agreement between the Washington State Department of Ecology and the City of Arlington for additional grant funds to fund Stormwater NPDES Phase II activities. HISTORY: – The Department of Ecology is awarding the City of Arlington $115,678.00 through its Municipal Stormwater Capacity Grants Program. The purpose of the program is to provide grants for implementation of Phase II municipal stormwater National Pollutant Discharge Elimination System (NPDES) permits. This program is being offered with carry-over funds from previous stormwater management base funds. There is no city match required for these grants. The city may choose to use these funds for stormwater management (NPDES) activities, retrofit of existing stormwater facilities, or implementation of low-impact development techniques. ALTERNATIVES: Do not accept the grant. RECOMMENDED ACTION: - Discussion only – no action is being requested. i FY 2011 MUNICIPAL STORMWATER CAPACITY GRANTS PROGRAM GRANT AGREEMENT BETWEEN THE STATE OF WASHINGTON DEPARTMENT OF ECOLOGY AND CITY OF ARLINGTON GRANT AGREEMENT NUMBER G1100012 TABLE OF CONTENTS PART I. GENERAL INFORMATION .......................................................................................... 3 PART II. PERFORMANCE MEASURES ..................................................................................... 4 PART III. PROJECT DESCRIPTION ........................................................................................... 5 PART IV. PROJECT BUDGET ..................................................................................................... 5 PART V. SCOPE OF WORK ......................................................................................................... 6 PART VI. SPECIAL TERMS AND CONDITIONS .................................................................... 10 ATTACHMENT I: GENERAL PROJECT MANAGEMENT REQUIREMENTS FOR THE CENTENNIAL CLEAN WATER PROGRAM AND THE FEDERAL CLEAN WATER ACT SECTION 319 NONPOINT SOURCE FUND............................................................................. 12 ARCHEOLOGICAL AND CULTURAL RESOURCES ......................................................................................................... 12 EDUCATION AND OUTREACH ..................................................................................................................................... 12 EQUIPMENT PURCHASE ............................................................................................................................................. 12 FUNDING RECOGNITION ............................................................................................................................................ 13 INCREASED OVERSIGHT ............................................................................................................................................. 13 INDIRECT RATE ......................................................................................................................................................... 13 LIGHT REFRESHMENTS .............................................................................................................................................. 13 MINORITY AND WOMEN'S BUSINESS PARTICIPATION ................................................................................................ 13 PAYMENT REQUEST SUBMITTALS.............................................................................................................................. 14 POST PROJECT ASSESSMENT ...................................................................................................................................... 14 PROCUREMENT .......................................................................................................................................................... 15 PROGRESS REPORTS .................................................................................................................................................. 15 REQUIRED DOCUMENT SUBMITTALS ......................................................................................................................... 15 SPECIAL CONDITION FOR RECIPIENTS IN SNOHOMISH AND KING COUNTY .............................................................. 16 WATER QUALITY MONITORING ................................................................................................................................. 16 ii ATTACHMENT II: GENERAL TERMS AND CONDITIONS PERTAINING TO GRANT AND LOAN AGREEMENTS OF THE DEPARTMENT OF ECOLOGY ................................. 18 A. RECIPIENT PERFORMANCE ........................................................................................................................... 18 B. SUBGRANTEE/CONTRACTOR COMPLIANCE ............................................................................................. 18 C. THIRD PARTY BENEFICIARY ......................................................................................................................... 18 D. CONTRACTING FOR SERVICES (BIDDING) ................................................................................................. 18 E. ASSIGNMENTS .................................................................................................................................................. 18 F. COMPLIANCE WITH ALL LAWS ..................................................................................................................... 18 G. KICKBACKS....................................................................................................................................................... 19 H. AUDITS AND INSPECTIONS ........................................................................................................................... 19 I. PERFORMANCE REPORTING ........................................................................................................................... 19 J. COMPENSATION ................................................................................................................................................ 19 K. TERMINATION .................................................................................................................................................. 20 L. WAIVER .............................................................................................................................................................. 21 M. PROPERTY RIGHTS ......................................................................................................................................... 21 N. SUSTAINABLE PRODUCTS ............................................................................................................................. 22 O. RECOVERY OF PAYMENTS TO RECIPIENT ................................................................................................. 22 P. PROJECT APPROVAL ........................................................................................................................................ 23 Q. DISPUTES ........................................................................................................................................................... 23 R. CONFLICT OF INTEREST ................................................................................................................................. 23 S. INDEMNIFICATION .......................................................................................................................................... 23 T. GOVERNING LAW ............................................................................................................................................ 24 U. SEVERABILITY ................................................................................................................................................. 24 V. PRECEDENCE .................................................................................................................................................... 24 3 MUNICIPAL STORMWATER CAPACITY GRANTS PROGRAM FUNDING AGREEMENT BETWEEN THE STATE OF WASHINGTON DEPARTMENT OF ECOLOGY AND CITY OF ARLINGTON THIS is a binding agreement entered into, by, and between the state of Washington Department of Ecology (DEPARTMENT), and the City of Anacortes (RECIPIENT). The purpose of this agreement is to provide funds to the RECIPIENT to carry out the requirements described herein. PART I. GENERAL INFORMATION Project Title: Municipal Stormwater Capacity Grant Program State Fiscal Year: FY2011 Grant Number: G1100012 RECIPIENT Name: City of Arlington Mailing Address: 238 N. Olympic Ave. Arlington, WA 98223 RECIPIENT Federal ID Number: 91-6001401 Total Eligible Cost ($70,000 plus per capita calculated amount): $115,678 DEPARTMENT Funding Sources: State Toxics Control Account: $45,678 Local Toxics Control Account: $70,000 Referendum ##: $ Referendum ##: $ DEPARTMENT Share: $115,678 DEPARTMENT Maximum Percentage: 100% 4 RECIPIENT Contact: Kris Wallace Telephone Number: (360) 403-3538 Fax Number: (360) 435-7944 E-Mail Address: kwallace@arlingtonwa.gov RECIPIENT Billing Contact: Kris Wallace Telephone Number: (360) 403-3538 Fax Number: (360) 435-7944 E-Mail Address: kwallace@arlingtonwa.gov DEPARTMENT Project/Financial Manager: Tracy Farrell Mailing Address: Water Quality Program Washington State Department of Ecology P.O. Box 47600 Olympia, WA 98504-7600 Telephone Number: 360- 407-6502 Fax Number: 360- 407-7151 E-Mail Address: DESIGNATED LOCAL GOVERNMENT PARTNERS N.A. (if applicable) For partnerships, the lead government and partners must submit a copy of the signed agreement in Appendix B with each copy of the grant agreement. The effective date of this grant agreement is July 1, 2010. Any work performed prior to the effective date of this agreement is not eligible for reimbursement. This agreement expires on June 30, 2012. PART II. PERFORMANCE MEASURES A. Water Quality Goal. Improved stormwater oversight and water quality protection through the direct development and implementation of a comprehensive stormwater management program. OR ** Use the following for Construction Projects – delete if not applicable A. The overall goals of this project are focused on the protection of [name of water body] and include one or more of the following: 1. Stormwater system retrofits 2. Low impact development best management practices B. Project Outcomes. 5 Implementation of Phase I and II municipal stormwater National Pollutant Discharge Elimination System (NPDES) permits. OR ** Use the following for Construction Projects – delete if not applicable B. Water Quality Project Outcomes. The following summarize the quantitative results anticipated from the project: 1. 2. 