HomeMy WebLinkAbout04-23-18 Council WorkshopSPECIAL ACCOMMODATIONS: The City of Arlington strives to provide accessible meetings for people with disabilities. Please contact the
ADA coordinator at (360) 403‐3441 or 711 (TDD only) prior to the meeting date if special accommodations are required.
WORK SESSION (6:30 to 7:00 p.m.)
Design Standards
Marc Hayes
WORKSHOP CALL TO ORDER (7:00 p.m.)
Mayor Barb Tolbert
PLEDGE OF ALLEGIANCE
ROLL CALL
Mayor Barb Tolbert – Kristin
APPROVAL OF THE AGENDA
Mayor Pro Tem Marilyn Oertle
INTRODUCTION OF SPECIAL GUESTS AND PRESENTATIONS
Chris Collier ‐ Program Manager, Alliance for Housing Affordability
Mayor Barb Tolbert
WORKSHOP ITEMS – NO FINAL ACTION WILL BE TAKEN
1. Public Art Proposals ATTACHMENT A
Staff Presentation: Paul Ellis
Council Liaison: Marilyn Oertle
2. Low Bid Award for the 2018 Utility Improvement and Pavement ATTACHMENT B
Preservation Project
Staff Presentation: Jim Kelly
Council Liaison: Mike Hopson
3. Opal Properties, LLC Release of Easements ATTACHMENT C
Staff Presentation: Jim Kelly
Council Liaison: Mayor Pro Tem Marilyn Oertle
4. Resolution Adopting Updated Fee Schedule ATTACHMENT D
Staff Presentation: Kristin Banfield
Council Liaison: Mayor Pro Tem Marilyn Oertle
Arlington City Council Work Session and Workshop
Monday, April 23, 2018 at 6:30 p.m.
City Council Chambers – 110 E 3rd Street
SPECIAL ACCOMMODATIONS: The City of Arlington strives to provide accessible meetings for people with disabilities. Please contact the
ADA coordinator at (360) 403‐3441 or 711 (TDD only) prior to the meeting date if special accommodations are required.
5. Ordinance Correcting a Typographical Error in Ordinance 2014‐016 ATTACHMENT E
Relating to the Sunset Provision of Utility Taxes
Staff Presentation: Kristin Banfield
Council Liaison: Mayor Pro Tem Marilyn Oertle
6. Construction Services Amendment for Taxiway Charlie Project ATTACHMENT F
Staff Presentation: Lorene Robinson
Council Liaison: Jan Schuette
7. Inter‐fund Loan from Growth Fund to EMS Fund ATTACHMENT G
Staff Presentation: Kristin Garcia
Council Liaison: Mayor Pro Tem Marilyn Oertle
8. March 2018 Financial Report ATTACHMENT H
Staff Presentation: Kristin Garcia
9. Miscellaneous council items
PUBLIC COMMENT
For members of the public who wish to speak to the Council. Please limit your remarks to three minutes.
COUNCILMEMBER REPORTS
EXECUTIVE SESSION
RECONVENE
ADJOURNMENT
Mayor Barb Tolbert
City of Arlington
Council Agenda Bill
Item:
WS #1
Attachment
A
COUNCIL MEETING DATE:
April 23, 2018
SUBJECT:
Public Art Proposals
ATTACHMENTS:
Photos and descriptions
DEPARTMENT OF ORIGIN
Administration, Community Revitalization
EXPENDITURES REQUESTED: None
BUDGET CATEGORY: N/A
LEGAL REVIEW:
DESCRIPTION:
Public Art Proposals:
1. “Steelies” metal fish art for 67th Avenue Medians. Proposal by Monica Bretherton
and Erika Bruss. Value of materials $2,000. 6 fish total.
2. “Rip Rap” metal sculpture by Reg Akright for City Hall plaza. Value $8,500.
3. “Duck Dash” painting reprint on metal by Jack Gunter for Haller Park, size 4ft
wide. Value $2,500
4. “Dancing Bears” metal sculptures by Monica Bretherton for landscape by stage at
Legion Park. Size approximately 4 ft. Value approximately $2,000. One year loan.
5. Haiku Rock for Terrace Park, second addition. Value is $1,000.
HISTORY:
In accordance with the public art policy, the proposals have been reviewed and
recommended by the Public Art Committee and PARC on April 17, 2018.
ALTERNATIVES
Do not accept some or all of the public art pieces.
RECOMMENDED MOTION:
Workshop; discussion only. At the May 7, 2018 council meeting, the recommended
motion will be, “I move to accept the public art pieces into the City’s Public Art
Collection.”
“Steelies” metal powder coated fish art. 6 fish total.
Cutouts would include found steel objects (industrial) welded in, powder coated black.
Donation from Arlington Arts Council
Location: 67th Avenue Medians
Proposal by Monica Bretherton & Erika Bruss
Value of materials $2,000. Size: 5ft long
Would require support from City for installation.
“Rip Rap” metal and stone sculpture
Donation from Arlington Arts Council in memory of
George Boulton.
Location: Next to Plaza, City Hall
Artist: Reg Akright
Value: $8,500 (reduced price for AAC $6,000).
Would require city to provide base and installation.
Incorporate memorial garden for George Boulton.
“Duck Dash” painting reprint on metal
Donation: Arlington Arts Council
Location: Haller Park, new splash pad pump house
Artist: Jack Gunter for Haller Park
Value: $2,500 Size: 4ft wide
Would require city to help with installation.
Metal has anti-graffiti coating. Lifespan is approximately 10 years
“Dancing Bears” metal sculptures
On Loan: Through Monica Bretherton, for approx. one year
Location: Legion Park, next to stage in landscaping
Size: 4 ft tall Value: Approximately $4,000
Haiku Rock for Terrace Park, second addition.
Donation: Arlington Arts Council
Location: Terrace Park
Value is $1,000.
the woods grow mushrooms
on logs or hidden by trees
some are homes for gnomes
- Carl Richardson
City of Arlington
Council Agenda Bill
Item:
WS #2
Attachment
B
COUNCIL MEETING DATE:
April 23, 2018
SUBJECT:
Low Bid for the 2018 Utility Improvement and Pavement Preservation Project
ATTACHMENTS:
Bid Tab
DEPARTMENT OF ORIGIN
Public Works – Jim Kelly
EXPENDITURES REQUESTED: $ 2,399,917.46
BUDGET CATEGORY: Water Capital Fund, Transportation Benefit District
BUDGETED AMOUNT: $2,200,000.00
LEGAL REVIEW:
DESCRIPTION:
Review of apparent low bid and bid tabulation for the 2018 Utility Improvement and Pavement
Preservation Project.
HISTORY:
The City has planned capital improvement projects for the years 2018 – 2021 for the replacement of
aged and failing water‐sewer‐storm infrastructure and to resurface roads in the same streets where
utility improvements occur. The roads that get resurfaced are the ones listed in the TBD Pavement
Preservation Plan.
The capital improvements and pavement preservation for year 2018 were advertised for bid in early
April and bids were opened on April 12th. Three bids were received and the low qualifying bid was
received by Reece Construction Company. The bid amount was $2,399,917.46 and funds have been
budgeted for 2018.
ALTERNATIVES
- Reject bid, re‐advertise the project
- Remand to staff for further evaluation
RECOMMENDED MOTION:
Workshop; discussion only. At the May 7, 2018 council meeting the recommended motion will be: “I
move to award the 2018 Utility Improvement and Pavement Preservation Project to Reece
Construction Company in the amount of $2,399,917.46 and authorize the Mayor to sign the
construction contract, pending review by the City Attorney.”
Item
No.
DESCRIPTION
WSDOT
Standard
Item No.
WSDOT
Spec Ref
Sect.
Approx.
