HomeMy WebLinkAboutResolution No. 2019-023 Adopting the Official Six Year Transportation Improvement Plan for the City of Arlington RESOLUTION NO. 2019-023 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF ARLINGTON, WASHINGTON ADOPTING THE OFFICIAL SIX YEAR TRANSPORTATION IMPROVEMENT PLAN FOR THE CITY OF ARLINGTON WHEREAS, the City of Arlington has the responsibility to plan for transportation improvements within the City pursuant to the Growth Management Act and RCW 36.70A.070; and WHEREAS, the City Council considered the proposed six year transportation improvement plan (TIP) at their City Council workshop on September 23, 2019, and at a public hearing conducted on November 4, 2019 and determined approving the six year TIP was in the best interest of the City and its citizens; NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF ARLINGTON, WASHINGTON, DO HEREBY RESOLVE: SECTION 1. That certain comprehensive Transportation Improvement Plan for the six years commencing July 1, 2020 as detailed in the attached "Exhibit A" is hereby adopted as the Official Six Year Transportation Improvement Plan for the City of Arlington. PASSED at a regular meeting of the City of Arlington, Washington held on the 4tn day of November, 2019. CITY OF ARLINGTON a- tky' Barbara Tolbert, Mayor ATTEST: 7/z 1 4&x eddy Wendy Va Der Meersche, City Clerk APPROVED AS TO FORM: Steve . P ff e Ci ttorney 1. MUM 0 2020 2021 2023-2025 6 YEAR SUMMARY PROJECT NAME AND DESCRIPTION Z 2019 OBLIG 2020 OBLIG 2021 OBLIG& 2022-2024 a &PHASE* CITY FUNDS OTHER FUNDS FUND SOURCE &PHASE CITY FUNDS OTHER FUNDS FUND SOURCE PHASE CITY FUNDS OTHER FUNDS FUND SOURCE OBLIG&PHASE CITY FUNDS OTHER FUNDS FUND SOURCE CITY FUNDS OTHER FUNDS 6 YR.PROJECT COST • • • � • . 1 1 . 1 1 1 1 1 11 1 1 1 1 COA 74th St Trail Segment 0 0 75 75 ARL-TIF 710 35 Non-Moto 75 710 785 Construct a multiuse(ped/bike)trail along the west side of 741h Ave between north end of PE CN 675 UNFUNDED Arlington Valley Rd trail and 204th St trail segment 2 COA Gilman Trail Segment 0 0 75 75 ARL-TIF 675 75 675 750 Construct a 12-ft wide multiuse trail connecting the Centennial Trail to Country Charm Park PE CN 675 UNFUNDED 3 COA 2nd Street Sidewalk Completion 0 480 65 0 0 65 415 480 Project to install sidewalks on 2nd St(French Ave to Washington Ave)where none exists. ALL 415 UNFUNDED 4 JCOA 63rd Ave Trail-Gap Project to connect 197th to Cemetery Road 0 0 75 75 ARL-TIF 0 75 0 75 Extend 12-ft wide multiuse trail behind the cemetery to Cemetery Road PE CN 5 . 