3. **Add more as needed C. Post Project Assessment. The RECIPIENT agrees to submit a brief survey three years after project completion regarding the key project outcomes and the status of environmental results or goals from the project. The DEPARTMENT’s Performance Measures Lead will e-mail the RECIPIENT the Post Project Assessment Survey. The DEPARTMENT may conduct on-site interviews and inspections, and may otherwise evaluate the Project. The DEPARTMENT will enter the information provided into its performance measures database to be provided to the Washington State Legislature, United States Environmental Protection Agency, and other natural resource agencies. Approximate Post Project Assessment Date: June 30, 2013 PART III. PROJECT DESCRIPTION **For NPDES activities only – choose the following Project Description: The RECIPIENT’s stormwater project will address implementation or management of municipal stormwater programs. **For planning/design/construction projects –fill in an appropriate Project Description: PART IV. PROJECT BUDGET Municipal Stormwater Capacity Grants Program, FY2011 Elements/Objects TOTAL ELIGIBLE COST (TEC)* Task 1 – Project Administration/Management (limited to 10% of total) $ Task 2 – Implementation and management of Stormwater Program $ Task 3 - $ Task 4 - $ Task 5 - $ 6 Total (limited to $ per RECIPIENT partner) $115,678 *The DEPARTMENT's Fiscal Office will track to the Total Eligible Project Cost. MATCHING REQUIREMENTS (There are no matching requirements) DEPARTMENT Share FY 2011 (100% of TEC) $115,678 Payment Request Submittals. Payment requests will not be submitted more often than monthly, unless allowed by the DEPARTMENT’s Project/Financial Manager. The DEPARTMENT’s Project/Financial Manager may require the RECIPIENT to submit regular payment requests to ensure efficient and timely use of funds. Payment Schedule. Payments will be made on a cost-reimbursable basis. PART V. SCOPE OF WORK The RECIPIENT will ensure that this project is completed according to the details of this agreement. The RECIPIENT may elect to use its own forces or it may contract for professional services necessary to perform and complete project related work. The RECIPIENT certifies by signing this agreement that all applicable requirements have been satisfied in the procurement of any professional services. Eligible and ineligible project costs are separate and identifiable for billing purposes. If professional services are contracted, the RECIPIENT will submit a copy of the final contract to the DEPARTMENT’s Project/Financial Manager. Task 1 - Project Administration/Management A. The RECIPIENT will administer the project. Responsibilities will include, but not be limited to: maintenance of project records; submittal of payment vouchers, fiscal forms, and progress reports; compliance with applicable procurement, contracting, and interlocal agreement requirements; application for, receipt of, and compliance with all required permits, licenses, easements, or property rights necessary for the project; and submittal of required performance items. B. The RECIPIENT will manage the project. Efforts will include: conducting, coordinating, and scheduling project activities and assuring quality control. Every effort will be made to maintain effective communication with the RECIPIENT's designees; the DEPARTMENT; all affected local, state, or federal jurisdictions; and any interested individuals or groups. The RECIPIENT will carry out this project in accordance with any completion dates outlined in this agreement. C. The RECIPIENT will submit all invoice voucher submittals and supportive documentation, to the DEPARTMENT’s Project/Financial Manager. Copies of all applicable forms will be included with an original A19-1A, and will be submitted to the 7 DEPARTMENT. Blank forms are found in Administrative Requirements for Recipients of Ecology Grants and Loans at http://www.ecy.wa.gov/biblio/9118.html D. If work conducted results in a report, the RECIPIENT will submit the following to the DEPARTMENT’s Project/Financial Manager and in the quantities identified: Draft project completion reports – one electronic copy Final project completion reports – five copies Electronic copy of final project completion report The RECIPIENT will submit two copies of any document(s) which requires DEPARTMENT approval. Once approval is given, one copy will be returned to the RECIPIENT. If the RECIPIENT needs more than one approved copy, the number of submittals should be adjusted accordingly. Task 2 – Implementation of Stormwater Planning and Management Needs A. The RECIPIENT will address stormwater management needs that protect or restore water quality. The RECIPIENT may conduct work related to implementation of activities required by the municipal stormwater National Pollutant Discharge Elimination System (NPDES) permits. The following is a list of elements your project may include. Please check all boxes that apply to your project. Public education and outreach activities Public involvement and participation activities Illicit discharge detection and elimination (IDDE) program activities, including: 1. Mapping or geographic information systems of municipal separate storm sewer systems (MS4s); 2. Staff training; 3. Activities to identify and remove illicit stormwater discharges; 4. Dry weather outfall screening procedures and field activities; 5. Complaint hotline database or tracking system improvements. Activities to support programs to control runoff from new development, redevelopment, and construction sites, including: 1. Development of an ordinance and associated technical manual; 2. Inspections before, during, and upon completion of construction, or for post- construction long-term maintenance; 3. Training for plan review and/or inspection staff. Required Forms: Where Eligible Costs Have Incurred: Form A19-1A (original signature) Form E (ECY 060-12) Form B2 (ECY 060-7) Form F (ECY 060-13) Form C2 (ECY 060-9) Form G (ECY 060-14) Form D (ECY 060-11) Form H (F-21) Form I (ECY 060-15) 8 Pollution prevention, good housekeeping, and operation and maintenance program activities, such as: 1. Inspecting and/or maintaining the MS4 infrastructure; 2. Developing and/or implementing policies, procedures, or stormwater pollution prevention plans at municipal properties or facilities. Annual reporting activities, including developing a summary of identified barriers to the use of low impact development. Establishing and refining stormwater utilities, including stable rate structures. Water quality monitoring to implement permit requirements for a Water Cleanup Plan (TMDL). Note that any monitoring funded by this program requires submittal of a Quality Assurance Project Plan that Ecology approves prior to awarding funding for monitoring. Monitoring, including: 1. Developing a report to plan for monitoring the next permit cycle; 2. Monitoring activities to meet Phase I permit requirements; Structural stormwater controls program activities (Phase I permit requirement) Source control for existing development (Phase I permit requirement), including: 1. Inventory and inspection program; 2. Technical assistance and enforcement; 3. Staff training. Equipment purchases that result directly in improved compliance with permit requirements. Allowed costs for equipment purchases must be specific to implementing a permit requirement (such as a vactor truck) rather than general use (such as a general us pick-up truck). Qualified equipment purchases include but are not limited to: 1. Illicit discharge testing equipment and materials; 2. Vactor truck or sweeper truck or MS4 maintenance activities; 3. Electronic devices dedicated to mapping of MS4 facilities and attributes; 4. Software dedicated to tracking permit implementation activities. ** Delete the following Tasks if not applicable PLANNING and DESIGN PROJECTS, use the following task: Task 3 – Stormwater Retrofit or LID Planning and Design Only (Total Task Cost: $ ) ** Use the following Tasks as applicable for design/construct or construction projects DESIGN/CONSTRUCT PROJECTS: use the following tasks: Task 4 – Plans and Specifications (Total Task Cost: $ ) A. Plans and specifications must be submitted to the DEPARTMENT's Project Manager 45 days prior to bid advertisement. The DEPARTMENT’s Project Manager will work with Ecology’s engineer to review the plans and specifications for consistency. The RECIPIENT must justify significant deviations from the following: 1. The following depends on the region that your project is conducted: Western Washington Stormwater Maintenance Manual (SWMMWW), found at: 9 http://www.ecy.wa.gov/programs/wq/stormwater/manual.html, or Eastern Washington Stormwater Maintenance Manual found at: http://www.ecy.wa.gov/biblio/0410076.html, or Puget Sound Low Impact Development – Technical Guidance found at: http://www.psp.wa.gov/downloads/LID/LID_manual2005.pdf, or equivalent design manuals. 2. Good engineering practices and generally recognized engineering standards, 3. The project pre-design report. B. The plans, specifications, construction contract documents, and addenda must be approved by the RECIPIENT prior to submittal to the DEPARTMENT. C. The RECIPIENT will prepare and submit projected construction schedule to the DEPARTMENT. D. The RECIPIENT will submit a current, updated construction cost estimate along with each plans and specifications submittal. E. All construction plans submitted to the DEPARTMENT will be reduced to no larger than 11-1/2" x 17" in size. The RECIPIENT may bind them with the specifications or related construction contract documents or bound as a separate document. All reduced drawings must be legible. F. The RECIPIENT will develop and submit a maintenance plan for the stormwater treatment and low impact development (LID) features. The maintenance plan will describe how the RECIPIENT will ensure project success consistent with the design manual used; an example may be plant establishment and survival rates. The maintenance plan must also address long term activities to assure ongoing pollutant removal and flow-control capability of the project. (See the Stormwater Maintenance Manual for Eastern or Western Washington Volume 5, Section 4.6) Required Performance: 1. 2. 3. Task 5 – Construction Management (Total Task Cost: $ ) A. The RECIPIENT will submit a detailed construction quality assurance plan to the DEPARTMENT before the start of construction. This plan must describe how adequate and competent construction oversight will be performed. 10 B. The RECIPIENT will submit a construction schedule to the DEPARTMENT within 30 days of the start of construction. The construction schedule will be revised and/or updated whenever major changes occur and at a minimum of every three months. C. The RECIPIENT will, upon completion of construction, provide the DEPARTMENT’s Project Manager with a set of "as-built" plans that include a record of construction drawings which reflect major changes, modifications, or other significant revisions made to the project during construction. D. The RECIPIENT will provide a Declaration of Completion, signed by the professional responsible for construction inspection, indicating that the project was completed in accordance with the plans, specifications, and major change orders. Required Performance: 1. 2. 3. Task 6 – Construction (Total Task Cost: $ ) A. The RECIPIENT will submit to the DEPARTMENT’s Project Manager a copy of the construction contract within 30 days of execution. Required Performance: 1. 2. 3. Task 7 - (Total Task Cost: $ ) Required Performance: 1. 2. 3. *content in the following section can be edited* PART VI. SPECIAL TERMS AND CONDITIONS A. Failure to Commence Work. In the event the RECIPIENT fails to commence work on the project within four months of the signatory date, the DEPARTMENT reserves the right to terminate this agreement. B. ** Add more as needed. 