Quantity Unit Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price
SCHEDULE A - UTILITY IMPROVEMENTS
1 MOBILIZATION / DEMOBILIZATION 1--09 1 LS 129,500.00$ 129,500.00$ 79,000.00$ 79,000.00$ 95,000.00$ 95,000.00$ 100,723.76$ 100,723.76$
2 SPCC PLAN 1--07 1 LS 1,000.00$ 1,000.00$ 800.00$ 800.00$ 2,970.00$ 2,970.00$ 1,000.00$ 1,000.00$
3 TEMPORARY TRAFFIC CONTROL 1-10 SP 1 LS 110,000.00$ 110,000.00$ 53,000.00$ 53,000.00$ 26,500.00$ 26,500.00$ 165,500.00$ 165,500.00$
4 SHORING OR EXTRA EXCAVATION CLASS A 2--09 1 L.S.4,000.00$ 4,000.00$ 5,800.00$ 5,800.00$ 1,000.00$ 1,000.00$ 2,500.00$ 2,500.00$
5 EROSION CONTROL AND WATER POLLUTION CONTROL 8-01 SP 1 LS 13,500.00$ 13,500.00$ 25,000.00$ 25,000.00$ 6,250.00$ 6,250.00$ 2,000.00$ 2,000.00$
6 REMOVING HYDRANT 2-02 SP 8 EA 1,250.00$ 10,000.00$ 980.00$ 7,840.00$ 510.00$ 4,080.00$ 450.00$ 3,600.00$
7 REMOVING WATER METER 2-02 SP 72 EA 150.00$ 10,800.00$ 115.00$ 8,280.00$ 112.00$ 8,064.00$ 50.00$ 3,600.00$
8 DUCTILE IRON PIPE FOR WATER MAIN 4" DIAM.7--09 70 LF 105.00$ 7,350.00$ 59.00$ 4,130.00$ 68.70$ 4,809.00$ 95.00$ 6,650.00$
9 DUCTILE IRON PIPE FOR WATER MAIN 6" DIAM.7--09 20 LF 115.00$ 2,300.00$ 60.00$ 1,200.00$ 87.75$ 1,755.00$ 95.00$ 1,900.00$
10 DUCTILE IRON PIPE FOR WATER MAIN 8" DIAM.7--09 2060 LF 120.00$ 247,200.00$ 70.00$ 144,200.00$ 73.65$ 151,719.00$ 105.00$ 216,300.00$
11 DUCTILE IRON PIPE FOR WATER MAIN 12" DIAM.7--09 3800 LF 160.00$ 608,000.00$ 95.00$ 361,000.00$ 85.30$ 324,140.00$ 117.50$ 446,500.00$
12 CONNECTION TO EXISTING WATER MAIN 7-09 SP 19 EA 2,400.00$ 45,600.00$ 3,275.00$ 62,225.00$ 3,300.00$ 62,700.00$ 2,500.00$ 47,500.00$
13 REUSE OF NATIVE BACKFILL 7-09 SP 5950 LF (9.00)$ (53,550.00)$ (12.40)$ (73,780.00)$ 6.00$ 35,700.00$
14 GATE VALVE 6"7--12 1 EA 1,300.00$ 1,300.00$ 900.00$ 900.00$ 865.00$ 865.00$ 1,000.00$ 1,000.00$
15 GATE VALVE 8"7--12 9 EA 1,700.00$ 15,300.00$ 1,300.00$ 11,700.00$ 1,275.00$ 11,475.00$ 1,200.00$ 10,800.00$
16 GATE VALVE 12"7--12 27 EA 2,700.00$ 72,900.00$ 2,150.00$ 58,050.00$ 1,975.00$ 53,325.00$ 2,200.00$ 59,400.00$
17 HYDRANT ASSEMBLY 7-14 SP 8 EA 5,500.00$ 44,000.00$ 5,330.00$ 42,640.00$ 5,135.00$ 41,080.00$ 5,000.00$ 40,000.00$
18 SERVICE CONNECTION 5/8" IN DIAM. (LONG SIDE)7-15 SP 34 EA 1,900.00$ 64,600.00$ 1,550.00$ 52,700.00$ 1,934.00$ 65,756.00$ 1,450.00$ 49,300.00$
19 SERVICE CONNECTION 5/8" IN DIAM. (SHORT SIDE)7-15 SP 38 EA 1,860.00$ 70,680.00$ 1,775.00$ 67,450.00$ 1,655.00$ 62,890.00$ 1,250.00$ 47,500.00$
20 SERVICE RECONNECTION 1 IN. DIAM.7-15 SP 1 EA 1,700.00$ 1,700.00$ 900.00$ 900.00$ 831.00$ 831.00$ 1,200.00$ 1,200.00$
21 SERVICE RECONNECTION 2 IN. DIAM.7-15 SP 3 EA 1,850.00$ 5,550.00$ 1,350.00$ 4,050.00$ 1,155.00$ 3,465.00$ 3,250.00$ 9,750.00$
22 1 IN. HDPE WATER SERVICE PIPE 7-15 SP 60 LF 50.00$ 3,000.00$ 0.50$ 30.00$ 53.00$ 3,180.00$ 10.00$ 600.00$
23 SERVICE PRESSURE REDUCING VALVE 7-15 SP 55 EA 1,075.00$ 59,125.00$ 700.00$ 38,500.00$ 645.00$ 35,475.00$ 535.00$ 29,425.00$
24 CEMENT CONC. DRIVEWAY ENTRANCE TYPE RES.8-06 SP 20 SY 110.00$ 2,200.00$ 185.00$ 3,700.00$ 169.00$ 3,380.00$ 165.60$ 3,312.00$
25 HMA FOR PAVEMENT REPAIR CL. 1/2 IN. PG64-22 5-04.5 720 TON 92.00$ 66,240.00$ 120.00$ 86,400.00$ 150.00$ 108,000.00$ 106.00$ 76,320.00$
26 REMOVING ASPHALT CONC. PAVEMENT 2-02.5 3300 SY 25.00$ 82,500.00$ 8.50$ 28,050.00$ 9.40$ 31,020.00$ 12.00$ 39,600.00$
27 CEMENT CONC. SIDEWALK 8-14 SP 30 LF 195.00$ 5,850.00$ 87.00$ 2,610.00$ 66.60$ 1,998.00$ 111.00$ 3,330.00$
28 RECORD DRAWINGS 1-05 SP 1 LS 2,000.00$ 2,000.00$ 2,900.00$ 2,900.00$ 2,000.00$ 2,000.00$ 2,000.00$ 2,000.00$
29 UNFORSEEN CONDITIONS (FORCE ACCOUNT)1-05 SP 1 EST 60,000.00$ 60,000.00$ 60,000.00$ 60,000.00$ 60,000.00$ 60,000.00$ 60,000.00$ 60,000.00$
SCHEDULE B - PAVEMENT PRESERVATION
PREPARATION
101 MOBILIZATION / DEMOBILIZATION 0001 1-09.7 1 LS 78,243.28$ 78,243.28$ 20,000.00$ 20,000.00$ 83,600.00$ 83,600.00$ 76,000.00$ 76,000.00$
102 INLET PROTECTION 6471 8-01.5 63 EA 77.00$ 4,851.00$ 100.00$ 6,300.00$ 70.00$ 4,410.00$ 75.00$ 4,725.00$
103 PLANNING BITUMINOUS PAVEMENT 5711 5-04.5, SP 6200 SY 7.00$ 43,400.00$ 5.00$ 31,000.00$ 5.00$ 31,000.00$ 7.25$ 44,950.00$
104 ROADWAY REMOVAL AND GRADING --5-04.5, SP 9140 SY 8.00$ 73,120.00$ 7.00$ 63,980.00$ 7.35$ 67,179.00$ 12.00$ 109,680.00$
105 CRACK SEALING 5703 5-04.5 50 LF 35.00$ 1,750.00$ 28.00$ 1,400.00$ 22.00$ 1,100.00$ 20.00$ 1,000.00$
106 REMOVING CEMENT CONC. SIDEWALK 0100 2-02.5 100 SY 40.00$ 4,000.00$ 133.00$ 13,300.00$ 11.50$ 1,150.00$ 20.00$ 2,000.00$
107 REMOVING CEMENT CONC. CURB AND GUTTER 0108 2-02.5 740 LF 13.00$ 9,620.00$ 20.00$ 14,800.00$ 9.75$ 7,215.00$ 5.00$ 3,700.00$
108 REMOVING ASPHALT CONC. PAVEMENT 0120 2-02.5 90 SY 25.00$ 2,250.00$ 30.00$ 2,700.00$ 16.70$ 1,503.00$ 12.00$ 1,080.00$
109 REMOVING DRAINAGE STRUCTURE 0049 2-02.6 4 EA 780.00$ 3,120.00$ 1,000.00$ 4,000.00$ 675.00$ 2,700.00$ 500.00$ 2,000.00$
PAVEMENT
110 HMA CL. 1/2 IN. PG64-22 5767 5-04.5 3870 TON 92.00$ 356,040.00$ 98.00$ 379,260.00$ 97.65$ 377,905.50$ 106.00$ 410,220.00$
111 CEMENT CONC. TRAFFIC CURB AND GUTTER 6700 8-04.5 740 LF 52.00$ 38,480.00$ 55.00$ 40,700.00$ 50.00$ 37,000.00$ 50.50$ 37,370.00$
112 CEMENT CONC. GRADE CORRECTION CURB --8-04.5, SP 620 LF 46.00$ 28,520.00$ 34.00$ 21,080.00$ 40.15$ 24,893.00$ 44.40$ 27,528.00$
113 DETECTABLE WARNING SURFACE 7054 8-14.5 400 SF 50.00$ 20,000.00$ 56.00$ 22,400.00$ 53.00$ 21,200.00$ 38.40$ 15,360.00$
114 CEMENT CONC. SIDEWALK 7055 8-14.5 100 SY 93.00$ 9,300.00$ 144.00$ 14,400.00$ 138.00$ 13,800.00$ 107.50$ 10,750.00$
115 SHOULDER MATERIAL --2-11.5, SP 25 TON 61.00$ 1,525.00$ 40.00$ 1,000.00$ 41.00$ 1,025.00$ 25.00$ 625.00$
116 CRUSHED SURFACING TOP COURSE 5120 4-04.5 130 TON 35.00$ 4,550.00$ 100.00$ 13,000.00$ 22.60$ 2,938.00$ 25.00$ 3,250.00$
117 CEMENT CONC. CURB RAMP TYPE PERPENDICULAR A 7058 8-14.4 1 EA 5,650.00$ 5,650.00$ 1,475.00$ 1,475.00$ 2,450.00$ 2,450.00$ 2,700.00$ 2,700.00$
118 CEMENT CONC. CURB RAMP TYPE A --8-14.5, SP 14 EA 5,000.00$ 70,000.00$ 2,500.00$ 35,000.00$ 3,438.00$ 48,132.00$ 2,700.00$ 37,800.00$
119 CEMENT CONC. CURB RAMP TYPE B --8-14.5, SP 4 EA 5,000.00$ 20,000.00$ 2,280.00$ 9,120.00$ 3,211.00$ 12,844.00$ 2,700.00$ 10,800.00$
120 CEMENT CONC. CURB RAMP TYPE PARALLEL A 7058 8-14.5 2 EA 4,800.00$ 9,600.00$ 2,600.00$ 5,200.00$ 3,480.00$ 6,960.00$ 2,700.00$ 5,400.00$
121 CEMENT CONC. CURB RAMP TYPE PARALLEL B 7058 8-14.5 3 EA 4,450.00$ 13,350.00$ 2,175.00$ 6,525.00$ 3,100.00$ 9,300.00$ 2,700.00$ 8,100.00$
122 CEMENT CONC. CURB RAMP TYPE SINGLE DIRECTION B 7058 8-14.6 1 EA 5,000.00$ 5,000.00$ 3,000.00$ 3,000.00$ 4,060.00$ 4,060.00$ 2,700.00$ 2,700.00$
TRAFFIC
123 PROJECT TEMPORARY TRAFFIC CONTROL 6971 1-10.5 1 LS 117,000.00$ 117,000.00$ 85,000.00$ 85,000.00$ 129,600.00$ 129,600.00$ 91,200.00$ 91,200.00$
124 PAINT LINE 6806 8-22.5 3700 LF 0.25$ 925.00$ 1.00$ 3,700.00$ 0.90$ 3,330.00$ 0.95$ 3,515.00$
125 PLASTIC CROSSWALK LINE 6857 8-22.5 2790 SF 6.00$ 16,740.00$ 4.75$ 13,252.50$ 4.40$ 12,276.00$ 4.80$ 13,392.00$
126 PLASTIC STOP LINE 6859 8-22.5 450 LF 10.00$ 4,500.00$ 9.50$ 4,275.00$ 8.80$ 3,960.00$ 9.60$ 4,320.00$
127 RAISED PAVEMENT MARKER TYPE 2 6884 8-22.5 1 HUND 500.00$ 500.00$ 580.00$ 580.00$ 550.00$ 550.00$ 600.00$ 600.00$