59th/188th Sidewalk and connectivity improvements 530 530 TIB-CS 40 40 TIB-CS 0 0 0 570 570 Sidewalks,parking,ADA ramps,street trees,public art. Funding is from Compete Streets Grant ALL CN 6 . Non-Motorized Improvements-Cemetery Rd(47th Ave/188th St 0 1,000 0 0 0 11000 11000 Create protected bike lanes,connect sidewalks,improve existing airport trail(fencing to meet ALL 1,000 UNFUNDED meet FAA requirements)Target Complete Streets or Non-Motorized Funding Opportunities 7 DEV 204th Portage Creek Trail 80 80 DEV 220 220 DEV 0 0 0 300 300 Multi use Trail along Portage Creek from HWY 9 to Centennial Trail. ALL ALL $ DEV Multi Use Trail From Portage Creek Trail to Hazel(HWY 9) 0 0 0 0 0 0 0 Multi use Trail along Highway 9(west side)to Hazel,then along Hazel(east side)to Highland intersection PE CN 9 COA Multi Use Trail From 204th to Crown Ridge Blvd(HWY 9) 0 0 0 0 0 0 0 Multi use Trail along Highway 9(east side)to Crown Ridge Blvd,trail to be vertically separated from highway tm IPE CN 10 . 59th Sidewalk gap project 0 0 1,000 20 200 DEV 0 20 980 11000 Connect gaps in sidewalk on east side of 59th and improvements to Airport Trail on east side ALL 780 UNFUNDED Target Complete Streets or Non-Motorized Funding Opportunities 11 COA lGilman Loop Trail-Gilman to 88th Dr NE 0 0 0 0 0 0 0 Trail connecting Country Charms Park to 88th Dr. From Gilman Ave PE CN 12 COA Bluff Trail—188th St to Smokey Point Blvd 0 0 0 0 0 0 0 Trail(1 2-foot wide)connecting 188th St to Smokey Point Blvd along the bluff PE CN 13 1CoA Burke Trail—Centennial Trail to Eagle Trail 0 0 0 0 0 0 0 Connect the Eagle Trail to the Centennial Trail through Haller Park PE CN 14 nLv Country Charm Access—Gilman to Country Charm Park 0 0 0 0 0 0 0 COA Connect the Gilman Trail to the County Charm Park with a trail/access driveway. IPE CN Page 1 2020 6yrT1P ProgctL nt VEAL 10 30 19) 2020 2021 2023-2025 6 YEAR SUMMARY Ld- d PROJECT NAME AND DESCRIPTION 2019 OBLIG 2020 oauc 2021 OBLIG& 2022-2024 &PHASE* CITY FUNDS OTHER FUNDS FUND SOURCE &PHASE CITY FUNDS OTHER FUNDS FUND SOURCE PHASE CITY FUNDS OTHER FUNDS FUND SOURCE OBLIG&PHASE CITY FUNDS OTHER FUNDS FUND SOURCE CITY FUNDS OTHER FUNDS 6 YR.PROJECT COST Developer driven and funded project. 15 JCOA Country Charm Park Trail and Connection to Twin Rivers Park 0 0 0 0 0 0 0 Construct a walking trial loop within Country Charm Park. PE CN Connect Country Charm Park to Twin Rivers Park. Requires a bridge. 16 ICOA Edgecombe Trail—172nd to City Limits 0 0 0 0 0 0 0 Connect 172nd to Marysville Edgecombe creek trail,along the re-aligned Edgecombe Creek PE CN 17 1111011iffFrontage Trail—211th to Portage Creek Wildlife Refuge 0 0 0 0 0 0 0 SN(X.'O Trail would connect Centennial Trail to the Portage Creek Wildlife Refuge PE CN 18 Gleneagle Trail—Centennial Trail to Arlington High School 0 0 0 0 0 0 0 Trail would connect Centennial Trail to Arlington High School through Gleneagle PE CN 19 COA Olympic Ave Ped Improvements 0 300 300 0 0 300 0 300 Stop sign at 1st Ave,Bulb out ramps at crossings ALL PE Target Complete Streets or Non-Motorized Funding Opportunities 20 . 67th BNSF Rall/Trall Crossing Improvement 0 0 0 0 0 0 0 Realign and improve the Centennial Trail crossing at BNSF RR on 67th Ave PE CN 21 . 