Loading...
HomeMy WebLinkAbout05-22-17 Council Workshop.docx SPECIAL ACCOMMODATIONS:  The City of Arlington strives to provide accessible meetings for people with disabilities. Please contact the  ADA coordinator at (360) 403‐3441 or 1‐800‐833‐8388 (TDD only) prior to the meeting date if special accommodations are required.    CALL TO ORDER  Mayor Barb Tolbert    PLEDGE OF ALLEGIANCE    ROLL CALL  Mayor Barb Tolbert – Kristin     APPROVAL OF THE AGENDA  Mayor Pro Tem Debora Nelson    INTRODUCTION OF SPECIAL GUESTS AND PRESENTATIONS     WORKSHOP ITEMS – NO FINAL ACTION WILL BE TAKEN    1. Resolution adopting amended Financial Policies       ATTACHMENT A        Staff Presentation: Kristin Garcia        Council Liaison: Mayor Pro Tem Debora Nelson       2. April 2017 Financial Report           ATTACHMENT B        Staff Presentation: Kristin Garcia       3. Website Redesign – CivicPlus Proposal         ATTACHMENT C         Staff Presentation: Bryan Terry         Council Liaison: Mayor Pro Tem Debora Nelson       4. Citizens’ Salary Review Commission Decision       ATTACHMENT D             Staff Presentation: Kristin Banfield/Heather Logan         Council Liaison: Mayor Pro Tem Debora Nelson       5. Bid Award and Grant Acceptance – Taxiway Charlie Lighting and  ATTACHMENT E            Signing Improvements Project         Staff Presentation: Dave Ryan        Council Liaison: Chris Raezer/Jan Schuette       6. Interlocal Agreement with Arlington School District for     ATTACHMENT F        School Resource Officer        Staff Presentation: Jonathan Ventura        Council Liaison: Jesica Stickles/Marilyn Oertle   Arlington City Council Workshop                                                       Monday, May 22, 2017 at 7:00 pm          City Council Chambers – 110 E 3rd Street SPECIAL ACCOMMODATIONS: The City of Arlington strives to provide accessible meetings for people with disabilities. Please contact the ADA coordinator at (360) 403-3441 or 1-800-833-8388 (TDD only) prior to the meeting date if special accommodations are required.     7. Authorization to file Quiet Title Action for Arlington Valley Road ATTACHMENT G        Presentation: Steve Peiffle        Council Liaison: Debora Nelson/Jesica Stickles       8. Hayden Park Utility Extension Agreement       ATTACHMENT H        Staff Presentation: Jim Kelly        Council Liaison: Mayor Pro Tem Debora Nelson       9. Villas at Arlington Rezone            ATTACHMENT I        Staff Presentation: Marc Hayes        Council Liaison: Mike Hopson/Jan Schuette     10. Stewart Rezone                ATTACHMENT J                               Staff Presentation: Marc Hayes        Council Liaison: Mike Hopson/Jan Schuette     11. Miscellaneous Council Items    EXECUTIVE SESSION    RECONVENE    PUBLIC COMMENT  For members of the public who wish to speak to the Council. Please limit your remarks to three minutes.    ADJOURNMENT  Mayor Barb Tolbert            To open all attachments, click here  City of Arlington Council Agenda Bill Item: WS #1 Attachment A COUNCIL MEETING DATE: May 22, 2017 SUBJECT: Adopt Resolution Revising the City’s Financial Policies ATTACHMENTS: Financial Policies Executive Summary Resolution No. 2017‐XXX Financial Management Policies DEPARTMENT OF ORIGIN Finance; Kristin Garcia – Finance Director 360‐403‐3431 EXPENDITURES REQUESTED: 0 BUDGET CATEGORY: N/A BUDGETED AMOUNT: N/A LEGAL REVIEW: DESCRIPTION: Attached is a resolution to revise the City’s financial policies. A draft of the policy document, with suggested updates, was presented to council at the retreat in April. A summary of significant changes are reflected on the attached “Financial Policies Executive Summary” document. HISTORY: The City last updated its financial policies May 5, 2014. ALTERNATIVES: 1) Not revise the financial policies. 2) Defer approval for further discussion and review. RECOMMENDED MOTION: Workshop; discussion only. At the June 5 council meeting, the motion will read; “I move to approve Resolution 2017‐XXX replacing Resolution No. 2014‐024 and adopting revised financial policies for the City, and authorize the Mayor to sign the resolution.” 1    Financial Policies Executive Summary – Kristin Garcia, Finance Director  BACKGROUND  Research was conducted from a variety of sources in order to identify best practices in the industry  that would confirm and/or enhance the City of Arlington’s current financial policies.  Research was  gathered from; the Municipal Research Services Center, State Auditor’s Office, the Government  Finance Officer’s Association, Revised Code of Washington, cities of similar size and cities within  King, Snohomish, Skagit and Whatcom counties.  RESERVES  A fund balance reserve policy is important because it establishes minimum levels to ensure stable  service delivery, ability to meet future needs and to protect against financial instability.  Based on  the research conducted, a two month operating reserve is seen as a best practice.  Our current  policy reflects a minimum one month operating reserve.  A one month operating reserve isn’t  sufficient to cover operations and to have the time needed to make a course direction in the event  of an economic downturn.  The suggested updates include the following;   Progressive intent to increase the one month operating reserve to two months by December  31, 2022. This date was chosen because our 10 year financial plan indicates that we’ll be able  to meet a two month operating reserve by this date assuming the financial trends hold true.   Language was added to reflect;  o The current practice of contributions into the equipment replacement fund  o Minimum reserve levels for the enterprise funds  o Protocol for when reserves fall below the minimum standard  REVENUES  Revenue policies are to identify resources to fund ongoing operations, how one time revenue  sources will be handled and how to address short/long term revenue downturns.  The suggested updates include the following;   Establishing authority for writing off accounts.  Write offs are minimal as we have many  options available for collection of accounts, however, in the event all efforts have been  exhausted, it is a best practice not to hold uncollectible accounts on the books.   Language was added to reflect;  o Use of one time revenues  o Current practice of levying the statutory 1% limit of property taxes or banking the  capacity for future use  o Approval of grant revenue  2    EXPENDITURES  Minimal updates were made to the expenditure policies and all updates are reflective of current  practices.  ACCOUNTING, AUDITING AND FINANCIAL REPORTING  The updates to this section are to reflect current practice and requirements by state and federal  law.  The suggested updates include the following;   FAA Assurances require that we include a business continuity provision in our financial  policies.  Language was added to meet compliance with FAA Assurances.   Other language changes reflect;  o Finance director is authorized to create revenue/expenses accounts as prescribed by  the State Auditor’s Office  o Funds are created as prescribed by the State Auditor’s Office  o Deposits shall be made every 24 hours  o Cash refunds are prohibited  BUDGET AND OPERATING   Budget and operating policies establish the framework that guides how resources will be allocated  to City services and programs.  The language added to this section includes the City’s current  practices of;   Development and maintenance of a ten year financial plan   Consideration of long term financial implications when developing the budget   Budget amendment process  CAPITAL ASSETS  A capital asset policy establishes stewardship and accountability of public assets.  Most of the  changes to this policy are to remove language applicable to accrual basis of accounting as the City of  Arlington is a cash basis organization.  Other significant changes were to remove procedural  language.  Policies set the guidelines for how business will be conducted, procedures are developed  at the department level for how the policies will be implemented.  The procedural elements  removed from this policy document will be incorporated into a procedure document managed by  the finance department.      3    PURCHASING  Purchasing procedures outline the requirements of procuring goods and services.  The bidding  thresholds used in the policy are in accordance with State and Federal Law.    The suggested updates include the following;   Adding language to reflect “exemptions” to bid laws that are already authorized by State Law  and currently being utilized by the City.  They are;  o Sole source  o Special market conditions  o Emergencies  o Purchase of insurance and bonds   Clarified use of vendor lists   Simplified the contract amendment process   Added process for telecommunications and data processing purchases    Simplify and make consistent the levels of signature authority between the different types of  purchases (i.e. small work vs equipment vs professional service).  It was confusing to have  different levels of authority depending on what type of purchase was being made.  The  policy update intended to bring consistency to authority levels to reduce audit risk.  The  signature authority applies to items already approved by council through the budget  process.  Any unbudgeted item requires separate council approval.  For the most part,  Director levels were kept the same or very near the original levels that were established.   The biggest change was adding a level of approval for the City Administrator and updating  the dollar threshold for Mayor and council authority.  COST ALLOCATION  The cost allocation policy outlines how the indirect costs of performing central services will be  allocated to users of those services.  In 2015 the auditor’s requested that the City develop a  methodology which was in accordance with the BARS manual.  With development of the 2016  budget, the methodology was updated and accepted by the auditor’s.  Our next step is to update  the formal policy document to reflect the updated methodology currently being used.   DEBT AND INVESTMENT  No changes.    RESOLUTION NO. 2017-xxx RESOLUTION NO. 2017—xxx A RESOLUTION OF THE CITY OF ARLINGTON REPLACING RESOLUTION NO. 2014‐024 AND ADOPTING REVISED FINANCIAL POLICIES FOR THE CITY WHEREAS, the National Advisory Council on State and Local Budgeting Practices recommends budget practices, including the development of a series of financial policies; and WHEREAS the Arlington City Council has reviewed and deliberated on the recommended revisions to the financial policies and finds that it is in the best interest of the city to adopt financial policies; NOW, THEREFORE, BE IT HEREBY RESOLVED BY THE CITY COUNCIL OF THE CITY OF ARLINGTON: Section 1. The “Financial Management Policies” dated June 5, 2017 are hereby adopted as the financial policies and practices of the City. Section 2. This resolution shall take effect immediately upon passage thereof. APPROVED by the Mayor and City Council of the City of Arlington this 5th day of June, 2017. CITY OF ARLINGTON ___________________________ Barbara Tolbert Mayor ATTEST: _________________________________ Kristin Banfield City Clerk APPROVED AS TO FORM: __________________________________ Steven J. Peiffle City Attorney                                                                                                                       1 Financial Management Policies City of Arlington  Adopted  5/5/2014DRAFT  5.15.17  DRAFT 3.30.17 Table of Contents OPERATING POLICIES Purpose, objectives ............................................................................................ 2 Reserve Fund Policies ........................................................................................ 3 Revenue Policies ................................................................................................ 4 Expenditure Policies .......................................................................................... 5 Accounting and Financial Reporting ................................................................ 6 Budget Policies ................................................................................................... 7 Capital Assets ..................................................................................................... 8 Purchasing ........................................................................................................ 15 Cost Allocation… ............................................................................................ 29 DEBT MANAGEMENT POLICY ............................................................................ 31 INVESTMENT POLICY .......................................................................................... 33 GLOSSARY................................................................................................................ 37 Formatted: Tab stops: 2.28", Left DRAFT 3.30.17 Purpose: The Comprehensive Financial Management Policy assembles all of the City’s financial policies in one document. They are the tools to ensure that the City is financially able to meet its immediate and long-term service objectives. The individual policies contained herein serve as guidelines for both the financial planning and internal financial management of the City. The City of Arlington is accountable to its citizens for the use of public dollars. Municipal resources must be wisely used to ensure adequate funding for the services, public facilities, and infrastructure necessary to meet the community’s present and future needs. These policies safeguard the fiscal stability required to achieve the City’s goals and objectives. Objectives: In order to achieve its purpose, the Financial Management Policies have the following objectives for the City’s fiscal performance. A. To guide the City Council and management policy decisions that have significant impact. B. To set forth-operating principles that minimize the cost of government and financial risk. C. To employ balanced and fair revenue policies that provide adequate funding for desired programs. D. To maintain appropriate financial capacity for present and future needs. E. To promote sound financial management by providing accurate and timely information on the City’s financial condition. F. To protect the City’s credit rating and provide for adequate resources to meet the provision of the City’s debt obligations on all municipal debt. G. To ensure the legal use of financial resources through an effective system of internal controls. H. To promote cooperation and coordination with other governments and the private sector in the financing and delivery of services. Reserve Fund Policies DRAFT 3.30.17 Adequate reserve levels are a necessary component of the City’s overall financial management strategy to mitigate current and future risks such as revenue shortfalls or unanticipated expenditures. Reserve levels are also a and key factor in external agencies’ measurement of the City’s financial strength which results in favorable credit ratings and access to lower cost of financing.. a. The City will strive to maintain a Mandatory General Fund Reserve with a target balance of eight percent (8%) of the total General Fund budgeted taxes and lLicenses & pPermits revenues. These operating reserves are maintained to address temporary revenue shortfalls; payment of approved expenditures due to cash flow shortage; reserves for expenditures deemed necessary by the Mayor and City Council; temporary short-term inter-fund loans, and other unanticipated expenses as approved by the City Council. An annual contribution will be budgeted from General Fund resources as available to maintain the target reserve level. 1) This “reserve” shall be in addition to the maintenance of one-month operating cash within the General Fund itself. b. The City will maintain an ending fund balance within the General Fund of an amount equal to one month of operating expenditures with the intent to grow the fund balance, by December 31, 2022 equal to two months of operating expenditures. Use of any surplus funds will be approved by council through the budget process. c. It will be the policy of Tthe City will to maintain a Capital Facilities/Building Fund to provide funding for future facilities including debt repayment, less proprietary fund projects. Contributions into this fund will be made from available funds as identified in the adopted or amended budget.The use of any funds within the Capital Facilities/Building Fund will be as approved by the City Council. d. The City will maintain an Equipment Replacement Fund that will receive annual contributions from the operating expenses of departments owning the equipment. Contributions will be based on availability of funds as approved through the budget process. The intent is to replace equipment at the end of the asset’s useful life. b. It shall be best practice of all enterprise funds to maintain an ending fund balance (in operational funds) of an amount equal to or greater than one month operating expenses or an amount as otherwise required by federal, state or other regulations (i.e. rate studies, debt covenants). c. Contributions to the Mandatory General Fund Reserve and Capital Facilities/Building Funds will be made from available funds as identified in the annual budget, or amended budget at the end of the year. The Finance Director shall make a recommendation to the Council with regard to transfers to reserve funds. The Council, by motion (and amending the budget by ordinance as necessary) shall authorize the transfers, as the Council shall determine to be appropriate at that time. e. Reserves that fall below the minimum standards will require a financial plan presented to Formatted: Font: 12 pt Formatted: List Paragraph, Right: 0.52", Numbered + Level: 1 + Numbering Style: a, b, c, … + Start at: 1 + Alignment: Left + Aligned at: 0.07" + Indent at: 0.32", Tab stops: 0.57", Left Formatted: Font: 12 pt, Not Highlight Formatted: Font: 12 pt Formatted: Font: 12 pt Formatted: Indent: Left: 0.32", Hanging: 0.25", Right: 0", No bullets or numbering, Tab stops: Not at 0.32" Formatted: Font: 12 pt Formatted: Indent: Left: 0.32", Hanging: 0.25", Right: 0", No bullets or numbering, Tab stops: Not at 0.32" Formatted: Indent: First line: 0" Formatted: List Paragraph, Indent: Left: 0.32", Right: 0.07", Tab stops: 0.32", Left Formatted: Font: 12 pt Formatted: Indent: Left: 0.32", Hanging: 0.25", Right: 0", No bullets or numbering, Tab stops: Not at 0.32" Reserve Fund Policies DRAFT 3.30.17 council within 60 days of the shortfall. Fund balances will be restored to the minimum standard within a 3 year period. d.f. All expenditures drawn from reserve accounts shall require prior Council approval unless previously specifically authorized by the City Council through the budget and/or budget amendment processfor expenditure in the annual budget. Formatted: Not Highlight Revenue Policies DRAFT 3.30.17 The City will identify resources that are sufficient to provide for the regular and ongoing operations associated with providing public services. a. To the extent possible, a diversified and stable revenue system will be maintained to shelter public services from short-run fluctuations in any one revenue source. Trends analyzing the dependence on distinct revenue sources shall be included in the budget documents for consideration by the Council. b. Revenue forecasts shall be realistically estimated and based on the best information available. The City will follow a vigorous policy of collecting revenues.The finance director is responsible for developing a policy for the collection of revenues. The policies will include any and all collection methods allowable by state and federal statute or otherwise provided for in Municipal Code, leases or other agreements. If all collection efforts have been exhausted, the finance director has authority to write off uncollectible accounts up to $2,500 and the city administrator has authority to write off uncollectible accounts up to $5,000. Any write off in excess of $5,000 require council approval. c. Revenue forecasts will assess the full spectrum of resources that can be allocated for public services. Each year the Council shall review potential sources of revenue as part of the annual budget process. d. The use of one time revenues to fund ongoing expenditures is discouraged. e. Property taxes provide a consistent base of revenues for the City to provide public services. The City shall levy property taxes within its statutory limit or bank the levy capacity so the City can continue to provide a safe, economically vibrant place to live and work. c. d.f. Short-term (anticipated less than one year) economic downturns and temporary gaps in cash flow: Expenditure reductions or restrictions may be imposed. Inter-fund loans may be used to address short-term cash flow needs as authorized by Chapter 3.90 of Arlington Municipal Code.Council may approve an interfund loan to address temporary downturns in City revenues. e.g. Long-term (greater than one year) revenue downturns: Revenue forecasts will be revised. Expenses will be reduced to conform to the revised long-term revenue forecast or revenue increases will be considered. The City will not pursue deficit financing and borrowing to support on-going operations as a response to long-term revenue shortfalls. f.h. All potential grants shall be carefully examined for matching requirements. Some grants may not be accepted if the local matching funds cannot be justified. Grants may also be rejected if programs must be continued with local resources after grant funds are exhausted. g.i. The City shall develop and maintain a comprehensive list of various fees and charges. Fees Formatted: Indent: Left: 0.07" Formatted: Font: 12 pt Formatted: Not Highlight Formatted: Not Highlight Formatted: Font: 12 pt Formatted: Indent: Left: 0.32", Hanging: 0.25", Right: 0", No bullets or numbering, Tab stops: Not at 0.32" Formatted: Font: 12 pt Formatted: Indent: Left: 0.32", Hanging: 0.25", Right: 0", No bullets or numbering, Tab stops: Not at 0.32" Formatted: Font: 12 pt Formatted: Indent: Left: 0.32", Hanging: 0.25", Right: 0", No bullets or numbering, Tab stops: Not at 0.32" Formatted: Normal, No bullets or numbering Revenue Policies DRAFT 3.30.17 may be set at levels sufficient to cover the entire cost of service delivery (such as in “Enterprise Funds”), or the service may be subsidized, as Council deems appropriate. The City will systematically review user fees and rates and consider adjustments as necessary to take into account the effects of additional service costs and inflation. Rate studies shall be conducted to ensure that the rates will continue to support direct and indirect costs of operations, administration, plant maintenance, debt service, depreciation of capital assets, and moderate system extensions. Based on a market analysis, fees for similar services in other communities may also be considered. The criteria used to evaluate recommended target rates (equity, cost recovery policy, market demand, etc) shall be included in the staff report during the review. Such review should be scheduled periodically and be incorporated into the budget process for possible action by the City Council. j. The City, or Council approved board(s) or commission(s), will review contracts and leases which result in revenues to the City. Leases and contracts will be reviewed on a timely basis, prior to the expiration date or at least every 3 years if on a continuing basis. will review contracts and leases, which result in revenues to the city on a timely basis in order to provide for careful evaluation by the City Council. h.k. The City will refrain from using grants to meet ongoing service needs. Grants will be evaluated from a financial planning perspective to ensure the City has adequate matching funds (if applicable). Grants with a matching component, not previously approved through the budget process, require Council approval. All other grants will be approved by City Council through the budget amendment process and will be reviewed to ensure compliance with state, federal and City regulations. Formatted: Font: 12 pt Formatted: Indent: Left: 0.32", Hanging: 0.25", Right: 0", No bullets or numbering, Tab stops: Not at 0.32" Formatted: Not Highlight DRAFT 3.30.17 Expenditure Policies The City will provide for a sustainable level of service by adopting a balanced budget where ongoing resources are sufficient to support ongoing expenditures. a. The City will only propose operating expenditures, which can be supported from on-going operating revenues. Before the City undertakes any agreements that would create fixed on- going expenses, the cost implications of such agreements will be fully determined for current and future years. Capital expenditures may be funded from one-time revenues, but the operating budget expenditure impacts of capital expenditures will be reviewed for compliance with this policy provision. b. Department heads are responsible for managing their budgets within the total appropriation for their department. The finance director is responsible for oversight of all budget expenditures and is authorized to make unilateral changes within line item expenditures as long as the changes are within the overall budget. c. The City will maintain expenditure categories according to prescribed accounting standards, state statute, federal and and administrative regulation. All expenditures shall be audited and certified by the finance director or designee prior to submitting to the City Council for approval. c.d. All expenditures must be related to some public purpose and are reasonable in the amount and nature. d.e. The City will assess funds for services provided internally by other funds. The estimated direct and indirect costs of service will be budgeted and charged to the fund performing the service. Interfund service fees charged to recover these costs will be recognized as revenue to the providing fund. A review of the method for determining the amount of the interfund assessment will be reviewed periodically. e.f. Emphasis is placed on improving individual and work group productivity rather than adding to the work force. The City will invest in technology and other efficiency tools to maximize productivity. The City will hire additional staff only after the need of such positions has been demonstrated and documented. f.g. All compensation planning and collective bargaining will focus on the total cost of compensation, which includes direct salary, health care benefits, pension contributions, training allowance, and other benefits of a non-salary nature, which are a cost to the City. Collective bargaining decisions will not negatively impact the City’s efforts to maintain reserve balances in compliance with the City’s reserve policy (see page 3). Formatted: Body Text, Right: 0", Space Before: 0 pt Formatted: Font: 12 pt Formatted: Indent: Left: 0.32", Hanging: 0.25", Right: 0", No bullets or numbering, Tab stops: Not at 0.32" Accountin , Auditin and Financial Reportin DRAFT 3.30.17 The City will maintain a system of financial monitoring, control, and reporting for all operations and funds in order to provide effective means of ensuring that overall City goals and objectives are met. Accounting Records and Reporting. The City will maintain its accounting records in accordance with state and federal regulations, which includes requirements for data retention for archival purposes and business continuity. City records will be archived and destroyed in accordance with the Washington State Records Retention Schedule. The continuation of services after a disaster is critical to the success of the City. The City must ensure that its applications, data and network resources can continue and be appropriately accessible to users. The information technology department is responsible for developing procedures for the security, storage, retention and retrieval of data to ensure operations continue during and after a disaster. Budgeting, accounting and reporting will conform to the Budgeting, Accounting and Reporting System (BARS) for Governments as prescribed by the Washington State Auditor. Changes to the City’s revenue and expense accounts must be authorized by the finance department and will be made only if it’s in the best interest of the overall accounting system. All known or suspected loss of public funds shall be reported to the State Auditor’s Office in accordance with RCW 43.09.185. Auditing. The State Auditor will perform the City’s financial and compliance audit in accordance with state and federal laws. Results of the audit will be provided to the Council in a timely manner. Simplified Fund Structure. To the extent possible, the City will minimize the number of Funds. Funds will be created and accounted for in accordance with BARS. Cash Management. The Finance Department will develop, maintain, and consistently seek to improve cash management systems which ensure the accurate and timely accounting, investment, and security of all cash assets. All monies received from City departments by the Finance Department prior to the end of each business day will be deposited the same day.- There are several locations where monies are received by the City. Those locations are: the Finance office, the Airport office, the Permits office, and the Police department, the Public Works office and the Cemetery office. Formatted: Indent: Left: 0", First line: 0" Formatted: Right: 0.21", Space Before: 0 pt Formatted: Not Expanded by / Condensed by Formatted: Indent: Left: 0.07" Accountin , Auditin and Financial Reportin DRAFT 3.30.17 Deposits will be made every 24 hours as per RCW 43.09.240, including deposits received from City departments by the finance department. The Finance, Airport and Permits office locations all have cash drawers. These funds are used to make change for cash payments. The amount of these cash drawers are authorized by resolution. No change shall be given when a check is presented for payment. Cash refunds are prohibited. Refunds shall be processed through the method payment was received such as by check or credit card. No one is authorized, at any time, to borrow funds from any cash drawer. Doing so will result in discipline up to and including termination. The Finance Office also has a Petty Cash Revolving Fund (Checking Account). The Petty Cash Fund is authorized in the Arlington Municipal Code Section 3.69. This fund is used to pay very small expenditures or reimburse small expenditures made where waiting for a payment from the normal payment process is unreasonable. No one is authorized to borrow monies from this Fund. Formatted: Indent: Left: 0.07" Formatted: Indent: Left: 0", First line: 0.07" Formatted: Indent: Left: 0.07" Formatted: Indent: Left: 0.07" Formatted: Indent: Left: 0.07" Bud et and Operatin Policies DRAFT 3.30.17 The City’s budget is part of an overall policy framework that guides the services and functions of the City. The budget serves as a key role in that framework by allocating financial resources to programs which implement the City’s overall vision and goals. A. All decisions will be within the context of long-range plans (Capital Facilities Plan, / Comprehensive Plan/Capital Improvement Plan, Long Term Financial Plan). Staff shall provide a review of the implications of budgetary proposals on long-range plans. A.B. The City will develop and maintain a ten year financial plan that estimates the resources and expected costs over a ten year period. This planning tool will provide the City’s decision makers with an indication of long-term fiscal impacts of current policies and budget decisions. C. The annual budget shall be developed consistent with state law and in a manner which encourages early involvement with the public and City Council. A calendar related to budget development shall be presented to the City Council each year. The budget will be adopted by ordinance at the fund level. B. The budget will be developed to consider long term financial implications. The City will strive to build a budget so that recurring expenditures are covered by recurring revenues and a budget that supports a trend of revenues growing at a rate equal to or greater than expenditures. D. The Finance Department will maintain a system for monitoring the City’s budget performance. The system will provide the City Council with monthly and or quarterly information in a timely manner on fund level resource collections and department level expenditures. E. Under the provisions of State Law and the City’s operating procedures, the budget may be adjusted or amended in two different ways. Adjustment of the budget involves a reallocation of existing appropriations and does not change the “bottom line”. No City Council action is needed as State Law allows budget adjustments to be done administratively. Amendment of the budget involves an addition to or reduction of existing appropriations. A budget amendment requires an ordinance amending the original budget and identifies the funding sources for the incremental appropriations. Initially, a motion by the City Council is required. Amendments Items that may require a budget amendment, such as an unanticipated grant, will be approved by City Council throughout the year in accordance with the City’s procurement and expenditure policies. A formal Budget Amendment Ordinance will be adopted by City Council no later than December 31 of the second year of the biennium.made to the budget throughout the year by City Council motion will be adopted through the annual Budget Amendment Ordinance. C. Fixed asset inventories. Accurate inventories of all physical assets, their condition, life spans, and cost will be maintained to ensure proper stewardship of public property. Formatted: Indent: Left: 0.07" Formatted: Font: 12 pt Formatted: Indent: Left: 0.32", No bullets or numbering Formatted: Left, Right: 0.11", Space Before: 0 pt Formatted: Font: 12 pt Formatted: Font: 12 pt Formatted: Indent: Left: 0.32", Hanging: 0.25", Right: 0", No bullets or numbering, Tab stops: Not at 0.32" Formatted: Font: 12 pt Formatted: List Paragraph, Numbered + Level: 2 + Numbering Style: A, B, C, … + Start at: 1 + Alignment: Left + Aligned at: 0.07" + Indent at: 0.32", Tab stops: 0.32", Left Formatted: List Paragraph, Tab stops: 0.32", Left Formatted: List Paragraph, Numbered + Level: 2 + Numbering Style: A, B, C, … + Start at: 1 + Alignment: Left + Aligned at: 0.07" + Indent at: 0.32", Tab stops: 0.32", Left DRAFT 3.30.17 CAPITAL ASSETS POLICIES AND PROCEDURES A. Purpose This policy is established to provide guidelines to ensure adequate stewardship over City resources through control and accountability of capital assets, and to collect and maintain complete and accurate capital assets information in the Capital Assets System B. Reference Specific requirements of the Washington State Auditor’s Office are contained in Budgeting and Reporting System (BARS) Volume 1, Part 3, Chapter 7, which will be applied by the City as relevant. In addition, the federal government has issued property management requirements which apply to all governments that receive federal assistance. Each federal agency has published a Federal Agency Implementation of the Common Rule which will be adhered to as applicable. The policies and procedures contained in this policy are not intended to and may not supersede federal, state or local laws. C. Definitions 1. “Assets” - All land, buildings, improvements, works of art and historic collections and equipment purchased, donated, constructed, or acquired by the City. 2.1. “Capital Assets” – Land of any value; artwork and historic collections of any value; improvements to buildings, their furnishings, fixtures, and furniture; equipment, machinery, vehicles, and tools, with a value of $5,000 or more and having a useful life exceeding one year from the date of acquisition. “Capital Assets” are defined as land, buildings, improvements, equipment, machinery, vehicles, tools, works of art, furnishings and other improvements costing more than $7,500 and have a useful life of more than one year. These assets will be tracked and an inventory listing will be maintained. 