11 PART VII. ALL WRITINGS CONTAINED HEREIN The following contain the entire understanding between the parties, and there are no other understandings or representations other than as set forth, or incorporated by reference, herein: This agreement Attachment I: General Project Management Requirements for the Municipal Stormwater Capacity Grants Program. Attachment II: General Terms and Conditions The effective edition, at the signing of this agreement, of the DEPARTMENT's “Administrative Requirements for Ecology Grants and Loans” The associated funding guidelines that correspond to the fiscal year in which the project is funded The applicable statutes and regulations No subsequent modifications or amendments of this agreement will be of any force or effect unless signed by authorized representatives of the RECIPIENT and the DEPARTMENT and made a part of this agreement, EXCEPT that in response to a request from the RECIPIENT, the DEPARTMENT may redistribute the grant budget. The DEPARTMENT or the RECIPIENT may change their respective staff contacts without the concurrence of either party. The RECIPIENT acknowledges that they have had the opportunity to thoroughly review the terms of this agreement, the attachments, all incorporated or referenced documents, as well as all applicable statutes, rules, and guidelines mentioned in this agreement. STATE OF WASHINGTON CITY OF ARLINGTON DEPARTMENT OF ECOLOGY _____________________________________ ____________________________________ KELLY SUSEWIND, P.E., P.G. DATE JAMES X. KELLY DATE WATER QUALITY PROGRAM MANAGER [TITLE] APPROVED AS TO FORM ONLY ASSISTANT ATTORNEY GENERAL 12 ATTACHMENT I: GENERAL PROJECT MANAGEMENT REQUIREMENTS FOR THE CENTENNIAL CLEAN WATER PROGRAM AND THE FEDERAL CLEAN WATER ACT SECTION 319 NONPOINT SOURCE FUND ARCHEOLOGICAL AND CULTURAL RESOURCES The RECIPIENT must comply with all requirements listed in Executive Order 05-05 prior to implementing any project that involves disturbing soil. Compliance includes coordinating with the Department of Historic and Archeological Preservation and affected tribes. Executive Order 05-05 is found at: http://www.dahp.wa.gov/pages/EnvironmentalReview/documents/EO05_05.pdf The Department of Historic and Archeological Preservation has provided guidance to initiate the 05-05 process that can be accessed online at: http://www.dahp.wa.gov/pages/Documents/EnvironmentalReview.htm and http://www.dahp.wa.gov/pages/EnvironmentalReview/documents/eo0505Guidance_000.pdf. EDUCATION AND OUTREACH The RECIPIENT must do a regional search for existing materials before producing any new educational flyers or pamphlets. The RECIPIENT must request the use of those materials before time and resources are invested to duplicate materials that are already available. The RECIPIENT must also check the Washington Waters website http://www.ecy.wa.gov/washington_waters/index.html for useful educational materials. These materials are available for public use and can be downloaded directly from the website. The RECIPIENT must provide the DEPARTMENT up to two copies and an electronic copy either on floppy disks or CD-ROM of any tangible educational products developed under this grant, such as brochures, manuals, pamphlets, videos, audio tapes, CDs, curriculum, posters, media announcements or gadgets, such as a refrigerator magnet with a message. If this is not practical, the RECIPIENT must provide a complete description including photographs or printouts of the product. The RECIPIENT must also supply the DEPARTMENT with the names and contact information of local project leads. If there are a significant number of people in the community that speak languages other than English, the RECIPIENT must produce all pamphlets, fliers, meeting notices, reports, and other educational and public outreach materials in English and in the other prevalent language. * content of this condition can be edited or deleted to fit the needs of the agreement* EQUIPMENT PURCHASE The following equipment will be eligible for purchase through this project: . The total cost of all equipment purchased under this project will not exceed $ . Changes in equipment type must have prior approval from the DEPARTMENT. 13 FUNDING RECOGNITION The RECIPIENT must inform the public about DEPARTMENT or EPA funding participation in this project through the use of project signs, acknowledgement in published materials, reports, the news media, or other public announcements. Projects addressing site-specific locations must utilize appropriately sized and weather-resistant signs. Sign logos are available from the DEPARTMENT upon request. INCREASED OVERSIGHT If this project is selected for increased oversight (as indicated on page 3 of this agreement), the RECIPIENT must submit all backup documentation with each payment request submittal. In addition, the DEPARTMENT’s Project Manager must establish a schedule for additional site visits to provide technical assistance to the RECIPIENT and verify progress or payment information. INDIRECT RATE To acknowledge overhead costs, the RECIPIENT may charge an indirect rate of up to 25 percent based on employees’ direct salary and benefit costs incurred while conducting project-related work. The DEPARTMENT’s Financial Manager may require a list of items included in the indirect rate at any time. LIGHT REFRESHMENTS The RECIPIENT may spend up to $ per meeting for light refreshments associated with this project. The total amount spent for light refreshments under this agreement cannot exceed $ . MINORITY AND WOMEN'S BUSINESS PARTICIPATION The RECIPIENT agrees to solicit and recruit, to the extent possible, certified minority-owned (MBE) and women-owned (WBE) businesses in purchases and contracts initiated after the effective date of this agreement. Contract awards or rejections cannot be made based on MBE or WBE participation. M/WBE participation is encouraged, however, and the RECIPIENT and all prospective bidders or persons submitting qualifications should take the following steps, when possible, in any procurement initiated after the effective date of this agreement: a) Include qualified minority and women's businesses on solicitation lists. b) Assure that qualified minority and women's businesses are solicited whenever they are potential sources of services or supplies. c) Divide the total requirements, when economically feasible, into smaller tasks or quantities, to permit maximum participation by qualified minority and women's businesses. 14 d) Establish delivery schedules, where work requirements permit, which will encourage participation of qualified minority and women's businesses. e) Use the services and assistance of the State Office of Minority and Women's Business Enterprises (OMWBE) and the Office of Minority Business Enterprises of the U.S. Department of Commerce, as appropriate. The RECIPIENT must report to the DEPARTMENT at the time of submitting each invoice, on forms provided by the DEPARTMENT, payments made to qualified firms. Please include the following information: a) Name and state OMWBE certification number (if available) of any qualified firm receiving funds under the invoice, including any sub-and/or sub-subcontractors. b) The total dollar amount paid to qualified firms under this invoice. PAYMENT REQUEST SUBMITTALS Frequency. The RECIPIENT must submit payment requests at least quarterly but no more often than monthly, unless allowed by the DEPARTMENT’s Financial Manager. The DEPARTMENT’s Financial Manager may require the RECIPIENT to submit regular payment requests to ensure efficient and timely use of funds. Supporting Documentation. The RECIPIENT must submit all payment request vouchers and supportive documentation to the DEPARTMENT’s Financial Manager. Payment request voucher submittals are based on match requirements found in the budget. Required Forms. Reporting eligible costs. The RECIPIENT must report all eligible costs incurred on the project, regardless of the source of funding for those costs. This includes costs used as match. All eligible and ineligible project costs must be separate and identifiable. Reimbursements. Payments will be made on a cost-reimbursable basis. POST PROJECT ASSESSMENT The RECIPIENT agrees to submit a brief survey regarding the key project results or water quality project outcomes and the status of long-term environmental results or goals from the project three years after project completion. (original signature)(original signature) 15 The DEPARTMENT’s Water Quality Program Performance Measures Lead will contact the RECIPIENT before the Post Project Assessment date to request this data. The DEPARTMENT may also conduct site interviews and inspections, and may otherwise evaluate the Project, as part of this assessment. PROCUREMENT The RECIPIENT certifies by signing this agreement that all applicable requirements have been satisfied in the procurement of any professional services. PROGRESS REPORTS The RECIPIENT must submit quarterly progress reports to the DEPARTMENT’s Financial Manger and Project Manager. Payment requests will not be processed without a progress report. Reporting Periods. January 1 through March 31 April 1 through June 30 July 1 through September 30 October 1 through December 31 Reporting Due Date. Quarterly progress reports are due 15 days following the end of the quarter. Report Content. At a minimum, all progress reports must contain a comparison of actual accomplishments to the objectives established for the period, the reasons for delay if established objectives were not met, analysis and explanation of any cost overruns, and any additional pertinent information specified in this agreement. The recipient must also attach all landowner agreements signed during the respective quarter to each progress report. REQUIRED DOCUMENT SUBMITTALS The RECIPIENT must submit the following documents to the DEPARTMENT as requested by the DEPARTMENT’s Project Manager or Financial Manager: Draft project completion reports – up to 3 copies Electronic copy of final project completion report – 1 copy Final project completion reports – up to 8 copies Final project completion reports of statewide significance – up to 50 copies Educational products developed under this agreement – up to 2 copies Documents that require DEPARTMENT Approval – 2 copies (one for the DEPARTMENT and one for the RECIPIENT) Interlocal agreements – 1 copy for the DEPARTMENT’s Financial Manager Professional services procurement agreements – 1 copy to the DEPARTMENT’s Financial Manager 16 Additional Required Document Submittals for the Federal Clean Water Act Section 319 Funded Projects and Centennial projects used by the DEPARTMENT to satisfy its Section 319 matching requirement. Federal Clean Water Act Section 319 Grant Data Reporting Form – 1 copy to DEPARTMENT’s Financial Manager during the first quarter following the effective date of the agreement Federal Clean Water Act Section 319 Grant Load Reductions Reporting Form – 1 copy to the DEPARTMENT’s Financial Manager by January 15 of each year and at the end of the project. * this condition may be deleted if not applicable* SPECIAL CONDITION FOR RECIPIENTS IN SNOHOMISH AND KING COUNTY For RECIPIENTS in either Snohomish or King County: When this agreement crosses the RECIPIENT's fiscal year, the obligation of the RECIPIENT to continue or complete the project described herein will be contingent upon appropriation of funds by the RECIPIENT's governing body; provided that nothing contained herein will preclude the DEPARTMENT from demanding repayment of funds paid to the RECIPIENT in accordance with Section O of the appended General Terms and Conditions. WATER QUALITY MONITORING Quality Assurance Project Plan (QAPP). Prior to initiating water quality monitoring activities, the RECIPIENT must prepare a Quality Assurance Project Plan (QAPP). The QAPP must follow Ecology’s Guidelines and Specifications for Preparing Quality Assurance Project Plans for Environmental Studies, February 2001 (Ecology Publication No. 01-03-003). The applicant may also reference the Technical Guidance for Assessing the Quality of Aquatic Environments, revised February 1994 (Ecology Publication No. 91-78) or more current revision, in developing the QAPP. The RECIPIENT must submit the QAPP to Ecology’s project manager for review, comment, and must be approved before starting the environmental monitoring activities. The RECIPIENT must use an environmental laboratory accredited by Ecology to analyze water samples for all parameters to be analyzed that require bench testing. Information on currently accredited laboratories and the accreditation process is provided on the Department of Ecology’s Environmental Assessment Program’s website, available at: http://www.ecy.wa.gov/programs/eap/labs/search.html The RECIPIENT should manage all monitoring data collected or acquired under this agreement in order to be available to secondary users and meet the “ten-year rule.” The ten-year rule means that data documentation is sufficient to allow an individual not directly familiar with the specific monitoring effort to understand the purpose of the data set, methods used, results obtained, and quality assurance measures taken ten years after data are collected. 17 Monitoring Data Submittal / Environmental Information Management System. Funding recipients that collect water quality monitoring data must submit all data to Ecology through the Environmental Information Management System (EIM). Data must be submitted by following instructions on the EIM website, currently available at: http://www.ecy.wa.gov/eim The data submittal portion of the EIM website provides information and help on formats and requirements for submitting tabular data. Specific questions about data submittal can be directed to the EIM Data Coordinator, currently available at: eim_data_coordinator@ecy.wa.gov If GIS data is collected, Ecology data standards are encouraged. An Ecology Focus Sheet entitled GIS Data and Ecology Grants (Publication No. 98-1812-SEA) outlines the standards. Common standards must be used for infrastructure details, such as geographic names, Geographic Information System (GIS) coverage, list of methods, and reference tables. 