128 PERMANENT SIGNING 6890 8-21.5 1 LS 2,000.00$ 2,000.00$ 1,900.00$ 1,900.00$ 6,600.00$ 6,600.00$ 2,500.00$ 2,500.00$
STRUCTURE ADJUSTMENT
129 ADJUST MANHOLE 3080 7-05.5 11 EA 700.00$ 7,700.00$ 700.00$ 7,700.00$ 700.00$ 7,700.00$ 475.00$ 5,225.00$
130 ADJUST MONUMENT CASE AND COVER 7380 7-05.5 5 EA 320.00$ 1,600.00$ 700.00$ 3,500.00$ 560.00$ 2,800.00$ 250.00$ 1,250.00$
131 ADJUST VALVE BOX 6243 7-05.5 39 EA 350.00$ 13,650.00$ 600.00$ 23,400.00$ 565.00$ 22,035.00$ 150.00$ 5,850.00$
132 LOCKING SOLID METAL COVER AND FRAME FOR MH --7-05.5, SP 11 EA 700.00$ 7,700.00$ 875.00$ 9,625.00$ 837.00$ 9,207.00$ 850.00$ 9,350.00$
133 CATCH BASIN FRAME AND GRATE --7-05.5, SP 2 EA 650.00$ 1,300.00$ 750.00$ 1,500.00$ 745.00$ 1,490.00$ 797.80$ 1,595.60$
134 LOCKING RING AND COVER FOR CLEANOUT --7-05.5, SP 1 EA 700.00$ 700.00$ 875.00$ 875.00$ 400.00$ 400.00$ 235.00$ 235.00$
135 CATCH BASIN TYPE 1 3091 7-05.5 4 EA 2,200.00$ 8,800.00$ 2,300.00$ 9,200.00$ 1,385.00$ 5,540.00$ 1,250.00$ 5,000.00$
136 AWWA C900 STORM PIPE 6 IN. DIAM.--7-04.5, SP 60 LF 95.00$ 5,700.00$ 50.00$ 3,000.00$ 57.00$ 3,420.00$ 75.00$ 4,500.00$
137 STORM DRAIN FITTINGS AND COUPLINGS --7-04.5, SP 1 LS 2,100.00$ 2,100.00$ 1,250.00$ 1,250.00$ 1,925.00$ 1,925.00$ 1,000.00$ 1,000.00$
OTHER
138 UNFORSEEN CONDITIONS (FORCE ACCOUNT)7715 1-09.6 1 EST 60,000.00$ 60,000.00$ 60,000.00$ 60,000.00$ 60,000.00$ 60,000.00$ 60,000.00$ 60,000.00$
139 SPCC PLAN 7736 1-07.15 (1)1 LS 1,000.00$ 1,000.00$ 800.00$ 800.00$ 11,220.00$ 11,220.00$ 1,000.00$ 1,000.00$
140 TRIMMING AND CLEANUP 7490 1-07.15 (1)1 LS 2,000.00$ 2,000.00$ 4,000.00$ 4,000.00$ 32,550.00$ 32,550.00$ 25,000.00$ 25,000.00$
SCHEDULE C - ADD ALTERNATE
PREPARATION
101 MOBILIZATION / DEMOBILIZATION (8%)0001 1-09.7 1 LS 12,351.44$ 12,351.44$ 5,750.00$ 5,750.00$ 1,400.00$ 1,400.00$ 10,867.00$ 10,867.00$
102 INLET PROTECTION 6471 8-01.5 4 EA 77.00$ 308.00$ 100.00$ 400.00$ 75.00$ 300.00$ 75.00$ 300.00$
103 PLANNING BITUMINOUS PAVEMENT 5711 5-04.5, SP 1670 SY 7.00$ 11,690.00$ 5.00$ 8,350.00$ 3.20$ 5,344.00$ 9.00$ 15,030.00$
104 CRACK SEALING 5703 5-04.5 10 LF 35.00$ 350.00$ 28.00$ 280.00$ 22.00$ 220.00$ 20.00$ 200.00$
105 REMOVING CEMENT CONC. SIDEWALK 0100 2-02.5 50 SY 40.00$ 2,000.00$ 139.00$ 6,950.00$ 12.00$ 600.00$ 20.00$ 1,000.00$
106 REMOVING CEMENT CONC. CURB AND GUTTER 0108 2-02.5 150 LF 13.00$ 1,950.00$ 45.00$ 6,750.00$ 12.00$ 1,800.00$ 5.00$ 750.00$
107 REMOVING ASPHALT CONC. PAVEMENT 0120 2-02.5 40 SY 25.00$ 1,000.00$ 20.00$ 800.00$ 41.00$ 1,640.00$ 12.00$ 480.00$
PAVEMENT
109 HMA CL. 1/2 IN. PG64-22 5767 5.04-5 330 TON 92.00$ 30,360.00$ 98.00$ 32,340.00$ 103.00$ 33,990.00$ 120.00$ 39,600.00$
110 CEMENT CONC. TRAFFIC CURB AND GUTTER 6700 8-04.5 150 LF 52.00$ 7,800.00$ 55.00$ 8,250.00$ 52.30$ 7,845.00$ 50.50$ 7,575.00$
111 CEMENT CONC. GRADE CORRECTION CURB --8-04.5, SP 130 LF 46.00$ 5,980.00$ 34.00$ 4,420.00$ 42.50$ 5,525.00$ 44.40$ 5,772.00$
112 DETECTABLE WARNING SURFACE 7054 8-14.5 110 SF 50.00$ 5,500.00$ 56.00$ 6,160.00$ 53.00$ 5,830.00$ 38.40$ 4,224.00$
113 CEMENT CONC. SIDEWALK 7055 8-14.5 50 SY 93.00$ 4,650.00$ 144.00$ 7,200.00$ 142.00$ 7,100.00$ 107.50$ 5,375.00$
114 CRUSHED SURFACING TOP COURSE 5120 4-04.5 40 TON 35.00$ 1,400.00$ 150.00$ 6,000.00$ 25.00$ 1,000.00$ 25.00$ 1,000.00$
115 CEMENT CONC. CURB RAMP PERPENDICULAR A 7058 8-14.4 4 EA 5,650.00$ 22,600.00$ 1,725.00$ 6,900.00$ 2,680.00$ 10,720.00$ 2,700.00$ 10,800.00$
116 CEMENT CONC. CURB RAMP TYPE PARALLEL A 7058 8-14.5 1 EA 4,800.00$ 4,800.00$ 2,600.00$ 2,600.00$ 3,770.00$ 3,770.00$ 2,700.00$ 2,700.00$
117 CEMENT CONC. CURB RAMP TYPE PARALLEL B 7058 8-14.5 2 EA 4,450.00$ 8,900.00$ 2,175.00$ 4,350.00$ 3,112.00$ 6,224.00$ 2,700.00$ 5,400.00$
TRAFFIC
118 PROJECT TEMPORARY TRAFFIC CONTROL 6971 1-10.5 1 LS 19,000.00$ 19,000.00$ 55,000.00$ 55,000.00$ 5,410.00$ 5,410.00$ 29,000.00$ 29,000.00$
119 PAINT LINE 6806 8-22.5 100 LF 0.25$ 25.00$ 1.00$ 100.00$ 0.90$ 90.00$ 0.95$ 95.00$
120 PLASTIC CROSSWALK LINE 6857 8-22.5 340 SF 6.00$ 2,040.00$ 4.75$ 1,615.00$ 4.50$ 1,530.00$ 4.80$ 1,632.00$
121 PLASTIC STOP LINE 6859 8-22.5 30 LF 10.00$ 300.00$ 9.50$ 285.00$ 9.00$ 270.00$ 9.60$ 288.00$
122 PERMANENT SIGNING 6890 8-21.5 1 LS 2,000.00$ 2,000.00$ 200.00$ 200.00$ 900.00$ 900.00$ 2,500.00$ 2,500.00$
STRUCTURE ADJUSTMENT
123 ADJUST MANHOLE 3080 7-05.5 3 EA 700.00$ 2,100.00$ 700.00$ 2,100.00$ 700.00$ 2,100.00$ 475.00$ 1,425.00$
124 ADJUST MONUMENT CASE AND COVER 7380 7-05.5 1 EA 410.00$ 410.00$ 700.00$ 700.00$ 400.00$ 400.00$ 250.00$ 250.00$
125 ADJUST VALVE BOX 6243 7-05.5 10 EA 320.00$ 3,200.00$ 600.00$ 6,000.00$ 400.00$ 4,000.00$ 150.00$ 1,500.00$
126 ADJUST CATCH BASIN 3100 7-05.5 2 EA 350.00$ 700.00$ 700.00$ 1,400.00$ 600.00$ 1,200.00$ 475.00$ 950.00$
OTHER
127 UNFORSEEN CONDITIONS (FORCE ACCOUNT)7715 1-09.6 1 EST 12,000.00$ 12,000.00$ 12,000.00$ 12,000.00$ 12,000.00$ 12,000.00$ 12,000.00$ 12,000.00$
128 SPCC PLAN 7736 1-07.15 (1)1 LS 1,000.00$ 1,000.00$ 800.00$ 800.00$ 200.00$ 200.00$ 1,000.00$ 1,000.00$
129 TRIMMING AND CLEANUP 7490 1-07.15 (1)1 LS 2,000.00$ 2,000.00$ 4,000.00$ 4,000.00$ 2,750.00$ 2,750.00$ 15,000.00$ 15,000.00$
1,746,195.00$ 1,159,505.00$ 1,099,947.00$ 1,467,010.76$
158,903.75$ 105,514.96$ 100,095.18$ 133,497.98$
1,056,284.28$ 943,197.50$ 1,076,967.50$ 1,053,270.60$
166,414.44$ 191,700.00$ 124,158.00$ 176,713.00$
3,127,797.47$ 2,399,917.46$ 2,401,167.68$ 2,830,492.34$
Apparent Low Bidder
Reece Construction SRV Construction D & G Backhoe Inc.
SCHEDULE A TAX
2018 UTILITY IMPROVEMENTS & PAVEMENT PRESERVATION PROJECTS
Engineer's EstimateBid Opening Date: 4/12/2018
SCHEDULE A UTILITY IMPROV.
TOTAL BID
SCHEDULE B PAVEMENT PRESERV. (NO TAX)
SCHEDULE C - BID ALTERNATE (NO TAX)
City of Arlington
Council Agenda Bill
Item:
WS #3
Attachment
C
COUNCIL MEETING DATE: April 23, 2018
SUBJECT:
Opal Properties, LLC Release of Easements
ATTACHMENTS:
‐ Release of Easement Interests Crossing Parcel 31050400302900
‐ Map showing location of Easement
DEPARTMENT OF ORIGIN
Public Works ‐ Transportation
EXPENDITURES REQUESTED: None
BUDGET CATEGORY: N/A
BUDGETED AMOUNT: N/A
LEGAL REVIEW:
DESCRIPTION:
Council is being asked to authorize the release the City of Arlington’s interest in a 60‐ft wide non‐
exclusive access easement road crossing a property owned by Opal Properties, LLC.
HISTORY:
The Arlington Valley Land Company divided property and sold lots on a parcel of land situated on
the east side of 67th Ave, and roughly between 188th St to 197 St. There were no roads or utilities
installed when the lots were sold so access easements were created to allow access to many of the
lots. Original Lot #6 (Snohomish County Tax Parcel No. 31050400302900) still has a 60‐ft wide non‐
exclusive access easement road (Auditor File Number 7905290175) crossing the property.
With Arlington Valley Road being constructed, there will be full access to all lots and the City does
not require any interest in the aforementioned 60‐ft wide non‐exclusive access easement road.
ALTERNATIVES:
- Do not authorize the Release of Easements
‐ Remand to staff for further evaluation
RECOMMENDED MOTION:
Workshop; discussion only. At the May 7, 2018 council meeting the recommended motion will be: “I
move to authorize the Release of Easements for Opal Properties pending final approval by the City
Attorney”.
