HomeMy WebLinkAbout300 N West Ave_BLD6343_2025 CITY OF ARLINGTON
18204 59th Avenue NE, Arlington, WA 98223
INSPECTIONS: 360-403-3417 - Permit Center: 360-403-3551
BUILDING PERMIT
300 N WEST AVE Permit #: 6343
PERMIT EXPIRES 180 DAYS AFTER
Parcel #: 31050200302300
DATE OF ISSUANCE.
Scope of Work: Demolish the large building Valuation: 1.00
OWNER APPLICANT CONTRACTOR
HACIENDA CUSTOM WOODWORK Hacienda Custom Woodwork/Elda Hacienda Custom Woodwork LLC
LLC Villalobos
23213 239TH PL SE 23703 114 ave e 23703 114th Ave E
MAPLE VALLEY, WA 98038 Graham wa Graham , WA 98338
206-922-9330 2069229330
LIC: 603293981 EXP: 02/28/2026
LIC: HACIECW860L6 EXP: 09/20/2026
MECHANICAL CONTRACTOR PLUMBING CONTRACTOR
LIC #: EXP: LIC #: EXP:
JOB DESCRIPTION
PERMIT TYPE: DEMOLITION CODE YEAR: 2021
STORIES: 1 CONST. TYPE: lA
DWELLING UNITS: OCC GROUP: B; Business
BUILDINGS: OCC LOAD:
PERMIT APPROVAL
The issuance or granting of this permit shall not be construed to be a permit for, or approval of, any violation of this Code or any
other ordinance or order of the City, of any state or federal law, or of any order, proclamation, guidance advice or decision of the
Governor of this State. To the extent the issuance or granting of this permit is interpreted to allow construction activity during any
period of time when such construction is prohibited or restricted by any state or federal law, or order, proclamation, guidance advice
or decision of the Governor of this State, this permit shall not authorize such work and shall not be valid. The building official is
authorized to prevent occupancy or use of a structure where in violation of this Code, any other City ordinances of this jurisdiction or
any other ordinance or executive order of the City, or of any state or federal law, or of any order, proclamation, guidance advice or
decision of the Governor. The building official is authorized to suspend or revoke this permit if it is determined to be issued in error or
on the basis of incorrect, inaccurate or incomplete information, or in violation of any City ordinance, regulation or order, state or
federal law, or any order, proclamation, guidance or decision of the Governor.
I AGREE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUCTION AND IN DOING THE WORK
AUTHORIZED THEREBY; NO PERSON WILL BE EMPLOYED IN VIOLATION OF THE LABOR CODE OF THE
STATE OF WASHINGTON RELATING TO WORKMEN'S COMPENSATION INSURANCE AND RCW 18.27.
THIS APPLICATION IS NOT A PERMIT UNTIL SIGNED BY THE BUILDING OFFICIAL OR HIS/HER DEPUTY AND
ALL FEES ARE PAID.
IT IS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL A FINAL INSPECTION HAS BEEN
MADE AND APPROVAL OR A CERTIFICATE OF OCCUPANCY HAS BEEN GRANTED. IBC110/IRC110.
SALES TAX NOTICE: Sales tax relating to construction and construction materials in the City of Arlington must be reported on
your sales tax return form and coded City of Arlington #3101.
02/10/2025
Applicant Signature Date Building Official Date
CONDITIONS
Enviornmental specialist shall be onsite for the demolition and a post assessment shall be submitted to the city once the demolition is
complete. Existing sewer lines shall be cut and capped prior to demolition and shall be inspected by the wastewater department.
Contact the City of Arlington Public Works Department at 360-435-3526 for notification of demolition for water and wastewater
inspections.
The property owner shall ensure that the construction project complies with all applicable zoning codes and regulations. The property
owner shall also ensure that the construction project does not cause any adverse impact on the surrounding environment or
community. The property owner shall be responsible for obtaining all necessary permits and approvals from the relevant authorities
before commencing construction. The property owner shall ensure that the construction project complies with all applicable design
review requirements.
THIS PERMIT AUTHORIZES ONLY THE WORK NOTED. THIS PERMIT COVERS WORK TO BE DONE ON PRIVATE
PROPERTY ONLY. ANY CONSTRUCTION ON THE PUBLIC DOMAIN (CURBS, SIDEWALKS, DRIVEWAYS,
MARQUEES, ETC.) WILL REQUIRE SEPARATE PERMISSION.