18 ATTACHMENT II: GENERAL TERMS AND CONDITIONS PERTAINING TO GRANT AND LOAN AGREEMENTS OF THE DEPARTMENT OF ECOLOGY A. RECIPIENT PERFORMANCE All activities for which grant/loan funds are to be used shall be accomplished by the RECIPIENT and RECIPIENT's employees. The RECIPIENT shall only use contractor/consultant assistance if that has been included in the agreement’s final scope of work and budget. B. SUBGRANTEE/CONTRACTOR COMPLIANCE The RECIPIENT must ensure that all subgrantees and contractors comply with the terms and conditions of this agreement. C. THIRD PARTY BENEFICIARY The RECIPIENT shall ensure that in all subcontracts entered into by the RECIPIENT pursuant to this agreement, the state of Washington is named as an express third-party beneficiary of such subcontracts with full rights as such. D. CONTRACTING FOR SERVICES (BIDDING) Contracts for construction, purchase of equipment and professional architectural and engineering services shall be awarded through a competitive process, if required by State law. RECIPIENT shall retain copies of all bids received and contracts awarded, for inspection and use by the DEPARTMENT. E. ASSIGNMENTS No right or claim of the RECIPIENT arising under this agreement shall be transferred or assigned by the RECIPIENT. F. COMPLIANCE WITH ALL LAWS 1. The RECIPIENT shall comply fully with all applicable Federal, State and local laws, orders, regulations and permits. Prior to commencement of any construction, the RECIPIENT shall secure the necessary approvals and permits required by authorities having ju risdiction over the project, provide assurance to the DEPARTMENT that all approvals and permits have been secured, and make copies available to the DEPARTMENT upon request. 2. Discrimination. The DEPARTMENT and the RECIPIENT agree to be bound by all Federal and State laws, regulations, and policies against discrimination. The RECIPIENT further agrees to affirmatively support the program of the Office of Minority and Women's Business Enterprises to the maximum extent possible. If the agreement is federally-funded, the RECIPIENT shall report to the DEPARTMENT the percent of grant/loan funds available to women or minority owned businesses. 3. Wages And Job Safety. The RECIPIENT agrees to comply with all applicable laws, regulations, and policies of the United States and the State of Washington which affect wages and job safety. 4. Industrial Insurance. The RECIPIENT certifies full compliance with all applicable state industrial insurance requirements. If the RECIPIENT fails to comply with such laws, the DEPARTMENT shall have the right to immediately terminate this agreement for cause as provided in Section K.1, herein. 19 G. KICKBACKS The RECIPIENT is prohibited from inducing by any means any person employed or otherwise involved in this project to give up any part of the compensation to which he/she is otherwise entitled or, receive any fee, commission or gift in return for award of a subcontract hereunder. H. AUDITS AND INSPECTIONS 1. The RECIPIENT shall maintain complete program and financial records relating to this agreement. Such records shall clearly indicate total receipts and expenditures by fund source and task or object. All grant/loan records shall be kept in a manner which provides an audit trail for all expenditures. All records shall be kept in a common file to facilitate audits and inspections. Engineering documentation and field inspection reports of all construction work accomplished under this agreement shall be maintained by the RECIPIENT. 2. All grant/loan records shall be open for audit or inspection by the DEPARTMENT or by any duly authorized audit representative of the State of Washington for a period of at least three years after the final grant payment/loan repayment or any dispute resolution hereunder. If any such audits identify discrepancies in the financial records, the RECIPIENT shall provide clarification and/or make adjustments accordingly. 3. All work performed under this agreement and any equipment purchased, shall be made available to the DEPARTMENT and to any authorized state, federal or local representative for inspection at any time during the course of this agreement and for at least three years following grant/loan termination or dispute resolution hereunder. 4. RECIPIENT shall meet the provisions in OMB Circular A-133 (Audits of States, Local Governments & Non Profit Organizations), including the compliance Supplement to OMB Circular A-133, if the RECIPIENT expends $500,000 or more in a year in Federal funds. The $500,000 threshold for each year is a cumulative total of all federal funding from all sources. The RECIPIENT must forward a copy of the audit along with the RECIPIENT’S response and the final corrective action plan to the DEPARTMENT within ninety (90) days of the date of the audit report. I. PERFORMANCE REPORTING The RECIPIENT shall submit progress reports to the DEPARTMENT with each payment request or such other schedule as set forth in the Special Conditions. The RECIPIENT shall also report in writing to the DEPARTMENT any problems, delays or adverse conditions which will materially affect their ability to meet project objectives or time schedules. This disclosure shall be accompanied by a statement of the action taken or proposed and any assistance needed from the DEPARTMENT to resolve the situation. Payments may be withheld if required progress reports are not submitted. Quarterly reports shall cover the periods January 1 through March 31, April 1 through June 30, July 1 through September 30, and October 1 through December 31. Reports shall be due within thirty (30) days following the end of the quarter being reported. J. COMPENSATION 1. Method of compensation. Payment shall normally be made on a reimbursable basis as specified in the grant agreement and no more often than once per month. Each request for payment will be submitted by the RECIPIENT on State voucher request forms provided by the DEPARTMENT along with documentation of the expenses. Payments shall be made for 20 each task/phase of the project, or portion thereof, as set out in the Scope of Work when completed by the RECIPIENT and approved as satisfactory by the Project Officer. The payment request form and supportive documents must itemize all allowable costs by major elements as described in the Scope of Work. Instructions for submitting the payment requests are found in "Administrative Requirements for Ecology Grants and Loans", part IV, published by the DEPARTMENT. A copy of this document shall be furnished to the RECIPIENT. When payment requests are approved by the DEPARTMENT, payments will be made to the mutually agreed upon designee. Payment requests shall be submitted to the DEPARTMENT and directed to the Project Officer assigned to administer this agreement. 2. Period of Compensation. Payments shall only be made for actions of the RECIPIENT pursuant to the grant/loan agreement and performed after the effective date and prior to the expiration date of this agreement, unless those dates are specifically modified in writing as provided herein. 3. Final Request(s) for Payment. The RECIPIENT should submit final requests for compensation within forty-five (45) days after the expiration date of this agreement and within fifteen (15) days after the end of a fiscal biennium. Failure to comply may result in delayed reimbursement. 4. Performance Guarantee. The DEPARTMENT may withhold an amount not to exceed ten percent (10%) of each reimbursement payment as security for the RECIPIENT's performance. Monies withheld by the DEPARTMENT may be paid to the RECIPIENT when the project(s) described herein, or a portion thereof, have been completed if, in the DEPARTMENT's sole discretion, such payment is reasonable and approved according to this agreement and, as appropriate, upon completion of an audit as specified under section J.6. herein. 5. Unauthorized Expenditures. All payments to the RECIPIENT may be subject to final audit by the DEPARTMENT and any unauthorized expenditure(s) charged to this grant/loan shall be refunded to the DEPARTMENT by the RECIPIENT. 6. Mileage and Per Diem. If mileage and per diem are paid to the employees of the RECIPIENT or other public entities, it shall not exceed the amount allowed under state law for state employees. 7. Overhead Costs. No reimbursement for overhead costs shall be allowed unless provided for in the Scope of Work hereunder. K. TERMINATION 1. For Cause. The obligation of the DEPARTMENT to the RECIPIENT is contingent upon satisfactory performance by the RECIPIENT of all of its obligations under this agreement. In the event the RECIPIENT unjustifiably fails, in the opinion of the DEPARTMENT, to perform any obligation required of it by this agreement, the DEPARTMENT may refuse to pay any further funds there under and/or terminate this agreement by giving written notice of termination. A written notice of termination shall be given at least five working days prior to the effective date of termination. In that event, all finished or unfinished documents, data studies, surveys, 21 drawings, maps, models, photographs, and reports or other materials prepared by the RECIPIENT under this agreement, at the option of the DEPARTMENT, shall become Department property and the RECIPIENT shall be entitled to receive just and equitable compensation for any satisfactory work completed on such documents and other materials. Despite the above, the RECIPIENT shall not be relieved of any liability to the DEPARTMENT for damages sustained by the DEPARTMENT and/or the State of Washington because of any breach of agreement by the RECIPIENT. The DEPARTMENT may withhold payments for the purpose of setoff until such time as the exact amount of damages due the DEPARTMENT from the RECIPIENT is determined. 2. Insufficient Funds. The obligation of the DEPARTMENT to make payments is contingent on the availability of state and federal funds through legislative appropriation and state allotment. When this agreement crosses over state fiscal years the obligation of the DEPARTMENT is contingent upon the appropriation of funds during the next fiscal year. The failure to appropriate or allot such funds shall be good cause to terminate this agreement as provided in paragraph K.1 above. When this agreement crosses the RECIPIENT's fiscal year, the obligation of the RECIPIENT to continue or complete the project described herein shall be contingent upon appropriation of funds by the RECIPIENT's governing body; provided, however, that nothing contained herein shall preclude the DEPARTMENT from demanding repayment of ALL funds paid to the RECIPIENT in accordance with Section O herein. 3. Failure to Commence Work. In the event the RECIPIENT fails to commence work on the project funded herein within four months after the effective date of this agreement, or by any date agreed upon in writing for commencement of work, the DEPARTMENT reserves the right to terminate this agreement. L. WAIVER Waiver of any RECIPIENT default is not a waiver of any subsequent default. Waiver of a breach of any provision of this agreement is not a waiver of any subsequent breach and will not be construed as a modification of the terms of this agreement unless stated as such in writing by the authorized representative of the DEPARTMENT. M. PROPERTY RIGHTS 1. Copyrights and Patents. When the RECIPIENT creates any copyrightable materials or invents any patentable property, the RECIPIENT may copyright or patent the same but the DEPARTMENT retains a royalty-free, nonexclusive and irrevocable license to reproduce, publish, recover or otherwise use the material(s) or property and to authorize others to use the same for federal, state or local government purposes. Where federal funding is involved, the federal government may have a proprietary interest in patent rights to any inventions that are developed by the RECIPIENT as provided in 35 U.S.C. 200-212. 