1
(27-698 SJP/ms)
RETURN TO:
BAILEY, DUSKIN & PEIFFLE PS
P.O. Box 188
Arlington, WA 98223
Please print or type information WASHINGTON STATE RECORDER’S Cover Sheet (RCW 65.04)
Document Title(s) (or transactions contained therein): (all areas applicable to your document must be filled
in)
RELEASE OF EASEMENTS
Reference Number(s) of Documents assigned or released:
Additional reference #’s on page ______ of document
Grantor(s) (Last name, first name, initials)
1.City of Arlington
Additional names on page ______ of document.
Grantee(s) (Last name first, then first name and initials)
1.Opal Properties, LLC
Additional names on page ______ of document.
Legal description (abbreviated: i.e. lot, block, plat or section, township, range)
PTN OF SW 1/4 OF SECTION 14, TOWNSHIP 31 NORTH, RANGE 5 EAST, W M
Additional legal is on page ____ of document.
Assessor’s Property Tax Parcel/Account Number Assessor Tax # not yet assigned
31050400302900
The Auditor/Recorder will rely on the information provided on the form. The staff will not read the document to
verify the accuracy or completeness of the indexing information provided herein.
I am requesting an emergency nonstandard recording for an additional fee as provided in RCW 36.18.010. I
understand that the recording processing requirements may cover up or otherwise obscure some part of the text of
the original document.
_____________________________________________________Signature of Requesting Party
2
(27-698 SJP/ms)
AFTER RECORDING RETURN TO:
Bailey, Duskin & Peiffle, P.S.
Attorneys at Law
P.O. Box 188
Arlington, WA 98223
GRANTOR: CITY OF ARLINGTON, a municipal corporation of the state of
Washington
GRANTEE: OPAL PROPERTIES, LLC
LEGAL (abbrev.): PORTION, SW 1/4, SECTION 14, T. 31 N., R. 5 E, W.M.
TAX PARCEL NO.: 31051400302900
RELEASE OF EASEMENT INTERESTS
The City of Arlington, a municipal corporation of the state of Washington
(“Declarant”) does declare as follows:
Recitals
(a) OPAL PROPERTIES LLC is the owner of certain real property commonly
known as Snohomish County Tax Parcel
3105040030290031051400302900, legally described as follows:
See attached Exhibit A.
(b) The City has acquired certain real property and is in the process of
construction constructing a roadway in the vicinity of the property owned
by OPAL PROPERTIES, LLC, which would allow the release of existing
easements intended for public roadway and utility purposes.
NOW, THEREFORE, in consideration of the benefits to be derived, the City of
Arlington does hereby grant, sell, bargain and convey as follows:
3
(27-698 SJP/ms)
Grantor, City of Arlington, does hereby release any interest which the City of Arlington
may have in the following recorded Easements, Surveys, or documents which are or
might be construed to be in favor of the City of Arlington, which documents are recorded
under the following Snohomish County Auditor’s File Numbers:
7905290175
Any interest which the City of Arlington has in said easements or documents shall be
and hereby are released by the City.
DATED this _____ day of ___________, 2018.
CITY OF ARLINGTON, GRANTOR
_______________________________
Barbara Tolbert, Mayor
4
(27-698 SJP/ms)
STATE OF WASHINGTON )
: ss
COUNTY OF SNOHOMISH )
On this _____ day of __________________, 2018, before me, the undersigned, a
Notary Public in and for the State of Washington, duly commissioned and sworn,
personally appeared Barbara Tolbert and Kristin Banfield, to me known to be the Mayor
and City Clerk, respectively, of the City of Arlington, the municipal corporation that
executed the foregoing instrument and acknowledged the said instrument to be the free
and voluntary act and deed of said municipal corporation, for the uses and purposes
herein mentioned, and on oath stated that they are authorized to execute the said
instrument and that the seal affixed (if any) is the corporate seal of said municipal
corporation.
Witness my hand and official seal hereto affixed the day and year first above
written.
__________________________________________
NOTARY PUBLIC in and for the State of
Washington, residing at _______________________
My commission expires: ______________________
Name:_____________________________________
City of Arlington
Council Agenda Bill
Item:
WS #4
Attachment
D
COUNCIL MEETING DATE:
April 23, 2018
SUBJECT:
Resolution adopting an updated Fee Schedule
ATTACHMENTS:
Draft Resolution – Fee Schedule
DEPARTMENT OF ORIGIN
Administration; Kristin Banfield – City Clerk 360‐403‐3444
EXPENDITURES REQUESTED: None
BUDGET CATEGORY: N/A
BUDGETED AMOUNT: N/A
LEGAL REVIEW:
DESCRIPTION:
Staff has prepared an update to the City’s fee schedule. The fees included in the schedule cover all
departments in the city and address items not included in the Arlington Municipal Code. Staff is
recommending updates to the planning, public works, EMS, and finance fees. Additional updates will
be made in the fall to recreation fees and public records fees. Updates to public records fees require
a public hearing.
HISTORY:
The Council last updated the City’s fee schedule in December 2016.
ALTERNATIVES:
Remand to staff for further revision.
RECOMMENDED MOTION:
Workshop; discussion only. At the May 7, 2018 council meeting, the recommended motion will be, “I
move to approve the proposed resolution replacing Resolution No. 206‐023 and adopting a revised
fee schedule.”
Page 1
RESOLUTION NO. 2016-0232018-xxx
A RESOLUTION REPLACING RESOLUTION NO. 2015-0092016-023,
AND ADOPTING A REVISED FEE SCHEDULE
WHEREAS, the City Council, through ordinance, has adopted regulations requiring certain
actions and services; and,
WHEREAS, these various ordinances set forth that fees shall be set by resolution; and,
WHEREAS, the cost of providing these various services consistent with applicable codes,
regulations, and policies periodically increase or decrease, or certain services or practices are
discontinued and fees are no longer needed; and,
WHEREAS, it is the intent of the City of Arlington to charge appropriate fees and charges
that are consistent with the services provided and to cover the public cost of providing these various
services so that the public is not subsidizing individual benefits derived therefrom;
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
ARLINGTON AS FOLLOWS:
The following rates, fees, and charges for various services provided, actions performed, or items
sold by the city and/or its contract service providers, and fines levied against code violators, are
hereby adopted:
Section 1. Fees and Charges—General.
1.1 Fees. Fees are intended to cover the normal, recurring costs associated with
providing a given service. Fees are non-refundable.
1.2 Prices. In some instances, the City provides certain goods and merchandise for sale.
Prices for these goods may be included in this resolution.
1.3 Payment Due. Fees are due at the time the action is requested (e.g., at time of
application) or occurs (e.g., prior to a specific action). An applicant may pay all
fees of a multi-phased project in advance; however, doing so does not vest
applicable fees due. Fees due are those in effect at the time the specific action or
phase of an action is requested or occurs.
1.4 Waivers. Upon petition by the applicant, the City Council may waive any of the
fees, or portions thereof, for any non-profit organization or government agency.
CITY OF ARLINGTON FEE SCHEDULE RESOLUTION #2016-0232018-XXX
Page 2
Section 2. Land Use Fees. Fees for various services, actions, and permits regarding land use,
as per AMC Title 20 Land Use Code, shall be as listed in Table 1: Land Use Fees
Table 1: Land Use Fees
Action 2016 Fee ($) 2017 Fee ($)
Land Use Permits
Zoning Permit 2,222 2,300.00
Special Use Permit 3,306 plus actual cost of
Hearing Examiner (if
req’d)
3,400.00 plus actual cost of
Hearing Examiner (if
req’d)
Conditional Use Permit 3,862 plus actual cost of
Hearing Examiner
4,000.00 plus actual cost of
Hearing Examiner
Administrative Conditional Use Permit
Temporary / Seasonal Event
Homeless Encampment
102
508
125.00
500.00
Preliminary Plats
Conditional Use Permit for a Long Plat 6,983 plus actual cost of
Hearing Examiner
7,000.00 plus actual cost of
Hearing Examiner
Zoning Permit for a Short Plat 3,068 3,100.00
Final Plats
Long Plat 3,389 3,400.00
Short Plat 1,823 2,000.00
Binding Site Plans
Conditional Use Permit for Binding
Site Plans ≥ 10 lots
7,000.00 plus actual cost of
HE
Zoning Permit for Binding Site Plans ≤
9 lots
3,100.00
Text and/or Design Deviation 741 750.00
Lot Line Adjustment or Changes to
Number of Lots
1,323 1,400.00
Development Agreements 3,862 plus actual cost of
Hearing Examiner (if
req’d)
$4,000.00 plus actual cost
of Hearing Examiner (if
req’d)
Master Plan 12,500 12,500.00
Design Review
Administrative 212 300.00
Design Review Board 423 450.00
Mixed Use Development
Binding Site Plan 7,000.00
Conditional Use Permit 4,000.00
Special Use Permit 3,400.00
Use Permit 2,300.00
Developer’s Agreement $750.00 plus actual cost for
recording
Forest Practices Permits
Permit Review 423 450.00
CITY OF ARLINGTON FEE SCHEDULE RESOLUTION #2016-0232018-XXX
Page 3
Action 2016 Fee ($) 2017 Fee ($)
Forest Practices Permit Application Fee 106 plus 106 per acre 125.00 plus 125.00 per
acre
Review Fee for Conversion Option
Harvest Plan Approval
106 plus 106 per acre 125.00 plus 125.00 per
acre
Review Fee To Lift Moratorium 300 300.00
Inspection Fee 127 per hour plus 106 per
acre
150.00 per hour plus
125.00per acre
Tree mitigation in-lieu fee (number of
trees removed x3), total trees 1,000 or
less
10.00 per tree
Tree mitigation in-lieu fee (number of
trees removed x3), total trees more than
1,000
7.00 per tree
Appeals
To City Council 212 250.00
To Planning Commission 212 250.00
To Hearing Examiner 582 plus actual cost of
Hearing Examiner
600.00 plus actual cost of
Hearing Examiner
To Shoreline Hearings Board 582 600.00
Reconsideration of Decision by:
Community Development Director
and/or a designee
79 100.00
Planning Commission 106 150.00
Hearing Examiner 212 plus actual cost of
Hearing Examiner
250.00 plus actual cost of
Hearing Examiner
City Council 132 150.00
Permit Extension
Extension 53 200.00
Resubmittal Extension 125.00
Amendment to or Modification of
Permit
Insignificant Design Deviations 53 60.00
Minor Amendment 317 325.00
Major Amendment 1,067 plus cost of Hearing
Examiner (if req’d)
1,100.00 plus actual cost of
Hearing Examiner (if
req’d)
Development Agreement 741 plus actual cost of
Hearing Examiner (if
req’d)
750.00 plus actual cost of
Hearing Examiner (if
req’d)
Boundary Line Adjustment
Boundary Line Adjustment / Lot Line
Elimination
1,664 1,700.00
Land Use Ordinance Amendment
Amendment to Text of Land Use
Ordinance
741 750.00
CITY OF ARLINGTON FEE SCHEDULE RESOLUTION #2016-0232018-XXX
Page 4
Action 2016 Fee ($) 2017 Fee ($)
Amendment to Zoning Map (rezone)
< 5 acres 1,111 1,200.00
> or = 5 acres 1,957 2,000.00
Comprehensive Plan Amendment
Minor Amendment (annual cycle) 1,428 1,500.00
Major Amendment (5-year cycle) 2,116 2,200.00
Annexations
Submission of 10% Petition 106 150.00
Submission of 60% Petition 1,058 1,100.00
If it goes to BRB hearing 794 800.00
Shoreline Development Permit
(SDP)
SDP in conjunction with a Land Use
Permit
529 550.00
SDP not in conjunction with a Land
Use Permit
1,058 1,100.00
Variance
Administrative 635 700.00
If it goes to hearing (fee in addition to
that paid for Admin. Decision)
1,217 plus actual cost
of Hearing Examiner
1,300.00 plus actual
cost of Hearing Examiner
Miscellaneous Actions/Items
Pre-Application Meetings / General
Information Meeting
1st two hours 0 0.00
Subsequent meetings 317 per meeting 325.00 per meeting
SEPA Review (note: review of
checklist included in Land Use
Permit fee )
SEPA Only (no land use permit
required)
529 550.00
Review of requested studies (i.e.
traffic, wetland, etc.)