3.2. “Control”- Being in charge of, and having the authority to manage the asset. Having the custodial responsibility of the asset that includes, but is not limited to the caring, keeping, safekeeping and protecting the asset. 4. “Inventory” – The process of physically confirming the existence and location of capital assets. 3. “Small and Attractive Assets” - All assets with a cost less than $7,500 and at risk or vulnerable to loss are considered “small and attractive assets”. These assets will be tracked and an inventory listing will be maintained. Assets considered to be small and attractive include, but are not limited to the following; 5. “Small and Attractive Assets” – small and attractive assets are those assets that are particularly at risk or vulnerable to loss and cost less than $5,000. Departments have discretion in defining small and attractive assets in many instances; however, departments must include, at a minimum, the following assets with unit costs of $500 or more as small and attractive: • Communications Equipment; both Audio and Video • Optical Devices, Binoculars, Telescopes, Infrared Viewers, and Range finders • Cameras and Photographic Projection Equipment • Microcomputer Systems, Laptop and Notebook Computers • Other data processing Accessory Equipment and Components (Scanners, Data Displays, etc.) • Office Equipment • Stereos, Radios, Television Sets, Tape Recorders, DVD players, VCRs, and Video Cameras and cell phones Formatted: Indent: Left: 0.57", No bullets or numbering Formatted: Indent: Left: 0.32", Hanging: 0.25", No bullets or numbering, Tab stops: Not at 0.57" Formatted: Indent: Left: 0.57", No bullets or numbering Formatted: Indent: Left: 0.57", No bullets or numbering Formatted: Indent: Left: 1", Hanging: 0.09" DRAFT 3.30.17 D. Applicability This policy applies to all departments of the City of Arlington. The term "Department" is defined to include every city office, officer, and every department, division, board and commission. E. Insurance Insurance is required for all land, building and vehicle purchases and assets with a cost in excess of $25,000 as deemed appropriate by the finance department. E. Department responsibilities Departments are responsible for protecting and controlling the use of City assets assigned to their department. The department head must designate one or more Department Inventory Officers to be responsible for maintaining and safeguarding the department's capital assets and small and attractive F. Department responsibilities Department directors are responsible for tracking, inventory and safekeeping of all assets assigned to their department. Each department is responsible for notifying the finance department, in writing, any assets purchased, sold, traded, transferred, surplused, lost or stolen. The finance department is responsible for keeping and updating the fixed asset database, coordinating the physical inventory process and developing procedures for the safeguarding of assets. 9 assets. Any time an asset is added, deleted, or transferred, the Department Inventory Officer will complete an Asset Control Sheet which will be submitted to the Finance Department with the related documentation. F.G. Capitalization –Capital Outlay Threshold All assets with a cost of $5,0007,500 or more will be capitalizedrecorded as capital outlay. Although Small and Attractive Assets (assets costing less than $7,500 $5,000) do not meet the city’s capitalization capital outlay threshold, due to ease of conversion to private use, they are considered assets for purposes of marking and identification, records keeping, and tracking. H. Valuation of Capital Assets The City of Arlington reports its financial activity on a cash basis. Expenditures for capital assets will be expensed at cost in the period the expenditure occurred. A. Small and Attractive Assets Small and attractive assets shall be expensed. Annually each department will conduct an inventory verified by the Finance Department on a sampling basis. Small and attractive assets (even if they do not contain an asset tag) may not be transferred, traded, sold, auctioned, gifted, surplused, or discarded without written notice to and authorization from the Finance Department. A.B. Improvement/Repair/Maintenance Expenses Routine repair and maintenance costs will be expensed as they are incurred. and will not be capitalized. Major repairs will be capitalized if they result in betterments/improvements. To the extent that a project replaces the “old” part of a capital asset, outlays will not be capitalized; and to the extent that the project is betterment/improvement, outlays will be capitalized. B. Additions The city may acquire property via purchase, construction, donation, or lease. Capital assets shall be capitalized and purchased from a capital outlays code (60’s) as defined in the BARS Manual line of either: 61 – Land and Land Improvements; 62 – Buildings and Structures; 63 – Other Improvements; 64 – Machinery & Equipment; 65 – Construction of Capital Assets. When a capital asset is purchased, the department will submit a completed Asset Control form (See attachment A.) to the Finance Department. The Finance Department will identify those assets that meet the capitalization requirements. Finance will assign a unique inventory control number to the asset and assign an inventory ID tag number, if applicable. When the Asset Control Sheet and ID tag are received by the department, the department designee will immediately affix the ID tag to the asset, complete and sign the Asset Control Sheet, and return the completed form to Finance. Whenever feasible, each piece of property will be affixed with an inventory ID tag identifying the capital asset as the property of the City of Arlington, and including city identification number. Departments may determine where to place the tag on the capital asset. However, the identification and control number should be located on the principal body of the asset, rather than a removable part. Such tag will be removed or obliterated only when the item is sold, scrapped, or otherwise disposed of. Should the Formatted: Indent: Left: 0" Formatted: List Paragraph, Numbered + Level: 1 + Numbering Style: A, B, C, … + Start at: 1 + Alignment: Left + Aligned at: 0.07" + Indent at: 0.32" Formatted: Indent: Left: 0.07" 1 inventory ID tag be removed or defaced, the item shall be assigned a new inventory ID tag, and the new number recorded in the capital assets database. Occasionally, it will be impractical or impossible to mark some inventorial capital assets according to these standards. For example, do not tag if the capital asset:  Is stationary in nature and not susceptible to theft (such as land, buildings, improvements other than buildings, and leasehold improvements);  Has a unique permanent serial number that can be used for identification, security and inventory control (such as vehicles);  Would lose significant historical or resale value by being tagged; or  Would have its warranty negatively impacted by being permanently marked; 11 In these cases, the identification tag is not required, and the department is to apply alternative procedures to inventory and identify such assets. C. Deletions Asset deletion (assets over $5,0007,500) may be required due to the sale of the asset, scrapping, lost or stolen items, or involuntary conversion (fire, flood, etc). Due to the monetary value, capital assets deleted from the capital asset system for any reason require authorization by resolution of the City Council. D. Disposal Disposal of capital assets may occur only after being declared surplus by resolution of the City Council. A Public Hearing is required if the asset was owned for Public Utility purposes. Disposal will be made in whichever manner is determined to be most cost effective for the City. This may include sale, disposal, conversion, or any other means as approved by the City Council in the surplus declaration. When original or replacement equipment acquired under a grant or sub-grant is no longer needed for the original project or program, disposition of the equipment will be made as follows: 1) Items of equipment with a current per-unit fair market value of less than $5,0007,500 may be retained, sold or otherwise disposed of with no further obligation to the awarding agency. 2) Items of equipment with a current per-unit fair market value of $5,0007,500 or more may be retained, sold or otherwise disposed of only as authorized by the awarding agency. In the event the City is provided federally owned equipment: 1) The City will comply with federal requirements known as “the common rule” or as specifically stated in the grant agreement.Title will remain vested in the federal government. 2) The City will manage the equipment in accordance with federal agency rules and procedures, and submit an annual inventory listing. 3) When the equipment is no longer needed, the City will request disposition instructions from the federal agency. E. Lost or stolen property When suspected or known losses of capital assets or small and attractive items occur, departments should conduct a search for the missing property and immediately notify the finance department. The finance department will report known or suspected losses of assets to the State Auditor’s Office in accordance with RCW 43.09.185.. The search should include transfers to other divisions or departments, storage, scrapping, conversion to another asset, etc. If the missing property is not found:  Notify the inventory control officer and department head.  Have the individual deemed to be primarily responsible for the asset, as well as that individual’s supervisor, complete and sign a statement to include a description of events surrounding the disappearance of the property, who was notified of the loss, and steps taken to locate the property.  Finance will report known or suspected losses of assets to the State Auditor’s office in accordance with RCW 43.09.185, and a copy of the report will be provided to the Mayor and City Administrator.  Finance will remove the lost or stolen property from the department’s inventory and accounting records where applicable. F. Transfers Occasional transfers of property between departments, individuals within a department or funds may occur. The original controlling department is accountable for all assets in its inventory and for initiating a notice of transfer. Interdepartmental transfers involving a proprietary fund (i.e. Surface Water) require a 12 transfer of money. The sale price will be fair market value, which may result in a gain or a loss on sale of capital assets. Exception:with the exception of a The trade between departments of assets of similar value. As stated above “The original controlling department is accountable for all assets in its inventory and for initiating a notice of transfer.” G. Modifications Larger assets such as major pieces of equipment and many buildings are often modified to increase their lifetime or usefulness. Modifications may include partial additions or deletions, major repairs (new engine for fire truck), or component replacement (new roof, heating system, etc.). Several vouchers may be prepared for the modification as the work is in progress. Therefore, it is very important to notify the Finance Department that modifications are coded as capital outlay and when it is given to accounts payable for payment. The inventory number should be included on the voucher of the equipment; building or other structure reflecting what is being modified. H.G. Inventory The finance department is responsible for establishing procedures for the inventory and reconciliation process. A physical inventory will be conducted at least once every year. By February 15th of each year, the Finance Department will supply each department with an inventory worksheet of all capital assets under their control as of December 31st of the prior year. As coordinated by the finance department, eEach department will conduct a physical inventory of the items, verifying the existence and condition of each item on the worksheet, and making note of any additions, deletions, interdepartmental transfers, modifications, or leases of property that are not reflected on the list. The final list will be reviewed and signed by the department head, and returned to the Finance Department by March 31st of every year. Verification of the inventory shall be done annually by the Finance Department by performing a sampling of the physical inventory of the items. 1. Inventory of IT (Information Technology) related items. The Information Technology Department will be responsible for inventorying all stationary items such as desktop computers, laptop computers with docking stations, servers, printers and network equipment. Individual departments will be responsible for inventorying all “portable” small and attractive IT related items such as: Tablets (iPad, Android, etc.) and mobile computers (Netbooks, Police Car computers, Fire tablets etc.) In order to ensure objective reporting of inventory items, personnel having no direct responsibility (custody and receipt/issue authority) for the assets should perform the physical inventory. If it is not feasible to use such personnel for all or a part of the inventory, then those portions are; at least, to be tested and verified by a person with neither direct responsibility for that portion of the inventory nor supervised by the person directly responsible. Departments are encouraged to exchange and use personnel from other departments to perform their inventory if possible. 2. Physical inventory instructions Written physical inventory instructions will be documented and distributed to each person participating in the inventory process. The instructions will describe:  How and where to record each item,  What information to record,  What to do when they have a question,  What procedures to follow when they finish their assignments,  What procedures to follow when equipment is located but not listed,  The procedure by which the person counting the assets attests to the accuracy of the count, such as by signing his or her name at the bottom of each inventory page, or signing a cover page for a group of pages sorted by another method (batches, location, equipment type, etc.), and  How to record assets not being used or in an obviously unserviceable condition. Formatted: Tab stops: 0.8", Left 13 Such information is to be used to schedule repair or disposition of such assets. 12 3. Physical inventory reconciliation After the physical inventory count is completed, the department inventory officer is to conduct the reconciliation process. Only when all differences have been identified and explained, is the inventory considered reconciled. Departments should conduct the following steps during the reconciliation process:  Search the inventory lists to determine whether inventory noted during the count as unrecorded is, in fact, listed on another portion of the inventory.  Enter unrecorded assets into the inventory system as soon as possible after discovery.  If a significant number of unrecorded assets are located, a major problem with the asset recording procedures may exist. The department inventory officer should contact the Finance Department for assistance in determining why the problem is occurring and how to correct it.  Conduct a search in an effort to locate missing assets.  For assets not located, follow the lost or stolen property procedures in this policy. After the inventory is reconciled, the department inventory officer is to certify the reconciliation with a statement and signature that it is correct and report this to the supervisor. If the certification cannot be made, the inventory officer is to disclose that fact and the supervisor is to determine the appropriate course of action. 4.2. Retaining physical inventory records The certification, together with the reconciliation and the inventory listing, serves as the support for the inventory balance and for accounting adjustments, if any, and must be retained by the Finance Department. The documentation will be retained in accordance with the approved records retention schedulesWashington State Retention Records Schedule and. At a minimum the asset records must be retained until after the next annual audit. I. Small and Attractive Assets Procedures Small and attractive assets shall be expensed and purchased from the small tools and minor equipment as defined in the BARS manual object code (35). All small and attractive assets shall be tracked and recorded in a database by each department in control of those assets. Annually each department will have the small and attractive asset inventory listing under their control verified by the Finance Department on a sampling basis. Small and attractive assets may not be transferred, traded, sold, auctioned, gifted, surplused, or discarded without written notice to and authorization from the Finance Department. J. Valuation of Capital Assets Assets shall be valued at cost - including any ancillary charges necessary to place the asset in its intended location and condition for use. However expenses which do not add to the utility of an asset shall not be capitalized. For example, expenditure to repair a piece of equipment that was damaged during shipment should be expensed. Values will be determined in the following manner: 1. Purchased Assets Historical costs including taxes (e.g., sales taxes), and all appropriate ancillary costs less any discounts or rebates. If the historical cost is not practicably determinable, estimated cost will be used. 13 2. Land The capitalized value of land includes the purchase price plus costs such as legal fees, fill, and any excavation costs incurred to put the land in condition for its intended use. If land is acquired by gift, the capitalized value will reflect its appraised or fair market value at the time of acquisition. 3. Equipment Furniture, fixtures, or other equipment should be classified as equipment. Since they are not an integral part of a building they are not considered capital improvements. The cost for this asset type should reflect the actual or estimated cost of the asset, including the cost of an extended maintenance/warranty contract if the contract is purchased at the same time (or soon thereafter) as the capital asset. 4. Self-Constructed Assets All direct costs associated with construction and management costs associated with a construction project will be capitalized. 5. Donated Assets Donated assets will be recorded at the fair market value at the time of acquisition plus all appropriate ancillary costs. If the fair market value is not determinable due to lack of sufficient records, estimated cost will be used. K. Improvement, Repair and/or Maintenance Expenditures Routine repair and maintenance costs will be expensed as they are incurred. Extraordinary repairs, betterments or improvements will be capitalized if they increase future benefits from an existing capital asset beyond its previously assessed standard of performance. Increased future benefits typically include an extension in the estimated useful life of the asset or an increase in the capacity or efficiency of an existing capital asset. L. Replacements For building improvements other than buildings and equipment the cost of outlays that replace a part of another capital asset will be capitalized when the cost of the replacement is $5,000 or more and at least 10 percent of the total replacement value of the asset, or $100,000, whichever is less. Example: A $9,000 replacement of a heating boiler in a building having a replacement value of $120,000 would not be capitalized. In this case $9,000 is not at least 10 percent of the building's replacement value. Had the building's replacement value been less than $90,000, the $9,000 boiler replacement would have been capitalized. 1. Improvement cost exceeds $5,000 2. Building cost is greater than $100,000 3. Improvement is < 10% of replacement M. EXCEPTIONS to this policy are:  Replacement roof coverings are not capitalized unless the replacement extends the useful life of the building.  Replacement floor coverings and window coverings are not capitalized.  Costs to remodel (convert) a building to a different use, where the remodeling does not extend the useful life of the structure itself, are not capitalized. After replacing a part of another asset, the capitalized value and the associated accumulated depreciation of the replaced item will be removed from the accounting records, and the costs of the replacement will be capitalized. Formatted: Indent: Left: 0.07" 14 In the case of capital outlays that are partly replacements and partly betterments/improvements, to the extent that the project replaces the “old” part of a capital asset, outlays will not be capitalized; and to the extent that the project is betterment/improvement, outlays will be capitalized. When the distinction between replacement and betterment/improvement is not easily determinable, the City will expense the entire cost of the project. When the cost of improvement is substantial or where there is a change in the estimated useful life of an asset, depreciation charges for future periods will be revised based on the new book value and the new estimated remaining useful life. N. Ancillary Costs Normally, ancillary costs will be included in the cost of a capital asset. However, minor ancillary costs, not measurable at the time a capital asset is recorded, are not required to be capitalized. Ancillary costs for Land include:  Legal and title fees;  Professional fees of engineers, attorneys, appraisers, financial advisors, etc.;  Surveying fees;  Appraisal and negotiation fees;  Damage payments;  Site preparation costs; and  Costs related to demolition of unwanted structures. Ancillary costs for Buildings and Building Improvements include:  Professional fees of architects, engineers, attorneys, appraisers, etc.;  Damage payments;  Costs of fixtures permanently attached to a building or structure;  Insurance premiums, interest, and related costs incurred during construction; and  Any other costs necessary to place a building or structure into its intended location and condition for use. For furnishings, equipment, or other capital assets;  Transportation charges,  Sales tax,  Installation costs; and  Extended maintenance/warranty contracts or any other normal or necessary costs required to place the asset in its intended location and condition for use. CITY OF ARLINGTON, WASHINGTON OPERATING POLICIES 15 PURCHASING PROCEDURES Sections: I. Purpose. II. Policy statement. III. Definitions. IV. General provisions. V. Purchase of materials, supplies or equipment. VI. Public works projects. VII. Services. VIII. Inter-local joint purchasing agreements. IX. Real property acquisition. I. Purpose. This policy is intended to direct the purchase of goods and services at a reasonable cost, using an open, fair, documented and competitive process whenever reasonable and possible. The integrity, efficiency, and effectiveness of Arlington's procurement functions are critical elements of sound government. II. Policy statement. A. The City desires a fair and open process for procurement of goods and services that is free from the potential for bias and conflict of interest. In addition, the City desires consistent and appropriate practices for solicitations and contracting. All procurements of goods and services shall provide the City with the best quality and best value. All purchases are to be made within budgetary limitations and for the purpose of the goals and objectives approved in the City's budget. Any requested purchase that is not included in the current City budget shall be pre-approved by the Department Director, City Administrator, or City Council, based on allowable signing authority, and will include a completed Capital Outlay form. All purchases made by the City shall ultimately be approved by the City Council through the voucher approval process. B. All City of Arlington departments shall make a good faith effort to purchase goods within the City when they are available and suitable to City needs at a price that is competitive. Departments are expected to procure goods and services that are of high quality and that perform for their intended purpose, and to use good judgment during the procurement process. Goods and services may be purchased locally if they are less than $5.000 and within 10% of the lowest price available outside City limits. Items that are valued over $5,000 will be purchased on a competitive basis. C. The finance department is charged with developing administrative procedures to implement this policy. Procedures should ensure the fiscal responsibility of the City in expending resources for goods and services for City operations. The procurement procedures of the City shall be based on guidelines provided in the Revised Code of Washington, by the State Auditor's Office, and by Municipal Research Services Center. Formatted: Indent: Left: 0.15", First line: 0.5" CITY OF ARLINGTON, WASHINGTON OPERATING POLICIES 16 D. The purchasing procedures of this policy govern the purchase of supplies, materials and equipment, nonprofessional and professional services, and public works contracts. These policies authorize the City to procure goods and services through the small works roster process as defined in Section VI.D. The small works roster procedures are established for use by the City, pursuant to RCW 35.23.352, 35A.40.210 and Chapter 39.04 RCW. Leases of equipment or other personal property shall follow procedures for purchase of goods, with the aggregate of lease payments used in lieu of purchase price. Purchase or lease of real estate, franchise agreements, and intergovernmental or inter-local agreements will be entered into in accordance with state law. E. Each City Department purchases specialty items unique to their function and items that are purchased just in time to make necessary repair or to keep equipment and amenities in safe a good working order. All department directors will make good faith effort to utilize a central purchasing for purchases of consumable goods and reoccurring purchases. This will enable the best value by combining orders and purchasing in bulk on larger quantities when possible. III. Definitions. A. "Architectural and engineering services" means professional services rendered by any person, other than a City employee, to perform activities within the scope of the professional practice of architecture (Chapter 18.08 RCW), professional practice of engineering and land surveying (Chapter 18.43 RCW), and/or professional practice of landscape architecture (Chapter 18.96 RCW). B. “Contract Authorization Summary” outlines the levels at which managers, directors, or the Mayor may commit the City to a contract. Attached as Exhibit B. C. "Formal competitive bid" is the process of advertising and receiving sealed written bids from perspective vendors. The selection of the vendor is primarily based on the lowest cost from a responsible vendor. D. "Informal competitive quotes" are price quotes from vendors that are obtained using a variety of mediums such as phone, fax, e-mail, or writing. Results must be documented. The selection of the vendor is primarily based on the lowest cost from a responsible vendor. E. "Inter-local agreements" are the exercise of governmental powers in a joint or cooperative undertaking with another public agency. F. "Life cycle cost" means the total cost of an item to the City over its estimated useful life, including costs of selection, acquisition, operation, maintenance, and where applicable, disposal, as far as these costs can reasonably be determined, minus the salvage value at the end of its estimated useful life. G. “MSRC Small Works and Consultant Roster” is a shared statewide small public works and consultant roster service managed by the Municipal Research and Services Center of Washington used by Washington state local public agencies. The Small Works and Consultant Roster is maintained and operated in full compliance with state laws and purchasing requirements. H. "Nonprofessional services" are services that are purchased by the City for which the contractor receives specific instructions and guidance from the City and does not meet the definition of professional services, architectural and engineering services, or public CITY OF ARLINGTON, WASHINGTON OPERATING POLICIES 17 works projects. Examples include machine repair, debt collection services, temporary service agencies, credit card services, equipment service agreements, auctioning services, delivery services, inspections, advertising, etc. I. "On-call contract" means a contract that is awarded with general provisions for the services to be rendered. As services are to be rendered, specific task orders are initiated that are to be completed by the contracting firm. J. “Ordinary maintenance" is work not performed by contract and that is performed on a regularly scheduled basis (e.g., daily, weekly, seasonally, semiannually, but not less frequently than once per year), to service, check, or replace items that are not broken; or work not performed by contract that is not regularly scheduled but is required to maintain an asset so that repair does not become necessary. K. “Prevailing Wage” is defined as the hourly wage, usual benefits and overtime, paid in the largest city in each county, to the majority of workers, laborers, and mechanics. Prevailing wages are established, by the Department of Labor & Industries, for each trade and occupation employed in the performance of public work. They are established separately for each