188th BNSF RaiUTrafl Crossing Project 0 0 0 500 100 400 UNFUNDED 100 400 500 Extend trail across BNSF RR to intersection at 67th Ave on 188th ST PE ALL Target Complete Streets or Non-Motorized Funding Opportunities 22 COA Annual Sidewalk Program 20 20 60 60 TBD 80 80 TBD 300 300 TBD 20 440 460 Repair existing sidewalks;citywide CN CN CN CN Include in TBD in 2021 INTERSECTIONTRAFFIC SAFETY/ •VEMENTS 3,452 802 2,650 1,130 130 1,0001 1 1 •0 23 COA Island Crossing Temporary Signal 0 0 0 0 0 0 0 Install temporary signal at SR530 and Smokey Point Blvd 24 1coA 204th St and 74th Ave Intersection Improvement(Proj#1.9) 940 140 800 UNFUNDED 0 0 140 Boo 940 Install control and pedestrian improvements at the 204th St and 74th Ave intersection. ALL 25 COA 204th St and 77th Ave Roundabout(Pro,-7 2,350 500 1,850 TIB GRANT 0 0 0 500 11850 2,350 Install roundabout at 204th St and 77th Ave intersection ALL 26 1coA 40th Ave Intersection Improvement(Proj#1.13) 72 72 1,000 0 0 72 1,000 1,072 Install intersection control at40th Ave/172nd St(SR-531) PE ALL 1,000 UNFUNDED 27 COA ntersection Improvements 67th and 188th 10 10 10 10 0 0 20 0 20 Convert to a controlled intersection. PE CN Page 2 2020 6yrT1P ProgctL nt VEAL 10 30 19) 2020 2021 2023-2025 6 YEAR SUMMARY PROJECT NAME AND DESCRIPTION Z 2019 OBLIG 2020 oauc 2021 osuc& 2022-2024 a C,' &PHASE* CITY FUNDS OTHER FUNDS FUND SOURCE &PHASE CITY FUNDS OTHER FUNDS FUND SOURCE PHASE CITY FUNDS OTHER FUNDS FUND SOURCE OBLIG&PHASE CITY FUNDS OTHER FUNDS FUND SOURCE CITY FUNDS OTHER FUNDS 6 YR.PROJECT COST 28 1coA Radius Improvements 172nd and 91st Ave 0 0 0 250 250 DEV 0 250 250 Increase radius,improve site distance,reduce speeds,adjust grade of cross section.Connect sidewalks. 29 1coA Analysis of intersection at SP8/172n 1 80 80 120 120 0 0 200 0 200 Study of intersection for improved traffic flow. PE PE 30 JCOA Airport Blvd/188th St NE Intersection Improvement Ad0 0 01 01 0 0 0 Install a roundabout at the Airport Blvd/188th St NE intersection PE CN 31 ODA 211TH PL-67th AVE to SR 530 0 0 0 0 0 0 0 Rehabilitate 59th Ave into a 3-lane roadway with sidewalks,connect to 211th PI Extension 32 100A Burn Road Rehabilitation 0 0 0 0 0 0 0 Rehabilitate Burn Road to address instability issues and stream channel. 33 JCOA Highland Dr.Corridor-SR9 to Stillaguamish Ave(Proj#R-5 and#T4) 50 50 125 125 3,550 450 3,100 UNFUNDED 0 625 3,100 3,725 Project to upgrade the Highland Drive corridor from SR-9 to Stillaguamish Ave to arterial standards PE RW CN 34 JCOA Smokey Pt Blvd Design-174th Ave to 200th Ave(Proj#R-30) 0 403 53 350 PSRC 570 70 PSRC 75 10 PSRC 133 915 1,048 Complete preliminary planning,public outreach,engineering design,and ALL 500 UNFUNDED 65 UNFUNDED ROW plan for corridor improvements to expand Smokey Point Blvd 35 ICOA SR-531Corridor Rehabilitation(Proj#R-14S) 0 1,300 260 PSRC/STP 