159 175.00
Review of requested studies (i.e.
drainage, geo -tech, etc.)
711 750.00
Environmental Impact Statement (EIS) 1,058 plus actual cost of
consultant
1,100.00 plus actual cost of
consultant
Deferral of Impact Fee
Application $200.00
Request of Utility Services Outside
City
Single-Family Residence/Duplex 212 225.00
Other Development 635 650.00
CITY OF ARLINGTON FEE SCHEDULE RESOLUTION #2016-0232018-XXX
Page 5
Action 2016 Fee ($) 2017 Fee ($)
Property Tax Exemption Certificate
Processing Fee 500.00
Recording
Recording Fees / Conformed Copies Actual cost paid directly to
the Snohomish County
Auditor
Processing / Technology Fee
Added to all Land Use, Site Civil &
Building Permits
25.00
Section 3. Public Works Fees. Fees for various services, actions and permits shall be as
listed in Tables 2-1: Review Fees, 2-2: Grading Plan Review Fees, 2-3: Grading Permit Fees,
and 2-4: Public Works Labor and Equipment Charges.
Table 2-1: Review Fees
Action 2016 Fee ($) 2017 Fee ($)
Site Civil Review 6% E.E.C.C1 with a
minimum charge of 1,587
6% E.E.C.C. 2 with a
minimum charge of
1,600.00
Administrative Review Fee 212 each 250.00 each
Miscellaneous Engineering Fee 529 each 550.00 each
1,E.E.C.C Engineer’s Estimated Cost of Construction-Includes labor, equipment, material, overhead and profit.
Prices shall be from RS Means (latest edition) data adjusted for the Snohomish County area or from local sources if
not included in the RS Means database.
* Simple Site Plan Review - No water or sewer extension - Single family residence with maximum of 2 lots.
* Additional plan review applies when there is a change, addition or revision to the plan.
* Additional plan review fees will be charged at any point in the project when more than 2 reviews are required.
* Inspection Fee - commercial and residential plats (storm drainage, landscape, right-of-way and bond
inspections).
* Outside Consultant Review Fee.
* Water Availability Certificate Fee.
* Engineering Meetings (first 2 hours are no charge).
* Miscellaneous engineering fee - traffic and storm water report/design reviewed in-house.
2,E.E.C.C Engineer’s Estimated Cost of Construction-Includes labor, equipment, material, overhead and profit.
Prices shall be from RS Means (latest edition) data adjusted for the Snohomish County area or from local sources if
not included in the RS Means database.
* Simple Site Plan Review - No water or sewer extension - Single family residence with maximum of 2 lots.
* Additional plan review applies when there is a change, addition or revision to the plan.
* Additional plan review fees will be charged at any point in the project when more than 2 reviews are required.
* Inspection Fee - commercial and residential plats (storm drainage, landscape, right-of-way and bond
inspections).
* Outside Consultant Review Fee.
* Water Availability Certificate Fee.
* Engineering Meetings (first 2 hours are no charge).
* Miscellaneous engineering fee - traffic and storm water report/design reviewed in-house.
CITY OF ARLINGTON FEE SCHEDULE RESOLUTION #2016-0232018-XXX
Page 6
Action 2016 Fee ($) 2017 Fee ($)
As-Built Review Fee Included in the site civil
review fee
Included in the site civil
review fee
Final Plat Review Fee Included in the site civil
review fee
Included in the site civil
review fee
Inspection Fee 127 per hour-1/2 hour
minimum
150.00 per hour, ½ hour
minimum
Outside Consultant Review Fee Actual cost Actual cost
Simple Site Plan Review 265 per lot 275.00 per lot
CITY OF ARLINGTON FEE SCHEDULE RESOLUTION #2016-0232018-XXX
Page 7
Action 2016 Fee ($) 2017 Fee ($)
Right of Way 6% E.E.C.C3 or maximum
1,058 with a minimum
charge of 106 plus
inspection fees
6% E.E.C.C.4 or maximum
1,100.00 with a minimum
charge of 125.00 plus
inspection fees
Right of Way Vacation 1,058 1,100.00
Miscellaneous Staff Time 127 per hour per person-
1/2 hour minimum
150.00 per hour per person,
½ hour minimum
Engineering Meetings-after 2 hours 317 per meeting 350.00 per meeting
Water Availability Certificate SFR 32 – Non-SFR 106 SFR 50.00
Non-SRF 125.00
Recovery Contract 1,058 plus actual cost 1,100.00 plus actual cost
Significant tree replacement mitigation
(3:1 ratio)
150.00 per tree5
Table 2-2: Grading Plan Review Fees
Action Fee ($)
50 Cubic Yards or less No fee
51 to 100 cubic yards 25.50
101 to 1,000 cubic yards 40.00
3 E.E.C.C Engineer’s Estimated Cost of Construction-Includes labor, equipment, material, overhead and profit.
Prices shall be from RS Means (latest edition) data adjusted for the Snohomish County area or from local sources if
not included in the RS Means database.
* Simple Site Plan Review - No water or sewer extension - Single family residence with maximum of 2 lots.
* Additional plan review applies when there is a change, addition or revision to the plan.
* Additional plan review fees will be charged at any point in the project when more than 2 reviews are required.
* Inspection Fee - commercial and residential plats (storm drainage, landscape, right-of-way and bond
inspections).
* Outside Consultant Review Fee.
* Water Availability Certificate Fee.
* Engineering Meetings (first 2 hours are no charge).
* Miscellaneous engineering fee - traffic and storm water report/design reviewed in-house.
4 E.E.C.C Engineer’s Estimated Cost of Construction-Includes labor, equipment, material, overhead and profit.
Prices shall be from RS Means (latest edition) data adjusted for the Snohomish County area or from local sources if
not included in the RS Means database.
* Simple Site Plan Review - No water or sewer extension - Single family residence with maximum of 2 lots.
* Additional plan review applies when there is a change, addition or revision to the plan.
* Additional plan review fees will be charged at any point in the project when more than 2 reviews are required.
* Inspection Fee - commercial and residential plats (storm drainage, landscape, right-of-way and bond
inspections).
* Outside Consultant Review Fee.
* Water Availability Certificate Fee.
* Engineering Meetings (first 2 hours are no charge).
* Miscellaneous engineering fee - traffic and storm water report/design reviewed in-house
5 AMC 20.76.120(c)
CITY OF ARLINGTON FEE SCHEDULE RESOLUTION #2016-0232018-XXX
Page 8
1,001 to 100,000 cubic yards
First 1,000 cubic yards
Plus - for each additional 10,000 yards or fraction thereof
53.35
26.50
100,001 to 200,000 cubic yards
For the first 100,000 cubic yards
Plus - for each additional 10,000 yards or fraction thereof
292.00
14.40
200,001 cubic yards or more
For the first 200,000 cubic yards
Plus - for each additional 10,000 cubic yards or fraction thereof
435.45
7.85
Other Fees: Additional plan review required by changes, additions or
revisions to approved plans (minimum charge – 1/2 hour)
54.706
Per hour
6 Or the total hourly cost to the City, whichever is the greatest. This cost shall include supervision, overhead,
equipment, hourly wages and fringe benefits of the employees involved.
CITY OF ARLINGTON FEE SCHEDULE RESOLUTION #2016-0232018-XXX
Page 9
Table 2-3: Grading Permit Fees
Action Fee ($)
50 cubic yards or less 25.50
51 to 100 cubic yards 40.00
101 to 1,000 cubic yards
First 100 cubic yards
Plus – for each additional 100 cubic yards or fraction thereof
40.00
18.90
1,001 to 10,000 cubic yards
For the first 1,000 cubic yards
Plus - for each additional
1,000 yards or fraction thereof
210.50
15.70
10,001 to 100,000 cubic yards
For the First 10,000 cubic yards
Plus - for each additional
10,000 yards or fraction thereof
351.80
71.40
100,001 or more cubic yards or more
For the first 100,000 cubic yards
Plus - for each additional 10,000 cubic yards or fraction thereof
994.80
39.50
Table 2-4: Public Works Labor and Equipment Charges
A. Services and work included in the below schedule will be charged a 15%
administrative/overhead fee for accounting, billing and general City administrative costs.
B. All work or services not included in the below schedule must be mutually agreed upon
prior to the commencement of work.
C. Equipment and machinery that is not explicitly included in the below schedule will be
charged at the rate set forth in the most current Rental Rate Blue Book for Construction
Equipment ("Blue Book"). If the equipment or machinery rate is not available in the Blue
Book, the City will determine an appropriate fee or rate based on the original cost of the
asset plus operating and ma intenance cost and/or comparable rates charged by other
organizations.
CITY OF ARLINGTON FEE SCHEDULE RESOLUTION #2016-0232018-XXX
Page 10
Item Fee ($)
Labor Rate Cost
Lead Maintenance Worker Hourly 60.00
Sr. Maintenance Worker Hourly 55.00
Maintenance Worker Hourly 50.00
PW Inspector Hourly 60.00
Administrative Staff Hourly 45.0050.00
Equipment Rate Cost
Pick-up Truck Hourly 15.00
Dump Truck Hourly 75.00
Back-hoe Hourly 55.00
Vactor-Jetter Truck Hourly 105.00
Snow Plow Hourly 75.00
Street Sweeper Hourly 55.00
Section 4. Building Permit Fees. For determining the value of a structure, the most current
issue of the Building Safety Journal Magazine, which offers the legacy building valuation data
fee schedule as published by the International Code Council, is adopted by reference. Fees
shall be as listed in Tables 3-1: Building Permit Fees, 3-2: Building Plan Fees, 3-3:
Miscellaneous Building Inspection Fees and 3-4: Miscellaneous Building Permit Fees.