county, and are reflective of local wage conditions. L. "Professional services" are services provided by consultants that provide highly specialized, generally one-time expertise to solve a problem or render professional opinions, judgments or recommendations. The labor and skill involved to perform these types of services are predominately mental or intellectual, rather than physical or manual. Examples include graphics design, advertising, analysis, financial expertise, accounting, artists, attorneys, bond brokers, computer consultants, insurance brokers, economists, planners, real estate services, etc. This term does not include architectural and engineering services. M. “Public work," as defined in RCW 39.04.010, means a complete project, and includes all work, construction, alteration, repair or improvement other than ordinary maintenance, executed at the cost of the City or which is by law a lien or charge on any City property. Public work projects include the related materials, supplies and equipment to complete the project. For purposes of this policy, the term “public work” may include contracts for maintenance of City facilities or real property (i.e. janitorial services). N. "Request for proposals (RFP)" means a process that requests interested firms to submit a statement of their proposal for completing a project. Proposals are then evaluated based on the idea, including originality, suitability, practicality, expertise, etc. Proposals may be selected based on the quality of the proposal, experience, cost, and references. O. "Request for qualifications (RFQ)" means a process that requests interested consultants to submit a letter of interest and a statement of their qualifications. Consultants are evaluated upon their qualifications, expertise, and references. Cost cannot be a consideration until after a consultant has been selected at which point the price may be negotiated. P. "Small works roster" is a roster of qualified contractors maintained for use in a modified formal bid process. When the contract amount for a public works project is within the limits set forth by RCW 39.04.155, a city may follow the small works roster process for construction of a public work or improvement as an alternative to formal competitive bid requirements. Q. “Small Works Roster Manual for Local Governments” is a manual prepared by the Municipal Research & Service Center of Washington (MRSC) that contains state laws and regulations regarding small works contracting. R. “Sole Source” occurs when competition amoung potential vendors is not possible for Formatted: Font: 12 pt Formatted: Font: 12 pt CITY OF ARLINGTON, WASHINGTON OPERATING POLICIES 18 a particular procurement. These situations may occur when; there is clearly and legitimately only one source capable of supplying the subject matter, when there are special market conditions that result in only one source and in the event of an emergency. S. “Vendor list” means the process to award contracts for the purchase of any materials, equipment, supplies or services in lieu of formal sealed bidding pursuant to RCW 39.04.190. Formatted: Left, Right: 0.32", Numbered + Level: 1 + Numbering Style: A, B, C, … + Start at: 9 + Alignment: Left + Aligned at: 0.07" + Indent at: 0.32", Tab stops: 0.32", Left + Not at 0.57" CITY OF ARLINGTON, WASHINGTON OPERATING POLICIES 19 IV. General provisions. A. Grant funded projects may have additional regulations required for expending federal and state funding. The signature authority as outlined in the Contract Authorization Summary gives authorization to sign state and federal grant documents, the department director and/or finance director have signature authority to sign reimbursement request documents. B. Breaking Down or Splitting Purchases. The breaking down, or splitting, of any purchase or contracts into units of phases for the purpose of avoiding the maximum dollar amount is prohibited. B.C. It shall be the responsibility of the Central Purchasing Coordinator and City Clerk to ensure MRSC rosters and vendor lists are maintained, paid for and advertised as may be required by state law. C. Emergency Procurements. Notwithstanding any other provisions of this policy, the Mayor or designated agent may make or authorize others to make emergency procurements of materials, supplies, equipment, or services without complying with the requirements of this section when there exists a threat to public health, welfare, or safety or threat to proper performance of essential functions; provided, that such emergency procurements shall be made with such competition as is practicable under the circumstances. A written determination of the basis for the emergency and for the selection of the particular contractor shall be included in the contract file. As soon as practicable, a record of each emergency procurement shall be made and shall set forth the contractor's name, the amount and type of the contract, and listing of the item(s) procured under the contract, which shall be reported to the City Council at the next subsequent meeting. The City must produce a negotiated contract for each emergency purchase within fourteen (14) days of procurement or the work being performed. D. Amendments and Change Orders. a. Amendments or change orders to contracts, including inter-local agreements, which result in the final contract amount (original contract amount plus all change orders) in excess of purchase limits identified in this policy may be administratively approved if the changes are: i. By the City Administrator if the excess is 5% over the purchase limit. ii. By the Mayor if the excess is 10% over the purchase limit. iii. By City Council if the excess is more than 10% over the purchase. i. Within the scope and budget of the project or purchase; ii. Executed in writing; iii. limit.The amount in excess of the Mayor's purchase limits, shown in Exhibit B, will not exceed the Mayor's authority for non-budgeted capital or operating expenditures as defined in the Contract Authorization Summary adopted by City Council or the approved project budget, whichever is greater. b. Contract amendments that keep the final contract amount within purchase limits may be administratively approved by the Department Director within signing authority. b.c. Contract amendments that are strictly a change in contract expiration date may be administratively approved by the Department Director. c. The value of all change orders will be aggregated, and when any single amendment or combination of change orders on the same project or purchase Formatted: Font: 12 pt Formatted: Normal, Left, Indent: Left: 1.36", No bullets or numbering CITY OF ARLINGTON, WASHINGTON OPERATING POLICIES 20 exceeds the limit under subsection (D)(a)(iii) of this section the change must be approved by the City Council, except: i. For service contracts to accomplish an ongoing city program rather than a discrete project, the aggregation of administrative change orders shall be recalculated after each contract year; and ii. Where the size of the contract makes it probable that administrative change order authority will be quickly exhausted, the City Council may, upon recommendation of the Mayor, extend the aggregate limits of subsection (D) (a) (iii) of this section upon award of the particular contract. CITY OF ARLINGTON, WASHINGTON OPERATING POLICIES 21 E. Signature Authority. The Mayor may delegate his/her signature authority to other City employees (City Administrator, Department Director, and Division Manager) as deemed appropriate. V. Purchase of materials, supplies or equipment. A. Purchasing Limitations. Purchase limitations apply to the cost of individual items or the sum of the same items purchased at the same time to fulfill a specific business need, which are not part of a public works project as defined by RCW 39.04.010 and these policies. Cost is inclusive of sales tax, delivery charges and any related miscellaneous charges. Limits shown and processes identified in the Contract Authorization Summary Commitment Authority shall be followed when authorizing the acquisition of materials, supplies or equipment. A. Purchases Less Than$7,500. Purchases of materials, supplies, or equipment, where the cost is under $7,500, do not require formal competitive quotes or purchase orders. B.A. Exceptions to Purchasing Limitations (RCW 39.04.280). The Mayor is authorized to allow open market purchases without obtaining the regularly required competitive quotes or bids under the following conditions: A. Special Market Conditions.Surplus or Distress Sale. When supplies or used equipment is offered at a very favorable price and will be sold before the City will have a chance to complete the bidding process. Iit is possible to procure obvious bargains through the procurement of surplus or distress material, supplies or equipment without following bidding procedures. B. Auctions. RCW 39.30.045 authorizes the City to acquire supplies, materials, and equipment through an auction conducted by the United States or any agency thereof, an agency of the state of Washington, a municipality or other government agency, or any private party, without quotations or bids, if the items to be purchased can be obtained at a competitive price. C. Inter-local Joint Purchasing Agreements. Materials, equipment, supplies and. services may be purchased under RCW 39.34.080 using joint purchasing agreements with a city, county, state or other public agency where bid requirements of this policy have been followed by the cooperating agency in obtaining bids. Originating agency’s bid process shall be vetted to assure compliance with all applicable laws. D. Sole Source Procurement. A contract for the purchase of materials, supplies, or equipment may be awarded without complying with the bidding requirements of this policy when the department director determines in writing, subject to council approval through resolution, after conducting a good faith review of available resources, that there is only one source of the required materials, supplies, or equipment. The department director or his/her designee shall conduct negotiations, as appropriate, as to price, terms, and delivery time. Sole source purchases shall be made available for public inspection.To comply with RCW 39.04.020, a record of sole source procurement shall be recorded with the County Auditor that lists each contractor's name, the amount and type of each contract, and a listing of the item(s) procured under each contract. The City Clerk or his/her designee shall perform this recording task. E. No Bids or Quotations Received. When no bids or quotations are received in response to an invitation to bid or request for quotations, the department director CITY OF ARLINGTON, WASHINGTON OPERATING POLICIES 22 or his/her designee is authorized to procure the required item through direct negotiations with a vendor or to rebid as the Mayor or designee deems appropriate. F. Emergency Procurements. Notwithstanding any other provisions of this policy, the Mayor or designated agent may make or authorize others to make emergency procurements of materials, supplies, equipment, or services without complying with the requirements of this section when there exists a threat to public health, welfare, or safety or threat to proper performance of essential functions; provided, that such emergency procurements shall be made with such competition as is practicable under the circumstances. A written determination of the basis for the emergency and for the selection of the particular contractor shall be included in the contract file. As soon as practicable, a record of each emergency procurement shall be made and shall set forth the contractor's name, the amount and type of the contract, and listing of the item(s) procured under the contract, which shall be reported to the City Council at the next subsequent meeting. The City must produce a negotiated contract for each emergency purchase within fourteen (14) days of procurement or the work being performed. E.G. RCW 39.04.280 allows waiving of competitive bidding for the purchase of insurance and bonds. Formatted: Left CITY OF ARLINGTON, WASHINGTON OPERATING POLICIES 20 C.B. Informal Competitive Quotes - Materials, Supplies or Equipment over $3,000 up to $7,500. A. A City representative shall make an effort to contact at least three vendors. The number of vendors contacted may be reduced if the item being sought is only available from a smaller number of vendors. When fewer than three quotes are requested or if there are fewer than three replies, an explanation shall be placed in the procurement file. B. Whenever possible, quotes will be solicited on a lump sum or fixed unit price basis. C. At the time quotes are solicited, the City representative shall not inform a vendor of any other vendor's quote. D. A written record shall be made by the City representative of each vendor's quote on the materials, supplies, or equipment, and of any conditions imposed on the quote by such vendor. E. All of the quotes shall be collected and presented at the same time to the appropriate designee as appropriate for consideration, determination of the lowest responsible vendor and award of purchase. F. Whenever there is a reason to believe that the lowest acceptable quote is not the best price obtainable, all quotes may be rejected and the City may obtain new quotes or enter into direct negotiations to achieve the best possible price. In this case, the department shall document, in writing, the basis upon which the determination was made for the award. G. All purchases of over $5,000 will have a completed and approved Capital Outlay Form submitted to the finance department prior to the purchase of materials, supplies, or equipment is executed. C. Vendor Lists – Materials, Supplies or Equipment between $7,501 and $15,000 A. The use of vendor lists is authorized by RCW 39.04.190 and whenever possible, requires at least 3 written, informal quotes. B. Vendor lists must be solicited at least twice per year in a newspaper of general circulation. C. Contracts must be awarded to the lowest responsible bidder. D. Immediately after the award from a vendor list, all bid quotations must be recorded and made open to public inspection. E. At least every two months, the agency must post a list of contracts awarded using each list, including the date, the name of the contractor, the amount of the contract and a brief description of the items purchased. D. Formal Competitive Bid – Materials, Supplies, or Equipment over $15,000 $7,500 A. General. Unless otherwise specifically approved by the City Council, all contracts relating to the purchase of materials, equipment, or supplies shall be in accordance with the City budget. B. Invitation for Bids. An invitation for bids shall be issued which shall include the specifications and the contractual terms and conditions applicable to the procurement. C. Public Notice. Public notice of the invitation for bids shall be published at least once in a newspaper of general circulation within the City, not less than 13 calendar days prior to the date set forth therein for the opening of bids, unless for good cause shown, the City Council authorizes a different period of time. The public notice shall state the date and time of bid opening. Bids not received by the Formatted: Left CITY OF ARLINGTON, WASHINGTON OPERATING POLICIES 20 date and time stated for bid opening will not be accepted or considered. D. Bid Opening. Bids shall be opened publicly and recorded at the time and place designated in the invitation for bids. E. Withdrawal of Bids - Cancellation of Awards. Bids may be modified or the bid may be withdrawn by written notice received in the office designated in the invitation for bids prior to the time set for opening. After bid opening, withdrawal of bids shall be permitted only to the extent that the bidder can show by clear and convincing evidence presented in a sworn affidavit or declaration submitted no later than 5:00 p.m. on the first business day after bid opening, that a clerical mistake was made and not a mistake in judgment, and the bid price actually CITY OF ARLINGTON, WASHINGTON OPERATING POLICIES 21 intended. All decisions to permit the withdrawal of bids after bid opening, or to cancel awards or contracts based on bid mistakes, shall be made by the Mayor after consulting with legal counsel. F. Award. The City Council shall award purchases for amounts greater than or equal to the limits as identified in the City budget and for purchases not included in the adopted budget. The award of bid shall be made to the lowest responsible bidder whose bid meets the specifications and evaluation criteria set forth in the invitation for bids. The City may reject all bids at its discretion. G. All purchases of over $7,500 5,000 (including tax) will have a completed and approved Capital Outlay Form submitted to the finance department prior to the purchase of materials, supplies, or equipment. E. Lowest Responsible Vendor. The following factors, in addition to price, may be taken into account by the City in determining the lowest responsible vendor; these criteria shall also apply in selecting products or services either offered with, or associated indirectly with, City programs or facilities: A. Any preferences provided by law to local products and vendors; B. The ability, capacity, and skill of the vendor to perform the contract; C. The character, integrity, reputation, judgment, experience, and efficiency of the vendor; D. Whether the vendor can perform the contract within the time specified; E. The quality of performance of previous contracts or services; F. The previous and existing compliance by the vendor with laws relating to the contract; G. Such other information as may be secured having a bearing on the decision to award the contract. F. Life Cycle Costing. In considering the purchase of materials, equipment, supplies, whenever there is a reason to believe that applying the "life cycle costing" method of quote evaluation would result in the lowest total cost to the City, first consideration shall be given to purchases with the lowest life cycle cost which complies with the specifications. G. Recycled Products. The City shall also seek to maximize purchase of products using recycled materials and products suitable for recycling, unless the purchase will result in an unreasonable increase in price or degradation of quality or performance over comparable products. VI. Public works projects. A. Purchasing Procedures. Procedures for any public work or improvement shall be governed by RCW 35.23.352. At such time as the City’s population exceeds twenty thousand, purchases shall be governed by RCW 35.22.620.(RCW 35A.40.210) Cost for a public works project includes all amounts paid for materials, supplies, equipment, and labor on the construction of that project which is inclusive of sales tax, unless exempted by law. B. Purchasing Limitations. The Mayor may authorize the purchase and execution of public works projects equal to or less than the dollar threshold for small works projects as provided under RCW 39.04.155 as amended. CITY OF ARLINGTON, WASHINGTON OPERATING POLICIES 22 C. Competitive Bids. "Craft" or "trade" means a recognized construction trade or occupation for which minimum wage categories are established by the Department of Labor and Industries of the State of Washington in the locality of the City's projects or purchases. a. Projects for single craft or multiple crafts with a reasonably anticipated price equal to or less than the dollar thresholds as provided under RCW 35.23.352, as amended, require a minimum of 2 – 4 written quotes. do not require the use of competitive quotes or bids.. All purchases require an executed contract. b. Projects for single craft or multiple crafts with a reasonably anticipated price higher than the dollar thresholds as provided under RCW 35.23.352, as amended, up to the limits set forth by RCW 39.04.155 as amended shall either use the small works roster or a formal competitive bid procurement process. All purchases require an executed contract. c. Projects with a cost in excess of the maximum dollar threshold as provided in RCW 35.23.352, as amended, require a formal competitive bid process. The City Council shall authorize these purchases and provide authority for the Mayor to execute the related contract. All purchases require an executed contract. D. Small Works Roster. There is established for the City of Arlington a small works roster contract award process for accomplishment of public works projects with an estimated value threshold as provided under RCW 39.04.155, as amended. a. Roster List. The City of Arlington shall contract with the Municipal Research and Service Center (MRSC) annually to establish, maintain and manage a current roster of eligible contractors from which the City may solicit bids for work on Small Public Work Projects (Projects $300,00 and under). It shall be the responsibility of the Public Works Staff Accountant to ensure that the contract with MRSC for Small Works and Consultant Rosters remains in force and that all required fees are paid. b. Process. Whenever work that has received City Council approval in the current budget, or otherwise been approved by the City Council, is sought to be accomplished using a small works roster, a City representative shall obtain telephone, written or electronic quotations from contractors on the appropriate small works roster to assure that a competitive price is established and to award contracts to the lowest responsible bidder as follows: i. A contract awarded from a small works roster need not be advertised. Invitations for quotations shall include an estimate of the scope and nature of the work to be performed as well as materials and equipment to be furnished. However, detailed plans and specifications need not be included in the invitation. This paragraph does not eliminate other requirements for architectural or engineering approvals as to quality and compliance with building codes. ii. Quotations shall be invited from all contractors in the appropriate category of the small works roster. As an alternative, quotations may be invited from at least five contractors on the appropriate small works roster who have indicated the capability of performing the kind of work being contracted, in a manner that will equitably distribute the opportunity among the contractors on the appropriate roster. If the estimated cost of CITY OF ARLINGTON, WASHINGTON OPERATING POLICIES 23 the work is $150,000 200,000 or more but less than or equal to the dollar threshold for small works projects as provided under RCW 39.04.155, as amended, the City may choose to solicit bids from less than all the appropriate contractors on the appropriate small works roster but must also notify the remaining contractors on the appropriate small works roster that quotations on the work are being sought. The City has the sole option of determining whether this notice to the remaining contractors is made by: 1. Publishing notice in a legal newspaper in general circulation in the area where the work is to be done; 2. Mailing a notice to these contractors; or 3. Sending a notice to these contractors by facsimile or other electronic means. iii. For purposes of this policy, "equitably distribute" means that the City may not favor certain contractors on the appropriate small works roster over other contractors on the appropriate small works roster who perform similar services. At the time bids are solicited, the City representative shall not inform a contractor of the terms or amount of any other contractor's bid for the same project. iv. A written record shall be made by the project manager of each contractor's bid on the project and of any conditions imposed on the bid. Immediately after an award is made, the bid quotations obtained shall be recorded, open to public inspection, and available by telephone inquiry. v. At least once every year, the City Clerk or his/her designee shall provide a list of the contracts awarded under this process to the City Council and to the general public. The list shall contain the name of the contractor or vendor awarded the contract, the amount of the contract, a brief description of the type of work performed or items purchased under the contract, and the date it was awarded. The list shall also state the location where the bid quotations for these contracts are available for public inspection. E. Determining Lowest Responsible Bidder. Where bidders have not been prequalified, the City shall award the contract for the public works project to the lowest responsible and qualified bidder; provided, all bids may be rejected and the City may call for new bids. F. Cancellation of Invitations for Quotations or Bids. An invitation for quotations or bids may be canceled at the discretion of the department director. The reasons shall be made part of the contract file. Each invitation for quotations or bids issued by the City shall state that the invitation may be canceled. Notice of cancellation shall be sent to all parties that have been provided with a copy of the invitation. The notice shall identify the invitation for quotations or bids and state briefly the reasons for cancellation. G. Limited Public Works Process. The City may use the limited public works process to award public works projects as provided under RCW 39.04.155, as amended. H. Formal Competitive Bid. For public works not using a small works roster, the formal competitive bid process, as defined by applicable `RCW’s, shall be used. CITY OF ARLINGTON, WASHINGTON OPERATING POLICIES 24 I. Bid Deposit, Performance Bond and Non-collusion Affidavit for Public Works Improvement Projects. Whenever competitive quotes or bids are required, a bidder may be required make a deposit in the form of a certified check or bid bond in an amount equal to not less than five percent of the total bid, which percentage shall be specified in the call for bids. As part of any bid submitted, the bidder shall be required to warrant that the bid is a genuine bid, and that he/she has not entered into collusion with any other bidder or any other person. All public works contractors shall furnish a performance bond in an amount equal to the total amount of the contract and an executed and notarized non-collusion affidavit on a form approved by the City Attorney. In lieu of a performance bond on contracts of $35,000 or less, per RCW 39.08.010, a contractor may choose to have 50 percent of the contract retained for a period of 30 days after the date of final acceptance. VII. Contracts and Agreements for Services. A. Purchasing Limitations. Purchase limitations apply to the cost related to the acquisition of services to fill a specific business need. Cost is inclusive of any required sales tax and related expenses. i. All initial agreements with governmental agencies require council approval; annual renewal or extension of existing contracts and agreements require the Mayor's approval. ii. Contracts and Agreements under $20,000 can be executed by department directors or designee; and contracts/agreements above $20,000 can be executed by the Mayor or designee. B. On-Call Service Contracts. On-call service contracts will be procured with the processes identified in subsection C below. Individual task orders of on-call service contracts shall not exceed $50,000. C. Process. i. Architectural, Landscape Architectural, and Engineering Services Contracts. Procedures set forth in Chapter 39.80 RCW shall be followed for contracts for architectural and engineering services, as defined in RCW 39.80.020. a. Roster. The City of Arlington shall contract with the Municipal Research and Service Center (MRSC) to establish, maintain and manage a current roster of eligible Architectural, Landscape Architectural and Engineering consultants from which the City may solicit bids for contract for providing these services. It shall be the responsibility of the Public Works Staff Accountant to ensure that the contract with MRSC for Small Works and Consultant Rosters remains in force and that all required fees are paid. a. 1. Contracts Less Than $100,000. Contracts that have an estimated cost of less than $100,000 can be procured using an informal request for qualification process. This process requires the City representative to develop a written scope of the project and any criteria used to select the service provider and then select a qualified contractor from the City's architectural, landscape architectural, and engineering service roster. If the City representative does not choose to use the appropriate Formatted: List Paragraph, Right: 0.15", Numbered + Level: 3 + Numbering Style: a, b, c, … + Start at: 1 + Alignment: Left + Aligned at: 0.82" + Indent at: 1.07", Tab stops: 1.07", Left CITY OF ARLINGTON, WASHINGTON OPERATING POLICIES 25 roster, then a formal request for qualification process must be followed. 2. Contracts Greater Than $100,000. Contracts that have an estimated cost in excess of $100,000 must use a formal request for qualification (RFQ) process. The development of an RFQ along with the proper public notification shall be made in accordance with procedures adopted by the finance department in the best interest of the City; provided, however, that the Mayor may in the following circumstances waive the RFQ process for contracts greater than $100,000, and allow the acquisition of services from the City's architectural, landscape architectural and engineering services roster: a. It is deemed in the best interest of the City to expedite the acquisition of services; or b. It can be demonstrated that there are sufficient consultants on the roster that possess the required qualifications to perform the scope of work; or c. A consultant on the City's roster has previously provided satisfactory service to the City, has previously provided services related to the specific project, and has the qualifications to perform the scope of work. 3. Contract Required. A contract is required to purchase architectural, landscape architectural, and engineering services. ii. Professional and Nonprofessional Services (Services which are not Architectural, Landscape Architectural, and Engineering Services). 1. Contracts Less Than $100,000. Contracts that have an estimated cost of less than $100,000 can be procured using an informal request for proposal process. This process requires the City representative to develop a written scope of the project and any criteria used to select the service provider. The City representative will use this information when selecting the contractor to provide the services. Multiple proposals are optional and at the discretion of the department director. If multiple proposals are used to make a selection, a standard process must be used for obtaining all proposals. 