2. Publications. When the RECIPIENT or persons employed by the RECIPIENT use or publish information of the DEPARTMENT; present papers, lectures, or seminars involving information supplied by the DEPARTMENT; use logos, reports, maps or other data, in printed reports, signs, brochures, pamphlets, etc., appropriate credit shall be given to the DEPARTMENT. 22 3. Tangible Property Rights. The DEPARTMENT's current edition of "Administrative Requirements for Ecology Grants and Loans", Part V, shall control the use and disposition of all real and personal property purchased wholly or in part with funds furnished by the DEPARTMENT in the absence of state, federal statute(s), regulation(s), or policy(s) to the contrary or upon specific instructions with respect thereto in the Scope of Work. 4. Personal Property Furnished by the DEPARTMENT. When the DEPARTMENT provides personal property directly to the RECIPIENT for use in performance of the project, it shall be returned to the B-4 DEPARTMENT prior to final payment by the DEPARTMENT. If said property is lost, stolen or damaged while in the RECIPIENT's possession, the DEPARTMENT shall be reimbursed in cash or by setoff by the RECIPIENT for the fair market value of such property. 5. Acquisition Projects. The following provisions shall apply if the project covered by this agreement includes funds for the acquisition of land or facilities: a. Prior to disbursement of funds provided for in this agreement, the RECIPIENT shall establish that the cost of land/or facilities is fair and reasonable. b. The RECIPIENT shall provide satisfactory evidence of title or ability to acquire title for each parcel prior to disbursement of funds provided by this agreement. Such evidence may include title insurance policies, Torrens certificates, or abstracts, and attorney's opinions establishing that the land is free from any impediment, lien, or claim which would impair the uses contemplated by this agreement. 6. Conversions. Regardless of the contract termination date shown on the cover sheet, the RECIPIENT shall not at any time convert any equipment, property or facility acquired or developed pursuant to this agreement to uses other than those for which assistance was originally approved without prior written approval of the DEPARTMENT. Such approval may be conditioned upon payment to the DEPARTMENT of that portion of the proceeds of the sale, lease or other conversion or encumbrance which monies granted pursuant to this agreement bear to the total acquisition, purchase or construction costs of such property. N. SUSTAINABLE PRODUCTS In order to sustain Washington’s natural resources and ecosystems, the RECIPIENT is encouraged to implement sustainable practices where and when possible. These practices include use of clean energy, and purchase and use of sustainably produced products (e.g., recycled paper). For more information, see http://www.ecy.wa.gov/sustainability/. O. RECOVERY OF PAYMENTS TO RECIPIENT The right of the RECIPIENT to retain monies paid to it as reimbursement payments is contingent upon satisfactory performance of this agreement including the satisfactory completion of the project described in the Scope of Work. In the event the RECIPIENT fails, for any reason, to perform obligations required of it by this agreement, the RECIPIENT may, at the DEPARTMENT's sole discretion, be required to repay to the DEPARTMENT all grant/loan funds disbursed to the RECIPIENT for those parts of the project that are rendered worthless in the opinion of the DEPARTMENT by such failure to perform. Interest shall accrue at the rate of twelve percent (12%) per year from the time the DEPARTMENT demands repayment of funds. If payments have been discontinued by the DEPARTMENT due to insufficient funds as in 23 Section K.2 above, the RECIPIENT shall not be obligated to repay monies which had been paid to the RECIPIENT prior to such termination. Any property acquired under this agreement, at the option of the DEPARTMENT, may become the DEPARTMENT'S property and the RECIPIENT'S liability to repay monies shall be reduced by an amount reflecting the fair value of such property. P. PROJECT APPROVAL The extent and character of all work and services to be performed under this agreement by the RECIPIENT shall be subject to the review and approval of the DEPARTMENT through the Project Officer or other designated official to whom the RECIPIENT shall report and be responsible. In the event there is a dispute with regard to the extent and character of the work to be done, the determination of the Project Officer or other designated official as to the extent and character of the work to be done shall govern. The RECIPIENT shall have the right to appeal decisions as provided for below. Q. DISPUTES Except as otherwise provided in this agreement, any dispute concerning a question of fact arising under this agreement which is not disposed of in writing shall be decided by the Project Officer or other designated official who shall provide a written statement of decision to the RECIPIENT. The decision of the Project Officer or other designated official shall be final and conclusive unless, within thirty days from the date of receipt of such statement, the RECIPIENT mails or otherwise furnishes to the Director of the DEPARTMENT a written appeal. In connection with appeal of any proceeding under this clause, the RECIPIENT shall have the opportunity to be heard and to offer evidence in support of this appeal. The decision of the Director or duly authorized representative for the determination of such appeals shall be final and conclusive. Appeals from the Director's determination shall be brought in the Superior Court of Thurston County. Review of the decision of the Director will not be sought before either the Pollution Control Hearings Board or the Shoreline Hearings Board. Pending final decision of dispute hereunder, the RECIPIENT shall proceed diligently with the performance of this agreement and in accordance with the decision rendered. R. CONFLICT OF INTEREST No officer, member, agent, or employee of either party to this agreement who exercises any function or responsibility in the review, approval, or carrying out of this agreement, shall participate in any decision which affects his/her personal interest or the interest of any corporation, partnership or association in which he/she is, directly or indirectly interested; nor shall he/she have any personal or pecuniary interest, direct or indirect, in this agreement or the proceeds thereof. S. INDEMNIFICATION 1. The DEPARTMENT shall in no way be held responsible for payment of salaries, consultant's fees, and other costs related to the project described herein, except as provided in the Scope of Work. 2. To the extent that the Constitution and laws of the State of Washington permit, each party shall indemnify and hold the other harmless from and against any liability for any or all 24 injuries to persons or property arising from the negligent act or omission of that party or that party's agents or employees arising out of this agreement. T. GOVERNING LAW This agreement shall be governed by the laws of the State of Washington. U. SEVERABILITY If any provision of this agreement or any provision of any document incorporated by reference shall be held invalid, such invalidity shall not affect the other provisions of this agreement which can be given effect without the invalid provision, and to this end the provisions of this agreement are declared to be severable. V. PRECEDENCE In the event of inconsistency in this agreement, unless otherwise provided herein, the inconsistency shall be resolved by giving precedence in the following order: (a) applicable Federal and State statutes and regulations; (b) Scope of Work; (c) Special Terms and Conditions; (d) Any terms incorporated herein by reference including the "Administrative Requirements for Ecology Grants and Loans"; and (e) the General Terms and Conditions. SS-010 Rev. 04/04 City of Arlington Council Agenda Bill AGENDA ITEM: ATTACHMENT E COUNCIL MEETING DATE: August 9, 2010 SUBJECT: Comprehensive Emergency Management Plan DEPARTMENT OF ORIGIN: FIRE ATTACHMENTS: - Change to Mayor Pro Tem / Alternate Mayor Pro Tem (The CEMP was previously distributed to Council) EXPENDITURES REQUESTED: None BUDGET CATEGORY: DNA LEGAL REVIEW: DNA DESCRIPTION: The Comprehensive Emergency Management Plan (CEMP) is an all hazards plan that provides the structure and mechanisms for policy and operational coordination for emergency management. This plan is consistent with the National Incident Management System (NIMS) and parallels the Snohomish County’s CEMP. The CEMP was first presented to the Council at the May 24, 2010 Council Workshop. Council was to review the plan and provide written comments or suggestions to be considered by the Council at the August 9, 2010 Council Workshop. HISTORY: The City’s CEMP was last updated in 2003. ALTERNATIVES: Continue to function under the County’s CEMP as an advisory member of the Department of Emergency Management. RECOMMENDED ACTION: There is no action at this time. CEMP – Change to Mayor Pro Tem / Alternate Mayor Pro Tem Temporary Absence – During the temporary absence or incapacity of the mayor, the Mayor Pro Tem will be acting mayor and will assume the powers and duties of the mayor including those for emergencies and veto power. In the absence of both the Mayor and Mayor Pro Tem, the council member with the longest tenure will assume the office of acting mayor. If more than one council member has the same total period of tenure in office the council member who received the largest number of votes at the last election will be acting mayor. Alternate Mayor Pro Tem will assume the office. Vacancy – When a mayoral vacancy occurs, the Mayor Pro Tem will serve as the acting mayor with all powers and duties of the mayor, including emergency powers, until a mayoral successor is elected. A mayoral vacancy arises when one or more of the following occurs: o Resignation o Death o Judicial determination of incompetence o Conviction of a felony o Removal from office for breach of public trust If the Mayor Pro Tem is unable to serve as acting mayor, the council member with the longest tenure Alternate Mayor Pro Tem will assume the office of acting mayor. If more than one council member has the same total period of tenure in office the council member who received the largest number of votes at the last election will be acting mayor. CEMP – Change to Mayor Pro Tem / Alternate Mayor Pro Tem Temporary Absence – During the temporary absence or incapacity of the mayor, the Mayor Pro Tem will be acting mayor and will assume the powers and duties of the mayor including those for emergencies and veto power. In the absence of both the Mayor and Mayor Pro Tem, the council member with the longest tenure will assume the office of acting mayor. If more than one council member has the same total period of tenure in office the council member who received the largest number of votes at the last election will be acting mayor. Alternate Mayor Pro Tem will assume the office. Vacancy – When a mayoral vacancy occurs, the Mayor Pro Tem will serve as the acting mayor with all powers and duties of the mayor, including emergency powers, until a mayoral successor is elected. A mayoral vacancy arises when one or more of the following occurs: o Resignation o Death o Judicial determination of incompetence o Conviction of a felony o Removal from office for breach of public trust If the Mayor Pro Tem is unable to serve as acting mayor, the council member with the longest tenure Alternate Mayor Pro Tem will assume the office of acting mayor. If more than one council member has the same total period of tenure in office the council member who received the largest number of votes at the last election will be acting mayor. City of Arlington Council Agenda Bill AGENDA ITEM: ATTACHMENT F COUNCIL MEETING DATE: August 9, 2010 SUBJECT: Revision to the City Council Rules of Procedure for the terms of Mayor Pro Tem and Alternate Mayor Pro Tem and participation in Council meetings by phone DEPARTMENT OF ORIGIN: Legal ATTACHMENTS: Council Rules of Procedure, revised March 2009 with strikeouts EXPENDITURES REQUESTED: -0- BUDGET CATEGORY: N/A LEGAL REVIEW: City Attorney wrote the proposed language DESCRIPTION: The City Council requested that new language be included in the Council Rules of Procedure to outline the terms of the Mayor Pro Tem and Alternate Mayor Pro Tem. City Council is also requested to consider language regarding the participation of Council members in Council meetings by phone. In accordance with the Council requests, the City Attorney has revised the Council Rules of Procedure. HISTORY: The City Council initially adopted rules of procedure in 2002. The Council has periodically updated these procedures. The Rules of Procedure were last updated in March 2009. ALTERNATIVES: RECOMMENDED ACTION: No action at this time. March 9, 2009August 4, 2010 Page 1 City Council Rules of Procedure I General Rules 1.1 Meetings to be Public: All official meetings of the Arlington City Council shall be open to the public with the exception of executive sessions for certain limited topics (as defined in RCW Chapter 42.30). The journal of proceedings (minute book) shall be open to public inspection. 