Table 3-1: Building Permit Fees
Total
Valuation($)
2016 2017 2018 2019 2020 Fee Calculation ($)
1.00 – 500.00 32.00 32.50 33.00 33.50 34.00 0.00 to 500.00
501.00 – 2,000.00 32.00
4.22
32.50
4.31
33.00
4.39
33.50
4.48
34.00
4.57
For the first 500.00
PLUS for each additional
100.00, or fraction thereof,
to and including 2,000.00
2001.00 –
25,000.00
95.30
19.43
95.17
19.81
98.85
20.21
100.70
20.62
102.55
21.03
For the first 2,000.00
PLUS for each additional
1,000.00, or fraction thereof,
to and including 25,000.00
25,001.00 –
50,000.00
542.19
14.08
552.78
14.36
563.68
14.65
574.96
14.94
586.24
15.24
For the first 25,000.00
PLUS for each additional
1,000.00, or fraction thereof,
to and including 50,000.00
50,001.00 –
100,000.00
894.19
9.80
911.78
9.99
929.93
10.19
948.46
10.40
967.24
10.61
For the first 50,000.00
PLUS for each additional
1,000.00, or fraction thereof,
to and including 100,000.00
CITY OF ARLINGTON FEE SCHEDULE RESOLUTION #2016-0232018-XXX
Page 11
100,001.00 –
500,000.00
1,384.1
9
7.77
1,411.2
8
7.93
1,439.4
3
8.08
1,468.4
6
8.25
1,497.7
4
8.41
For the first 100,000.00
PLUS for each additional
1,000.00, or fraction thereof,
to and including 500,000.00
500,001.00 –
1,000,000.00
4,492.1
9
6.64
4,583.2
8
6.78
4,671.4
3
6.91
4,768.4
6
7.05
4,861.7
4
7.19
For the first 500,000.00
PLUS for each additional
1,000.00, or fraction thereof,
to and including
1,000,000.00
1,000,001.00 and
up
7,819.1
9
5.0
7
7,973.2
8
5.17
8,126.4
3
5.27
8,293.4
6
5.38
8,456.7
4
5.49
For the first 1,000,000.00
PLUS for each additional
1,000.00, or fraction thereof
Table 3-2: Building Plan Fees
Total
Valuation($)
2016 2017 2018 2019 2020
All valuations 65% of
Building
Permit Fee
65% of
Building
Permit Fee
65% of
Building
Permit Fee
65% of
Building
Permit Fee
65% of
Building
Permit Fee
Table 3-3: Miscellaneous Building Inspection Fees
Action Fee ($)
Inspections outside of normal business hours 50.00 per hour7 (minimum charge 1 hour)
Reinspection fees assessed under provisions of the
current IBC
50.00 per hour1
Inspection for which no fee is specifically indicated 50.00 per hour8 (minimum charge—1 hour)
Additional plan review required by changes,
additions or revised plans
50.00 per hour9 (minimum charge—1 hour)
For use of outside consultants for plan review and
inspections, or both.
Actual costs10
Stop work order (working without permit) 11
7 Or the total hourly cost to the City, whichever is greatest. This cost shall include supervision, overhead, equipment, hourly wages,
and benefits of the employees involved.
8 Or the total hourly cost to the City, whichever is greatest. This cost shall include supervision, overhead, equipment, hourly
wages, and benefits of the employees involved.
9 Or the total hourly cost to the City, whichever is greatest. This cost shall include supervision, overhead, equipment, hourly
wages, and benefits of the employees involved.
10 Actual costs include administrative and overhead costs.
11 Stop work order (SWO): failure to obtain a valid per mit within 48 hour of a SWO will result in double permit fees or a fine of
$500 whichever is less. A permit applied for within the 48 hour timeframe may be subject to a fine and/or fee at the discreti on of
the building official.
CITY OF ARLINGTON FEE SCHEDULE RESOLUTION #2016-0232018-XXX
Page 12
Table 3-4: Miscellaneous Building Permit Fees
Action Fee ($)
Change lot after plan review completed 100.00
Change plans during or after plan review. New Plan Review Fee
Change or revise plans after issuance of
permit.
Current hourly rate per IBC or new plan review fee
Commercial or industrial re-roof IBC value or bid amount
Demolitions 100.00
Espresso carts (portable and stand alone) 250.00
Fences over 6 feet in height Current hourly rate per IBC for plan review plus 20.00
permit fee
Mobile homes 500.00
Modular offices (job shacks) 350.00
Moved buildings 100.00 prior to moving together with a building permit
fee based on the IBC valuation for new building and
cost of moved building.
Residential re-roofs 0.00
if plan review required 50.00
Retaining walls (permit not required under
four (4) feet
100.00 or IBC valuation, whichever is greater
Signs IBC valuation, using permit fee only
4.2 Plumbing Fees. Plumbing fees shall be as listed in Table 3-4: Plumbing Fees.
Table 3-4: Plumbing Permit Fees
Action Fee ($)
PERMIT ISSUANCE
Plumbing Permit Base Fee 25.00
Medical Gas Systems 100.00
Fixtures and Vents
For each plumbing fixture or trap or set of fixtures on one trap (including water, drainage
piping and backflow protection thereof)
12.00
Sewers, Disposal Systems and Interceptors
For each industrial waste pretreatment interceptor, including its trap and vent, except
kitchen-type grease interceptors functioning as fixture traps
25.00
Water Piping and Water Heaters
For each water heater including vent 25.00
Lawn Sprinklers, Vacuum Breakers and Backflow Protection Devices
For each lawn sprinkler system on any one meter, including backflow protection devices
thereof
25.00
Swimming Pools For each swimming pool or spa:
Public pool 90.00
Public spa 90.00
Private pool 60.00
Private spa 30.00
CITY OF ARLINGTON FEE SCHEDULE RESOLUTION #2016--—0232018-XXX
Page 13
Action Fee ($)
Miscellaneous
For each appliance or piece of equipment regulated by the Plumbing Code but not
classed in other appliance categories, or for which no other fee is listed in this code
12.00
4.3 Mechanical Permit Fees. Mechanical permit and inspection shall be as listed in Table
3-5: Mechanical Permit and Inspection Fees.
Table 3-5: Mechanical Permit & Inspection Fees
Action Fee ($)
PERMIT ISSUANCE AND HEATERS
Mechanical Permit Base Fee 25.00
Furnaces 25.00
Appliance Vents
For the installation, relocation or replacement of each appliance vent installed and not
included in an appliance permit
10.00
Boilers 25.00
AHU’s and Condensing Units 100.00
Evaporative Coolers & Heat Pumps 25.00
Ventilation and Exhaust
For each ventilation fan connected to a single duct 10.00
Refrigeration Systems 50.00
For each gas piping system of 1 to 5 outlets 10.00
For each additional outlet over 5, each 1.00
Miscellaneous
For each appliance or piece of equipment regulated by the Mechanical Code but not
classed in other appliance categories, or for which the fee is listed in the table
25.00
Table 3-6: Plumbing & Mechanical Plan Review Fees
LESS THAN $500.00 ROUND DOWN TO NEAREST $1,000.
GREATER THAN $500.00 ROUND UP TO NEAREST $1,000.
Total Valuation Fee ($)
Less than $1,000.00 150.00
$1,000.00 to $9,999.99 200.00
$10,000 to $19,999.99 250.00
$20,000.00 to $29,999.99 300.00
$30,000.00 to $39,999.99 350.00
$40,000.00 to $49,999.99 400.00
$50,000.00 to $59,999.99 450.00
$60,000.00 to $69,999.99 500.00
$70,000.00 to $79,999.99 550.00
$80,000.00 to $89,999.99 600.00
$90,000.00 to $99,999.99 650.00
$100,000.00 to $199,999.99 700.00
CITY OF ARLINGTON FEE SCHEDULE RESOLUTION #2016--—0232018-XXX
Page 14
Total Valuation Fee ($)
$200,000.00 to $299,999.99 800.00
$300,000.00 to $399,999.99 900.00
$400,000.00 to $499,999.99 1,000.00
$500,000.00 to $599,999.99 1,100.00
$600,000.00 to $699,999.99 1,200.00
$700,000.00 to $799,999.99 1,300.00
$800,000.00 to $899,999.99 1,400.00
$900,000.00 to $999,999.99 1,500.00
$1,000,000.00 to $1,999,999.99 1,600.00
$2,000,000.00 to $2,999,999.99 1,700.00
$3,000,000.00 to $3,999,999.99 1,800.00
$4,000,000.00 to $4,999,999.99 1,900.00
5 Million and Up 2,000.00 for the first $5M plus
$1.00 for each additional
$1,000.00 or fraction thereof
Table 3-7: Fire Permit Fees
Action Fee ($)
Fire Sprinklers
Plan Review Fee 100.00
Permit Fee Based on Valuation
Fire Alarms
Plan Review Fee 100.00
Permit Fee Based on Valuation
Commercial Hoods (Type I & Type II)
Plan Review Fee 100.00
Permit Fee Based on Valuation
Other Fire Safety System
Plan Review Fee 100.00
Permit Fee Based on Valuation
Section 5. Fire Department Life-Safety Inspection Fees. Fees for re-inspections for life-
safety issues conducted by the Fire Department shall be as listed in Table 4: Fire Department
Life-Safety Inspection Fees.
CITY OF ARLINGTON FEE SCHEDULE RESOLUTION #2016--—0232018-XXX
Page 15
Table 4: Fire Depart ment Life-Safety Inspection Fees
Action Fee ($)
Life / Safety Inspections of Businesses
Initial Inspection 0.00
First reinspection for corrections 0.00
Second reinspection for corrections 100.00
Third reinspection for corrections 150.00
Additional inspections to complete life/safety corrections
and attain compliance
250.00
Fireworks Stand Inspection 50.00
Section 6. Fees for the Use of City Owned Facilities. Fees for various services, actions, and
permits regarding use of City owned facilities shall be as listed in Table 6: Fees for the Use
of City Owned Facilities.
Table 5: Fees for the Use of City Owned Facilities
Use/Activity Fee ($)
Hadley Hall at the Arlington Community Youth Center,
Stillaguamish Conference Room* at Public Works
Administration (154 W. Cox).
*This facility does NOT have a kitchen facility available for use.
Room usage fees for community youth related activities and
Neighborhood Watch meetings may be waived.