2. Contracts in Excess of $100,000. Contracts that have an estimated cost in excess of $100,000 shall be procured using a formal request for proposal (RFP) process. The development of an RFP along with the proper public notification shall be made in accordance with procedures adopted by the finance department in the best interest of the City. 3. Contract Required. A contract is required to purchase professional and nonprofessional services. D. Sole Source Procurement. A contract for the provision of services may be awarded without complying with the bidding requirements of this policy when the department director determines in writing, subject to Council approval through resolution, after conducting a good faith review of available resources, that there is only one source of the required services. The department director or his/her designee shall conduct negotiations, as appropriate, as to price, terms, and delivery time. Sole source purchases shall be made available for public inspection. To comply with CITY OF ARLINGTON, WASHINGTON OPERATING POLICIES 26 RCW 39.04.020, a record of sole source procurement shall be recorded with the County Auditor that lists each contractor's name, the amount and type of each contract, and a listing of the item(s) procured under each contract. VIII. Interlocal joint purchasing agreements. A. Cooperative Purchasing. The City may enter into interlocal governmental cooperative purchasing arrangements with other public agencies similarly authorized under RCW 39.34.030 when the best interests of the City of Arlington would be served thereby. Any cooperative purchasing agreement shall set forth fully the purposes, powers, rights, objectives and responsibilities of the contracting parties and shall be governed by the requirements of State law in regard to competitive bidding, when applicable. The competitive bid process of the original jurisdiction shall substitute for Arlington's. All interlocal joint purchasing agreements shall be presented to the City Council for prior approval. Originating agency’s bid process shall be vetted to assure compliance with all applicable RCW’s. IX. Real property acquisition. A. Real Property - Mayor's Acquisition Authority. The Mayor or designee is authorized, in the following instances, to accept by gift or acquire dedications, easements, rights- of-way, fee estates or other interests in real property for use by or on behalf of the City or any department of the City: i. Minor Acquisitions. Any such acquisition where the estimated value is less than $10,000. ii. All other real property acquisitions will be submitted to the City Council for approval. B. Real Property Mayor's Leasing Authority. i. The Mayor or designee is authorized to execute leases of real property on behalf of the City where the term of the lease does not exceed one year and the consideration does not exceed $10,000 per year as budgeted by the City Council. ii. A lease that exceeds the limits stated in subsection (B)(i) of this section, shall be submitted to the council for approval. X. Telecommunications and Data Processing Purchases RCW 39.04.270 allows local governments to use a competitive negotiation process when purchasing telecommunications and electronic data processing computer equipment or software instead of traditional competitive bidding. This alternative process requires; A. A request for proposals must be published in a newspaper of general circulation at least 13 days before the submission deadline. B. The RFP must identify evaluation factors, including price. C. Reasonable procedures for technical evaluation of the proposal must be used for awarding the contract. D. The contract must be awarded to the qualified bidder whose proposal is most advantageous to the City. E. The agency may reject all proposals for good cause and request new proposals. Formatted: Left, Indent: Left: 0.57", No bullets or numbering Formatted: List Paragraph, Left, Indent: Left: 0.57", Right: 0.15", Numbered + Level: 2 + Numbering Style: A, B, C, … + Start at: 1 + Alignment: Left + Aligned at: 0.4" + Indent at: 0.65", Tab stops: 0.82", Left CITY OF ARLINGTON, WASHINGTON OPERATING POLICIES 27 Formatted: Left, Right: 0", Tab stops: Not at 0.82" CITY OF ARLINGTON, WASHINGTON OPERATING POLICIES 28 CITY OF ARLINGTON CONTRACT AUTHORIZATION SUMMARY Assumes all expenditures are included in adopted operating and capital improvement budgets. If the expenditure is not adopted in operating and capital improvement budgets, Council authorization of the budget amendment is required prior to contract. Additionally, if contracts/purchases are included in the adopted budget and have been approved through an applicable committee or commission, whose authority has been granted by council through Arlington Municipal Code, those contracts/purchases do not need separate approval by council. Department Directors shall not assign signature authority to other staff. CONTRACT TYPE DOLLAR LIMIT BID PROCESS SIGNATURE AUTHORITY C OU Public Works Public Works-single trade or craft Under $40,000 NoRequires a minimum of 2-4 written quotes. Department Director No Public Works- single trade of craft Over $40,0010 up to $300,000 YesSmall works roster or competitive bids. Up to $50,000 – City Administrator Between $50,001 - $100,000 – Mayor Over $100,001 - Council Yes Public Works-multi trade or craft Under $65,000 No Requires a minimum of 2-4 written quotes. Department Director No Public Works-multi trade or craft Over $65,0010 up to $300,000 Yes Small works roster or competitive bids. Between $50,001 - $100,000 – Mayor Over $100,001 – Council Mayor Yes Public Works Over $300,000 Competitive bids Council Small Works Roster Small Works Roster-up to $35,000 Under $35,000 No Department Director No Small Works Roster- from $35,000 up to $150,000 Over $35,000 No Mayor Yes Small Works Roster- from $150,000 up to $300,00 Over $150,000 No Mayor Yes Materials, supplies and equipment Materials, supplies, equipment* Between $3,000 and $7,500 No; Requires a minimum of 3 written or verbal quotes Department Director* No Formatted: Font: Bold Formatted Table Formatted Table Formatted: Indent: Left: 0" CITY OF ARLINGTON, WASHINGTON OPERATING POLICIES 29 Materials, supplies, equipment Over $7,500 Yes Mayor* Yes Materials, supplies, equipment*With $7,5010- $15,000 Vendor listNo Department Director* No Materials, supplies, equipment* Over $15,000 Formal Bid Between $15,001 and $50,000 – City Administrator Between $50,001 - $100,000 – Mayor Over $100,001 - Council With government bidMaterials, supplies, equipment* Over $15,000No limit NoGovernment Bid Mayor* Up to $15,000 – Department Director Between $15,001 and $50,000 – City Administrator Between $50,001 - $100,000 – Mayor Over $100,001 - Council Yes Maintenance & non-professional services Maintenance & non- professional services Under $530,000 No; Anything over $3,000 requires a minimum of 3 quotes Up to $25,000 Department Director Between $25,001 - $50,000 City Administrator No Maintenance & non- professional services Over $530,000 YesChosen from consultant roster Mayor Between $50,001 - $100,000 – Mayor Over $100,001 - Council Yes *All capital purchases over $5,000 $7,500 require approval of Capital Outlay Request form by Finance Director and Administration Department. Formatted: Line spacing: Exactly 13.4 pt Formatted: Font: 12 pt CITY OF ARLINGTON, WASHINGTON OPERATING POLICIES 30 CONTRACT TYPE DOLLAR LIMIT BID PROCESS SIGNATURE AUTHORITY COU NCIL Professional Service ContractsConsulting** Consulting/professional servicesOn-call service contracts (legal, human resources, design, development review services) Contract nNot to exceed $50,000 Legal, human resources- ongoing contracts; Development review, design services-from consultant roster Chosen from consultant roster MayorCity Administrator Yes Up to $20,000 per instance No Department Director No Over $20,000 per instance No Mayor Yes Non-A&E Consulting/professional services (comprehensive planning, feasibility studies, preliminary design) Under $10020,000 Chosen from consultant roster Department Director Up to $25,000 Department Director Between $25,001 - $50,000 City Administrator Between $50,001 - $100,000 – Mayor No Non-A&E Consulting/professional services (comprehensive planning, feasibility studies, reliminary design) Over $20,000100,001 Chosen from consultant roster More than $100,001 formal RFP process Mayor Over $100,001 - Council Yes Consulting/professional services(construction projects)A&E Services Under $20,000100,000 Less than $100,000 Chosen from consultant roster Department Director Up to $25,000 Department Director Between $25,001 - $50,000 City Administrator Between $50,001 - $100,000 – Mayor No Formatted Table Formatted Table Formatted: Indent: Left: 0" Formatted: Indent: Left: 0" CITY OF ARLINGTON, WASHINGTON OPERATING POLICIES 31 A&E Services Over $100,00120,0 00 More than $100,000 Chosen from consultant rosterformal RFQ process Mayor Over $100,001 - Council Yes **Consulting for; architecture, engineering, surveying and landscape architecture are not subject to bidding requirements. Formatted: Indent: Left: 0" CITY OF ARLINGTON, WASHINGTON OPERATING POLICIES 32 Cost Allocation The City of Arlington desires to comply with all laws and recommendations in calculating and receiving full cost recovery for services rendered to other funds. Cost allocation is a method to identify and distribute indirect costs. Direct costs are costs assignable to a specific objective, whereas indirect costs are costs incurred for multiple cost objectives or not assignable to a specific cost objective without effort disproportionate to the benefit received. The Washington State Auditor’s Office prescribes the accounting and reporting of local governments in the State of Washington under the Revised Code of Washington (RCW) 43.9.200. Washington State law provides, at RCW 43.09.210. It states in part: Separate accounts shall be kept for each department, public improvement, undertaking, institution, and public service industry under the jurisdiction of every taxing body. All service rendered by, or property transferred from , one department, public improvement, undertaking, institution, or public service industry receiving the same, and no department, public improvement, undertaking institution, or public service industry shall benefit in any financial manner whatever by an appropriation of fund made for the support of another. The RCW does not specifically address how “full value” is to be determined. RCW 35A.33.122/35A.34.205/35.33.123 states: Administration, oversight, or supervision of utility – Reimbursement from utility budget authorized. Whenever any code city apportions a percentage of the city manager’s, administrator’s, or supervisor’s time, or the time of other management or general government staff, for administration, oversight, or supervision of a utility operated by the city, or to provide services to the utility, the utility budget may identify such services and budget for reimbursement of the city’s current expense fund for the value of such services. The Federal Office of Management and Budget (OMB) Circular A-87 OMB Circular A-87 establishes cost principals for State, local, and Indian Tribal Governments for determining costs for Federal Awards. Item 5 of the Circular states that, “The principals are for determining allowable costs only.” In defining allowable costs, the Circular provides a definition of allocable costs at Attachment A, paragraph C.3.a, “A cost is allocable to a particular cost objective if the goods or services involved at chargeable or assignable to such cost objective in accordance with relative benefits received.” The Circular further outlines costs that are allowable for charging the Federal government and distinguishes those that are specifically excluded from recovery. Governmental Accounting Standards Board (GASB) GASB is the independent organization that establishes and improves standards of accounting and financial reporting for U.S. state and local governments. While GASB is not a governmental agency and does not have enforcement authority, compliance with GASB is tested by the Washington State Auditor’s Office’s annual audit of the City. CITY OF ARLINGTON, WASHINGTON OPERATING POLICIES 30 Allocated Costs The City’s General Fund provides a variety of central services including but not limited to; legal support, human resources, administrative functions, personnel services, billing (utility and airport), processing accounts payable, budget and cash management, payroll and information technology services. The City allocates these indirect costs as follows;  Central services will be distributed based on a percentage of total fund expenditures  Expenditures will exclude inter-fund transfers to capital improvement and/or reserve funds  The previous year’s budgeted expenditures or previous year’s actual expenditures will be used to determine each fund’s percent of the City’s budget and to determine the amount to be budgeted for cost allocation  At year end, the budgeted allocation will be reconciled to actual costs and percent allocation  The Transportation Benefit District (TBD) Fund is excluded as the TBD is its own entity  The Cemetery Endowment Fund is excluded because these funds are held in trust and expenditures from the endowment fund will be captured in the Cemetery Capital Fund has identified a variety of ways to identify and determine an appropriate percentage of costs for allocation to various using funds. These ways include;  Number of employees (FTE’s) in each fund  Total operating expenses (dollar amounts) in each fund (not including debt service and capital improvements)  Total operating revenues (dollar amounts) in each fund (not including beginning fund balances, grant receipts or interfund transfers), and  Number of expenditure line items used in each fund (or transactions, if available)  What Percentage of Finance Dept. time is directly attributable to utility billing  Information Technology costs allocated based on number and location of computers supported Human Resources costs allocated based on number and location of employees The following is the plan to allocate General Fund Service costs - Administrative, Financial (including payroll), Information Services (computer and communications), and Human Resources to the various funds that utilize those services. One of the tasks of the Finance Department is to manage the Utility Billing function for the Water/Sewer and Stormwater Funds. A large percentage of all Finance costs are considered to be directly related to the utility funds. The percentages stay relatively constant but may vary each year. A time survey will be performed each year to determine the proper allocation to the utilities. Identify the General Fund costs to be allocated. 1) On an annual basis, the Finance Department will compile the numbers from the above mentioned ways to determine the appropriate percentages to use in allocating General Fund accounting and administrative costs to various funds. An average percentage rate will then Formatted: Indent: Left: 0" Formatted: Bulleted + Level: 1 + Aligned at: 0.32" + Indent at: 0.57" Formatted: Indent: Left: 0.07", Right: 0.19" Formatted: Body Text, Indent: Left: 0.07", Right: 0.19", Line spacing: single, No bullets or numbering, Tab stops: Not at 0.57" + 0.57" CITY OF ARLINGTON, WASHINGTON OPERATING POLICIES 30 be determined. 1) Allocate the General Fund Accounting and Utility Billing, Information Technology, Human Resources and Payroll costs. 2) Review General Fund Legal fees to determine appropriate allocation (if needed) based on number of employees and or billing description. It is important to maintain back-up documentation that indicates how each cost allocation is determined and calculated. The Airport is also authorized, through a Memo of Understanding with the Federal Aviation Administration, to provide monetary support for Police and Fire/EMS services to the Airport. This is accomplished through a survey of Police hours spent patrolling on and around the Airport property. A new survey is to be completed within a two year period following the last survey. CITY OF ARLINGTON, WASHINGTON DEBT MANAGEMENT POLICY 31 Debt Management Policy The objectives of the City’s Debt Management Policy will be:  To reduce the use of debt so that debt service payments will be a predictable and manageable part of the operating budget.  To raise capital at the lowest cost, consistent with the need to borrow. This will be accomplished by: - Keeping a high credit rating (while making attempts to strengthen credit rating) - Maintaining a good reputation in the credit markets by adjusting the capital program for regular entry to the bond market and managing the annual budget responsibly. E. Professional service providers (underwriters, financial advisors, bond insurer’s, etc) may be selected through negotiation, RFQ process or City’s procurement policies. F. Debt issues will be sold on competitive basis (except when conditions make a negotiated sale preferable) and awarded to the bidder who produces the lowest interest cost. Revenue bonds can be issued through a negotiated sale when the issue is unusually large, the project is speculative or complex, the issue is a refunding, or the market is unstable. G. The term of long-term debt issued will not exceed the life of the projects financed. Current operations will not be financed with long-term debt. H. Short-term borrowing will not be used for operating purposes. I. The City will comply with its obligation to inform the Municipal Securities Rulemaking Board through the EMMA website (Electronic Municipal Market Access) any and all continuing disclosure documents and annual financial statements. This site is used by the ratings agencies and investors. The City’s annual audited financial report will be sent to EMMA as soon as the State Auditor’s Office issues the report. J. The City shall strive to maintain favorable current credit ratings. K. The City will comply with all statutory debt limitations imposed by the Revised Code of Washington (RCW). The City of Arlington debt will not exceed an aggregated total of 7.5% of the assessed valuation of the taxable property within the City. Compliance with state law and this policy shall be documented each year. The following individual percentages (as defined in state law) shall not be exceeded in any specific debt category: General Debt 2.5% of assessed valuation Utility Debt 2.5% of assessed valuation Open Space and Park facilities 2.5% of assessed valuation CITY OF ARLINGTON, WASHINGTON DEBT MANAGEMENT POLICY 32 L. No debt shall be issued for which the City is not confident that a sufficient, specifically identified revenue source is available for repayment. The Finance Director shall prepare an analytical review for this purpose prior to the issuance of any debt. M. It shall be the policy of the City to limit bonded indebtedness to levels that permit sufficient borrowing to support a reasonable rate of capital programming, permit a level and pace of debt amortization within the City’s ability to pay, and support the City’s credit rating objectives. It shall further be the policy of the City not to exceed 75% of City’s LTGO debt limit, unless approved by the City Council. N. Credit enhancements shall be considered with a cost/benefit analysis for each long-term bond issue. O. Reserve accounts shall be maintained as required by bond ordinances and where deemed advisable by the City Council. The city shall structure such debt service reserves so that they do not violate IRS arbitrage regulations. P. The City will maintain debt service coverage ratios as required for any bond issues. Q. Interfund borrowing may be used where such borrowing is effective. Interfund borrowing will be approved and authorized by the City Council. 33 CITY OF ARLINGTON, WASHINGTON INVESTMENT MANAGEMENT POLICY Investment Policy POLICY. It is the policy of the City of Arlington to invest its public funds in a manner which will provide the highest investment return consistent with a high degree of security while meeting the daily cash flow demands of the City and conforming to all state statutes and local ordinances governing the investment of public funds. Cash may, at the discretion of the Finance Director be invested separately by fund or be co-mingled into a common investment portfolio and earnings from such portfolio distributed at least quarterly. The Finance Director is authorized to manage the investments described herein. SCOPE. This investment policy applies to all financial assets of the City except: for assets held in escrow and retirement funds managed by others such as state. City financial assets are accounted for in the City's Annual Financial Report and include: 2.1 Funds 2.1.1 General Fund 2.1.2 Special Revenue Funds 2.1.3 Debt Service Funds 2.1.4 Capital Project Funds 2.1.5 Enterprise Funds 2.1.6 Internal Service Funds 2.1.7 Trust Funds and Agency Funds PRUDENCE. The investments shall be made with judgment and care – under circumstances then prevailing - which persons of prudence, discretion and intelligence exercise in the management of their own affairs, not for speculation, but for investment, considering the probable safety of their capital as well as the probable income to be derived. OBJECTIVE. Funds of the City will be invested in accordance with the Revised Code of Washington (RCW) 35A.40.050, the BARS manual and these policies. The primary objectives, in order of priority, of the City's investment activities shall be as follows: Legality: The City's investments will be in compliance with all statutes governing the investment of public funds and the provisions of all applicable bond ordinances. Safety: Investments of the City shall be undertaken in a manner that seeks to ensure the preservation of capital in the overall portfolio. To attain this objective, diversification is required in order that potential losses on individual securities do not exceed the income generated from the remainder of the portfolio. Liquidity: The City's investment portfolio will remain sufficiently liquid to enable the City to meet all operating requirements, which might be reasonably anticipated. The Finance Director shall maintain adequate liquidity by maintaining a minimum balance in the LGIP. 34 CITY OF ARLINGTON, WASHINGTON INVESTMENT MANAGEMENT POLICY Return on Investment: The City's investment portfolio shall be designed with the objective of attaining a market rate of return throughout budgetary and economic cycles, taking into account the City's investment risk constraints and the cash flow characteristics of the portfolio. Local Institutions: Local Institutions shall be given preference when they are, in the judgment of the Finance Director, competitive with other institutions. The Finance Director’s investment actions shall be governed by this policy. The Finance Director shall be responsible for all transactions undertaken and shall establish a system of controls to regulate all investment activities, and report promptly to the Council any adverse development with any investment. ETHICS AND CONFLICTS OF INTEREST. The Finance Officer shall refrain from personal business activity that could conflict with proper execution of the investment program, or which could impair their ability to make impartial investment decisions. The Finance Officer shall disclose to the Mayor and the Council any material financial interests in financial institutions that conduct business with the City, and she/he shall further disclose any personal financial/investment positions that could be related to the performance of the City's portfolio. The City’s Finance Officer shall subordinate their personal investment transactions to those of the City, particularly with regard to the time of purchases and sales. AUTHORIZED FINANCIAL DEALERS AND INSTITUTIONS. The Finance Director will maintain a list of financial institutions authorized to provide investment services to the City of Arlington. In addition, a list will also be maintained of approved security broker/dealers selected by credit worthiness, who maintain an office in the State of Washington. These may include "primary" dealers or regional dealers that qualify under US Securities and Exchange Commission Rule 15c3-1 (uniform net capital rule). No public deposit shall be made except in a qualified public depository as established by State laws. At the request of the City, financial institutions, brokers and dealers performing investment services for the City shall provide their most recent financial statements or Consolidated Report of Condition (“call report”) for review. AUTHORIZED & SUITABLE INVESTMENTS. The City may invest in any of the securities identified as eligible investments as defined by RCW 35A.40.050. In general, these consist of: Investment deposits (certificates of deposits) with qualified public depositories as defined in Chapter 39.58 RCW. Certificates, notes or bonds of the United States, or other obligations of the United States or its agencies, or of any corporation wholly owned by the government of the United States whose securities carry full faith and credit guarantees. 35 CITY OF ARLINGTON, WASHINGTON INVESTMENT MANAGEMENT POLICY Obligations of government-sponsored corporations which are eligible as collateral for advances to member banks as determined by the Board of Governors of the Federal Reserve System. (These include but are not limited to, Federal Home Loan Bank notes and bonds, Federal Farm Credit Bank consolidated notes and bonds, and Federal National Mortgage Association notes.) Prime bankers' acceptances purchased on the secondary market. Repurchase agreements for securities listed above. The Washington Local Government Investment Pool. COLLATERALIZATION. Collateralization will be required on all repurchase agreements so as to anticipate market changes and provide a level of security for all funds, the collateralization level will be 102% of market value of principal and accrued interest. The City chooses to limit collateral to the obligations of the United States Government and its agencies. Collateral will always be held by an independent third party with whom the entity has a current custodial agreement (except certificates of deposits). A clearly marked evidence of ownership (safekeeping receipt) must be supplied to the entity and retained. Certificates of deposit are delivered to and held by the Finance Director until they mature. SAFEKEEPING AND CUSTODY. All investment securities purchased by the City, including collateral on repurchase agreements, shall be held by the City or in safekeeping by the City's custodian bank or a third party bank trust department, acting as agent for the City under the terms of a custody or trustee agreement executed by the bank and by the City. The primary agent shall issue a safekeeping receipt to the City listing the specific instrument, rate, maturity, and other pertinent information. All securities transactions, including collateral for repurchase agreements entered into by the City shall be conducted on a delivery-versus-payment (DVP) basis. Securities will be held by a third party custodian designated by the City Finance Director and evidenced by safekeeping receipts. DIVERSIFICATION. The City will diversify its investments by security type and issuer. With the exception of US Treasury and Agencies of the United States government, and the Washington State Local Government Investment Pool, no more than 50% of the City's total investment portfolio will be invested in a single security and no more than 25% will be invested with a single issuer. 36 CITY OF ARLINGTON, WASHINGTON INVESTMENT MANAGEMENT POLICY MAXIMUM MATURITIES. To the extent possible, the City will attempt to match its investments with anticipated cash flow requirements. Unless matched to a specific cash flow, the City will not directly invest in securities maturing more than five (5) years from the date of purchase. The average maturity will be consistent with the liquidity objective. However, the City may collateralize its repurchase agreements using longer-dated investments not to exceed 10 years. The City’s reserve funds may be invested in securities not to exceed (10) years if the maturity of such investments is made to coincide as nearly as possible with the expected use of funds. The purpose of permitting a portion of the investments to have longer maturities is to recognize that funds may yield higher yields when invested for longer periods of time. INTERNAL CONTROLS. The Finance Director shall establish a system of internal controls, which shall be reviewed annually by an external auditor. This review will provide internal control by assuring compliance with policies and procedures. PERFORMANCE STANDARDS. The City's investment portfolio will be designed to obtain a market average rate of return during budgetary and economic cycles, taking into account the City's investment risk constraints and cash flow needs. Investment Strategy. The City’s investment strategy is active. As a result, securities are purchased and sold as it best meets the needs of the City as determined by the Finance Director. The Finance Director will be authorized to trade before maturity if it is in the best interest of the City to do so. REPORTING. The Finance Director will determine what investment information will be included in the monthly financial report. 37 CITY OF ARLINGTON, WASHINGTON INVESTMENT MANAGEMENT POLICIES GLOSSARY ACCRUED INTEREST: The interest accumulated on a bond since its dated date or the most recent date to which interest has been paid by the City. The buyer of the bond pays the market price and accrued interest, which is payable to the seller. AGENCIES: Federal agency securities. ASKED: The price at which securities are offered. BANKERS' ACCEPTANCE (BA): A draft or bill or exchange accepted by a bank or trust company. The accepting institution guarantees payment of the bill, as well as the issuer. BOND: A long-term debt security (IOU) issued by a government or corporation. Generally pays a stated fixed rate of interest, and returns the face value at maturity. BOOK VALUE: The amount at which an asset is carried on the books of the owner. The book value of an asset does not necessarily have a significant relationship to market value. BROKER: A middleman who brings buyers and sellers together for a commission paid by the initiator of the transaction or by both sides; they do not position. In the money market, brokers are active in markets in which banks buy and sell money and in interdealer markets. CALL OPTION: The right to prepay or redeem a security at a predetermined price on or after a specified future date that is earlier than its scheduled maturity date. CERTIFICATE OF DEPOSIT (CD): A time deposit with a specific maturity earning a specified rate of return evidenced by a certificate. Certificates of Deposit bear rates of interest in line with money market rates current at the time of issuance. COLLATERAL: Securities, evidence of deposit or other property which a borrower pledges to secure repayment of a loan. Also refers to securities pledged by a bank to secure deposits of public monies. CONFIRMATION: A document used to state and supplement in writing the terms of a transaction which have previously been agreed to verbally. COUPON: (a) The annual rate of interest that a bond's issuer promises to pay the bondholder on the bond's face value. (b) A certificate attached to a bond evidencing interest due on a payment date (not used since 1982). CUSIP NUMBER (COMMITTEE OR UNIFORM SECURITIES IDENTIFICATION PROCEDURES): An identifying number assigned to a publicly traded security. A nine-digit code is permanently assigned to each issue and is generally printed on face of the security if it is in physical form. 38 CITY OF ARLINGTON, WASHINGTON INVESTMENT MANAGEMENT POLICIES GLOSSARY DEALER: A dealer, as opposed to a broker, acts as a principal in all transactions, buying and selling for his or her own account. DELIVERY VERSUS PAYMENT: There are two methods of delivery of securities: delivery versus payment and delivery versus receipt (also called free). Delivery versus payment is delivery of securities simultaneously with an exchange of money for the securities. Delivery versus receipt is delivery of securities simultaneously with an exchange of a signed receipt for the securities. DISCOUNT: There is "original issue discount" and "market discount." Original issue discount is the difference between the cost1price of a security when first offered for sale to the general public and its face value at maturity when quoted at lower than face value. Original issue discount is treated as interest. Market discount is the difference between principal amount of an outstanding security (reduced by any original issue discount) and the value of that security in the then-current market (if lower than its principal amount). If a security is bought at a market discount and later sold at a gain, the gain is taxable income. DIVERSIFICATION: Dividing investment funds among a variety of securities offering independent returns. FARM CREDIT DISCOUNT NOTES AND BONDS: Secured joint obligations of Farm Credit Banks that are issued with a minimum face value of $50,000 with maturities ranging from 5 to 360 days. FEDERAL CREDIT AGENCIES: Agencies of the Federal Government set up to supply credit to various classes of institutions and individuals, e.g., S&L's, small business firms, students, farmers, farm cooperatives, and exporters. FEDERAL FUNDS RATE: The rate of interest at which Federal funds are traded between banks. This rate is currently pegged by the Federal Reserve through open market operations. FEDERAL HOME LOAN BANKS (FHLB): The institutions that regulate and lend to savings and loan associations. The Federal Home Loan Banks play a role analogous to that played by the Federal Reserve Banks vis-à-vis member commercial banks. FEDERAL NATIONAL MORTGAGE ASSOCIATION (FNMA): FNMA, like GNMA was chartered under the Federal National Mortgage Association Act in 1938. FNMA is the corporation's purchases include a variety of adjustable mortgages and second loans in addition to fixed-rate mortgages FNMA's securities are also highly liquid and are widely accepted. FNMA assumes and guarantees that all security holders will receive timely payment of principal and interest. LIQUIDITY: A liquid asset is one that can be converted easily and rapidly into cash without a substantial loss of value. 