1.2 Quorum: Four Councilmembers shall be in attendance to constitute a quorum and be necessary for the transaction of business. If a quorum is not present, those in attendance will be named and they shall adjourn to a later time, but no adjournment shall be for a longer period than until the next regular meeting. Attendance by speakerphone shall be permitted at the discretion of the Mayor and with the consent of the Councilmembers in attendance; provided, however, that attendance by speakerphone shall not be authorized for public hearings or quasi-judicial hearings. 1.3 Attendance, Excused Absences: RCW 35A. 12.060 provides that a Councilmember shall forfeit his/her office by failing to attend three (3) consecutive regular meetings of the Council without being excused by the Council. Members of the Council may be so excused by complying with this section. The member shall contact the Chair prior to the meeting and state the reason for his/her inability to attend the meeting. If the member is unable to contact the Chair, the member shall contact the City Clerk or Deputy City Clerk, who shall convey the message to the Chair. The Chair shall inform the Council of the member's absence, state the reason for such absence and inquire if there is a motion to excuse the member. Upon passage of such motion by a majority of members present, the absent member shall be considered excused and the Recorder will make an appropriate notation in the minutes. If the motion is not passed, the Recorder will note in the minutes that the absence is unexcused. 1.4 Journal of Proceedings: A journal of all proceedings of the Council shall be kept by the City Clerk and shall be entered in a book constituting the official record of the Council. 1.5 Right of Floor: Any member desiring to speak shall be recognized by the Chair and shall confine his/her remarks to one subject under consideration or to be considered. 1.6 Rules of Order. Roberts Rules of Order Newly Revised shall be the guideline procedures for the proceedings of the Council. If there is a conflict, these rules shall apply. 2. Types of Meetings 2.1 Regular Council Meetings: The Council shall meet on the first and third Monday of each month at 7 p.m. When a Council meeting falls on a holiday, the Council shall meet Formatted: Font: Bold March 9, 2009August 4, 2010 Page 2 on Tuesday following the Monday holiday. The Council may reschedule regular meetings to a different date or time by motion. The location of the meetings shall be the Council Chambers at city hall110 E. Third Street, unless specified otherwise by a majority vote of the Council. All regular and special meetings shall be public. 2.2 Special Meetings: Special meetings may be called by the Mayor or any four (4) members of the Council. The City Clerk shall prepare a notice of the special meeting stating the time, place and business to be transacted. The City Clerk shall attempt to notify each member of the Council, either by telephone or otherwise, of the special meeting. The City Clerk shall give at least 24 hours' notice of the special meeting to each local newspaper of general circulation and to each local radio and/or television station, which has filed with the Clerk a written request to be notified of special meetings. No subjects other than those specified in the notice shall be considered. The Council may not make final disposition on any matter not mentioned in the notice. Special meetings may be called in less than 24 hours, and without the notice required in this section, to deal with emergencies involving injury or damage to persons or property or the likelihood of such injury or damage if the notice requirements would be impractical or increase the likelihood of such injury or damage. 2.3 Continued and Adjourned Sessions: Any session of the Council may be continued or adjourned from day to day, or for more than one day, but no adjournment shall be for a longer period than until the next regular meeting. 2.4 Study Sessions and Workshops: The Council may meet informally in study sessions and workshops, at the call of the Mayor or of any three or more members of the Council, to review forthcoming programs of the city, receive progress reports on current programs or projects, receive other similar information from city department heads or conduct procedures workshops, provided that all discussions and conclusions thereon shall be informal and do not constitute official actions of the Council. Study sessions and workshops held by the Council are "special meetings" of the Council, and the notice required by RCW 42.30.080 must be provided. 2.5 Executive Sessions: Executive sessions or closed meetings may be held in accordance with the provisions of the Washington State Open Public Meetings Act (Chapter 42.30 RCW). Among the topics that may be discussed in executive session or closed meetings are: (1) personnel matters; (2) consideration of acquisition of property for public purposes or sale of city-owned property; and (3) potential or pending litigation in which the city has an interest, as provided in the Revised Code of Washington. The Council may hold an executive session during a regular or special meeting. Before convening in executive session the Chair shall publicly announce the purpose for excluding the public from the meeting place and the time when the executive session will be concluded. If the Council wishes to adjourn at the close of a meeting from executive session, that fact will be announced along with the estimated time for the executive March 9, 2009August 4, 2010 Page 3 session. The announced time limit for executive sessions may be extended to a stated later time by the announcement of the Chair. 2.6 Attendance of Media at Council Meetings: All official meetings of the Council and its committees shall be open to the media, freely subject to recording by radio, television and photographic services at any time, provided that such arrangements do not interfere with the orderly conduct of the meetings. 3. Chair and Duties 3.1 Chair: The Mayor, if present, shall preside as Chair at all meetings of the Council. In the absence of the Mayor, the Mayor Pro Tem shall preside. In the absence of both the Mayor and Mayor Pro Tem, the Council shall elect a Chair. 3.2 Call to Order: The meetings of the Council shall be called to order by the Mayor or, in his absence, by the Mayor Pro Tem. In the absence of both the Mayor and Mayor Pro Tem, the meeting shall be called to order by the City Clerk or Clerk's designee for the election of a temporary Chair. 3.3 Preservation of Order: The Chair shall preserve order and decorum; prevent attacks on personalities or the impugning of members' motives and confine members in debate to the question under discussion. 3.4 Points of Order: The Chair shall determine all points of order, subject to the right of any member to appeal to the Council. If any appeal is taken, the question shall be "Shall the decision of the Chair be sustained?" 3.5 Questions to be Stated: The Chair shall state all questions submitted for a vote and announce the result. A roll call vote shall be taken upon all questions. 3.6 Mayor - Powers: The Mayor may not make or second motions, but may participate in debate to the extent that such debate does not interfere with chairing the meeting. If the mayor wishes to participate vigorously in the debate of an issue, the Mayor shall turn over chairing of that portion of the meeting to the Mayor Pro Tem, or to another Councilmember if the Mayor Pro Tem is absent. The Mayor's voting rights and veto power are as specified in RCW 35A. 12. 100. 4. Order of Business and Agenda 4.1 Order of Business: The order of business for all regular meetings shall be transacted as follows unless the Council, by a majority vote of the members present suspends the rules and changes the order: (1) Call to Order (2) Pledge of Allegiance March 9, 2009August 4, 2010 Page 4 (3) Visitors (4) Presentations/Proclamations/Communications (5) Consent Agenda (6) Action Items (7) Council Committee Reports (8) Information (9) Executive Session (10) Reconvene (11) Adjourn The Consent Agenda may contain items which are of a routine and non-controversial nature which may include, but are not limited to, the following: meeting minutes, payroll, claims, budget amendments, park use requests and any item previously approved by Council with a unanimous vote and which is being submitted to Council for final approval. Any item on the Consent Agenda may be removed and considered separately as an agenda item at the request of any Councilmember or any person attending a Council meeting. 4.2 Council Agenda: The mayor shall prepare the agenda for Council meetings. Subject to the Council's right to amend the agenda, no legislative item shall be voted upon which is not on the Council agenda, except in emergency situations (defined as situations which would jeopardize the public's health, safety or welfare). 4.3 Mayor and Councilmember Comments and Concerns: The agenda shall provide a time when the Mayor ("Mayor's Reports") or any Councilmember ("Comments From Councilmembers") may bring before the Council any business that he/she feels should be deliberated upon by the Council. These matters need not be specifically listed on the agenda, but formal action on such matters may be deferred until a subsequent Council meeting, except that immediate action may be taken upon a vote of a majority of all members of the Council. There shall be no lectures, speeches or grandstanding. 5. Consensus and Motions 5.1 Motions: No motion shall be entertained or debated until duly seconded and announced by the Chair. The motion shall be recorded and, if desired by any Councilmember, it shall be read by the Recorder before it is debated and, by the consent of the Council, may be withdrawn at any time before action is taken on the motion. 5.2 Votes on Motions: Votes shall be taken by voice vote; provided, that any member of the Council may request a roll call vote on any matter. Each member present shall vote on all questions put to the Council except on matters in which he or she has been disqualified for a conflict of interest or under the appearance of fairness doctrine. Such member shall disqualify himself or herself prior to any discussion of the matter and shall March 9, 2009August 4, 2010 Page 5 leave the Council Chambers. When disqualification of a member or members results or would result in the inability of the Council at a subsequent meeting to act on a matter on which it is required by law to take action, any member who was absent or who had been disqualified under the appearance of fairness doctrine may subsequently participate, provided such member first shall have reviewed all materials and listened to all tapes of the proceedings in which the member did not participate. 