0 0 260 1,040 1,300 Roadway and corridor improvements on 172nd St(SR-531)from 43rd Ave to Smokey Point Blvd. All 1,040 UNFUNDED 36 DEV 51stAve Improvements(Proj#R-20)-172nd to South City Limits 0 500 500 DEV 1,000 1,000 DEV 4,000 WSDOT/TIB 0 5,500 5,500 Extend 51st Ave as a five-lane roadway from SR-531 to south Arlington city limits ALL 4,000 UNFUNDED 37 JCOA 43rd Ave improvements-SR531 to 180th St 0 0 0 0 0 0 0 Construct a 3-lane road section with sidewalks and bike lanes PE CN 38 DEV 204th corridor Improvements-74thto69th 100 20 80 DEV 2,000 2,000 DEV 750 250 500 DEV 0 270 2,580 2,850 COA Construct a 3-lane road section with sidewalks and bike lanes PE CN CN 39 IDEV Smokey Point Blvd Safety Improvements 179th to 172nd 140 100 40 DEV 0 0 0 100 40 140 Construct restricted access and medians to improve safety.LID Project ALL 40 COA Smokey Point Blvd North 0 0 0 0 0 0 0 Reconstruct SPB from 200th to SR530 with a 3lane section Page 3 2020 6yrT1P ProgctL nt VEAL 10 30 19) 2020 2021 2023-2025 6 YEAR SUMMARY O PROJECT NAME AND DESCRIPTION Z 2019 OBLIG 2020 OBUG 2021 OBLIG& 2022-2024 a (7 &PHASE* CITY FUNDS OTHER FUNDS FUND SOURCE &PHASE CITY FUNDS OTHER FUNDS FUND SOURCE PHASE CITY FUNDS OTHER FUNDS FUND SOURCE OBLIG&PHASE CITY FUNDS OTHER FUNDS FUND SOURCE JCITY FUNDS OTHER FUNDS 6 YR.PROJECT COST 41 COA 172nd from HWY 9 to 91st 0 0 0 0 0 0 0 Improve 172nd to a 3 lane section from Highway 9 roundabout east to 91st Ave NE 42 IDEV 91st Ave NE Improvements 0 0 0 0 0 0 0 Improve gist Ave NE to a 3-lane road section 43 ICOA 59th Ave NE Improvements 0 0 0 0 0 0 0 DEV Improve 59th Ave NE to a 3-lane road section with sidewalk and on street parallel parking on the east and an improved trail section on the west 44 JODA 188th St NE Improvements from 59th Ave NE to 67th Ave NE 0 0 0 0 0 0 0 Improve 188th St NE to a 3-lane road section with sidewalk on the south and a trail section on the north 45 1coA Tveit Rd Improvements from Stillaguamish Ave to City Limits 0 0 0 0 0 0 0 Improve Tveit Road to a 3-lane section with sidewalk on the south side and a mixed-use trail on the north side 46 IDEV 180th St NE Improvements from 59th Ave NE to end of road F 20 DEV 0 0 0 0 20 20 Improve 180th St NE to a 2-lane industrial road section with an improved trail section on the north side 47 DEV 183rd Extension from Smokey Point Blvd to Airport Property 0 0 0 0 0 0 0 Construct a 3-lane road section with sidewalks and bike lanes PE CN 48 63rd Ave Phase 5 Improvements from 188th to 197th 0 0 0 0 0 0 0 Extend 63rd Ave as a three-lane roadway with 12-ft wide multiuse trail. PE CN Realign intersection at 188th to the east,add trail at east side of road. 49 COA Hazel St Improvements 0 0 0 0 0 0 0 Improve Hazel St to a 3 lane urban section with sidewalks and mixed use trail PE CN PROJECTSNEW ALIGNMENT 1 . 