PERMIT FEES
Date Description Fee Amount
02/13/2025 Web Only - Demolition $100.00
02/13/2025 Processing/Technology $25.00
02/13/2025 Inspection $75.00
02/13/2025 Credit Card Service $3.00
Total Due: $203.00
Total Payment: $203.00
Balance Due: $0.00
CALL FOR INSPECTIONS
Call by 3:30 pm for next day inspection, allow 48 hours for Fire Inspections
When calling for an inspection please leave the following information:
Permit Number, Type of Inspection being requested, and whether you prefer morning or afternoon
INSPECTION INFORMATION Pass/Fail
S I T E P L A N
ϯϬϬ N tÄžÆÆš AǀĞŶƵĞ
AƌůÅŶůšÅ½Å¶Í• tA ϵϴϮϮϯ
PĂƌÄĞů IDÍ— ϯÏϬϱϬϮϬϬϯϬϮϯϬϬ
scale 1"=20'
LŽƚ ĂƌĞĂ͗ Ϭ͘Ϯϰ AÄÆŒÄžÆ
PĂƉĞƌ SÅnjĞ͗ ÏÏΗdžÏϳΗ
PƌŽƉĞƌƚLJ ůÅŶĞ
ϵϮΖ
ϯϯΖ PƌŽƉĞƌƚLJ ůÅŶĞ
ϯϰΖ
ƌŽŽĨůÅŶĞ
ϲϲΖ
ϮϵΖ
ÇĂůů ůÅŶĞ N tÄžÆÆš AǀĞ
ƌŽŽĨůÅŶĞ ÇĂůů ůÅŶĞ
NŽ͘ϯϬϬ ÏϬϴΖ
ÏϬϱΖ EXISTING ϰϬΖ
BUILDING ƌŽŽĨůÅŶĞ
ϲϴΖ
ϯϰΖ ϯϯΖ
PƌŽƉĞƌƚLJ ůÅŶĞ
ÇĂůů ůÅŶĞ
ϮϲΖ
ϯϮΖ
ϯϮΖ
ϱΖ ÏϬϮΖ
PƌŽƉĞƌƚLJ ůÅŶĞ
Permit #: 6343
Permit Date: 02/04/25
Permit Type: DEMOLITION
Project Name: Demoliton old building
Applicant Name: Hacienda Custom Woodwork/Elda Villalobos
Applicant Address: 23703 114 ave e
Applicant, City, State, Zip: Graham wa
Contact: Elda Villalobos
Phone: 206-922-9330
Email: eldaymanuel@msn.com
Scope of Work: Demolish the large building
Valuation: 1.00
Square Feet: 1
Number of Stories: 1
Construction Type: lA
Occupancy Group: B; Business
ID Code:
Permit Issued: 02/13/2025
Permit Expires: 08/12/2025
Form Permit Type: DEMOLITION
Status: EXPIRED
Assigned To: Hannah Hardwick
Property
Parcel # Address Legal Description Owner Name Owner Phone Zoning
621 Laundering, Dry
HACIENDA CUSTOM
31050200302300 300 N WEST AVE Cleaning & Dyeing
WOODWORK LLC
Services
Contractors
Contractor Primary Contact Phone Address Contractor Type License License
#
Hacienda Custom Woodwork CONSTRUCTION
2069229330 23703 114th Ave E UBI 603293981
LLC CONTRACTOR
Hacienda Custom Woodwork CONSTRUCTION
2069229330 23703 114th Ave E Construction Contractor HACIECW860L6
LLC CONTRACTOR
Fees
Fee Description Notes Amount
Web Only - Demolition Enter 1 if permit is for demolition
$100.00
Processing/Technology
$25.00
Inspection
$75.00
Credit Card Service
$3.00
Total
$203.00
Attached Letters
Date Letter Description
02/10/2025 Building Permit
02/04/2025 Web Form - Building Application
Payments
Date Paid By Description Payment Type Accepted By Amount
02/04/2025 XBP Conf: 222218979
$100.00
02/07/2025 XBP Conf: 222562223
$100.00
02/07/2025 Elda Vegas 2225862223 Hannah Hardwick
$3.00
Outstanding Balance
$0.00
Notes
Date Note Created By:
07/24/2025 sent expiration notice Hannah Hardwick
06/27/2025 sent expiration notice Hannah Hardwick
02/10/2025 emailed applicant for contractor information. Hannah Hardwick
02/10/2025 Contractor needs to add COA to UBI Hannah Hardwick
Email sent to applicant:
Hello Jose,
02/07/2025 I spoke with our staff regarding this today. We can proceed with the permit application, but we will condition the permit Hannah Hardwick
that an environmental professional will have to be present for the demo and a post assessment will have to be made after
the demolition. I will proceed with processing the permit application. Please let me know if you have any questions.
02/05/2025 Property Alert states we need environmental study prior to permit issuance. Hannah Hardwick
email sent to applicant:
Hello,
02/05/2025 As part of the review for the demolition permit, a Phase II Environmental Site Assessment must be submitted to Hannah Hardwick
determine any additional material that may need to be removed in addition to the structure. Please let me know if you
have any questions.
Uploaded Files
Date File Name
02/13/2025 24222545-2025_BLD6343_IssuedPermit.pdf
02/04/2025 3874bd95a261be149715e8194b1c0dc3_img_2191_2.jpg
02/04/2025 66ef6728478c2ed8f23ef9d2719b2278_building_demolition_application.pdf
02/04/2025 53dcbe46c7250b438c4201f65c9eb1b8_300_n_west_ave_arlington_wa_98223-model.pdf