39 CITY OF ARLINGTON, WASHINGTON INVESTMENT MANAGEMENT POLICIES GLOSSARY LOCAL GOVERNMENT INVESTMENT POOL (LGIP): The aggregate of all funds from political subdivisions that are placed in the custody of the State Treasurer for investment and reinvestment. MARKET VALUE: The price at which a security is trading and could presumably be purchased or sold. MASTER REPURCHASE AGREEMENT: A written contract covering all future transactions between the parties to repurchase -- reverse purchase agreements that establishes each party's rights in the transactions. A master agreement will often specify, among other things the right of the buyer-lender to liquidate the underlying securities in the event of default by the seller-borrower. MATURITY: The date upon which the principal or stated value of an investment becomes due and payable. PORTFOLIO: A collection of securities held by an investor. PRIMARY DEALER: A group of government securities dealers that submit daily reports of market activity and positions and monthly financial statements to the Federal Reserve Bank of New York and are subject to its informal oversight. Primary dealers include Securities and Exchange Commission (SEC) registered securities broker-dealers, banks, and a few unregulated firms. PRINCIPAL: The stated face amount of an instrument, exclusive of accrued interest. PRUDENT PERSON RULE: An investment standard. In some states the law requires that a fiduciary such as a trustee may invest money only in a list of securities selected by the state-the-so-called legal list. In other states the trustee may invest in a security if it is one which would be bought by a product person of discretion and intelligence who is seeking a reasonable income and preservation of capital. QUALIFIED PUBLIC DEPOSITORIES: A financial institution which does not claim exemption from the payment of any sales or compensating use or ad valorem taxes under the laws of this state, which has segregated for the benefit of the Public Deposit Protection Commission eligible collateral having a value of not less than its maximum liability and which has been approved by the Public Deposit Protection Commission to hold public deposits. REPURCHASE AGREEMENT (RP or REPO): A holder of securities sells these securities to an investor with an agreement to repurchase them at a fixed price on a fixed date. The security "buyer" in effect lends the "seller" money for the period of the agreement, and the terms of the agreement are structured to compensate him for this. Dealers use RP extensively to finance their positions. Exception: When the Fed is said to be doing RP, it is lending money, that is, increasing bank reserves. CITY OF ARLINGTON, WASHINGTON INVESTMENT MANAGEMENT POLICIES GLOSSARY 40 SAFEKEEPING: A service to customers rendered by banks for a fee whereby securities and valuables of all types and descriptions are held in the bank's vaults for protection. SEC RULE 15c3-1: SEC uniform net capital rule requiring brokers and dealers to maintain certain amounts of net capitol. SECURITIES & EXCHANGE COMMISSION: Agency created by congress to protect investors in securities transactions by administering securities legislation. TREASURY BILLS: A non-interest bearing discount security issued by the US Treasury to finance the national debt. Most bills are issued to mature in three months, six months or one year. TREASURY BONDS: Long-term US Treasury securities having initial maturities of more than ten years. TREASURY NOTES: Intermediate term coupon bearing U.S. Treasury securities having initial maturities of from one to ten years. UNIFORM NET CAPITAL RULE: Securities and Exchange Commission requirement that member firms as well as nonmember broker-dealers in securities maintain a maximum ratio of indebtedness to liquid capital of 15 to 1; also called net capital rule and net capital ratio. Indebtedness covers all money owed to a firm, including margin loans and commitments to purchase securities, one reason new public issues are spread among members of underwriting syndicates. Liquid capital includes cash and assets easily converted into cash. YIELD: The rate of annual income return on an investment expressed as a percentage. Income Yield is obtained by dividing the current dollar income by the current market price for the security. Net Yield or Yield to Maturity is the current income Yield minus any premium above par or plus any discount in purchase price, with the adjustment spread over the period from the date of purchase to the date of maturity of the bond. City of Arlington Council Agenda Bill Item: WS #2 Attachment B COUNCIL MEETING DATE: May 22, 2017 SUBJECT: April 2017 Financial Report ATTACHMENTS: Financial Reports – Narrative General Fund Operating Statement Revenue Charts Other Fund Operating Statements DEPARTMENT OF ORIGIN Finance; Kristin Garcia – Finance Director 360‐403‐3431 EXPENDITURES REQUESTED: 0 BUDGET CATEGORY: N/A BUDGETED AMOUNT: N/A LEGAL REVIEW: DESCRIPTION: Attached is the April 2017 financial report. HISTORY: ALTERNATIVES: RECOMMENDED MOTION: Workshop; discussion only. 1    2017 April Financial Report – Kristin Garcia, Finance Director  GENERAL FUND   The general fund’s ending fund balance as of April 30, 2017 was $1,633,998.  The chart below shows  the ending fund balance for the past 3 years between January and April.  The important items that I  take away from this chart are;  1) Comparing each month’s ending fund balance over a period of years shows whether our  revenue and expenditure patterns are consistent.  If one particular year or month reflected a  different pattern, this would signal a need for me to follow to see what has changed.  You  can see the pattern is consistent month to month, year to year.    2) The chart shows the progression toward meeting financial policy.  In 2015 (for the months  being represented) the fund balance was between $250,000 and $500,000 and has increased  to over $1.5 million in 2017.  The red line in the chart represents the dollar amount required  to meet the one month operating reserve based on the 2017 budget.  You can see in 2017,  for every month represented, we’re meeting our one month operating reserve goal.    3) Not only did we meet our one month operating reserve goal at the end of 2016, this is the  first time (at least since 2011) that we’ve been able to maintain that goal for every month in  the first part of the year.  This indicates to me that we’re reaching a point of financial  stability assuming no major fluctuations in the market or any major unanticipated  expenditures.            ‐  250,000  500,000  750,000  1,000,000  1,250,000  1,500,000  1,750,000  2,000,000 Jan Feb March April General Fund Ending Fund Balance Jan ‐April 2015 2016 2017 One Month Reserve Polic  Re uirement 2    Sales tax revenues are a contributor to the financial stability that we are beginning to see.  We’ve  had 6% growth in revenues comparing year to date collections as of April 2016 vs April 2017.  This  growth exceeds projections included in our 10 year plan as we planned for 4% growth. We’ll need to  continue to monitor the trend to understand future budget impacts and/or investment  opportunities.    OTHER INFORMATION  Investments – In April we were able to invest another $1.5 million.  We were able to increase our  investment portfolio for a variety of reasons such as;  a portion of property tax payments received in  April, sales tax and real estate excise tax revenues exceeding projections, timing of grant  reimbursements and investing idle cash in between capital project payments.  $500,000 was  invested in our money market reserve account with Opus Bank and $1 million was invested in a  government agency bond in order to maintain a diverse investment portfolio.    City of Arlington Council Agenda Bill Item: WS #3 Attachment C COUNCIL MEETING DATE: May 22, 2017 SUBJECT: Website Redesign proposal ATTACHMENTS: Proposal from Civic Plus DEPARTMENT OF ORIGIN IT / Communications EXPENDITURES REQUESTED: $10,000 per year for 5 years BUDGET CATEGORY: Equipment Replacement BUDGETED AMOUNT: Not to exceed $50,000 LEGAL REVIEW: DESCRIPTION: Proposal for a redesign from Civic Plus of the City’s website with new enhancements, and a fresh look and feel. HISTORY: Our current website is reaching 8 years old. As a priority identified by the City Council at the 2016 retreat, a website redesign was budgeted for. When reaching out to our current vendor, Vision Internet, it was determined that they could not provide a redesign within our budget. After reaching out to Civic Plus, who is a large government website vendor, they were able to meet the City’s budget requirements and are on the GSA Schedule 40 contract, waiving the need to go to competitive bid. We also looked at the company Revise, but didn’t have the functionality or redesign options that we were requiring. After performing reference checks, it is determined that Civic Plus is the recommended solution for a website redesign for the City of Arlington. ALTERNATIVES: Table the purchase of a redesign / hosting solution of a new website. RECOMMENDED MOTION: Workshop; discussion only. At the May 15, 2017 meeting the motion will be “I move to approve the contract with Civic Plus for a redesign and hosting of the City’s website, not to exceed $50,000, and authorize the Mayor to sign the contract.” Achieve More With LessAchieve More With Less Powered by: THE INTEGRATED TECHNOLOGY PLATFORM FOR LOCAL GOVERNMENT 302 South 4th Street, Suite 500 Manhattan, Kansas 66502 | 888-228-2233 | www.civicplus.com Presented by: Will Spicer Senior Regional Sales Manager spicer@civicplus.com 785-323-4772 City of Arlington, Washington Website Redesign and Hosting Services April 3, 2017 Bryan Terry, IT Manager City of Arlington 238 N Olympic Avenue Arlington, WA 98223 RE: Website Redesignand Hosting Services Dear Bryan: Society expects instant access to information and the internet is the number one place people go for news, answers, interaction with officials, and as their main communication venue. In today’s virtual world, making your government work better can be a challenge when you don’t have the tools and resources to get the job done right. So how do you meet these ever-increasing expectations with already-constrained resources? As your partner, that’s where CivicPlus can help. Our company is passionate about our mission to help make local government better. We know we aren’t just designing a website; we are helping build a trusted and long-term relationship between you and your community through our state-of-the-art technology and process. Collaborating with you throughout the process ensures we deliver the right solution, housed within a sophisticated and custom design that captures the culture of your community. We know that Arlington is unique with your own set of values and goals. We don’t offer cookie-cutter solutions - we tailor our solutions to meet your specific needs. With CivicPlus as your partner, you’ll receive: „„A one-of-a-kind design that captures your community’s unique qualities, and we’ll work with you until you are completely satisfied with the design concept „„A pre-kickoff virtual Envision Consultation with our consulting expert to help you identify your project needs and goals - at no charge to you „„40+ modules with all of the features and functionality you need and that have been tried and tested by CivicPlus clients for over 20 years „„A guaranteed redesign after only 48 months of service to keep your website fresh and innovative „„Hands-on existing content migration by our team of experts to ensure the content you present is optimized, relevant, and accessible to all „„24/7/365 support with secure hosting and maintenance to keep your investment safe and current „„100% satisfaction with your new website - or your money back 302 South 4th Street, Suite 500 Manhattan, Kansas 66502 Your new site will be developed on the most robust and flexible content management system available. Our CivicEngage is an easy-to-use suite of cloud-based tools built specifically for local government that will help you evolve your web presence. You’ll be able to inform and empower your citizens and staff in more efficient ways. Easier for you, easier for them. CivicPlus will deliver a website that conveys your look (through a custom design), with the functionality you need to communicate your message effectively (with Notify Me and Send eCommunication), and encourage engagement for all visitors (WCAG 2.0 Level A & AA accessibility standards) among all the other features and functionalities built in to CivicEngage and CivicPlus websites. We encourage you to contact the references we’ve included and discover what their experiences are working with CivicPlus. An Arlington and CivicPlus partnership will save you time and money and will deliver your community a website that will grow with you and where your visitors can find what they need, when they need it. Sincerely, Will Spicer Senior Regional Sales Manager spicer@civicplus.com Direct Line 785-323-4772 Table of Contents 1 PROJECT APPROACH SUMMARY 4 CIVICPLUS COMPANY OVERVIEW 7 PROJECT TEAM 9 EXPERIENCE 11 CIVICENGAGE CMS 17 PROJECT ENHANCEMENTS 21 PROJECT TIMELINE/DEVELOPMENT 27 SUPPORT, HOSTING & SECURITY 33 SCOPE OF WORK 36 PROPOSED INVESTMENT ESTIMATE 1 Arlington’s proactive vision to develop a user-friendly, self-service government web environment for its community and employees is commendable. You should have complete confidence that the firm you choose to achieve your vision and create your website is the right choice. Becoming your strategic, trusted partner is paramount to the professionals at CivicPlus. Although you currently have a capable web presence, it’s time for a new look with better functionality. CivicPlus will help you re-envision, re-new, and re-invigorate your website. Working closely with you, we will assist in designing a new look, updated usability, accessibility, and quality for the delivery and exchange of information for your audience. Project Approach Summary 2 Executive Summary „„EASY-TO-USE CMS Our CivicEngage Content Management System (CMS) is developed specifically for local government with unique functionality to streamline your processes and offer self-service options to reduce call volumes and walk-ins for common requests. CivicEngage will empower your staff to update your website content easily and often with robust, straightforward editing tools and permission-based access. „„SEND eCOMMUNICATION MODULE Our integrated e-communication module easily sends emails, texts, and social media updates in visually rich, mobile responsive, and easily customizable templates through a single interface. „„MEDIA ON-DEMAND Engage your citizens through easy-to-use live streaming capabilities and accessible on-demand videos integrated with the CivicEngage CMS. „„MOBILE ADMIN APP Share important information with your citizens quickly by securely adding, modifying, and approving categories and items for CivicEngage’s module Alert Center. You can also include access to communication modules News Flash and Calendar for on-the-go updates and modifications for an annual fee. „„SECURE, CLOUD-BASED HOSTING Provide peace of mind for your staff and community that your site is in good hands. Our solution is supported by an enterprise-level hosting environment with vigilant 24/7/365 monitoring and continual system updating. We guarantee a 99.9% uptime for your website (excluding maintenance). „„24/7/365 SUPPORT Our helpful in-house support team is available via telephone, email and live chat to ensure your complete and ongoing satisfaction with our products and service. „„CUSTOM DESIGN Our experienced designers will work with you until you are 100% satisfied to create a custom, impactful design that reflects your unique story visually and meets the needs of your community. „„FULLY RESPONSIVE Support citizens on the go with abundant online resources accessible from their mobile phone or tablet. With responsive web design throughout, the content on your site will automatically adjust to the screen size of any device. For our mobile web clients, we design mobile first to ensure it is responsive! We propose the following approach to help you meet your goals: 3 „„CONTENT MIGRATION & OPTIMIZATION One of our Content Development teams will manually migrate text, documents, and images from your current site to your new CivicPlus site - saving your staff hours of effort, ensuring consistency, accessibility, and that your information is easier to access and navigate. „„DEDICATED PROJECT TEAM A specialized team of experts will assist you throughout the development process including a project manager, an art director, content developers and a trainer/consultant. „„ENVISION CONSULTATION CALL A pre-kickoff virtual Envision Consultation with our consulting expert to help you strategize your project needs and goals - at no charge to you. „„CUSTOMIZED TRAINING Through three days of interactive virtual instruction, our trainers will ensure your staff gains the confidence to effectively and easily maintain your new website with our WYSIWYG live editing tools and intuitive user interface. „„DESIGN ESSENTIALS These design tools within CivicEngage allow your staff to build, modify, and manage your website’s look and feel within the design and structure parameters of your website. „„GUARANTEED REDESIGN At the end of your third year of continuous service with us, you’re eligible to receive a basic website redesign with no further out-of-pocket expense. Your website stays current and doesn’t need to be rebuilt from the ground up. We set high standards for local government websites knowing that technology and trends are always changing. With CivicEngage, we’ll automatically update your system to keep pace with industry improvements, security enhancements, and your visitors’ changing needs. After partnering with CivicPlus, Portland, Michigan was able to connect and engage their community better through their innovative, mobile, secure and interactive site. Portland, Michigan Before CivicPlus With CivicPlus 4 CivicPlus Company Overview 20+ 20+ years of experience with a focus to help local governments. 200+ 200+ employees, many who have experience in local government organizations. 2,500+ More than 2,500 local government clients across Canada and the U.S. 55k+ Over 55,000 internal admin users 60M+ More than 60 million online visitors (and counting!) 5-time Inc. 5000 Honoree www.govtech.com/100 5 CivicPlus CivicPlus’ team of over 200 professionals develop and deliver superior local government web technology, human resources efficiency, parks & recreation management functionality and mass notification solutions for our clients. CivicPlus is the integrated technology platform for local government, working with over 2,500 local governments including municipalities, counties, and municipal departments. CivicPlus’ focus to help local governments work better and engage their citizens through their web environment began in 1994 in Manhattan, Kansas by the owner, Ward Morgan. CivicPlus became a Kansas Corporation in 1998 and are still headquartered in this vibrant university town. Our commitment to deliver the right solutions in design and development, end-user satisfaction, and secure hosting has been instrumental in making us a world leader in government web technology. We’ve steadily grown over the last 20+ years and have honed our skills working with municipal organizations across the US and Canada - helping them streamline their daily work and better inform and connect their communities. Ci v i c P l u s C o m m u n i t i e s 6 We believe in the goals our clients are seeking to achieve, and we work alongside them to do our part to help. These partnerships have provided great insight into how their web environments need to work and how we can help them find the right solutions to meet those needs. That help means: „„Guiding – with unparalleled consulting and training and facilitating stakeholder buy-in „„Supporting – with exceptional client service before, during and after launch „„Protecting – with industry-leading 24/7 security, support and service, and „„Learning – with continual client contact to better ourselves and our products Ultimately, CivicPlus is a company that’s about amazing people doing amazing things. CivicPlus continues to implement new technologies and services to maintain the highest standards of excellence and efficiency for our clients, their 55,000+ internal users and the 60 million online visitors (and counting!). We consider it a privilege to partner with our clients and provide them with a solution that will serve their needs today and well into the future. Our Promise To You We will deliver a high-caliber, responsive web presence that reflects your vision in design, features, and functionality. The CivicEngage premium solution is simple-to-use, yet flexible and powerful – with intuitive navigation for your citizens and an intuitive administration for your staff. True live editing and training is included so your staff can be efficient on day one, and we’ll continue to support you after launch. Your system will be secure and continuously updated, as our experts develop further cutting-edge solutions designed specifically for local government. Who is CivicPlus? (click the picture and find out more) 7 Project Team Adam Block – Manager of Project Administration Adam leads our project management team. This team oversees inter-departmental and client interactions assuring that your project will be developed in a timely manner by professional website experts. Zach Myers – Manager of Creative Services Zach’s team of designers, developers and art directors partner with the team project manager in designing and creating our websites. He will assign a dedicated senior art director to assist the project manager in the visual direction of your project. Our creative services staff, all with Bachelor of Fine Arts degrees, are responsible for each website overview and uniqueness of design and will work with you until it achieves your vision. Amanda Felber - Assistant Manager of Content Development Our expert content developers’ goal is to migrate and arrange content for usability that exceeds the expectations of citizens and local government. Amanda’s content development team strives to deliver a website on schedule that is easily understood, ADA compliant for Section 508 and WCAG Level A & AA, which can be efficiently maintained. Education BS Business Administration Management Economics Resume Lead Project Manager Financial Services 5+ Years of Experience Project Management Business Management Team Building Customer Service Education Bachelors of Fine Arts Graphic Design Resume Lead Senior Designer Design & Development 7+ Years of Experience Branding Illustration Visual & Web Design Education BA in Psychology Minor in Writing Coursework in Editing, Business, and HTML Resume Content Developer II Lead Content Developer 7+ Years of Experience Customer Service Team Building Leadership Coaching WCAG/ADA Compliance Web Best Practices for Usability From project management to design and development to training and support, a dedicated project team will assist you throughout the development process to ensure your project’s success and your complete satisfaction. Our expert project leaders will coordinate your needs with qualified specialists who will work directly with you throughout your project development and beyond. 8 COMPANY & CONTACT INFORMATION Contact Information Will Spicer Senior Regional Sales Manager Spicer@civicplus.com 785-323-4772 Primary Office 302 S. 4th Street, Suite 500 Manhattan, KS 66502 Toll Free 888-228-2233 Fax 785-587-8951 Legal Name CivicPlus, Inc.Company Founder Ward Morgan, Owner / Chairman of the Board Incorporated In State of Kansas Date Incorporated June 1998 Company Website www.CivicPlus.com Purchasing Vehicles GSA Contract # GS-35F-0124U TIPS/TAPS Contract # 2092613 CMAS Contract # 3-13-70-2966A Interlocal Purchasing Jim Flynn – Chief Systems Architect Jim coordinates and manages our in-house experts on the technical aspects of your project development.  His team will develop your new website so it delivers the functionality and integration you need. Jim also leads our hosting and security services to ensure your new website is safe, maintained, and remains updated. Jim Steffensmeier – Manager of Training and Consulting From consulting services to content development to technical specifications, our consulting and training department will assist you in developing the right message in the right way by the right team. He will coordinate his team of professionals to deliver the consulting and training services you need to achieve success. Sumre Amerin – Manager of Account Management Upon launch of your website to the public, Sumre will assign an account manager to your account. Your dedicated account manager is a specialized team member that will ensure you stay current on CivicPlus solutions. This individual is your main point of contact and will partner with you to create an on-going strategy to better engage your citizens by utilizing the tools and products that CivicPlus has to offer. Education BA Computer Information Systems Resume System Architect Information Technology Director 18+ Years of Experience Cyber Security Network Infrastructure System and Software Architecture Education MA in Education/Adult Education & Training BS in Psychology AA in Business Management Resume Training Consulting 10+ Years of Experience Customer Service Best Practices & Website Optimization US Army Veteran Education BS Business Administration Management Economics Resume Lead Project Manager Financial Services 5+ Years of Experience Project Management Business Management Team Building Customer Service 9 We have assisted more than 2,500 clients throughout the United States, Australia and Canada with the design, implementation and hosting of new, engaging, innovative and functional websites. Included are just a few examples of relevant sites, similar in scope, which we have designed. But don’t take our word for the success of these sites. Contact our clients and let them tell you about their experiences working with CivicPlus. Want to see more? Just let us know…we have about 2,500 we can share with you! Experience 10 Hallandale Beach, Florida www.pasco-wa.gov www.westerlyri.gov Westerly, Rhode Island Laguna Hills, California www.ci.laguna-hills.ca.us www.travelgrantspass.com www.cohb.org Paso, Washington Grants Pass Tourism, Oregon Design Portfolio www.snohomishcountywa.gov Snohomish County, Washington 11 CivicEngage CMS Content Management System The CivicEngage CMS is a robust and flexible CMS that has all of the features and functionality you need today and in the future. Developed for organizations that have a need to update their site frequently, CivicPlus provides a powerful government content management structure and website menu management system. The system allows non-technical employees the ability to easily update any portion of your website instantaneously. The CivicPlus content management system, CivicEngage utilizes Microsoft SQL Server, C# MVC, HTML5, AngularJS and CSS3 for web development. Each website begins with a unique design developed to meet your specific communication and marketing goals, while showcasing the individuality of your community. Features and capabilities are added and customized as necessary, and all content is organized in accordance with web usability standards. 12 User Interface CivicEngage’s intuitive interface empowers your staff in more efficient ways. Based on client input and extensive testing, the CivicPlus team has created a clean, crisp updated look-and-feel for the admin-side of CivicEngage. It’s sleek and streamlined, designed specifically to make your job easier. 13 Agenda Center – Create and display agendas and minutes for various civic organizations. Alert Center – Post emergency or important information on your website to notify citizens via email and SMS. Archive Center - Specifically for the storage and retrieval of agendas, minutes, newsletters and other date-driven documents. Bid Postings – Simple and easy-to-use method of posting your bids. Blog – Post opinions/information about various community topics and allow citizen comments and subscriptions. Business / Resource Directory – List municipal contact information and community resources. Calendar – Create multiple calendars and events to inform citizens of upcoming activities. Carousel Widget – Allows you to present more impactful information with easier navigation in a single page element that can hold up to 10 clickable rotating widgets. Citizen Request Tracker™ – Allow users to report a problem and provide follow-up communication with the point of contact. Community VoiceTM – Interact with citizens about projects in your community. Document Center – Organize and house documents in one central location. ePayments – Allow customers to have the ability to process payment transactions via the website. Facilities & Reservations – Showcase community facilities and allow reservations online. Form Center – Create custom online forms that can be completed and submitted online. Frequently Asked Questions (FAQs) – Answer the most frequently asked questions from your visitors. Job Postings – Post available jobs online and accept online applications. My Dashboard – Allow users to personalize their dashboard to stay updated on news, events, and information they care about. Notify MeTM – Send out mass emails and SMS to subscribers of specific lists. (Includes 500 SMS subscribers) News Flash – Post organizational news items, right on your home page, that are important to your citizens. Opinion Poll – Interact with your site visitors by posting various questions and polls. Photo Gallery – Store and display photos Quick Links – Place links on any page. Spotlight – Highlight important text or widgets in a compact, easy-to-update module. Staff Directory – Detailed contact information for your staff and offices. Modules & Tools Features & Functionality 14 Instantaneous Updates – Once published, updates are posted to the live site in real time. Browser Based – No installation of programs or software needed! Your staff can update the site from an internet connection or platform (Mac or PC) at any time. Mobile Updates – Immediately upgrade your site from any location using your tablet or phone. Pending Approval Items – Direct access to a queue of pending items to be published or reviewed by the administrator upon login. Site Search and Search Log – Powerful site search automatically indexes all content making it easy for visitors to find information. A log of all words that have been searched by visitors is kept, allowing you to update highly searched information and feature key items. Gov 2.0 & Social Networking CivicPlus understands the importance of Gov 2.0 and how social networking sites like Facebook and Twitter help governments connect with their residents in unique and innovative ways. We are dedicated to helping our clients integrate their web content into dynamic social media sites that easily drive citizens to more information. CivicPlus can sync your website to your Facebook and Twitter profiles to automatically publish news, notices, and calendar events from one central location. Other social networking sites (such as LinkedIn, YouTube, Pinterest, etc.) can have feeds displayed on any page of your site and can be featured on your website with links to your profiles. Administrative Features Features & Functionality Automatic Alt Tags – Built-in features ensure your site is Section 508 compliant without having to know the requirements. Bad Links Identifier – This module creates a list of the broken links on your site when they are accessed. Content Creation – CivicEngage makes it easy to add new content, edit old content, and keep page layout consistent through use of our What You See Is What You Get (WYSIWYG) editor. Content changes will not affect the design - site breadcrumbs, page structure and sitemaps will dynamically update upon publishing. With mega menus and drop-down, pop-out menu functionality, you can essentially get to any page on your website within a single click if desired! Content Scheduling – Material throughout the entire system can be set to auto-publish, auto- expire or can be manually retired. 