5.3 Failure to Vote on a Motion: Any Councilmember present who fails to vote without a valid disqualification shall be declared to have voted in the affirmative on the question. 5.4 Motions to Reconsider: A motion to reconsider must be made by a person who voted with the majority on the principal question and must be made at the same or succeeding regular meeting. No motion to reconsider an adopted quasi-judicial written -decision shall be entertained after the close of the meeting at which the written findings were adopted. 6. Public Hearing Procedures 6.1 Speaker Sign-In: Prior to the start of a public hearing the Chair may require that all persons wishing to be heard sign in with the Recorder, giving their name and whether they wish to speak as a proponent, opponent or from a neutral position. Any person who fails to sign in shall not be permitted to speak until all those who signed in have given their testimony. The Chair, subject to the concurrence of a majority of the Council, may establish time limits and otherwise control presentations. (Suggested time limit is three minutes per speaker or five minutes when presenting the official position of an organization or group.) The Chair may change the order of speakers so that testimony is heard in the most logical groupings (i.e. proponents, opponents, adjacent owners, etc.). 6.2 Conflict of Interest/Appearance of Fairness: Prior to the start of a public hearing the Chair will ask if any Councilmember has a conflict of interest or Appearance of Fairness Doctrine concern which could prohibit the Councilmember from participating in the public hearing process. A Councilmember who refuses to step down after challenge and the advice of the City Attorney, a ruling by the Mayor or Chair and/or a request by the majority of the remaining members of the Council to step down is subject to censure. The Councilmember who has stepped down shall not participate in the Council decision nor vote on the matter. The Councilmember shall leave the Council Chambers while the matter is under consideration, provided, however, that nothing herein shall be interpreted to prohibit a Councilmember from stepping down in order to participate in a hearing in which the Councilmember has a direct financial or other personal interest 6.3 The Public Hearing Process: The Chair introduces the agenda item, opens the public hearing and announces the following Rules of Order: March 9, 2009August 4, 2010 Page 6 (1) All comments by proponents, opponents or other members of the public shall be made from the podium; any individuals making comments shall first give their name and address. This is required because an official recorded transcript of the public hearing is being made. (2) No comments shall be made from any other location. Anyone making "Out of Order" comments shall be subject to removal from the meeting. If you are disabled and require accommodation, please advise the Recorder. (3) There will be no demonstrations during or at the conclusion of anyone's presentation. (4) These rules are intended to promote an orderly system of holding a public hearing, to give every person an opportunity to be heard, and to ensure that no individual is embarrassed by exercising his/her right of free speech. · The Chair calls upon city staff to describe the matter under consideration. · The Chair calls upon proponents, opponents and all other individuals who wish to speak regarding the matter under consideration. · The Chair inquires as to whether any Councilmember has questions to ask the proponents, opponents, speakers or staff. If any Councilmember has questions, the appropriate individual will be recalled to the podium. · The Chair continues the public hearing to a time specific or closes the public hearing. 7. Duties and Privileges of Citizens 7.1 Meeting Participation: Citizens are welcome at all Council meetings and are encouraged to attend and participate prior to the deliberations of the Council. Recognition of a speaker by the Chair is a prerequisite and necessary for an orderly and effective meeting, be the speaker a citizen, Councilmember or staff member. Further, it will be expected that all speakers will deliver their comments in a courteous and efficient manner and will speak only to the specific subject under consideration. Anyone making out-of- order comments or acting in an unruly manner shall be subject to removal from the meeting. Use of cellular telephones is prohibited in the Council Chambers. 7.2 Subjects Not on the Current Agenda: Under agenda item "Comments From Citizens" citizens may address any item they wish to discuss with the Mayor and Council. They shall first obtain recognition by the Chair, state their name, address and subject of their comments. The Chair shall then allow the comments, subject to a three (3) minute limitation per speaker, or other limitations as the Chair or Council may deem necessary. Following such comments, if action is required or has been requested, the Chair may place the matter on the current agenda or a future agenda or refer the matter to staff or a Council committee for action or investigation and report at a future meeting. 7.3 Subjects on the Current Agenda: Any member of the public who wishes to address the Council on an item on the current agenda shall make such request to the Chair or Presiding Officer. The Chair shall rule on the appropriateness of public comments as the agenda item is reached. The Chair may change the order of speakers so that testimony is heard in the most logical grouping (i.e. proponents, opponents, adjacent owners, etc.). All March 9, 2009August 4, 2010 Page 7 comments shall be limited to three (3) minutes per speaker, or other limitations as the Chair or Council may deem necessary. 7.4 Manner of Addressing the Council - Time Limit: Each person addressing the Council shall step up to the podium, give his/her name and address in an audible tone of voice for the record and, unless further time is granted by the Council, shall limit his/her remarks to three (3) minutes. Agenda items "Comments From Citizens" and "Continued Comments From Citizens" shall be limited to a total of 30 minutes each, unless additional time or less time is agreed upon by the Council (dependent upon the length of the Council agenda). All remarks shall be addressed to the Council as a body and not to any member thereof. No person, other than the Chair, members of the Council and the person having the floor, shall be permitted to enter into any discussion, either directly or through the members of the Council. No questions shall be asked of the Councilmembers, except through the Chair. 'The Council will then determine the disposition of the issue (information -only, place on present agenda, workshop, a future agenda, assign to staff, assign to Council Committee or do not consider). 7.5 Personal and Slanderous Remarks: Any person making personal, impertinent or slanderous remarks or who shall become boisterous while addressing the Council may be requested to leave the meeting and may be barred from further audience before the Council during that Council meeting by the Chair or Presiding Officer. 7.6 Written Communications: Interested parties, or their authorized representatives, may address the Council by written communication in regard to any matter concerning the city's business or over which the Council had control at any time. The written communication may be submitted by direct mail or by addressing the communication to the City Clerk who will distribute copies to the Councilmembers. The communication will be entered into the record without the necessity for reading as long as sufficient copies are distributed to members of the audience/public. 7.7 Comments in Violation of the Appearance Of Fairness Doctrine: The Chair may rule out of order any comment made with respect to a quasi-judicial matter pending before the Council or its Boards or Commissions. Such comments should be made only at the hearing on a specific matter. If a hearing has been set, persons whose comments are ruled out of order will be notified of the time and place when they can appear at the public hearing on the matter and present their comments. 7.8 ”Out of Order” Comments: Any person whose comments have been ruled out of order by the Chair shall immediately cease and refrain from further improper comments. The refusal of an individual to desist from inappropriate, slanderous or otherwise disruptive remarks after being ruled out of order by the Chair may subject the individual to removal from the Council Chambers. These rules are intended to promote an orderly system of holding a public meeting and to give every person an opportunity to be heard. March 9, 2009August 4, 2010 Page 8 8. Filling Council Vacancies and Selecting Mayor Pro Tem 8.1 Notice of Vacancy: If a Council vacancy occurs, the Council will follow the procedures outlined in MCW RCW 42.12-.070. In order to fill the vacancy with the most qualified person available until an election is held, the Council will widely distribute and publish a notice of the vacancy and the procedure and deadline for applying for the position. 8.2 Application Procedure: The Council will draw up an application form which contains relevant information that will answer set questions posed by Council. The application form will be used in conjunction with an interview of each candidate to aid the Council's selection of the new Councilmember. 8.3 Interview Process: All candidates who submit an application by the deadline will be interviewed by the Council during a regular or special Council meeting open to the public. The order of the interviews will be determined by drawing the names; in order to make the interviews fair, applicants will be asked to remain outside the Council Chambers while other applicants are being interviewed. Applicants will be asked to answer questions submitted to them in advance of the interview and questions posed by each Councilmember during the interview process. The Councilmembers will ask the same questions of each candidate. Each candidate will then be allowed two (2) minutes for closing comments. Since this is not a campaign, comments and responses about other applicants will not be allowed. 8.4 Selection of Councilmember: The Council may recess into executive session to discuss the qualifications of all candidates. Nominations, voting and selection of a person to fill the vacancy will be conducted during an open public meeting. 8.5 Selecting Mayor Pro Tem and Alternate Mayor Pro Tem: The Mayor Pro Tem and Alternate Mayor Pro Tem will be selected by a majority vote of the Councilmembers annually at the second meeting in January in even years or when there is a vacancy in either office. In selecting the Mayor Pro Tem, the Council will be guided by the following principles: • To preserve continuity in the office, the Mayor Pro Tem shall generally serve for a term of two (2) years. • The Mayor Pro Tem should have served as a Council member for at least two (2) years before appointment to the office of Mayor Pro Tem. • In general, the appointment of Mayor Pro Tem will be to the eligible Councilmember who has served the longest in office. March 9, 2009August 4, 2010 Page 9 9. Creation of Committees, Boards and Commissions 9.1 Citizen Committees, Boards and Commissions: The Council may create committees, boards and commissions to assist in the conduct of the operation of city government with such duties as the Council may specify not inconsistent with the city code. 9.2 Membership and Selection: Membership and selection of members shall be as provided by the Council if not specified otherwise in the city code. Any committee, board or commission so created shall cease to exist upon the accomplishment of the special purpose for which it was created, or when abolished by a majority vote of the Council. No committee so appointed shall have powers other than advisory to the Council or to the Mayor except as otherwise specified in the city code. 10. Suspension and Amendment of These Rules 10.1 Suspension of these Rules: Any provision of these rules not governed by the city code may be temporarily suspended by a vote of a majority of the Council. 