200 1 850 10 320 1,275 9045 6 380 950 5430 0 0 0 2,425 16,325 18 750 50 DEV 59th Extension from 195th to Cemetery Road 0 450 100 350 DEV 0 0 100 350 450 COA Construct 3 lane roadway with mixed use trail and intersection improvements at Cemetery Road. ALL 51 COA _jjjjjWfend Arlington Valley Road from 191st to 188th 0 0 0 0 0 0 0 Construct a 3-lane road section with mixed use trail.Wetland delineation to be determined in feasibility stage. PE ICN 52 IDEv 180 the Extension from Smokey Point Blvd to Airport Property 0 50 50 DEV 400 400 DEV 0 0 450 450 Construct a 3-lane road section with sidewalks and bike lanes PE ALL 53 COA 180 th Extension from Airport Property to Airport Blvd 0 50 25 25 DEV 800 50 0 75 775 850 Construct a 3-4ane road section with sidewalks and bike lanes PE ALL 750 UNFUNDED Page 4 2020 6yrT2 ProgctL nt VEAL 10 30 19) 1110MISITIVA: 2020 2021 2023-2025 6 YEAR SUMMARY O PROJECT NAME AND DESCRIPTION Z 2019 OBLIG 2020 oauc 2021 osuc& 2022-2024 a C7 &PHASE* CITY FUNDS OTHER FUNDS FUND SOURCE &PHASE CITY FUNDS OTHER FUNDS FUND SOURCE PHASE CITY FUNDS OTHER FUNDS FUND SOURCE OBLIG&PHASE CITY FUNDS OTHER FUNDS FUND SOURCE CITY FUNDS OTHER FUNDS 6 YR.PROJECT COST 54 ODA 188th St NE Tunnel Extension through Airport Property 0 0 0 0 0 0 0 Construct a tunnel and two-lane road with shoulders and mixed use trail PE CN Tunnel should be wide enough to expand to a 4-lane roadway in the future with a mixed-use trail 55 1COA 183rd Extension from Developer Project(183rd)to Airport Blvd 0 0 0 0 0 0 0 Construct a 3-4ane road section with sidewalks and bike lanes PE CN 56 IDEV 211TH PL Extension to 59th AVE(Proj#Dev-1) 0 0 0 0 0 0 0 COA Install a 3-lane urban connector road and sidewalks between 211th Place and 59th Ave I PE CN and install a multiuse trail in critical area buffer 57 IDEV 169th St Extension Phase 1 SPB to 38th Ave(Affinity Property)(Proj#R-19) 1,000 1,000 DEV 0 0 0 0 1,000 11000 Extend 169th St as a three lane urban roadway from Smokey Point Blvd to 38th Ave(Affinity lot). CN 58 100A 169th St/40th Ave Extension-Phase 2 0 100 100 1,500 250 0 350 1,250 1,600 Extend 169th St as a two lane urban roadway with multiuse trail from 38th Ave to 43rd PE CN 1,250 UNFUNDED (Bulldog Storage and Walmart Properties)and 40th(2 lane)from 171 to 169th. 59 IDEV 169thSt from 43rd Ave to51st Ave-Phase3 50 50 DEV 1,500 1,500 DEV 0 0 0 1,550 11550 Extend east-west street as a three lane urban roadway with multiuse trail from 67th to Arlington Valley Road PE 60 COA 169th St from 51st Ave to 59th Ave-Phase 4 0 0 01 01 0 0 0 Extend 169th St as a three lane urban roadway with multiuse trail from 51st to 59th Ave. PE CN 61 IDEV 169th St from 59th Ave to 67th Ave—Phase 5 0 0 0 0 0 0 0 Extend 169th St as a two lane urban roadway with multiuse trail from 59th to 67th. PE CN 62 DEV 199th/197thSt Extension(GaytewayPro%ect) 0 550 50 500 DEV 1,700 500 0 550 1,700 2,250 COA 67th Ave to Arlington Valley Rd connector-Industrial section with multiuse trail. 