15 Content Versioning – CivicEngage includes version control, a history log for reviewing changes made within the system, file locking through our permission system and an archive of all published content. Dynamic Layout – The layout for your website will be determined by you and the designer. Placement of navigation and dynamic areas are important in guiding site visitors to key information quickly and easily. Dynamic Page Components – Events Calendar, FAQs, Opinion Poll, News Flash and other new features may be included as dynamic page components. Dynamic Page Components may be placed on any page and will help dedicated areas of the site appear as its own website. For example, the entry page for your Parks and Recreation Department can be customized with specific lists of events, FAQs and news announcements pertaining to that department. Dynamic Breadcrumbs and Site Map – Dynamic Breadcrumbs are used to show a visitor’s location within the site. Breadcrumbs are automatically generated by our system. A dynamically generated site map automatically updates to reflect your new navigation if changes are made. ePayments / eCommerce Integration – The ePayments module is included with our premium website solution and allows customers to have the ability to process payment transactions via the website, saving staff time and effort by of manually processing payments. To take advantage of this module, additional processing transaction and merchant account fees will apply. History Log – Easily tracks changes made to your website including items in your Page Menu, Archive Center, Document Center and more. History Log information is searchable, sortable and exportable. Integration/Interfacing – CivicPlus’ integration services work cohesively with most third-party software applications. We have the capability to link with most software or databases currently utilized. Systems such as purchasing, taxes, assessment and utilities have been developed for many of our clients. Intranet – An intranet is a secure location on your website that allows employees and other groups to login and access non-public resources and information. You will have the ability to set up multiple intranet groups with varying view rights. Levels of Permissions – Levels of Permissions may be defined as publishers (create or publish) or authors (create but not publish), or as administrators of modules. Assigned groups may have the right to update their own content without affecting web pages, menu structure, top of page, banner or navigation. Active Directory Authentication – LDAP or ADFS authentication provides a powerful and simple way to manage users and permissions within our system by syncing your website with your existing active directory database - negating the need for multiple user upload and sign- on. Because LDAP and ADFS require custom programming time, additional fees apply. Features & Functionality 16 Link Redirects – Instead of sending your users to http://civicplus.com/248/Awards-and- Recognition, you can send them to http:// civicplus.com/awards. A more intuitive approach to help visitors find particular pages. Maps – Easily add maps to any page of your site to help website users find commonly requested information. Maps can be simple, clickable maps, using our native Image Map Editor to create different link areas, or more detailed and interactive maps can easily be embedded from Google, ESRI, and more using the HTML widget. Printer Friendly – Our printer friendly functionality does separate critical content from the site template to provide a clean print without menu structure and banner information included. RSS Feeds – RSS stands for Real Simple Syndication and in short, it brings your site to the people. After signing up, they receive email notifications of the latest news updates. Supported Browsers – CivicPlus websites are viewable in all common browsers. We optimize them for administrative use with Windows 2000+ and in the two most recent versions of major browsers including: Internet Explorer, Firefox, Safari and Chrome. Translation – Integration with Google Translate instantly translates web pages between English and over 100 other languages. Website Statistics – Administrators will be trained on the use and analysis of web statistics, provided through Piwik Analytics. Features & Functionality Application Programming Interfaces We have nearly a dozen application programming interfaces (APIs) throughout the system and continue to build more to make integrations with our CivicEngage CMS and disparate applications as straightforward as possible. It’s this “open architecture” approach that allows your IT staff and programmers to spend time creating applications and systems that are specific to your community’s needs and tie them into the site, using the site itself as a sturdy platform on which to build. 17 Project Enhancements Please take a look at additional information highlighting some of your included project enhancements. ­Media On-Demand ­Send eCommunication Module ­MobileAdmin App (with Alert Center) 18 Project Enhancements Media On-Demand CivicPlus offers a robust mobile video experience as part of our media solution. Consumption of video is continuing to grow, and providing this option as part of your overall experience is a must have to drive engagement for anything from board meetings to community events. Management of your videos is easy with dedicated storage space (separate from your website) and the ability to embed your videos within any page with the easy-to-use drag and drop tool. In addition, your citizens can: „„„Access videos anywhere and anytime „„„Watch high definition playback on most mobile devices „„„Engage with real-time videos „„„Live stream video with clear and crisp high definition viewing quality 19 Send eCommunication Module Send eCommunication is a visually rich communication module for government, used to efficiently distribute general (non-emergency) communication to citizens. Send eCommunication is more than a simple email newsletter tool; it provides CivicPlus clients with a single point of access, via integration with CivicEngage, to multiple communication channels, including: email, SMS/text, Facebook and Twitter. Send eCommunication centralizes communication, saves administrative users time and improves overall productivity. Additional benefits of the Send eCommunication module include: „„Content auto-posts to your website „„Unlimited communication – there isn’t a limit to the number of emails you can send (text messaging rates do apply) „„Template options to make customizing your message quick and easy „„Access to all subscriber lists in your CivicEngage website, including the ability to select multiple lists Project Enhancements 20 MobileAdmin App The MobileAdmin App puts the power of your website computer in the palm of your hand, allowing you to communicate important information to your citizens, anytime, anywhere. The MobileAdmin App provides access to key functions of your CivicEngage website from an Apple® or AndroidTM smart phone or tablet. This powerful administrative tool allows you to manage key features of your website when you’re away from your computer, helping you to more efficiently execute your citizen communication strategy. Share important information with your citizens quickly by securely adding, modifying, and approving categories and items for certain CivicEngage modules including Alert Center, with an optional upgrade to incorporate News Flash and Calendar. Continual hardware and software upgrades from CivicPlus ensures your MobileAdmin App remains fully-optimized – just like your communication strategy. Access to the Citizen Request Tracker module will be available in 2017. Project Enhancements 21 A dedicated project team will assist you throughout our proven development process to ensure your new website achieves your vision of success and delivers you complete satisfaction - guaranteed. Project Timeline/Development 22 Project Timeline Consulting, design, usability guidance, programming, secure hosting and dedicated training - CivicPlus delivers all of this and more during the development of your new website. PROJECT TIMELINE: 16 – 25 WEEKS Phase 1 Phase 2 Phase 3 Phase 4 Phase 5 4 – 6 Weeks 3 – 5 Weeks 3 – 5 Weeks 3 – 4 Weeks 3 – 5 Weeks Kick-Off Meeting During the initial kick-off meeting, you will meet your project manager to establish your project timeline, review the startup kit and discuss the takeaway items that need to be completed. Your project manager will discuss the implications of deadlines and the expectations required to keep the project on track. Project Phase Descriptions Kick-Off Phase 1 Phase 2 Phase 3 Phase 4 Phase 5 23 Project Phase Descriptions Phase 2: Design Presentation Based on the results and goals outlined during the Optimization, your project team will collaborate and present the most effective layout for your website, ensuring a responsive structure that’s optimized to display in any format – now and in the future. Responsive Prototype You’ll be presented with a simple, responsive prototype that demonstrates the placement of your navigation and key functionality. This prototype is a rudimentary version of a home and interior page that will act as a blueprint to ensure that design choices translate into effective user experiences. The layout is hosted on a unique web address so it can be viewed on multiple devices and easily shared with key stakeholders. Color Palette A custom color palette is also included with your responsive prototype. It is paired with your layout so that it is easy to envision how colors will enhance the design and engage your users. Kick-Off Phase 1 Phase 2 Phase 3 Phase 4 Phase 5 Our prototype presentation software allows you to visualize the proposed design and style of your new site and how it will respond on both desktop/tablets and smartphones. Phase 1: Website Optimization REVIEW NEEDS Goal: Review where you are now and discuss where you want to go. DESIGN, CONTENT & FUNCTIONALITY Goal: Determine how you want your website to look, feel and function. BEST PRACTICES Goal: Outline our CivicPlus content best practices and standards. 24 Project Phase Descriptions Phase 3: Production Site Development Your Project Team will present your layout, functionality and design based on your goals, our recommendations and our combined vision. CONTENT DEVELOPMENT During the Kick-Off Meeting and Phase 1 your staff has the role of updating the content on your current primary site. While you are making design decisions, our content development team will optimize and reorganize your content based on CivicPlus best practices. Content from sites other than the primary site can be migrated to the new primary site for an additional fee. DESIGN REVIEW You will have the opportunity to evaluate and collaborate with the Project Team on proposed changes. You can revise your design composition up to the deadline that you and your project manager agree upon during the timeline meeting (the average client requests a total of three). After that deadline, your project’s Go Live date will be adjusted. Following design approval and functionality development, we conduct a review to ensure your expectations are met and website best practices are upheld. ACCESSIBILITY COMPLIANCE Our designers and programmers automatically implement all the accessibility features necessary to ensure your site is compliant with accessibility standards outlined within Section 508 and WCAG Level A & AA. We will make recommendations on best practices for keeping your content accessible and available for all users by ensuring that, among other things: „„All menu items are clickable „„Submenus display throughout the site „„Alt tags are used for images „„Site maps are dynamically generated „„Documents and links can be set to open in the same window Kick-Off Phase 1 Phase 2 Phase 3 Phase 4 Phase 5 25 Project Phase Descriptions Phase 4: Website Review & Training Our goal for training is to give your staff the skills and tools they need to quickly and easily keep your website current. Trainers will work with you to ensure your staff is correctly trained. Before your site is launched, CivicPlus will provide in-person or online training to equip your staff with the knowledge, tools and comfort level needed to maintain the site’s integrity upon Go Live. Regardless of technical ability, we will help your staff gain the confidence to effectively maintain your website. FEATURES, MODULE & PAGE CREATION TRAINING Included in our training for Administrators & Content Contributors will be delivering an understanding of your site’s navigation and page layout and how these affect target audiences. We will instruct your staff on creating area-rights and back-end features for site administration as well as review all the modules included with your site. Your staff will learn how to create links, format text and lay out pages for usability and scanability. CivicPlus training manuals and videos are available for download at no cost from our online resources. Phase 5: Go Live This is an exciting time; it is the last step before your new site launches! Your Project Team will provide you the information you need to prepare your site for Go Live. TESTING AND REVIEW You typically have three weeks after training to become familiar with your site. This will allow you to add, create and make adjustments to content on your production site, as well as ensure overall satisfaction with your website. Content changes will display and function the same way before and after your Go Live date. Upon completion of a collaborative final review of the website and a final spelling and links checkup by our Quality Control Team, your domain name is directed to the newly developed website. Kick-Off Phase 1 Phase 2 Phase 3 Phase 4 Phase 5 26 ASSESS YOUR CURRENT WEBSITE For the best consulting experience possible the following takeaways need to be completed prior to your consulting: „„Functionality and Design Form – Prior to starting this form, research other websites that you like based on functionality and design elements. Provide URLs and specifics about what you like. This form also asks for details on your community’s tagline, logo and branding. „„Web Team Form – Prior to starting this form, please have an understanding of your project goals, focus and expectations. This allows your CivicPlus project team to develop a site specific to your needs and lays the foundation for developing a highly functional information architecture. „„Content Form – The information that you provide on this form will also help our content development professionals to assess your wants and needs. CLEAN HOUSE AND UPDATE CONTENT We will need you to update the content on your current primary live website. This step is critical to guaranteeing the information available is relevant, fresh and on-point. Your staff should delete any pages from your current website that you no longer want or need and ensure the remaining information is Your Role We will need your help to create the strongest possible website for Arlington. During the process, we will need you to: applicable and up-to-date. If you are not able to access your current site, our team will work with you to ensure that your content needs are addressed. GATHER PHOTOS AND LOGOS Collect pictures that will be used in the overall design and logos or branding that should remain consistent. DEPARTMENT LIST Provide a list of all departments in your organization. WEBSITE STATISTICS Provide statistics from your current site for the previous 12 months along with a list of all pages and downloaded documents. SITE MAP Provide the outline of your current site’s navigational structure. EXTERNAL APPLICATION LIST Supply a list of all third-party or in-house applications being utilized. VERBATIM CONTENT Compile a list of any content on your current website that must be migrated verbatim to your new site. UPDATE INTERNET BROWSERS Ensure you have most up-to-date web browser versions within your organization’s computers. 27 You are now a part of the CivicPlus family and will continue to receive both technical and consultative support from our Support and Account Management team. Support, Hosting & Security 28 Receive ongoing guidance and assistance from our knowledgable staff. Always obtain the answers you need to keep your website current and online. CONTINUING SERVICE & SUPPORT CivicPlus won’t be with you just for the development, design and launch – we will be here year after year to respond to new needs and new opportunities for you to continue to have the best site possible. We offer all of our clients continuing support and additional advantages as a member of the CivicPlus family. DEDICATED ACCOUNT MANAGEMENT CivicPlus has a team of dedicated account managers to help you implement the tools needed to successfully meet the level of community engagement that you desire. Upon website Go Live, you will have a dedicated member of this team to help you keep up on new CivicPlus products and optimize your site. This specialized team member can provide you with further information on how to engage your citizens, utilizing the tools that CivicPlus has put into place on your new website. Continuing Service & Support 29 AROUND-THE-CLOCK TECHNICAL SUPPORT Our support personnel are ready to answer your staff members’ questions and ensure their confidence in using our site. When you choose CivicPlus, our knowledgeable staff is available from 7 a.m. to 7 p.m. (CST) to field your calls and emails, and emergency services are available after regular hours with our on- call staff 24-hours a day. In addition to fielding support requests, CivicPlus is proactive in identifying any potential system issues. Through regularly scheduled reviews of site logs, error messages, servers, router activity and the internet in general, our personnel often identify and correct issues before they even affect our clients’ websites. Our expertise in website management provides assurance to our clients that their site is in good hands. Technical Support SUPPORT MAINTENANCE OF CIVICPLUS APPLICATION & MODULES 7 a.m. – 7 p.m. (CST) Monday – Friday (excluding holidays) / 24/7 Emergency Support Install service patches for OS system enhancements 2-hour response during normal hours Fixes Dedicated support personnel Improvements Integration of system enhancements Integration Usability improvements Testing Online training manuals Development Proactive support for updates & fixes Unlimited Administrative Users Monthly newsletters / Ongoing follow-up check-ins CivicPlus Connection Client Forums 30 Hosting & Security Redundant power sources and internet access ensures consistent and stable connections. We invest over $1.0M annually to ensure we adapt to the ever-changing security landscape while providing maximum availability. To help ensure your site is protected at the level you need, CivicPlus offers two options for coverage. INCLUDED HOSTING & SECURITY PACKAGE Your system is monitored 24/7/365. CivicPlus’ extensive, industry-leading process and procedures for protecting and hosting your site is unparalleled. From our secure data center facilities to constant and vigilant monitoring and updating of your system, including 99.9% guaranteed up-time (excluding maintenance), we’ve got you covered. PLATINUM HOSTING & SECURITY PACKAGE Ensuring your visitors can access your site and that it continues to be business as usual with the least amount of interruption is attainable through the CivicPlus Platinum hosting and security. Cyber security is a high profile topic that makes the news almost daily. Every industry is a target, including local government. Our Platinum package protects your site through all of our included hosting and security features, but also adds the peace of mind of comprehensive and continuous DDoS protection. Our team has been pressure tested by high-profile events and has the experience and expertise to handle any situation. We’ve got you covered. ONGOING PROTECTION SERVICES If you choose the Included Package and experience a DDoS attack or threat, CivicPlus has mitigation and DDoS Advanced Security options that are available to you at the time of event. Whatever your needs are, we have an option that will be a fit for your community. CivicPlus protects your investment and takes hosting and security of our client sites seriously. 31 HOSTING & SECURITY FEATURES INCLUDED PLATINUM Data Center Highly reliable data center Managed network infrastructure On-site power backup & generators Multiple telecom/network providers Fully redundant network Highly secure facility System monitoring 24/7/365 24/7/365 Hosting Automated CivicEngage software updates Server management & monitoring Multi-tiered software architecture Server software updates & security patches Database server updates & security patches Antivirus management & updates Server-class hardware from nationally recognized provider Redundant firewall solutions High performance SAN with N+2 reliability Bandwidth Multiple network providers in place Unlimited bandwidth usage for normal business operations (does not apply in the event of a cyber attack) Burst bandwidth 22 Gb/s 45 Gb/s 32 HOSTING & SECURITY FEATURES INCLUDED PLATINUM Disaster Recovery Emergency after-hours support, live agent (24/7) On-line status monitor by Data Center Event notification emails Guaranteed recovery TIME objective (RTO)8 hours 4 hours Guaranteed recovery POINT objective (RPO)24 hours 4 hours Pre-emptive monitoring for disaster situations Multiple data centers Geographically diverse data centers DDoS Mitigation Defined DDoS Attack Process Identify attack source Identify type of attack Monitor attack for threshold* engagement DDoS Advanced Security Coverage Continuous DDoS mitigation coverage NOT INCLUDED Additional coverage available at time of event. Additional fees will apply. Content Distribution Network support Proxy server support Live User Detection service *THRESHOLDS: Traffic exceeds 25 Mb/s sustained for 2+ hours. Traffic over 1 Gb/s at any point during attack 33 What we promise to deliver. Scope of Work 34 KICK-OFF MEETING Deliverable: Project timeline, training jump start, online forms, kick-off meeting PHASE 1: WEBSITE OPTIMIZATION Deliverable: Website optimization meeting „„Assign a project manager to your project „„Conduct a project kick-off meeting to review awarded contract „„Establish a communication plan for project duration „„Identify all key internal and external stakeholders „„Develop a project plan and timeline „„Provide project management and support „„Provide communication support and status to key stakeholders via email or phone as needed „„Review goals and expectations you submitted on the completed forms to ensure all needs are clearly understood „„Present best practices to enhance your new site PHASE 2: DESIGN PRESENTATION Deliverable: Website grayscale layout and mood board color pallet presentation „„Present a simple, responsive prototype that demonstrates the placement of your navigation and key functionality as well as a custom color palette that are based on previously determined goals „„Begin design development once approved Scope of Work 35 PHASE 3: PRODUCTION SITE DEVELOPMENT Deliverable: Website design and production „„Present a fully functional website on production URL „„Migrate up to 200 pages for url www.arlingtonwa.gov „„Migrate Microsoft Word or .pdf documents of current, plus previous three years, of agendas and minutes „„Conduct a quality review of the website to ensure the statement of work is met, after approval of design and functionality „„Coordinate training needs PHASE 4: WEBSITE REVIEW & TRAINING THREE (3) DAYS WEB-BASED TRAINING FOR UP TO SIX (6) STAFF MEMBERS Deliverable: Train System Administrator(s) on CivicEngage administration, permissions, setting up groups, users and module administration. Basic user training on pages, module entries and applying modules to pages. „„Provide training as agreed upon for staff members, based on internal daily task and workflow „„Train staff on CivicEngage, including updating content pages and modules „„Provide access to online training manuals and videos for additional assistance PHASE 5: GO LIVE Deliverable: Custom website launched to the public „„Address system issues identified „„Redirect the domain name to the newly developed website once you sign off on the completed project 36 What we promise to deliver. We will want to talk with you in more detail about your goals, expectations and vision before we finalize your scope so we deliver what you need, when you need it. Proposed Investment Estimate 37 As detailed in the proposal, Arlington’s project development includes: Total Investment – Year 1 $29,000 Year 1 Investment Proposal All quotes are priced per project and presented in US dollars. Pricing is valid for 60 days from April 3, 2017. Website Design, Development & Deployment „„CivicEngage Content Management System (including upgrades, hosting, maintenance and support) „„Migration of up to 200 pages for url www.arlingtonwa.gov „„Included Hosting and Security Package Professional Consulting Services & Training „„Three (3) Day Web-Based Implementation Training for up to Six (6) Staff Members Projects Enhancements & Functionality „„Media On-demand (Live Streaming and 10 GB additional storage) „„Send eCommunication Module „„MobileAdmin App (with Alert Center) 38 Annual Investment Annual Hosting & Maintenance (Beginning year 2) $5,000 Year 2 and Beyond Annual Hosting/Maintenance Service (Beginning year 2) Receive maximum benefit at minimal cost while protecting your investment. Each year of your contract, you’ll receive system enhancements, maintenance and optimization and have full access to our support staff so your site stays up-to-date with our latest features and functionality. Your annual services fee includes redundant hosting services, daily backups, extensive disaster recovery plans, 24/7 support, software maintenance, system enhancements, and access to the CivicPlus community. Annual Hosting/Maintenance Services are subject to a cumulative annual 5% technology fee increase beginning Year 3 (for non- CPA payment projects) and beyond. CivicPlus Advantage - Alternate Payment Plan The CivicPlus Advantage (CPA) provides zero interest, level payments that divides the Total Investment - Year One expense of your project over the first five (5) years of your contract. Each payment also includes your Annual Hosting/Maintenance Services. Our CivicPlus Advantage payment plan lowers your initial “out of pocket” expenses dramatically. Redesign Guarantee At the end of your third year of continuous service with us, you are eligible to receive a basic website redesign with no further out-of-pocket expense. Keep your website fresh, innovative and up-to-date! 1st Year CPA Payment ........................$9,800 2nd Year CPA Payment .......................$9,800 3rd Year CPA Payment ........................$9,800 4th Year CPA Payment ........................$9,800 5th Year CPA Payment ........................$9,800 6th Year Annual ...................................$5,250 (annual + 5% technology fee) City of Arlington Council Agenda Bill Item: WS #4 Attachment D COUNCIL MEETING DATE: May 22, 2017 SUBJECT: Citizens’ Salary Review Commission Decision ATTACHMENTS: Citizens’ Salary Review Commission 2017 Decision as filed with City Clerk on April 24, 2017 Summary of Citizens’ Salary Review Commission 2017 Decision Minutes from the March 29, 2017 Citizens’ Salary Review Commission Meeting Minutes from the April 12, 2017 Citizens’ Salary Review Commission Meeting DEPARTMENT OF ORIGIN City Clerk; Contact Kristin Banfield, 360‐403‐3444 EXPENDITURES REQUESTED: Additional $15,050 in 2017 BUDGET CATEGORY: General Fund – Legislative and Executive BUDGETED AMOUNT: $50,400 – legislative salaries; $18,000 – Mayor salary LEGAL REVIEW: DESCRIPTION: The City of Arlington’s Citizens’ Salary Review Commission has completed its work for 2017 and filed its compensation decision with the Arlington City Clerk. The notice specifies changes to the Mayor and Council salaries and per diem reimbursements on June 1, 2017, January 1, 2018, and January 1, 2019. The Arlington Citizens’ Salary Review Commission will meet again in 2019. HISTORY: The Arlington City Council established the Citizens’ Salary Review Commission in January 2015 to set the salaries and per diem reimbursements for the city’s elected officials. Since its formation, the Commission has focused its work on basing salaries and per diem reimbursement of elected officials on realistic standards so that elected officials of the city may be paid according to the duties of their offices, and so that citizens of the highest quality may be attracted to public service. ALTERNATIVES: No alternatives. By code, the decision of the Citizens’ Salary Review Commission is final and binding. RECOMMENDED MOTION: No action of the City Council is required. By code, the decision of the Citizens’ Salary Review Commission is final and binding. MEMO From: Citizen Salary Commission To: Kristin Banfield, City Clerk Date: April 17, 2017 Re: Mayor and Council Compensation On Wednesday, April 12, 2017, the Citizen Salary Commission approved the following changes to the Mayor and City Council compensation. Effective June 1, 2017: Mayor’s salary shall be increased to $2,250 per month City Council member meetings and workshop compensation, up to four per month, shall be increased to $200 Effective January 1, 2018: Mayor regional meetings expense reimbursement: $125 Mayor non‐regional meetings expense reimbursement: $100 Mayor meeting expense reimbursement to be capped at a maximum of 25 meetings per month. City Council expense reimbursement unchanged. Meetings expense reimbursement to be capped at a maximum of 10 meetings per month. Effective January 1, 2019: City Council expense reimbursement unchanged. Meeting expense reimbursement to be capped at a maximum of 12 meetings per month. Regional meeting definitions remain the same as outlined in AMC 2.04.027.   