10.2 Amendment of These Rules: These rules may be amended or new rules adopted by a majority vote of all members of the Council, provided that the proposed amendments or new rules shall have been introduced into the record at a prior Council meeting. City of Arlington Council Agenda Bill AGENDA ITEM: ATTACHMENT G COUNCIL MEETING DATE: August 9, 2010 Council Workshop SUBJECT: Development Agreement between Enviro Propane and the City of Arlington DEPARTMENT OF ORIGIN: Executive Community Development ATTACHMENTS: Development Agreement EXPENDITURES REQUESTED: None BUDGET CATEGORY: None LEGAL REVIEW: Reviewed by Steve Peiffle DESCRIPTION: Enviro propane is developing the lot on 74th Avenue NE, on the north half of parcel number 31051400203400. The property will be developed by Enviro Propane under Land Use Permit PLN20100012 and Public Works Permit PWD20100017. The purpose of the Development Agreement is to defer the required road improvements in front of the property to a later date. The property will be accessed with a private road until such time as the public road right of way is dedicated by an adjacent property owner. HISTORY: The lot in question was previously owned by the City. The lot was recently sold to Enviro Propane. The lot was part of a larger parcel that was subdivided previously. At that time, a dedication was required of the public right of way that would have accessed the property. An existing easement for ingress/egress still remains which will allow Enviro Propane to access their property with a private road. The agreement will allow the City time to acquire the said right of way from the adjacent property owner. At such time as the City receives the dedication of right of way, the City will notify Enviro Propane that within 18 months, the ¾ road improvements will need to be installed. Representatives from Enviro Propane have signed the agreement. All other code requirements for this project will be met. ALTERNATIVES: 1. Deny the Development Agreement between Enviro propane and the City. RECOMMENDED ACTION: There is no action requested at this time. AFTER RECORDING, RETURN TO: BAILEY, DUSKIN, PEIFFLE & CANFIELD, P.S. P.O. BOX 188 ARLINGTON, WA 98223 OUR FILE NO. 27-515 DEVELOPMENT AGREEMENT GRANTOR(S): PACER-ENVIRO PROPANE, L.L.C. GRANTEE(S): City of Arlington LEGAL (Abbrev.): Lot 20 BLA 9605085005, records of Snohomish County, WA ASSESSOR'S TAX #: 31051400203400 REFERENCE #: The City of Arlington, a Washington municipal corporation ("City"), and PACER- ENVIRO PROPANE, L.L.C., a Washington Limited Liability Company (“Applicant”), do enter into the following agreement to promote the development of certain real property located within the City, upon the following terms and conditions ("Agreement"). 1. 0 RECITALS 1.1 Location of Property. The City warrants that it controls certain real property located at 19701 - 74th Ave.NE, Arlington, WA, legally described as Lot 20 of City of Arlington Boundary Line Adjustment (BLA) recorded May 8, 1996 under recording number 9605085005 in Snohomish County, WA. Applicant has entered into a purchase and sale agreement to acquire the property. 1.2 Interim Departure from Installing Required Frontage Improvements (delay). Arlington Municipal Code (AMC) § 20.56.170 provides that no permit may be issued for a project unless and until all roads on which the project fronts are developed to their full ¾ street standards. The property is being sold by the City of Arlington to Applicant but the property is served by a private access and utility easement as depicted on the above-referenced BLA. The private easement is shown on the face of that BLA as DEVELOPMENT AGREEMENT 2 being “temporary and will be vacated in the future by the dedication to the City of Arlington.” Until the property is formally dedicated to public use, the parties agree that development of the property to City right of way standards may be premature. 1.3 Benefits. The City recognizes the public benefits which will accrue from frontage improvements by the permanent development of the property as proposed by Applicant. Likewise Applicant recognizes the benefit of this agreement to not cause a security to be set aside for the cost of required improvements for an undetermined length of time. 1.4 Consistentency With Development Regulations. The proposed development is a permitted use of Applicant’s property and is generally consistent with current City development regulations (at the time the land use permit was issued) and the interim departures therefore provided by this Agreement are offset by the public benefits received from the permanent use of the property. 1.5 Council Approval. The City Council has authorized the Mayor or City Administrator to enter into this Agreement. 2.0 INTERIM DEPARTURE FROM INSTALLING REQUIRED FRONTAGE IMPROVEMENTS. (Delay). 2.1 Required Frontage Improvements. The City hereby permits a departure from the AMC provisions requiring the denial of a permit until all roads which the project fronts are developed to their half street standards, as required by AMC § 20.56.170. The elements of the Required Frontage Improvements shall consist of, but not be limited to, curb/gutter, sidewalk, road widening including asphalt concrete paving and sub grade features, storm drainage, pavement markings, signage and landscaping, all in full compliance with the standards and specifications in effect at the time of construction. 2.2 Required Frontage Improvements - When Required . The City may, upon written notice to the Applicant, require said improvements to be installed or payment in an amount equal to the cost to the City of installation of said improvements within eighteen (18) months of notification by the City to Applicant that the private access easement has been formally dedicated. 3.0 DISPUTE RESOLUTION 3.1 Party Consultation. In event of any dispute as to interpretation or application of the terms or conditions of this Agreement, the Property Owner (if the same retains an ownership interest in the Property), the principal of the project applicant, and the City Administrator shall meet within ten (10) business days after request from any party for the purpose of attempting, in good faith, to resolve the dispute. The meeting may, by DEVELOPMENT AGREEMENT 3 mutual agreement, be continued to a date certain in order to include other parties or persons, or to obtain additional information. 3.2 Decision of City Administrator . In the event the parties are unable to reach agreement as to any dispute, the City Administrator shall issue his or her written determination concerning the disputed issues, which shall be the final decision of the City. 3.3 Judicial Appeal. Any aggrieved party may appeal the decision of the City Administrator to the Snohomish County Superior Court, as may be allowed by law and court rules. 4.0 GENERAL PROVISIONS 4.1 Recording. This Agreement shall, when approved by the City Council and executed by the parties hereto, be filed as a matter of public record in the office of the Snohomish County Auditor and shall be in the nature of a covenant running with the property. It is the intent to have this Agreement, so long as it is in force, to be considered, interpreted, and regarded as a covenant running with the land as to Applicant’s Property. 4.2 Applicable Law. This Agreement shall be governed by and be interpreted in accordance with the laws of the State of Washington. 4.3 Binding Effect. This Agreement shall be binding upon and inure to the benefit of the successors and assigns of each party hereto. The parties acknowledge that Applicant shall have the right to assign or transfer all or any portion of the interests, rights and obligations under this Agreement to other parties acquiring an interest or estate in the property. Consent by the City shall not be required for any transfer or rights pursuant to this Agreement. 4.4 Severabilitv. If any provision of this Agreement is determined to be unenforceable or invalid by a court of law, then this Agreement shall thereafter be modified to implement the intent of the parties to the maximum extent allowable under law. 4.5 Modification. This Agreement shall not be modified or amended except in writing signed by the City and Applicant or their respective successors in interest. 4.6 Merger. This Agreement represents the entire agreement of the parties with respect to the subject matter hereof. There are no other agreements, oral or written, except as expressly set forth herein. 4.7 Duty of Good Faith. Each party hereto shall cooperate with the other in good faith DEVELOPMENT AGREEMENT 4 to achieve the objectives of this Agreement. The parties shall not unreasonably withhold requests for information, approvals or consents provided for, or implicit, in this Agreement. 4.8 Disclosure Upon Transfer . Applicant agrees that in the event of a proposed sale, gift, transfer, segregation, assignment or devise of the Property, Applicant shall disclose the existence of this Agreement to the interested party. 4.9 No Presumption Against Drafter. This Agreement has been reviewed and revised by legal counsel for all parties and no presumption or rule that ambiguity shall be construed against the party drafting the document shall apply to the interpretation or enforcement of this agreement. 4.10 Notices. All communications, notices and demands of any kind which a party under this Agreement is required or desires to give to any other party and be either (1) delivered personally, (2) sent by facsimile transmission with an additional copy mailed first class, or (3) deposited in the U.S. mail, certified mail postage prepaid, return receipt requested, and addressed as follows: If to the City: City of Arlington 238 North Olympic Ave. Arlington, WA 98223 If to the Applicant: Pacer-Enviro Propane, L.L.C. P.O. Box 171 Arlington, WA 98223 Notice by hand delivery or facsimile shall be effective upon receipt. If deposited in the mail, notice shall be deemed received 48 hours after deposit. Any party at any time by notice to the other party may designate a different address or person to which such notice shall be given. IN WITNESS WHEREOF, the undersigned have set their hands the day and date set out next to their signatures. DEVELOPMENT AGREEMENT 5 APPLICANT/PROPERTY OWNER: PACER-ENVIRO PROPANE, L.L.C. Date ________________ By: _________________________ CITY OF ARLINGTON: Date __________________ By: __________________________ City Administrator Approved as to Form: __________________________ City Attorney City of Arlington Council Agenda Bill AGENDA ITEM: ATTACHMENT H COUNCIL MEETING DATE: August 9th 2010 SUBJECT: Authority to Advertise for Bid Proposals DEPARTMENT OF ORIGIN: Executive/ Paul Ellis 4603 ATTACHMENTS: Rendering and floor plans EXPENDITURES REQUESTED: Project Budget $1,700,000.00 BUDGET CATEGORY: Capital Facilities LEGAL REVIEW: Pending DESCRIPTION: The proposed Station 46 Renovation project would demolish the living quarters on the South end of the building and replace it with a 3900 square foot two story structure that will provide the living space for the increased staffing needs of the service area. A new roof over the truck bays will replace the current aging metal roof and the old administration building will be demolished to provide parking and an area to wash fire apparatus. The project will be advertised for competitive bids in September 2010 with a goal of breaking ground mid October. HISTORY: Fire Station # 46 is located 137 North MacLeod. The original portion of the building was constructed in 1961. It was expanded in 1972 with the addition of the Northern truck bays. Currently the living area is too small to accommodate the staffing levels required for the service area and the building design will not structurally support a second floor addition. The roof is failing and past the point of repair. Leaks both over the truck bays and in the living area can no longer be fixed. COMMITTEE REVIEW AND ACTION: ALTERNATIVES: RECOMMENDED ACTION: Discussion item only