1,200 UNFUNDED 63 COA 173rd St,Phase 1-SPB to 40th AVE(Pro%#R-28) 0 2,870 500 LID 730 150 LID 0 650 2,950 3,600 Project includes construction of new road and pedestrian facilities between Smokey Pt Blvd and 40th Ave. ALL 2,370 UNFUNDED 580 UNFUNDED 64 COA 173rd St,Phase 2(Proj#R-28) 0 0 0 0 0 0 0 Project includes redesign of road alignment and construction of new road and pedestrian facilities btwn 40th a d Ave PE CN 65 CoA 173rd St,Phase 3 43rd to Airport Blvd(Pro%#R-27) 0 3,250 500 300 AIRPORT 0 0 500 2,750 3,250 Project includes redesign of road alignment and construction of new road between 43rd Ave and Airport Blvd ALL 2,450 UNFUNDED 66 COA 47th Ave in Airport Business Park(Proj#R-21A) 0 0 01 0 0 0 Design,permit and construct 2-lane road through Airport Business Park extending from 173rd to Airport Blvd PE CN Page 5 2020 6yrT1P ProgctL nt VEAL 10 30 19) 1110MISITIVA: 2020 2021 2023-2025 6 YEAR SUMMARY O PROJECT NAME AND DESCRIPTION Z 2019 OBLIG 2020 oauc 2021 osuc& 2022-2024 a C7 &PHASE* CITY FUNDS OTHER FUNDS FUND SOURCE &PHASE CITY FUNDS OTHER FUNDS FUND SOURCE PHASE CITY FUNDS OTHER FUNDS FUND SOURCE OBLIG&PHASE CITY FUNDS OTHER FUNDS FUND SOURCE JCITY FUNDS OTHER FUNDS 6 YR.PROJECT COST 67 IDEv from 169th South to City Limits 0 0 0 0 0 0 0 Construct 47th as a 3lane industrial section from 169th south to city limits PE CN 68 IDEv I 63rd Ave Phase 1 PUD Site to Smartcap 188th Site 500 500 DEV 0 0 0 0 500 500 COA Extend 63rd Ave as a three-lane roadway from PUD improvements ALL 69 IDEv 63rd Ave Phase 2 188th south through HCI Property 100 100 DEV 0 0 0 0 100 100 COA Extend 63rd Ave as a three-lane roadway with 12-ft wide multiuse trail ALL 70 IDEV 63rd Ave Phase 3 Gap from HCI to Smartcap 50 50 350 0 0 50 350 400 COA I Extend 63rd Ave as a(2 lane alley)to be increased to a PE CN 350 UNFUNDED three-lane roadway with 12-ft wide multiuse trail by future development 71 COA 63rd Ave Phase 4 Gap from PUD site to 172nd 15U 150 750 1,250 0 150 2,000 2,150 Extend 63rd Ave as a three-lane roadway with 12-ft wide multiuse trail. PE RW 750 UNFUNDED 1,250 UNFUNDED 72 IDEv 74th Ave Extension from 204th North to Portage Creek 200 200 DEV 0 0 0 0 200 200 Extend 74th Ave as a 3 lane urban section from the intersection at 204th to Portage Creek ALL RW UNFUNDED 73 InEv 74th Ave Extension Portage Creek to Hazel St 0 0 0 0 0 0 0 Extend 74th Ave as a 3 lane urban section from Portage Creek,including the bridge expansion,to Hazel St PE CN 74 IDEv 71st Ave Extension from 204th to 74th Ave 0 400 400 DEV 0 0 0 400 400 Extend 71st Ave as a 3 lane urban section from the intersection at PE CN 204th northeast to meet up with and interconnect to 74th Ave 75 180th St NE Extension from BSNF Railway to 67th Ave NE 0 0 01 0 0 0 0 Extend 180th St NE from current end near BNSF railway to 67th