SUMMARY OF 2017 CITIZENS’ SALARY COMMISSION CHANGES   Current 6/1/17 1/1/18 1/1/19  Mayor salary $1,500/month $2,250 No change No change  Mayor regional  meetings  $75 each No change $125 each No change  Mayor non‐ regional meetings  $50 each No change $100 each No change  Mayor  compensable  meetings,  maximum  20 No change 25 No change            Council Arlington  meetings and  workshops, up to  4 per month  $150 $200 No change No change  Council regional  meetings  $75 No change No change No change  Council non‐ regional meetings  $50 No change No change No change  Council  compensable  regional and non‐ regional  meetings,  maximum  8 No change 10 12  List of meetings eligible for regional reimbursement:  National League of Cities  Association of Washington  Cities  Snohomish County Cities  Snohomish County  Tomorrow  Meetings in Olympia which  address issues with  legislature, governor, state  departments and boards  Economic Alliance  Snohomish County  Puget Sound Regional  Council  Meetings with Snohomish  County personnel or elected  officials  Mayors’ Association  Community Transit  Snohomish County  Committee for Improved  Transportation  DRAFT Page 1 of 2 2nd Floor Arlington City Hall 238 N Olympic Avenue March 29, 2017 Commission members Present: Chad Clay, Austin DeFreece, Steve Maisch, Sherri McCarthy (by phone), and Christopher St. John Commission Members Absent: None Staff Present: Heather Logan and Kristin Banfield. Commissioner Clay called the meeting to order at 6:30 pm and self‐introductions of those present followed. By consensus, Commissioner Clay was selected as chair of the Commission. City Clerk Kristin Banfield reviewed the materials included in the Commissioner’s notebooks. The materials included the contact list for the commission members and staff support, the Citizens’ Salary Review Commission decision from 2015, information from Municipal Research Services Center (MRSC) on city and town forms of government, 2016 Mayor and City Council salary data from Association of Washington Cities (AWC), and chapters 3‐6 of the Mayor & Councilmember Handbook published by AWC and MRSC. Administrative Services Director Heather Logan provided information about the Citizens’ Salary Revision Commission decision making process in 2015. Commissioners Clay and McCarthy also provided input as to the events and discussions leading to the prior Commission’s decision. Commissioner DeFreece inquired about any restrictions the Commissioners may have on gathering information to help make their decision. Ms. Logan confirmed that any information they gather is acceptable, but be aware of the sources from which the material is obtained. In the alternative, if the commission has specific information they would like to receive, Ms. Banfield can do the legwork. Discussion followed on the definition of a meeting under the City’s municipal code, the information collected and provided for the 2015 decision, and the process the prior commission undertook to make a decision. The commissioners requested to receive copies of the minutes from 2015, Arlington Municipal Code 2.04 effective January 1, 2015, Arlington Municipal Code 2.04 effective March 29, 2017, the last two years of payroll and reimbursement data for the mayor and Minutes of the Arlington Citizens’ Salary Review Commission Minutes of the Citizens Salary Review Commission March 29, 2017 Page 2 of 2  Council, and the per diem meeting reimbursement submittals (without the attached agendas). Commissioner Clay noted that the 2015 decision was based on the desire to incentivize Council members and the Mayor to participate in regional meetings. There was a significant amount of work to develop the definition of a “meeting” for per diem reimbursement. Commissioner DeFreece stated that the current system seems to work well and our focus should be on enticing talented members of our community to serve as Mayor or on the Council to attain as much investment in Arlington and impact our short and long‐term goals. Commissioner Clay inquired if the Commission needs to consider any budget constraints. Ms. Logan responded that the Commission’s job is to set the salaries for the City Council and Mayor; it is the City staff’s job to figure out how to appropriately budget for the salaries. Commissioner Maisch inquired if it means something different if the Mayor attends a particular meeting versus a Councilmember. Discussion followed. Commissioner McCarthy inquired if some additional data would be of interest to the other commisisoners, such as crime rates, assessed values, sales tax generation, and general fund budgets for our comparable cities. The commission was also interested in what was forecast in the 2018 General Fund budget for Mayor and City Council salaries. The Commission set their next meeting on Wednesday, April 12, 2017 at 6:30 p.m. Commissioner McCarthy will again attend the meeting by telephone. With no further business to consider, the meeting was adjourned at 7:35 pm. ____________________________ Chad Clay, Chair   DRAFT Page 1 of 3 2nd Floor Arlington City Hall 238 N Olympic Avenue April 12, 2017 Commission members Present: Chad Clay, Austin DeFreece, Steve Maisch, Sherri McCarthy (by phone), and Christopher St. John Commission Members Absent: None Staff Present: Heather Logan and Kristin Banfield. Commissioner Clay called the meeting to order at 6:44 pm. City Clerk Kristin Banfield reviewed the materials emailed to the Commissioners after the last meeting. These items included: minutes from 2015, Arlington Municipal Code 2.04 effective January 1, 2015, Arlington Municipal Code 2.04 effective March 29, 2017, the last two years of payroll and reimbursement data for the mayor and Council, and the per diem meeting reimbursement submittals. Commissioner Clay inquired where the Commission would like to start. Commissioner DeFreece noted the volume of materials provided over the last month is an impressive amount of information to review and digest. Commissioner Maisch commented that focusing on a percentage increase is risky, given the low dollar values at play. Commissioner St. John stated a good place to start might be looking at the rate of inflation over the past few years and whether that has been accounted for. Commissioners Maisch and McCarthy both noted that the City Council does not have city provided health insurance, like a lot of other jurisdictions provide. That was dispensed with in 2011 and needs to be taken into consideration. Administrative Services Director Heather Logan mentioned that the prior Commission took a piece work approach to compensation for the Mayor and Council whereby if the person does the work, they receive the compensation. Commissioner McCarthy shared the details of her recent conversation with one of the City’s Councilmembers regarding the work as a Councilmember. That Councilmember shared that the large majority that become a member of the Council do so for the love of Arlington and the desire to make a difference in the community. Commissioner Maisch expressed that after reviewing all the materials, especially the sheets with all of the meetings attended by the Mayor and Councilmembers, that you get the Minutes of the Arlington Citizens’ Salary Review Commission Minutes of the Citizens Salary Review Commission April 12, 2017 Page 2 of 3  feeling that the Mayor and Council are being taken advantage of. They donate a significant amount of time, with incredible results for the community, for very little compensation. Commissioner Clay asked if anyone had any proposals to make at this time. City Council Compensation Commissioner Maisch suggested that each Council meeting and workshop attendance be increased by $50 for the City Councilmembers. Commissioner St. John and Commissioner DeFreece suggested that the maximum number of meetings that receive expense reimbursement each month be increased from eight to 10. Discussion followed. It was suggested that this element take effect June 1, 2017. Commissioner DeFreece suggested that the maximum number of meetings that receive expense reimbursement each month be increased from eight to 10, effective January 1, 2018. He continued that the maximum Council expense reimbursement received each month be increased from 10 to 12, effective January 1, 2019. Mayor Compensation Multiple proposals regarding the Mayor’s compensation were made including:  Increase of the base salary from the current $1,500 per month to $2,000 per month  Increase of the base salary from the current $1,500 per month to $2,500 per month  Increase of the base salary from the current $1,500 per month to $1,700 per month  Increase of the base salary from the current $1,500 per month to $2,250 per month A proposal was made to increase the maximum number of meetings that receive expense reimbursement be increased from 20 to 25 and that the compensation for regional meetings be increased from $75 to $125 and that the compensation for non‐regional meetings be increased from $50 to $100. Extensive discussion on the City Council and Mayor compensation proposals was had including the differences in the role and scope of work of a Mayor and a Councilmember, what the increase of these proposals would mean dollar‐wise and percentage‐wise, and the desire to keep the formula set by the prior commission that incentivizes involvement. Commissioner DeFreece moved to increase the City Council member meetings and workshop compensation, up to four per month, to $200, effective June 1, 2017; to leave the City Council expense reimbursement unchanged and increase the City Council meetings expense reimbursement cap at a maximum of 10 meetings per month, effective January 1, 2018; and to leave the City Council expense reimbursement unchanged and increase the City Council meetings expense reimbursement cap at a maximum of 12 meetings per month, effective January 1, 2019. Commissioner Maisch seconded the motion which passed unanimously. Commissioner DeFreece moved to increase the Mayor’s monthly salary to $2,250 per month, effective June 1, 2017; to increase the Mayor expense reimbursement for regional meetings to $125, to increase the Mayor expense reimbursement for non‐regional meetings Minutes of the Citizens Salary Review Commission April 12, 2017 Page 3 of 3  to $100, and increase the Mayor meetings expense reimbursement cap at a maximum of 25 meetings per month, effective January 1, 2018. Commissioner Maisch seconded the motion which passed 4‐1. The Commission Chair directed the City Clerk to prepare the decision in a memo format, similar to the memo submitted in 2015. The Commission will review the decision as prepared by the City Clerk to determine if there is a need for any additional follow up meetings. With no further business to consider, the meeting was adjourned at 8:44 pm. ____________________________ Chad Clay, Chair   City of Arlington Council Agenda Bill Item: WS #5 Attachment E COUNCIL MEETING DATE: May 22, 2017 SUBJECT: Bid Award, Grant Acceptance, and Construction Management Services – Taxiway Charlie ATTACHMENTS: Bid Results, Construction Contract, Commission Resolutions, Const. Mgmt. Contract, and Scope of Work. DEPARTMENT OF ORIGIN Airport – Contact Director Dave Ryan, 360‐403‐3474 EXPENDITURES REQUESTED: Amount Not to Exceed $700,000 BUDGET CATEGORY: CIP Fund BUDGETED AMOUNT: LEGAL REVIEW: DESCRIPTION: The Taxiway Charlie Lighting & Signing Improvements Project involves installing taxiway edge lighting and lighted signs along the entire length of Taxiway Charlie on the west side of the airport. Lighting the taxiway will provide a higher level of safety for aircraft operating at the airport during nighttime and low visibility conditions and is eligible for FAA and WSDOT grant funding. The City advertised the project in the Builders Exchange and Daily Journal on April 18th. Colvico Inc. came in as the low bidder for construction at $520,309.55. Staff contacted references for the contractor and the references were complimentary of their work. Staff is requesting that City Council authorize the Mayor to sign the contract with Colvico Inc. in the amount not to exceed $520,309.55 (pending FAA and WSDOT grant offers.) Staff is also requesting the City Council authorize the Mayor and City Attorney to sign the WSDOT Airport Aid Grant Offer and FAA Grant offer subject to grant award for the Taxiway Charlie Lighting & Signing Improvements Project. We expect to receive both grant awards in the months of June and July. Finally, staff is requesting Council approve a construction management contract with WHPacific (pending FAA approval and an Independent Fee Estimate that is within FAA guidelines not to exceed $122, 462.00.) City of Arlington Council Agenda Bill Item: WS #5 Attachment E HISTORY: Airport staff has submitted a grant to the FAA to request 90% of the project be funded by the FAA AIP Program. Staff has budgeted $700,000 for the project. Though it is likely that the FAA will provide 90% funding for the construction and construction management services, payment by the FAA is made on a reimbursement basis, so the airport will need to pay 100% of the expenses first. The airport currently has $700,000.00 budgeted for this project with additional money in our CIP account. This will provide enough funds for the airport to pay the invoices initially and then immediately apply for reimbursement from the FAA. Airport staff has also applied for a WSDOT Aviation grant for up to half of the airport’s match on the project or 5%. After applying all grant funding, the Arlington Municipal Airport will only be paying approximately $33,000.00 for this project totaling some $645,271.55. The Airport Commission approved the contract with Colvico Inc. for the Taxiway Charlie Lighting & Signing Improvements Project in an amount not to exceed $520,309.55 as well as accepting a resolution for the WSDOT grant funding at their May 9th, 2017 meeting. ALTERNATIVES: Approve Staff’s Recommendation with Modifications Deny Staff’s Recommendation Table Staff’s Recommendation RECOMMENDED MOTION: Workshop; discussion only. At the June 5, 2017 meeting, the recommended motions will be: I move to authorize the Mayor to sign the contract with Colvico Inc. in the amount not to exceed $520,309.55 (pending FAA and WSDOT grant offers.) I also move to authorize the Mayor and City Attorney to sign the WSDOT Airport Aid Grant offer and FAA Grant offer subject to grant award for the Taxiway Charlie Lighting & Signing Improvements Project. I also move for Council to authorize the Mayor to sign a construction management contract with WHPacific (pending FAA approval and an Independent Fee Estimate that is within FAA guidelines not to exceed $122, 462.00.) MEMO City of Arlington Airport To: City Council From: Lorene Robinson, Airport Operations Specialist Date: June 5, 2017 Subject: Taxiway Charlie Lighting & Signing Improvements Project ISSUE: The Taxiway Charlie Lighting & Signing Improvements Project involves installing 4 lighted signs and taxiway edge lighting along the entire length of Taxiway Charlie on the west side of the airport. Taxiway Charlie is the primary taxiway for the airport serving the west side flightline area. DISCUSSION & ANALYSIS: The City advertised the project in the Builders Exchange and Daily Journal on April 18th. The five bids are shown below. All amounts shown include sales tax. Contractor Name Bid Amount * Colvico Inc. ** Sail Electric Inc. MD Marine Electric Deco/Dutton Electric Co. Burke Electric LLC *Corrected bid amount Colvico Inc came in as the low bidder at $520,309.55. Staff contacted references for the contractor and the references were complimentary of their work. ALTERNATIVES: Approve Staff’s Recommendation with Modifications Table Staff’s Recommendation Deny Staff’s Recommendation MEMO City of Arlington Airport RECOMMENDATION: Staff recommends the City Council approve a contract for the Taxiway Charlie Lighting & Signing Improvements Project with Colvico Inc in the amount of $520,309.55. P02.405.2 CONSTRUCTION CONTRACT THIS CONTRACT, dated this day of , 20 , is by and between the City of Arlington, a municipal corporation of the State of Washington, hereinafter referred to as the CITY, and Colvico Inc. referred to as the CONTRACTOR. WHEREAS, the City desires a Taxiway C Lighting System, and WHEREAS, the Contractor is qualified, willing and able to perform the necessary work. NOW, THEREFORE, in consideration of the mutual promises and covenants herein contained, to be kept, performed and fulfilled by the respective parties thereto, and other valuable considerations, it is mutually agreed as follows: 1.0 SERVICE BY CONTRACTOR Contractor agrees to perform the services described in the following project specification 2017 Taxiway C Lighting and Signing Improvements Project. These documents are on file with the Project Manager, a copy is held by the contractor, and by this reference incorporated herein. 2.0 TIME OF COMPLETION All work under this Agreement is to be done within 60 Calendar days from the Notice-to- Proceed, starting no later than 10-calendar days from the date of notice to proceed. 3.0 RESPONSIBILITY OF CONTRACTOR 3.1 Safety Contractor shall take all necessary precautions for the safety of employees on the work and shall comply with all applicable provisions of Federal, State and municipal safety laws and building codes. Contractor shall erect and properly maintain, at all times, as required by the conditions and progress of the work, all necessary safeguards for protection of workmen and the public; shall post danger signs warning against known or unusual hazards. 3.2 Warranty The Contractor shall be responsible for correcting all defects in workmanship and material within one year after acceptance of this work. When corrections of defects are made, Contractor shall be responsible for correcting all defects in workmanship and/or materials in the corrected work for one year after acceptance of the corrections by the City. The Contractor shall start work to remedy such defects within seven (7) days of mailing notice of discovery thereof by the City and shall complete such work within a reasonable time. In emergencies where damage may result from delay or where loss of services may result, such corrections may be made by the City, in which case the cost shall be borne by the Contractor. In the event the Contractor does not accomplish corrections at the time specified, the work will be otherwise accomplished and the cost of same shall be paid by Contractor. The Contractor shall be liable for any costs, losses, expenses or damages including consequential damages suffered by the City resulting from defects in the Contractor’s work including, but not limited to, cost of materials and labor extended by the City in making emergency repairs and cost of engineer, inspection and supervision by the City. The Contractor shall hold the City harmless from any and all claims which may be made against the City as a result of any defect work and the Contractor shall defend any such claim at his own expense. Where materials or procedures are not specified in the contract, the City relies on the professional judgment of the Contractor to make appropriate selections. 3.3. Prevailing Wages Contractor shall comply with every provision of Chapter 39.12 of the Revised Code of Washington and Davis Bacon wage rates, paying the higher of the two for like labor categories. City of Arlington P02.405.2 Arlington Municipal Airport Contract Taxiway C Lighting and Signing Project 1 3.4. Non-discrimination Contractor will not discriminate against any employee or applicant for employment because of race, creed, color, sex, age, national origin, marital status, physical or other motor handicap, unless based upon a bonfide occupational qualification. 3.5 Employment Any and all employees of the Contractor while engaged in the performance of any work or services required by the Contractor under this agreement, shall be considered employees of the Contractor only and not of the City and any and all claims that may or might arise under the Worker's Compensation Act on behalf of said employees, while so engaged and any and all claims made by a third party as consequence of any negligent act or omission on the part of the Contractor's employees, while so engaged on any of the work or services provided or rendered herein, shall be the sole obligation and responsibility of the Contractor. The contractor or subcontractor shall not discriminate on the basis of race, color, national origin, or sex in the performance of this contract. The contractor shall carry out applicable requirements of 49 CFR Part 26 in the award and administration of DOT assisted contracts. Failure by the contractor to carry out these requirements is a material breach of this contract, which may result in the termination of this contract or such other remedy, as the recipient deems appropriate, which may include, but is not limited to: (1) Withholding monthly progress payments; (2) Assessing sanctions; (3) Liquidated damages; and/or (4) Disqualifying the contractor from future bidding as non-responsible. 4.0 SUBCONTRACTOR RESPONSIBILITY 4.1 The Contractor shall include the language of this section in each of its first tier subcontracts, and shall require each of its subcontractors to include the same language of this section in each of their subcontracts, adjusting only as necessary the terms used for the contracting parties. The requirements of this section apply to all subcontractors regardless of tier. At the time of subcontract execution, the Contractor shall verify that each of its first tier subcontractors meets the following bidder responsibility criteria: 1. Have a current certificate of registration as a contractor in compliance with chapter 18.27 RCW, which must have been in effect at the time of subcontract bid submittal; 2. Have a current Washington Unified Business Identifier (UBI) number; 3. If applicable, have: a. Industrial Insurance (worker’s compensation) coverage for the subcontractor’s employees working in Washington, as required in Title 51 RCW; b. A Washington Employment Security Department number, as required in Title 50 RCW; c. A Washington Department of Revenue state excise tax registration number, as required in Title 82 RCW; d. An electrical contractor license, if required by Chapter 19.28 RCW; e. An elevator contractor license, if required by Chapter 70.87 RCW. 4. Not be disqualified from bidding on any public works contract under RCW 39.06.010 or 39.12.065(3). 5.0 COMPENSATION 5.1 The City shall pay the Contractor for the services identified in this contract the total amount of Five hundred twenty thousand, three hundred and nine dollars, and fifty-five cents ($520,309.55) (includes tax). Contractor shall submit monthly, for the City’s acceptance, a written Contract Project Estimate setting forth the quantities of work satisfactorily performed to date, and an invoice covering the contract price applicable to the work, unless otherwise directed, The City will, within 30 days after receipt of acceptable Contractor’s estimate and invoice, pay the Contractor the accepted progress invoice less actual accumulated amount previously paid. City of Arlington P02.405.2 Arlington Municipal Airport Contract Taxiway C Lighting and Signing Improvements 2 5.2 The City shall have the right to withhold payment to Contractor for any work not completed in a satisfactory manner until such time as Contractor modifies such work so that the same is satisfactory. 6.0 CITY'S RIGHT TO TERMINATE CONTRACT 6.1 The City may terminate the contract upon the occurrence of any one or more of the events hereafter specified: a. If the Contractor should be adjudged bankrupt. b. If the Contractor should make a general assignment of benefit of his creditors. c. If a receiver should be appointed on the account of insolvency of the Contractor. d. If Contractor should persistently or repeatedly refuse or fail to supply a sufficient number of properly skilled workmen or proper materials for completion of the work. e. If the Contractor shall fail to complete the work within the time specified in the contract. f. If the Contractor shall fail to make a prompt payment to subcontractors or for material or labor. g. If Contractor should persistently disregard laws, ordinances or regulations of Federal, State or municipal agencies or subdivisions thereof. h. If Contractor should persistently disregard instructions of Management, or otherwise be guilty of a substantial violation of the contract. 6.2 This contract Agreement, and any amendments or extensions to said Agreement may be terminated for any reason not previously identified by either party by giving ten (10) days written notice to the other party. In the event that the contract is terminated by the City, Contractor shall not be entitled to receive any further balance of the amount to be paid under this contract until the work shall have been fully finished. At such time, if the unpaid balance of the amount to be paid under this contract exceeds the expense incurred by the City in finishing the work, all of the damages sustained or which may be sustained by reason of such refusal, neglect, failure of discontinuance of employment, such excess shall be paid by the City to Contractor. If such expense and damages shall exceed the unpaid balance, Contractor and his surety and each thereof shall be jointly and severally liable therefore to City and shall pay the difference to the City. Such expense and damage shall include all legal costs incurred by the City in employment of attorneys to protect the rights and interests of the City under the contract; provided such legal costs shall be reasonable. 7.0 OWNERSHIP OF DOCUMENTS 7.1 On payment to the Contractor by the City of all compensation due under this Agreement all finished or unfinished documents and material prepared by the Contractor with funds provided by this Agreement shall become the property of the City and shall be forwarded to the City at its request. 7.2 Any records, reports, information, data or other documents or materials given to or prepared or assembled by the Contractor under this Agreement will be kept as confidential and shall not be made available to any individual or organization by the Contractor without prior written approval of the City or by court order. 8.0 CLAIMS 8.1 Any claim against the City for damages, expenses, costs or extras arising out of the performance of the contract must be made in writing to the City within thirty (30) days after the discovery of such damage, and in no event later than the time of approval by owner of final payment. Contractor, upon making applications for final payment, shall be deemed to have waived this right to claim for any other damages for which claim has not been made, unless such claim for final payment includes notice of additional claim and fully describes the alleged damage. City of Arlington P02.405.2 Arlington Municipal Airport Contract Taxiway C Lighting and Signing Improvements 3 9.0 ASSIGNMENT 9.1 This Agreement may not be assigned or otherwise transferred by the parties hereto without the written consent of the other party. 10.0 MODIFICATION 10.1 No change, alteration, modification or addition to the Agreement will be effective unless it is in writing and properly signed by all parties thereto. 11.0 HOLD HARMLESS 11.1 Contractor shall hold the City and its officers, agents and employees harmless, from all suits, claims or liabilities of any nature, including attorney's fees, costs and expenses for or on account of injuries or damages sustained by any persons or property resulting in whole or in part from negligent activities or omissions of the Contractor, its agents or other renumeration for services; and if a suit in respect to the above be filed, the Contractor shall appear and defend the same at its own cost and expense, and if judgment is rendered or settlement made requiring payment of damages by the City, which damages are based in whole or in part on the negligent activities or omissions of the Contractor, its agents or employees, the Contractor shall pay same. 12.0 INSURANCE Contractor shall procure and maintain, for the duration of this Agreement, insurance against claims for the injuries to persons or damages to property which may arise from or in connection with the performance of the work thereunder by the Contractor, his agent, representatives, employees or subcontractors. The cost of such insurance shall be paid by the Contractor. 12.1 Insurance Term The Contractor shall procure and maintain insurance, as required in this Section, without interruption from commencement of the Contractor’s work through the term of the contract and for thirty (30) days after the Physical Completion date, unless otherwise indicated herein. 12.2 No Limitation Contractor’s maintenance of insurance, its scope of coverage and limits as required herein shall not be construed to limit the liability of the Contractor to the coverage provided by such insurance, or otherwise limit the City’s recourse to any remedy available at law or in equity. 12.3 Minimum Scope of Insurance Contractor’s required insurance shall be of the types and coverage as stated below: 1. Automobile Liability insurance covering all owned, non-owned, hired and leased vehicles. Coverage shall be at least as broad as Insurance Services Office (ISO) form CA 00 01. 2. Commercial General Liability insurance shall be as least at broad as ISO occurrence form CG 00 01 and shall cover liability arising from premises, operations, independent contractors, products- completed operations, stop gap liability, personal injury and advertising injury, and liability assumed under an insured contract. The Commercial General Liability insurance shall be endorsed to provide a per project general aggregate limit using ISO form CG 25 03 05 09 or an equivalent endorsement. There shall be no exclusion for liability arising from explosion, collapse or underground property damage. The City shall be named as an additional insured under the Contractor’s Commercial General Liability insurance policy with respect to the work performed for City of Arlington P02.405.2 Arlington Municipal Airport Contract Taxiway C Lighting and Signing Improvements 4 the City using ISO Additional Insured endorsement CG 20 10 10 01 and Additional Insured- Completed Operations endorsement CG 20 37 10 01 or substitute endorsements providing at least as broad coverage. 3. Workers’ Compensation coverage as required by the Industrial Insurance laws of the State of Washington. 12.4 Minimum Amounts of Insurance. Contractor shall maintain the following insurance limits: 1. Automobile Liability insurance with a minimum combined single limit for bodily injury and property damage of $1,000,000 per accident. 2. Commercial General Liability insurance shall be written with limits no less than $1,000,000 each occurrence, $2,000,000 general aggregate and $2,000,000 products-completed operations aggregate limit. 12.5 City Full Availability of Contractor Limits If the Contractor maintains higher insurance limits than the minimums shown above, the City shall be insured for the full available limits of Commercial General and Excess or Umbrella liability maintained by the Contractor, irrespective of whether such limits maintained by the Contractor are greater than those required by this contract or whether any certificate of insurance furnished to the City evidences limits of liability lower than those maintained by the Contractor. 12.6 Other Insurance Provision The Contractor’s Automobile Liability and Commercial General Liability insurance policies are to contain, or be endorsed to contain that they shall be primary insurance as respect the City. Any insurance, self- insurance, or self-insured pool coverage maintained by the City shall be excess of the Contractor’s insurance and shall not contribute with it. 12.7 Acceptability of Insurers Insurance is to be placed with insurers with a current A.M. Best rating of not less than A: VII. 12.8 Verification of Coverage Contractor shall furnish the City with original certificates and a copy of the amendatory endorsements, including but not necessarily limited to the additional insured endorsements, evidencing the insurance requirements of the Contractor before commencement of the work. Upon request by the City, the Contractor shall furnish certified copies of all required insurance policies, including endorsements, required in this contract and evidence of all subcontractors’ coverage. 12.9 Subcontractors’ Insurance The Contractor shall cause each and every Subcontractor to provide insurance coverage that complies with all applicable requirements of the Contractor-provided insurance as set forth herein, except the Contractor shall have sole responsibility for determining the limits of coverage required to be obtained by Subcontractors. The Contractor shall ensure that the City is an additional insured on each and every Subcontractor’s Commercial General liability insurance policy using an endorsement at least as broad as ISO Additional Insured endorsement CG 20 38 04 13. 12.10 Notice of Cancellation The Contractor shall provide the City and all Additional Insureds for this work with written notice of any policy cancellation within two business days of their receipt of such notice. 12.11 Failure to Maintain Insurance Failure on the part of the Contractor to maintain the insurance as required shall constitute a material breach of contract, upon which the City may, after giving five business days’ notice to the Contractor to City of Arlington P02.405.2 Arlington Municipal Airport Contract Taxiway C Lighting and Signing Improvements 5 correct the breach, immediately terminate the contract or, at its discretion, procure or renew such insurance and pay any and all premiums in connection therewith, with any sums so expended to be repaid to the City on demand, or at the sole discretion of the City, offset against funds due the Contractor from the City. 12.12 Asbestos Or Hazardous Materials Abatement Work If asbestos abatement or hazardous materials work is performed, Contractor shall review coverage with the City’s Airport Manager and provide scope and limits of coverage that are appropriate for the scope of work. No asbestos abatement work will be performed until coverage is approved by Airport Manager. 13.0 INDEPENDENT CONTRACTOR 13.1 Contractor is and shall be at all times during the term of this Agreement an independent contractor. 14.0 GOVERNING LAW AND VENUE 14.1 This Agreement shall be governed by the law of the State of Washington. Venue for any action between the City and the Contractor, which action arises out of or in connection with this Agreement is situate. 15.0 ATTORNEY’S FEES 14.2 In the event suit or action be instituted to enforce any of the terms or conditions of this Agreement, the losing party shall pay to the prevailing party, in addition to the costs and disbursements allowed by statute, such sum as the court may adjudge reasonable as attorney's fees in such suit or action, in both trial and appellate courts. IN WITNESS WHEREOF, the parties have executed this Agreement on the date first above written. CITY OF ARLINGTON, WASHINGTON: CONTRACTOR: By By Mayor Barbara Tolbert City of Arlington P02.405.2 Arlington Municipal Airport Contract Taxiway C Lighting and Signing Improvements 6 RESOLUTION NO. 2017-________ A RESOLUTION OF THE CITY OF ARLINGTON, WASHINGTON AIRPORT COMMISSION CORRECTING A BID ON THE 2017 TAXIWAY C LIGHTING & SIGNING IMPROVEMENTS PROJECT AND FINDING COLVICO INC. TO BE THE APPARENT LOW BIDDER WHEREAS, the City of Arlington/Arlington Municipal Airport has solicited bids for a project known as the Taxiway C Lighting and Signing Improvements Project (hereinafter the “Project”); and WHEREAS, the apparent low bidder on the project, Colvico, Inc. was qualified to submit bids based on materials it submitted to the City on or about May 9, 2017; and WHEREAS, the bid submitted contains errors and the Airport Commission wishes to correct the bid of Colvico, Inc. (hereinafter “Colvico”); NOW, THEREFORE, the Arlington Airport Commission of the City of Arlington, Washington do hereby resolve as follows: 1. The Airport Commission finds as follows: a. The City of Arlington has sought qualified contractors to bid on the Project; b. Bids were due on May 9, 2017; c. The bid specifications stated that “The Bidder agrees that the unit prices represent a true measure of the labor and materials required to perform the work, including all allowances for overhead and profit for each type and unit of work called for in these Contract Documents. The amounts shall be shown in both words and figures. In case of a discrepancy, the amount shown in words shall govern; in the case of a discrepancy between unit prices and extensions, the unit prices shall govern.” In addition, the bid specifications authorized the City to reject bids, to waive irregularities and informalities in the bid process. d. Colvico submitted a bid which contained mathematical errors in the extension of unit prices, which resulted in their bid amount being revised per the bid specifications from $521,959.99 to $520,309.55, including base bid and taxes. e. The Airport Commission finds that Colvico’s bid must be re-calculated based on the bid specifications as set forth above, and as a result Colvico is the apparent low bidder for the project in the amount of $520,309.55. 