Without Kitchen
One to three hours 15.00 per hour
Over three hours 75.00
With Kitchen
One to three hours 20.00 per hour
Over three hours 125.00
Athletic Fields
League
Baseball
Youth, resident team 3.75 per youth per season
Youth, non-resident team 5.00 per team per use
Adult 12.50 per use
Softball
Youth, resident team 3.75 per youth per season
Youth, non-resident team 5.00per team per use
Adult 12.50 per use
Soccer
Youth, resident team 3.75 per youth per season
Youth, non-resident team 5.00 per team per use
Adult 12.50 per use
CITY OF ARLINGTON FEE SCHEDULE RESOLUTION #2016--—0232018-XXX
Page 16
Use/Activity Fee ($)
Other
Youth, resident team 3.75 per youth per season
Youth, non-resident team 5.00 per team per use
Adult 12.50 per use
Tournament
Baseball
Youth, resident team 3.75 per youth per tournament
Youth, non-resident team 5.00 per team per use
Adult 12.50 per use
Softball
Youth, resident team 3.75 per youth per tournament
Youth, non-resident team 5.00 per team per use
Adult 12.50 per use
Soccer
Youth, resident team 3.75 per youth per tournament
Youth, non-resident team 5.00 per team per use
Adult 12.50 per use
Other
Youth, resident team 3.75 per youth per season
Youth, non-resident team 5.00 per team per use
Adult 12.50 per use
Lighting
Youth 3.00 per hour
Adult 6.00 per hour
Scheduling Fee for League and Tournament
League 15.00 per team
Tournament 15.00 per tournament
Concession Sales
League 50.00 per season
Tournament 25.00 per day
6.1 Definitions.
A. “Youth” is defined as any person 18 years of age or younger.
B. “Resident” is defined as any team composed of at least 51% Arlington
residents.
Section 7. Appeal Fees for Violations and Abatement. Fees for various services and actions
regarding violations and abatement as per Chapter 11.01 of the Arlington Municipal Code
shall be as listed in Table 6: Appeal Fees for Violations and Abatement.
CITY OF ARLINGTON FEE SCHEDULE RESOLUTION #2016--—0232018-XXX
Page 17
Table 6: Appeal Fees for Violations and Abatement
Action Fee ($)
Appeals
To Hearing Examiner 582.00 plus actual cost of Hearing Examiner
Fines
Forest Practice Violation Fine 317.00
Section 8. Licensing Fees. Licensing fees for various licenses issued under various sections
of the Arlington Municipal Code shall be as listed in Table 7:- Licensing Fees.
Table 7: Licensing Fees
License/Activity Fee ($)
New application / renewal business license under AMC Chapter
5.28
60.00
Late payment penalty for business license under AMC Chapter 5.28 120.00
For new applications applied for between October 1st through
December 31st
45.00
For new applications applied for between January 1st through March
31st
30.00
For new applications applied for April 1 st through June 30th (Note:
$15 for the remainder of the current business license year and $60
for the new business license year for a total of $75, making the
business license valid thru June 30th of the following year.)
75.00
Businesses with offices located outside of city limits but conducting
business within city limits (AMC Chapter 5.28)
20.00
Peddlers & Solicitors License under AMC Chapter 5.04 25.00
Vehicles for Hire License under AMC Chapter 5.12
- First vehicle
- Each vehicle thereafter
35.00
15.00
Cabaret License under AMC Chapter 5.16 (annual) 75.00
Section 9. EMS Fees and Charges.
9.1 Fees and Mileage Charges Established. For purposes of AMC Chapter 3.06,
fees and mileage for EMS services shall be set as set forth in Table 8: Emergency
Medical Services Rates and Charges.
9.2 Beginning on January 1, 2013, the rates set forth for the year 2012 shall be
increased annually effective January 1 of each succeeding year by the June reported
percentage increase of the Consumer Price Index (CPI) for the Seattle-Tacoma-
Bremerton area for All Urban Consumers, or other measure commonly used by the city
should it change; provided, however, that notwithstanding any reduction in the CPI,
rates shall not decrease.
9.3 EMS Transport Fees. In accordance with the requirements of 42 Code of
Federal Regulations (CFR) Parts 410 and 414, which provides that Medicare fees and
charges shall apply to Medicare recipients;
CITY OF ARLINGTON FEE SCHEDULE RESOLUTION #2016--—0232018-XXX
Page 18
A. Unmet (excess fee) Part B Deductible and Part B coinsurance amounts. In
accordance with the provisions of 42 CFR Parts 410 and 414, the City shall
bill the patient for any unmet or excess fee to the extent authorized by
federal law.
B. Inability to Pay Excess Fee. Individuals who are on fixed or low incomes
or do not have the ability to pay the differential because of financial
difficulties may submit a request to waive the differential to the City with
supporting documentation of the inability to pay.
Table 8: Emergency Medical Services Rates and Charges
Service 2016 Rate ($) 2017 Rate ($) Rate ($)
BLS Non-emergent 558.80 568.86 775.00
BLS Emergent 558.80 568.86 775.00
ALS Emergent 1 965.20 982.57 1,150.00
ALS 2 965.20 982.57 1,225.00
ALS Response Fee 277.85 282.85 291.33
Specialty Care Transport Fee 965.20 982.57
Mileage (all categories) 16.77 per mile 17.07 per mile 20.00 per mile
Non-resident transport fee – additional
fee charged to those patients transported
from outside of the Arlington EMS
service area.
Arlington EMS Service area includes Arlington City
limits and the limits of Fire District 19, Fire District
21 (Arlington Rural), Fire District 24, and Fire
District 25
100.00 100.00
Section 10. Dog Licensing Fees.
10.1 Fees for dog licenses as called for in Arlington Municipal Code Chapter 8.09
shall be listed in Table 9: Dog Licensing Fees
10.2 Per RCW 49.60.380, the City of Arlington shall honor a request by a blind
person or hearing impaired person not to be charged a fee to license his or her guide
dog, or a request by a physically disabled person not to be charged a fee to license his
or her service animal.
10.3 All dogs require proof of current Rabies vaccination to be licensed .
10.4 Proof of alteration and micro -chip is required to receive reduced fees
Table 9: Dog Licensing Fees
License Annual Fee ($)
Dog -– unaltered (annual tag) 20.0040.00
Dog – alteredaltered (lifetime tag) 10.0020.00
Dog – altered (senior citizen owner – lifetime tag) 5.0010.00
Dog – altered & micro -chipped 5.00
Replacement Tag fee 5.00
Late Fee – for failure to purchase annual license before March 1 10.00
CITY OF ARLINGTON FEE SCHEDULE RESOLUTION #2016--—0232018-XXX
Page 19
Section 11. Fees for Police Services. Fees for various services, actions, and permits for police
services shall be as listed in Table 10: Fees for Police Services.
CITY OF ARLINGTON FEE SCHEDULE RESOLUTION #2016--—0232018-XXX
Page 20
Table 10: Police Services
Action / Service / License Fee ($)
Fingerprinting 20.00
Lamination of Concealed Weapons Permit 4.25
Anti-Harassment Order Service (Includes service, return of
service, mileage & fuel costs)
80.00
Fine for Parking:
1. Fine for parking as described in Arlington Municipal
Code 10.54.060, Prohibited Parking
2. Fine if paid within 24 hours of issuance
3. Fine if not paid within 15 days of issuance
50.00
25.00
100.00
Section 12. Fees for Duplication of Public Records. Fees for various services and actions
for duplication of public records shall be listed in Table 11: Public Records Services.
Table 11: Public Records Services
Action / Service Fee ($)
In house copying of City documents for the public 0.15 per page
In house copying of City documents to PDF when original
document is not in electronic format
0.10 per page
1.00 to copy to CD
2.50 to copy to USB Flash Drive
In house duplication of City documents to CD or USB Flash
Drive, such as Comprehensive Plan, Arlingt on Municipal Code
Title 20, Design Standards, Engineering Standards,
Development Standards, etc.
10 per CD or USB Flash Drive
Maps (For GIS specific services see below)
18” x 24”
22” x 34”
24” x 36”
30” x 30”
36” x 36”
1.50
2.60
3.00
3.15
4.50
Documents or CD/USB Flash Drive printed by outside party Actual cost to reproduce
Color Photos 0.40
Duplication of all other types of city media (e.g. photographs,
audio/video tapes, blueprints)
Actual cost to reproduce
Certified copy of a public record 5.00 for the first page; 1.00 for
each page thereafter
GIS
Zoning and Land Use Maps 10.00
11x17 5.00
2x3 13.00
3x3 19.00
3x4 25.00
Map CD 26.00
CITY OF ARLINGTON FEE SCHEDULE RESOLUTION #2016--—0232018-XXX
Page 21
Data CDs/FTP 26.00 per client
Hourly Rate for Custom Work 127.00 per hour, ½ hour minimum
Laminating 3.00/sq ft
Shipping 5.00
Fee 0.00
Section 13. Finance Department Services Fees for various services, actions, and permits
for police services shall be as listed in Table 12: Fees for Finance Department Services.
Action / Service Fee ($)
Non-Sufficient Funds – Dishonored or disallowed draft or check $35.00
Establishing a new utility account $18.00
Reactivating an existing utility account $18.00
Reconnection fee $50.00
Section 143. Repeal of Previous Fee Resolution. Resolution 2015-0092016-023 is hereby
repealed.
Section 15. Repeal of Previous Fee Resolution. Resolution 657 is hereby repealed.
Section 1416. Effective Date. This resolution will become effective immediately upon
passage.
PASSED by the City Council and APPROVED by the Mayor this 19th ______ day of
DecemberMay, 20162018.
CITY OF ARLINGTON
_________________________________
Barbara Tolbert, Mayor
ATTEST:
_________________________________
Kristin Banfield, City Clerk
APPROVED AS TO FORM:
CITY OF ARLINGTON FEE SCHEDULE RESOLUTION #2016--—0232018-XXX
Page 22
_______________________________
Steve Peiffle, City Attorney
City of Arlington
Council Agenda Bill
Item:
WS #5
Attachment
E
COUNCIL MEETING DATE:
April 23, 2018
SUBJECT:
Ordinance correcting a typographical error in Ordinance No. 2014‐016, relating to the sunset
provision of Ordinance 2011‐032 relating to utility taxes, retroactive to the date of adoption
ATTACHMENTS:
Draft Ordinance
DEPARTMENT OF ORIGIN
Administration; Kristin Banfield – City Clerk (360) 403‐3444
Legal; Steve Peiffle – City Attorney (360) 435‐2168
EXPENDITURES REQUESTED: None
BUDGET CATEGORY: N/A
BUDGETED AMOUNT: N/A
LEGAL REVIEW:
DESCRIPTION:
Staff has prepared an ordinance to correct a typographical error in Ordinance No. 2014‐016 relating
to the sunset provision of Ordinance 2011‐032 relating to utility taxes. City staff recently determined
that Section 1 of Ordinance 2014‐016 contained a typographical error by inadvertently repealing
Section 4 of Ordinance 2011‐032 instead of Section 6 of Ordinance 2011‐032. The ordinance also
makes the correction effective to the October 20, 2014 adoption date of Ordinance 2014‐016.
HISTORY:
Ordinance 2014‐016 was adopted for the purpose reaffirming the utility taxes of the City and to
eliminating the “sunset provision” in Ordinance No. 2011‐032.
ALTERNATIVES:
Remand to staff for further revision.