Ave NE PE CN including new crossing over the railroad tracks 76 jCoA jSmokeyPtBhdOverI8Y 73 73 TBD 915 189 TBD 0 0 0 988 988 Pavement preservation project on SPB from S City limits to 174th St. PE ALL 726 PSRC/STP 77 COA ANNUAL PAVEMENT PRESERVATION PROGRAM 1,100 1,100 TBD 1,1001 1,100 TBD 1,100 1,100 TBD 1,100 1,100 TBD 0 4,400 4,400 MISCELLANEOUS LOCATIONS DETERMINED BY PAVEMENT CONDITION ALL ALL ALL ALL Page 6 2020 6yrT1P ProgctL nt VEAL 10 30 19) 1110MISITIVil: 2020 2021 2023-2025 6 YEAR SUMMARY O PROJECT NAME AND DESCRIPTION Z 12019 OBLIG 2020 oauc 2021 osuc& 2022-2024 a C7 &PHASE* CITY FUNDS OTHER FUNDS FUND SOURCE &PHASE CITY FUNDS OTHER FUNDS FUND SOURCE PHASE CITY FUNDS OTHER FUNDS FUND SOURCE OBLIG&PHASE CITY FUNDS OTHER FUNDS FUND SOURCE CITY FUNDS OTHER FUNDS 6 YR.PROJECT COST 61,625 1,02560,600 1,550 76,10077,650 78 mDDT ISLAND CROSSING ROUNDABOUT 0 0 0 10,000 650 WSDOT,PSRC/STP, 650 9,350 10,000 COA CONSTRUCT ROUNDABOUT AT SR 530 AND SMOKEY POINT BLVD 9,350 UNFUNDED COUNTY S= 79 jvsayr ISR 530159TH ROUNDABOUT 0 0 0 01 0 0 0 COA INSTALL ROUNDABOUT AT 59TH AVE AND SR 530 PE CN 80 mix)rr 172nd and 63rd Ave Roundabout 0 250 WSDOT 250 WSDOT 0 0 500 500 COA Roundabout at intersection of 63rd and 172nd 250 UNFUNDED 250 UNFUNDED 81 JmDoT SR530/BurkeSignalization (Proj#1-7) 0 75 75 1,350 WSDOT 0 75 1,350 1,425 COA Installation of signal and improvements at SR9/SR530 1,350 UNFUNDED 82 WSDOT SR530/SR9/Division Signal(Proj#I.6) 0 0 0 2,625 75 WSDOT,PSRC/STP 75 2,550 2,625 COA Installation of improved signalization and channelization at SR530/SR9/Division intersection 2,550 UNFUNDED Page 7 2020 6yrT1P ProgctL mt VEAL 10 30 19) 2020 2021 2023-2025 6 YEAR SUMMARY O PROJECT NAME AND DESCRIPTION Z 2919 OBLIG 2020 oauc 2021 osuc& 2022-2024 a C7 &PHASE* CITY FUNDS OTHER FUNDS FUND SOURCE &PHASE CITY FUNDS OTHER FUNDS FUND SOURCE PHASE CITY FUNDS OTHER FUNDS FUND SOURCE OBLIG&PHASE CITY FUNDS OTHER FUNDS FUND SOURCE CITY FUNDS OTHER FUNDS 6 YR.PROJECT COST 83 ImsDor SR-531Widening Project(Proj#R-14A) 2,450 2,450 WSDOT 5,450 5,450 WSDOT 5,450 5,450 WSDOT 23,750 250 23,500 WSDOT 250 36,850 37,100 COA Project to widen SR-531(172nd Street)between 43rd Ave and 67th Ave. PE RW CN CN 84 JmDorr SR-531 Widening Phase 2 (PraiN/A) 0 0 0 25,000 0 25,000 25,000 COA IThis project proposes to widen SR-531 from 67th Ave to SR-9.Other funding to be determined. ALL 25,000 UNFUNDED 85 IMSDClr SR530/Broadway Intersection Improvement 0 0 0 0 0 0 0 COA Installation of improved signalization and channelization at Burke and Broadway PE CN 86 ICOA 89th from 172nd to 186th Feasibility study 0 150 150 150 150 0 300 0 300 COUNTY Determine location and alignment for connector to the Arlington High School and Crown Ridge Blvd to 172nd PE PE CN BEV 87 WSDOT Freeway On/OH Ramp at 188th 0 0 0 0 0 0 0 COA Create on/off ramp to facility access to the SPB