RECOMMENDED MOTION:
Workshop; discussion only. At the May 7, 2018 council meeting, the recommended motion will be, “I
move to approve the proposed ordinance correcting a typographical error in Ordinance No. 2014‐
016, relating to the sunset provision of Ordinance 2011‐032 relating to utility taxes, retroactive to
the date of adoption.”
ORDINANCE NO. 2018-XXX 1
ORDINANCE NO. 2018-XXX
AN ORDINANCE CORRECTING A TYPOGRAPHICAL ERROR IN ORDINANCE
2014-016, RELATING TO THE SUNSET PROVISION OF CITY ORDINANCE 2011-032
RELATING TO UTILITY TAXES, RETROACTIVE TO THE DATE OF ADOPTION
WHEREAS, on October 20, 2014 the City Council of the City of Arlington, Washington,
adopted Ordinance 2014-016, entitled “AN ORDINANCE OF THE CITY OF ARLINGTON,
WASHINGTON EXTENDING THE RATE OF UTILITY TAXES FOR ELECTRICAL,
COAXIAL TELEVISION CABLE TELEVISION, WATER, SEWER, STORMWATER AND
GARBAGE SERVICES AS SET FORTH IN ARLINGTON ORDINANCE 2011-032 AND
REPEALING THE SUNSET CLAUSE IN SAID ORDINANCE”; and
WHEREAS, Ordinance 2014-016 was adopted for the purpose reaffirming the utility
taxes of the City and to eliminating the “sunset provision” in Ordinance No. 2011-032; and
WHEREAS, the City did continue to charge utility taxes consistent with the intent of the
ordinance; and
WHEREAS, the City subsequently determined that Section 1 of Ordinance 2014-016
contained a typographical error by inadvertently repealing Section 4 of Ordinance 2011-032
instead of Section 6 of Ordinance 2011-032; and
WHEREAS, the City wishes to correct the error caused by the typographical errors,
retroactively to the date of adoption;
NOW, THEREFORE, the City Council of the City of Arlington does hereby ordain as
follows:
Section 1. Section 1 of Arlington Ordinance No. 2014-016 shall be and hereby is
corrected, retroactive to its date of adoption on October 20, 2014, to read:
Section 1. Section 4 6 of Arlington Ordinance 2011-032,
adopted by the City on December 19, 2011 shall be and hereby is
repealed.
Section 2. The title of this ordinance which summarizes the contents shall be
published in the official newspaper of the City. The ordinance shall take effect and be in full
force five (5) days after the date of publication.
ORDINANCE NO. 2018-XXX 2
PASSED by the City Council of the City of Arlington and APPROVED by the Mayor this
______ day of _____________________, 2018.
CITY OF ARLINGTON
____________________________________
Barbara Tolbert, Mayor
ATTEST:
___________________________________
Kristin Banfield, City Clerk
APPROVED AS TO FORM:
___________________________________
Steven J. Peiffle, City Attorney
City of Arlington
Council Agenda Bill
Item:
WS #6
Attachment
F
COUNCIL MEETING DATE:
April 23, 2018
SUBJECT:
Taxiway Charlie Lighting & Signing Improvement Project Amendment
ATTACHMENTS:
Consultant Fee Adjustment & Amendment
DEPARTMENT OF ORIGIN
Airport
EXPENDITURES REQUESTED: $18,000.00
BUDGET CATEGORY: Capital Improvement
BUDGETED AMOUNT: $18,000.00
LEGAL REVIEW:
DESCRIPTION:
Airport staff is requesting that council approve WH Pacific’s additional consultant fee adjustment
request for construction management services and authorize the mayor to sign the amendment for
the Taxiway Charlie Lighting and Signing Improvements Project in the amount of $18,000.00. The
FAA awarded the project grant later than anticipated in 2017, which resulted in pushing the project
into the winter months. A decision was made early on in the project to extend the project from 60
days to 85 days in consideration of procurement of materials, shorter daylight hours, and winter
weather delays. After discussion with staff and the FAA, we feel that this is a fair request. The FAA
will pay 90% of WH Pacific’s request.
HISTORY:
The Taxiway Charlie Lighting Project involved installing taxiway edge lighting and lighted signs
along the entire length of Taxiway Charlie on the west side of the airport. The Taxiway Charlie
Project was a budgeted project in the 2017 budget. City Council approved a construction
management contract with WH Pacific at their June 5th, 2017 City Council meeting in the amount of
$122, 462.00.
ALTERNATIVES:
Deny Staff’s Recommendation
Table Staff’s Recommendation
RECOMMENDED MOTION:
Workshop; discussion only. At the May 7, 2018 council meeting, the recommended motion will be, “I
move to approve WH Pacific’s additional fee request of $18,000.00 for construction management
services and authorize the mayor to sign the amendment for the Taxiway Charlie Lighting and
Signing Improvement Project. “
CI
T
Y
O
F
A
R
L
I
N
G
T
O
N
EX
H
I
B
I
T
B
AR
L
I
N
G
T
O
N
A
I
R
P
O
R
T
TW
Y
C
L
I
G
H
T
I
N
G
A
N
D
S
I
G
N
A
G
E
I
M
P
R
O
V
E
M
E
N
T
S
Fe
e
R
e
q
u
e
s
t
Pr
e
p
a
r
e
d
b
y
:
J.
S
h
u
t
e
Re
v
i
e
w
e
d
:
PR
O
J
.
CO
N
S
T
.
AV
I
A
T
I
O
N
RE
S
I
D
E
N
T
Ad
m
i
n
TA
S
K
MG
R
MG
R
EN
G
I
N
E
E
R
OB
S
E
R
V
E
R
CA
D
D
As
s
i
s
t
a
n
t
TO
T
A
L
PR
O
J
E
C
T
NO
PR
O
J
E
C
T
T
A
S
K
19
0
.
0
0
$
15
3
.
0
0
$
10
2
.
0
0
$
11
7
.
0
0
$
11
5
.
0
0
$
10
2
.
0
0
$
HR
S
BU
D
G
E
T
Se
r
v
i
c
e
s
D
u
r
i
n
g
C
o
n
s
t
r
u
c
t
i
o
n
1.
4
C
o
n
s
t
r
u
c
t
i
o
n
A
d
m
i
n
i
s
t
r
a
t
i
o
n
6
1
4
4
4
2
8
$
4
,
1
5
8
1.
5
R
e
s
i
d
e
n
t
S
e
r
v
i
c
e
s
(
1
3
-
D
a
y
s
a
t
8
h
r
s
/
d
a
y
)
2
2
1
0
4
1
0
8
$
1
2
,
8
5
4
0
$
0
0
$
0
0
$
0
0
$
0
Ta
s
k
5
T
o
t
a
l
B
u
d
g
e
t
:
8
1
6
0
1
0
8
0
4
1
3
6
$
1
7
,
0
1
2
EX
P
E
N
S
E
S
:
Co
s
t
Gr
o
u
n
d
R.
T
.
Tr
a
v
e
l
:
Pe
r
U
n
i
t
#
U
n
i
t
s
Tr
i
p
s
Da
y
s
Mi
l
e
s
Ma
r
k
u
p
54
5
.
5
5
$
Mi
l
e
a
g
e
$0
.
5
4
5
13
77
1
$5
4
5
.
5
5
Mi
s
c
.
e
x
p
e
n
s
e
s
:
20
8
.
0
0
$
Pr
i
n
t
i
n
g
(
3
s
e
t
s
a
t
1
0
e
a
)
$0
.
0
0
0
0
$0
.
0
0
Pe
r
D
i
e
m
$1
6
.
0
0
13
1
$2
0
8
.
0
0
Lo
d
g
i
n
g
$9
3
.
0
0
0
0
$0
.
0
0
Su
b
-
C
o
n
s
u
l
t
a
n
t
s
:
-
$
0
$0
.
0
0
Su
m
m
a
r
y
:
Su
b
t
o
t
a
l
-
L
a
b
o
r
17
,
0
1
2
.
0
0
$
Su
b
t
o
t
a
l
-
R
e
i
m
b
u
r
s
a
b
l
e
s
75
3
.
5
5
$
Su
b
t
o
t
a
l
-
S
u
b
c
o
n
s
u
l
t
a
n
t
s
-
$
To
t
a
l
-
17
,
7
6
5
.
5
5
$
BU
D
G
E
T
A
D
J
U
S
T
M
E
N
T
18
,
0
0
0
.
0
0
$
C:
\
W
a
s
h
i
n
g
t
o
n
\
A
r
l
i
n
g
t
o
n
\
T
w
y
C
L
i
g
h
t
i
n
g
\
A
W
O
A
d
d
i
t
i
o
n
a
l
F
e
e
R
e
q
u
e
s
t
3
-
1
5
-
2
0
1
8
.
x
l
s
x
3/
1
9
/
2
0
1
8
City of Arlington
Council Agenda Bill
Item:
WS #7
Attachment
G
COUNCIL MEETING DATE:
April 23, 2018
SUBJECT:
Inter‐fund Loan from Growth Fund to EMS Fund
ATTACHMENTS:
Loan Worksheet – Exhibit 1
DEPARTMENT OF ORIGIN
Finance: Kristin Garcia, Finance Director 360‐403‐3431
EXPENDITURES REQUESTED: $105,728.02
BUDGET CATEGORY: Growth Fund
BUDGETED AMOUNT: $223,915
LEGAL REVIEW:
DESCRIPTION:
For the month of March, the EMS fund required a loan of 105,728.02 as revenues were not sufficient
to cover operating expenses. This brings the total outstanding balance on the loan to $392,417.74
which exceeds the amount authorized in the budget.
HISTORY:
The previous outstanding loan from 2017 has not been fully repaid. The outstanding balance on the
2017 loan is $26,000. In January the fund required a loan of $139,478. In February the fund
required a loan of $121,212.
ALTERNATIVES:
Do not approve the inter‐fund loan and allow the fund to be negative. This could violate RCW
43.09.210 which states that no fund should unfairly benefit from another.
RECOMMENDED MOTION:
Workshop; discussion only. At the May 7, 2018 council meeting, the recommended motion will be; “I
move to authorize an inter‐fund loan of $105,728.02.”
City of Arlington
Council Agenda Bill
Item:
WS #8
Attachment
H
COUNCIL MEETING DATE:
April 23, 2018
SUBJECT:
March 2018 Financial Report
ATTACHMENTS:
Financial Reports –
Narrative
General Fund Operating Statement
Revenue Charts
Other Fund Operating Statements
DEPARTMENT OF ORIGIN
Finance; Kristin Garcia – Finance Director 360‐403‐3431
EXPENDITURES REQUESTED: 0
BUDGET CATEGORY: N/A
BUDGETED AMOUNT: N/A
LEGAL REVIEW:
DESCRIPTION:
Attached is the March 2018 financial report.
HISTORY:
ALTERNATIVES:
RECOMMENDED MOTION:
Workshop; discussion only.