corridor,create alternative routes in/out of the city for traffic 8 d safety. PE CN 88 ImsDoT Portage Creek Trail crossing at HWY 9 0 0 0 0 0 0 0 COA Trail crossing at HWY 9.Connects two segments of the Portage Creek Trail. PE CN 89 111D Smokey Point Local Improvement District 100 50 LID 100 50 LID 100 50 100 50 200 200 400 COA Create LID to improve areas of SPB,169th,40th,172nd,173rd PE 50 UNFUNDED PE 50 UNFUNDED CN 50 UNFUNDED CN 50 UNFUNDED May include Projects#19,27,31,40,and 45 90 1JD SR 530 Corridor Study 50 WSDOT 50 WSDOT 50 WSDOT 150 WSDOT 0 300 300 COA Corridor study PE 50 UNFUNDED CN 50 UNFUNDED CN 50 UNFUNDED CN 150 UNFUNDED Page 8 2020 6yrT1P ProgctL nt VEAL 10 30 19) 2020 2021 2022 2023-2025 6 YEAR SUMMARY O PROJECT NAME AND DESCRIPTION Z 2019 OBLIG 2020 OBLIG 2021 OBLIG& 2022-2024 a &PHASE* CITY FUNDS OTHER FUNDS FUND SOURCE &PHASE CITY FUNDS OTHER FUNDS FUND SOURCE PHASE CITY FUNDS OTHER FUNDS FUND SOURCE OBLIG&PHASE CITY FUNDS OTHER FUNDS FUND SOURCE CITY FUNDS OTHER FUNDS 6 YR.PROJECT COST 1 1,135 68,100 7,025 120.398 STATE,FEDERAL,OTHER AND UNFUNDED FUNDS: DEVELOPER DEVELOPER 1,242 2,070 DEVELOPER 2,483 5,545 DEVELOPER 2,165 2,100 DEVELOPER 1,135 250 DEVELOPER 7,025 9,965 DEVELOPER WSDOT WASH.ST.DEPT OF TRANSPORTATION 2,450 WSDOT 5,450 WSDOT 5,450 WSDOT 23,500 WSDOT 36,850 WSDOT UNFUNDED CITY UNDETERMINED 900 UNFUNDED 9,725 UNFUNDED 11,110 UNFUNDED 42,915 UNFUNDED 64,650 UNFUNDED COUNTY SNOHOMISH COUNTY 0 COUNTY 0 COUNTY 0 COUNTY 0 COUNTY 0 COUNTY TBD TRANSPORTATION BENEFIT DISTRICT 1,173 TBD 1,349 TBD 1,180 TBD 1,400 TBD 5,102 TBD AIR AIRPORT 0 AIR 300 AIR 0 AIR 0 AIR 300 AIR TIB TRANSPORTATION IMPROVEMENT BOARD 2,380 TIB 40 TIB 0 TIB 0 TIB 2,420 TIB PSRC PSRC 0 PSRC 1,076 PSRC 0 PSRC 0 PSRC 1,076 PSRC CMAQ CONGESTION MITIGATION AIR QUALITY 0 CMAQ 0 CMAQ 0 CMAQ 0 CMAQ 0 CMAQ HSIP HIGHWAY SAFETY IMPROVEMENT PROGRAM 0 HSIP 0 HSIP 0 HSIP 0 HSIP 0 HSIP PED-BIKE PEDESTRIAN AND BICYCLE PROGRAM 0 PED-BIKE 0 PED-BIKE 0 PED-BIKE 35 PED-BIKE 35 PED-BIKE SRTS SAFE ROUTES TO SCHOOL 0 SRTS 0 SRTS 0 SRTS 0 SRTS 0 SRTS TIGER TRANSPORTATION INVESTMENT GENERATING ECONOMIC RECOVER 0 BUILD 0 BUILD 0 BUILD 0 BUILD 0 BUILD FMSIB FREIGHT MOBILITY STRATEGIC INVESTMENT BOARD 0 FMSIB 0 FMSIB 0 FMSIB 0 FMSIB 0 FMSIB CDBG COMMUNITY DEVELOPMENT BLOCK GRANT 0 CDBG 0 CDBG 0 CDBG 0 CDBG 0 CDBG DOC DEPARTMENT OF COMMERCE 0 DOC 0 DOC 0 DOC 0 DOC 0 DOC OTHER BOND OR LOAN 0 OTHER OTHER 0 OTHER 0 OTHER 0 OTHER SUB TOT SUB TOT SUB TOT SUB TOT SUB TOT C[TY FUNDS: ART-ST ARTERIAL STREET FUND GM4ST GROWTH MANAGEMENT STREET FUND DEMAND PROJECTED GROWTH MANAGEMENT STREETS REVENUES TM TRAFFIC MITIGATION ANNUAL DEFICIT OR SURPLUS ESTIMATED CARRYOVER SURPLUS OR DEFICIT FROM PREVIOUS YEAR YEAR TO YEAR ESTIMATED ANNUAL SURPLUS OR DEFICIT SUB TOT SUB TOT SUB TOT SUB TOT SUB TOT 8,973 23,485 190840 68,100 1200398 Page 9 2020 6yrT1P ProgctL mt VEAL 10 30 19)