2. Based on the foregoing findings, the Airport Commission hereby finds that the bid submitted by Colvico Inc. for the 2017 Taxiway C Lighting and Signing Improvements Project is hereby corrected, and based on that corrected bid in the total amount of $520,309.55, including the base bid plus taxes, Colvico Inc. is declared to be the “apparent low bidder” for purposes of awarding the bid on that project. APPROVED by the Airport Commission of the City of Arlington this 9th day of May, 2017. CITY OF ARLINGTON ____________________________________ Don Munson, Chairperson APPROVED AS TO FORM: __________________________________ Steven J. Peiffle, City Attorney RESOLUTION 2017-___________ RESOLUTION NO. 2017-________ A RESOLUTION OF THE CITY OF ARLINGTON, WASHINGTON AIRPORT COMMISSION REJECTING A BID ON THE 2017 TAXIWAY C LIGHTING & SIGNING IMPROVEMENTS PROJECT AND FINDING SAIL ELECTRIC, INC. NOT TO BE THE LOWEST RESPONSIBLE BIDDER WHEREAS, the City of Arlington/Arlington Municipal Airport has solicited bids for a project known as the Taxiway C Lighting and Signing Improvements Project (hereinafter the “Project”); and WHEREAS, the apparent low bidder on the project, Sail Electric, Inc. was qualified to submit bids based on materials it submitted to the City on or about May 9, 2017; and WHEREAS, the bid submitted contains errors and the Airport Commission wishes to declare the bid of Sail Electric Inc. (hereinafter “Sail”) as not being the “lowest responsible bid” within the meaning of RCW 35.52.352; NOW, THEREFORE, the Arlington Airport Commission of the City of Arlington, Washington do hereby resolve as follows: 1. The Airport Commission finds as follows: a. The City of Arlington has sought qualified contractors to bid on the Project; b. Bids were due on May 9, 2017; c. Sail Electric submitted a bid which contained a discrepancy in line A15 of the Schedule of Prices, which listed a unit price for “No. 8 AWG 5 kV, L- 824, Type C Cable” of $1.20 per linear foot, but also listed the price in words as “Two Dollars and Twenty Cents LF”. In addition, the extension of computed price for Line A15 was $29,370.00, which is neither a correct extension of the unit price as stated in either words or figures. d. The bid specifications stated that “The Bidder agrees that the unit prices represent a true measure of the labor and materials required to perform the work, including all allowances for overhead and profit for each type and unit of work called for in these Contract Documents. The amounts shall be shown in both words and figures. In case of a discrepancy, the amount shown in words shall govern; in the case of a discrepancy between unit prices and extensions, the unit prices shall govern.” e. The Airport Commission finds that Sail Electric Inc.’s bid must be re- calculated based on the price as stated in words of “Two Dollars and Twenty Cents LF”, and as a result Sail Electric Inc. is not the low bidder for the project. 2. Based on the foregoing findings, the Airport Commission hereby declares that the bid submitted by Sail Electric, Inc. for the 2017 Taxiway C Lighting and Signing Improvements Project is hereby rejected, and Sail Electric, Inc. is declared not to be the “lowest responsible bidder” for purposes of awarding the bid on that project. APPROVED by the Airport Commission of the City of Arlington this 9th day of May, 2017. CITY OF ARLINGTON ____________________________________ Don Munson, Chairperson APPROVED AS TO FORM: __________________________________ Steven J. Peiffle, City Attorney RESOLUTION 2017-___________ Taxiway Charlie Lighting & Signing Improvements Project Project #P02.405.2 PROFESSIONAL SERVICES AGREEMENT THIS AGREEMENT is made and entered into in duplicate this day of , 2017, by and between the CITY OF ARLINGTON, a Washington municipal corporation, hereinafter referred to as the "CITY" and WH Pacific, Inc._, hereinafter referred to as the "SERVICE PROVIDER." RECITALS: WHEREAS, the CITY desires to have certain services and/or tasks performed as set forth below requiring specialized skills and other supportive capabilities; and WHEREAS, sufficient CITY resources are not available to provide such services; and WHEREAS, the SERVICE PROVIDER represents that the SERVICE PROVIDER is qualified and possesses sufficient skills and the necessary capabilities, including technical and professional expertise, where required, to perform the services and/or tasks set forth in this Agreement. NOW, THEREFORE, in consideration of the terms, conditions, covenants, and performance contained herein, the parties hereto agree as follows: 1. Scope of Services. The SERVICE PROVIDER shall perform such services and accomplish such tasks, including the furnishing of all materials and equipment necessary for full performance thereof, as are identified and designated as SERVICE PROVIDER responsibilities throughout this Agreement and as detailed in Exhibit "A" attached hereto and incorporated herein (the "Project"). 3. Compensation and Method of Payment. 3.1 Payments for services provided hereunder shall be made following the performance of such services, unless otherwise permitted by law and approved in writing by the CITY. 3.2 No payment shall be made for any service rendered by the SERVICE PROVIDER except for services identified and set forth in this Agreement. 3.3 The CITY shall pay the SERVICE PROVIDER for work performed under this PROFESSIONAL SERVICES AGREEMENT 1 Project #P02.405.2 Agreement as follows: SERVICE PROVIDER shall submit monthly invoices detailing work performed and expenses for which reimbursement is sought. CITY shall approve all invoices before payment is issued. Payment shall occur within thirty (30) days of receipt and approval of an invoice. 3.4 City shall pay SERVICE PROVIDER for such services: (check one)  Hourly: $ per hour, plus actual expenses, but not to exceed a total of $ without an amendment to the contract.  Fixed Sum: A total amount of $122 .  X Other: An hourly fee plus reimbursement of expenses per the scope of work attached as Exhibit A, but not to exceed $122,462.00 for all work performed and expenses incurred under this contract. 4. Reports And Inspections. 4.1 The SERVICE PROVIDER at such times and in such forms as the CITY may require, shall furnish to the CITY such statements, records, reports, data, and information as the CITY may request pertaining to matters covered by this Agreement. 4.2 The SERVICE PROVIDER shall at any time during normal business hours and as often as the CITY or State Auditor may deem necessary, make available for examination all of its records and data with respect to all matters covered, directly or indirectly, by this Agreement and shall permit the CITY or its designated authorized representative to audit and inspect other data relating to all matters covered by this Agreement. The CITY shall receive a copy of all audit reports made by the agency or firm as to the SERVICE PROVIDER'S activities. The CITY may, at its discretion, conduct an audit at its expense, using its own or outside auditors, of the SERVICE PROVIDER'S activities which relate, directly or indirectly, to this Agreement. 5. Independent Contractor Relationship. 5.1 The parties intend that an independent SERVICE PROVIDER/CITY relationship will be created by this Agreement. The CITY is interested primarily in the results to be achieved; subject to paragraphs herein, the implementation of services will lie solely with the discretion of the SERVICE PROVIDER. No agent, employee, servant or representative of the SERVICE PROVIDER shall be deemed to be an employee, agent, servant or representative of the CITY for any purpose, and the employees of the SERVICE PROVIDER are not entitled to any of the benefits the CITY provides for its employees. The SERVICE PROVIDER will be solely and Project #P02.405.2 entirely responsible for its acts and for the acts of its agents, employees, servants, subcontractors or representatives during the performance of this Agreement. 5.2 In the performance of the services herein contemplated the SERVICE PROVIDER is an independent contractor with the authority to control and direct the performance of the details of the work, however, the results of the work contemplated herein must meet the approval of the CITY and shall be subject to the CITY'S general rights of inspection and review to secure the satisfactory completion thereof. 6. Service Provider Employees/agents The CITY may at its sole discretion require the SERVICE PROVIDER to remove any employee, agent or servant from employment on this Project. The SERVICE PROVIDER may however employ that (those) individual(s) on other non-CITY related projects. 7. Hold Harmless/Indemnification. 7.1 Consultant shall defend, indemnify and hold the City, its officers, officials, employees and volunteers harmless from any and all claims, injuries, damages, losses or suits including attorney fees, arising out of or resulting from the negligent acts, errors or omissions of the Consultant in performance of this Agreement. 7.2 No liability shall attach to the CITY by reason of entering into this Agreement except as expressly provided herein. 8. Insurance. The SERVICE PROVIDER shall procure and maintain for the duration of the Agreement, insurance against claims for injuries to persons or damage to property which may arise from or in connection with the performance of the work hereunder by the SERVICE PROVIDER, its agents, representatives, or employees. 8.1 Minimum Scope of Insurance. SERVICE PROVIDER shall obtain insurance of the types described below: a. Automobile Liability insurance covering all owned, non-owned, hired and leased vehicles. Coverage shall be written on Insurance Services Office (ISO) form CA 00 01 or a substitute form providing equivalent liability coverage. If necessary, the policy shall be endorsed to provide contractual liability coverage. b. Commercial General Liability insurance shall be written on ISO occurrence form CG 00 01 and shall cover liability arising from premises, operations, independent contractors and personal injury and advertising Project #P02.405.2 injury. The City shall be named as an insured under the SERVICE PROVIDER's Commercial General Liability insurance policy with respect to the work performed for the City. c. Workers' Compensation coverage as required by the Industrial Insurance laws of the State of Washington. d. Professional Liability insurance appropriate to the SERVICE PROVIDER's profession. 8.2 Minimum Amounts of Insurance. SERVICE PROVIDER shall maintain the following insurance limits: a. Automobile Liability insurance with a minimum combined single limit for bodily injury and property damage of $1,000,000 per accident. b. Commercial General Liability insurance shall be written with limits no less than $1,000,000 each occurrence, $2,000,000 general aggregate. c. Professional Liability insurance shall be written with limits no less than $1,000,000 per claim and $1,000,000 policy aggregate limit. 8.3 Other Insurance Provisions. The insurance policies are to contain, or be endorsed to contain, the following provisions for Automobile Liability, Professional Liability and Commercial General Liability insurance: a. The SERVICE PROVIDER's insurance coverage shall be primary insurance as respects the City. Any insurance, self-insurance, or insurance pool coverage maintained by the City shall be excess of the SERVICE PROVIDER's insurance and shall not contribute with it. b. The SERVICE PROVIDER's insurance shall be endorsed to state that coverage shall not be cancelled by either party, except after thirty (30) days prior written notice by certified mail, return receipt requested, has been given to the City. 8.4 Acceptability of Insurers. Insurance is to be placed with insurers with a current A.M. Best rating of not less than A:VII. 8.5 Verification of Coverage. SERVICE PROVIDER shall furnish the City with original certificates and a copy of the amendatory endorsements, including but not necessarily limited to the additional insured endorsement, evidencing the insurance requirements of the SERVICE PROVIDER before commencement of the work. 9. Treatment of Assets. Title to all property furnished by the CITY shall remain in the name of the CITY and the CITY shall become the owner of the work product and other documents, if any, prepared by the Project #P02.405.2 SERVICE PROVIDER pursuant to this Agreement. 10. Compliance with Laws. 10.1 The SERVICE PROVIDER, in the performance of this Agreement, shall comply with all applicable federal, state or local laws and ordinances, including regulations for licensing, certification and operation of facilities, programs and accreditation, and licensing of individuals, and any other standards or criteria as described in this Agreement to assure quality of services. 10.2 The SERVICE PROVIDER specifically agrees to pay any applicable business and occupation (B & O) taxes which may be due on account of this Agreement. 11. Nondiscrimination. 11.1 The CITY is an equal opportunity employer. 11.2 Nondiscrimination in Employment. In the performance of this Agreement, the SERVICE PROVIDER will not discriminate against any employee or applicant for employment on the grounds of race, creed, color, national origin, sex, marital status, age or the presence of any sensory, mental or physical handicap; provided that the prohibition against discrimination in employment because of handicap shall not apply if the particular disability prevents the proper performance of the particular worker involved. The SERVICE PROVIDER shall ensure that applicants are employed, and that employees are treated during employment without discrimination because of their race, creed, color, national origin, sex, marital status, age or the presence of any sensory, mental or physical handicap. Such action shall include, but not be limited to: employment, upgrading, demotion or transfers, recruitment or recruitment advertising, layoff or termination, rates of pay or other forms of compensation, and programs for training including apprenticeships. The SERVICE PROVIDER shall take such action with respect to this Agreement as may be required to ensure full compliance with local, state and federal laws prohibiting discrimination in employment. 11.3 Nondiscrimination in Services. The SERVICE PROVIDER will not discriminate against any recipient of any services or benefits provided for in this Agreement on the grounds of race, creed, color, national origin, sex, marital status, age or the presence of any sensory, mental or physical handicap. 11.4 If any assignment and/or subcontracting has been authorized by the CITY, said assignment or subcontract shall include appropriate safeguards against Project #P02.405.2 discrimination. The SERVICE PROVIDER shall take such action as may be required to ensure full compliance with the provisions in the immediately preceding paragraphs herein. 12. Assignment/subcontracting. 12.1 The SERVICE PROVIDER shall not assign its performance under this Agreement or any portion of this Agreement without the written consent of the CITY, and it is further agreed that said consent must be sought in writing by the SERVICE PROVIDER not less than thirty (30) days prior to the date of any proposed assignment. The CITY reserves the right to reject without cause any such assignment. 12.2 Any work or services assigned hereunder shall be subject to each provision of this Agreement and proper bidding procedures where applicable as set forth in local, state and/or federal statutes, ordinances and guidelines. 12.3 Any technical/professional service subcontract not listed in this Agreement, must have express advance approval by the CITY. 13. Changes. Either party may request changes to the scope of services and performance to be provided hereunder, however, no change or addition to this Agreement shall be valid or binding upon either party unless such change or addition be in writing and signed by both parties. Such amendments shall be attached to and made part of this Agreement. 14. Maintenance and Inspection of Records. 14.1 The SERVICE PROVIDER shall maintain books, records and documents, which sufficiently and properly reflect all direct and indirect costs related to the performance of this Agreement and shall maintain such accounting procedures and practices as may be necessary to assure proper accounting of all funds paid pursuant to this Agreement. These records shall be subject at all reasonable times to inspection, review, or audit, by the CITY, its authorized representative, the State Auditor, or other governmental officials authorized by law to monitor this Agreement. 14.2 The SERVICE PROVIDER shall retain all books, records, documents and other material relevant to this agreement, for six (6) years after its expiration. The SERVICE PROVIDER agrees that the CITY or its designee shall have full access and right to examine any of said materials at all reasonable times during said Project #P02.405.2 period. 15. Other Provisions. If changes in state law necessitate that services hereunder be expanded, the parties shall negotiate an appropriate amendment. If after thirty (30) days of negotiation, agreement can not be reached, this Agreement may be terminated by the City no sooner than sixty (60) days thereafter. 16. Termination. 16.1 Termination for Convenience. The CITY may terminate this Agreement, in whole or in part, at any time, by at least five (5) days written notice to the SERVICE PROVIDER. 16.2 Termination for Cause. If the SERVICE PROVIDER fails to perform in the manner called for in this Agreement, or if the SERVICE PROVIDER fails to comply with any other provisions of the Agreement and fails to correct such noncompliance within five (5) days written notice thereof, the CITY may terminate this Agreement for cause. Termination shall be effected by serving a notice of termination on the SERVICE PROVIDER setting forth the manner in which the SERVICE PROVIDER is in default. The SERVICE PROVIDER will only be paid for services performed in accordance with the manner of performance set forth in this Agreement. 17. Notice. Notice provided for in this Agreement shall be sent by certified mail to the addresses designated for the parties on the last page of this Agreement. 18. Attorneys Fees and Costs. If any legal proceeding is brought for the enforcement of this Agreement, or because of a dispute, breach, default, or misrepresentation in connection with any of the provisions of this Agreement, the prevailing party shall be entitled to recover from the other party, in addition to any other relief to which such party may be entitled, reasonable attorney's fees and other costs incurred in that action or proceeding. 19. Jurisdiction and Venue. 19.1 This Agreement has been and shall be construed as having been made and delivered within the State of Washington, and it is agreed by each party hereto that this Agreement shall be governed by laws of the State of Washington, both as to interpretation and performance. Project #P02.405.2 19.2 Any action of law, suit in equity, or judicial proceeding for the enforcement of this Agreement or any provisions thereof, shall be instituted and maintained only in any of the courts of competent jurisdiction in Snohomish County, Washington. 20. Severability. 20.1 If, for any reason, any part, term or provision of this Agreement is held by a court of the United States to be illegal, void or unenforceable, the validity of the remaining provisions shall not be affected, and the rights and obligations of the parties shall be construed and enforced as if the Agreement did not contain the particular provision held to be invalid. 20.2 If it should appear that any provision hereof is in conflict with any statutory provision of the State of Washington, said provision which may conflict therewith shall be deemed inoperative and null and void insofar as it may be in conflict therewith, and shall be deemed modified to conform to such statutory provisions. 21. Entire Agreement. The parties agree that this Agreement is the complete expression of the terms hereto and any oral representations or understandings not incorporated herein are excluded. Further, any modification of this Agreement shall be in writing and signed by both parties. Failure to comply with any of the provisions stated herein shall constitute material breach of contract and cause for termination Both parties recognize time is of the essence in the performance of the provisions of this Agreement. It is also agreed by the parties that the forgiveness of the nonperformance of any provision of this Agreement does not constitute a waiver of the provisions of this Agreement. Project #P02.405.2 IN WITNESS WHEREOF the parties hereto have caused this Agreement to be executed the day and year first hereinabove written. CITY: SERVICE PROVIDER: CITY OF ARLINGTON Barbara Tolbert, Mayor Attest: Kristin Banfield, City Clerk Exhibit A Scope of Services Arlington Municipal Airport 2017 Taxiway C Lighting and Signing Improvements Project The City of Arlington (City) is the owner of the Arlington Municipal Airport located in Arlington, Washington. The City has proposed an improvements project for FY 2017. The project proposes to complete the following items of work: Lighting and Signing Improvements 1) Install a new Medium Intensity Taxiway Edge Lighting system along Taxiway C utilizing LED taxiway edge lights. 2) Remove existing retroreflective markers. 3) Extend the Medium Intensity Taxiway Edge Lighting system for connector Taxiways Cl-C4 and to taxi lanes connected to Taxiway C so that lights define the turn-radii. 4) Remove existing signs and install four new lighted LED signs on Taxiway C at its intersection with Runway 34. A tentative project schedule is included below: Project Schedule 1 April 18th, 2017 Advertise for Bid 2 May 9, 2017 3 May 9, 2017 to December 2017 Lighting and Signing Project, Project Closeout Funding for the construction of this project will come from a combination of local funds and a Federal Aviation Administration (FAA) Airport Improvement Program (AIP) Grant. The City also plans to apply for WSDOT Aviation grant funds. All work items are AIP Eligible. WHPacific, Inc. (Consultant) shall provide Construction Administration Services for the Project as described below. All engineering work shall be performed using accepted engineering principles and practices and shall provide quality products that meet or exceed industry standards. Administration of the project shall be in accordance with FAA guidelines and processes. 1 Exhibit A (Cont.) WHPacific, Inc. Scope of Services Arlington Municipal Airport -Taxiway C Lighting and Signing Improvements Task 1- Construction Management Phase Services Task 1.1 Project Management 1) Provide project management and administration. 2) Serve as liaison to the City and coordinate with FAA. 3) Prepare monthly progress reports and invoices for the construction management phase services. 4) PM to attend up to two meetings with City to discuss project items as needed. Task 1.2 Pre-Construction Conference 1) Review construction schedule with Airport staff prior to meeting. 2) Conduct a pre-construction conference. 3) Review the contractor’s construction phasing/safety plan with the successful bidder on-site prior to work commencing and make any necessary modifications that may be required. Review contractors Safety Plan Compliance Document (SPCD). 4) Develop meeting minutes and distribute to all attendees. Task 1.3 Submittal Review 1) Review contractor submittals for conformance with the plans and specifications. Return reviewed submittals to the Contractor and forward one copy of all approved submittals to the City for their records. 2) Coordinate submittal issues and clarifications with Contractor. Task 1.4 Construction Administration Provide construction administration services to include: 1) Preparation of up to four (4) Contractor progress payment requests. 2) Preparation of two (2) construction change orders, if required. 3) Respond to fifteen (15) Contractor RFI's and five (5) construction change order proposals. 4) Review weekly certified payrolls on a monthly basis prior to the pay request. 5) Prepare weekly meeting agenda and minutes using FAA form 5370-1 or equivalent. 2 Exhibit A (Cont.) WHPacific, Inc. Scope of Services Arlington Municipal Airport -Taxiway C Lighting and Signing Improvements Task 1.5 Resident Engineer 1) Provide Resident Engineer to monitor and document construction progress, confirm conformance with schedules, plans and specifications, document significant conversations or situations, document input or visits by local authorities, etc. a) Prepare daily activity reports. b) Submit weekly construction reports of construction progress to City and FAA. Reports include materials used, number of workers and work process, photos, and equipment used. 2) Conduct periodic employee wage interviews for both prime contractor and subcontractors using form SF 1445. 3) Conduct weekly meetings at the Airport office to coordinate progress of the construction work with City staff and the Contractor. 4) The WHPacific Project Manager will be onsite for the following: a) Weekly Meetings: 10 meetings (1 meeting per week, 4 hours per meeting with site visit). To provide attendance at the meeting and additional time to visit the site to review any key issues needed. b) The Resident Engineer will be on-site as follows: (1) Contract construction period is 60 Calendar days: Resident on-site budget is 5 days per week, 10 hours per day. 5) WHPacific shall coordinate Quality Assurance tests by an independent laboratory for a) Portland Cement Concrete b) Trench Fill materials Task 1.6 Final Inspection 1) Attend the final inspection with Airport personnel, FAA staff, WSDOT Aviation staff, and the Contractor. 2) Prepare punch list items and transmit to the Contractor. 3) Conduct follow up inspection when the Contractor has completed the punch list items. Task 1. 7 Record Drawings 1) Review Contractor as-built drawings. 2) Prepare record drawings. 3) Deliver one set of 22" x 34" prints and two electronic copies of record drawings in AutoCAD and PDF formats on CD. 3 Exhibit A (Cont.) WHPacific, Inc. Scope of Services Arlington Municipal Airport -Taxiway C Lighting and Signing Improvements Task 1.8 Final Construction Report and Closeout Documents 1) Prepare a Final Construction Report and project summary. 2) Prepare project and grant closeout documents including the annual DBE report. 3) Update the existing Airport Layout Plan (ALP) to illustrate the completed improvements, if necessary. Construction Management Phase Service Deliverables 1) Project Management: Monthly invoices and associated documentation. 2) Pre-Construction Conference Meeting Minutes - Microsoft Word via email 3) Submittal Review -via email. One hard copy of all approved submittals will be provided to the City. 4) Construction Administration a) Change Orders - 4 copies b) RFI Responses - PDF via email c) Pay Estimates - 3 copies 5) Resident Engineer a) Daily Reports - 1 copy b) Weekly Reports - 1 copy 6) Final Inspection Meeting Minutes - Microsoft Word via email 7) Record Drawings a) 22" X 24" - 3 sets b) PDF on CD - 2 sets 8) Final Construction Report - 3 copies Assumptions 1) All proposed improvements shall be included in one (1) construction bid package. 2) Construction surveying or staking is to be provided by the Contractor, based on Survey Control provided by the Consultant. 3) The Airport will coordinate/communicate with the tenants throughout construction. 4) The Airport will open bids and provide bid proposals to the Consultant for review. 5) The Consultant will not attend the bid opening. 6) Construction observation fee estimate is based on a construction duration of 60 days. 7) Materials Testing is to be provided by the Contractor. 4 Exhibit A (Cont.) WHPacific, Inc. Scope of Services Arlington Municipal Airport -Taxiway C Lighting and Signing Improvements 8) The Consultant will develop the quantities for pay estimates. The City will process pay estimates as prepared by WHPacific. 9) The City will provide space in its office for use by WHPacific staff as a field office. 10) The City will provide a desk, access to power, and access to an internet connection. 11) Closeout documents shall adhere to the FAA standards that are in effect at the time the Contract is executed. 5 City of Arlington Council Agenda Bill Item: WS #6 Attachment F COUNCIL MEETING DATE: May 22, 2017 SUBJECT: Interlocal Agreement with Arlington School District No. 16 for School Resource Officer ATTACHMENTS: Draft Interlocal Agreement with Arlington School District No. 16 for School Resource Officer DEPARTMENT OF ORIGIN Police – Contact Chief Ventura, 360‐403‐3400 EXPENDITURES REQUESTED: ‐0‐ BUDGET CATEGORY: Police BUDGETED AMOUNT: LEGAL REVIEW: DESCRIPTION: The City Council is asked to approve a renewal Interlocal Agreement with Arlington School District No. 16 (ASD) for law enforcement and related services provided through the assignment of a School Resource Officer (SRO). ASD will pay 100% of the SRO’s pay and benefits on a pro‐rated basis for those days the officer is actually at the school or on school business for the period beginning September 1, 2017 and ending the last day of school in June, 2020. Additionally, ASD will cover up to four (4) days of approved leave per school year. HISTORY: The City and the Arlington School District entered into an interlocal agreement in October 2014 that was set to expire at the end of June 2017. ALTERNATIVES: Take no action. Remand to staff for further review and discussion with Arlington Public Schools. RECOMMENDED MOTION: Workshop; discussion only. At the June 5, 2017 Council meeting, the motion will be “I move to approve the Interlocal Agreement with Arlington School District No. 16 for a School Resource Officer and authorize the Mayor to sign it.” Inter-Local Agreement – School Resource Officer Arlington School District No. 16/City of Arlington Police Department Page 1 of 7 October   INTER-LOCAL AGREEMENT   Between ARLINGTON SCHOOL DISTRICT NO. 16 and CITY OF ARLINGTON POLICE DEPARTMENT       THIS AGREEMENT, made and entered into this day of , 2014 2017 by and between ARLINGTON SCHOOL DISTRICT NO. 16 (hereinafter referred to as “School District”) and the CITY OF ARLINGTON, acting through its POLICE DEPARTMENT (hereinafter referred to as the “Police Department”);       WITNESSETH:   WHEREAS, the School District and the Police Department desire to continue to provide law enforcement and related services to the public schools of the City of Arlington; and   WHEREAS, the School District and the Police Department are mutually responsible for providing a safe environment within which students may receive appropriate instructional and educational services, which can be delivered more efficiently through the cooperative efforts of said partners to the benefits of public health, safety, and welfare; and   WHEREAS, the School District and the Police Department agree that it is in the best interest to assign a School Resource Officer(s) to schools mutually agreed upon by both parties.   NOW, THEREFORE, in consideration of the mutual promises and covenants herein contained, the School District and the Police Department hereby agree as follows:       ARTICLE I. PURPOSE   The purpose of this agreement is to develop a procedure that focuses on providing a safe and healthy environment for students and staff; to foster better relations between students and law enforcement personnel; to deter crime on or about school premises by the presence of a law enforcement officer; to enforce local, state, and federal laws; and to have law enforcement officers available for presentations to students, staff, and parents concerning law enforcement, school safety, and related law enforcement subjects. Inter-Local Agreement – School Resource Officer Arlington School District No. 16/City of Arlington Police Department Page 2 of 7 October   ARTICLE II. POLICE DEPARTMENT’S RESPONSIBILITIES   A. The Police Department agrees to:   1. Select a School Resource Officer, with input from the School District Superintendent or designee, based upon mutually agreed criteria.   2. Respond to any violation of local, state, or federal laws, statutes or ordinances on or adjacent to school property within the city limits or as permitted by mutual aid agreements.   3. At the conclusion of the investigations, those individuals who have committed violations may be charged. This action is in addition to any administrative action taken by the school.   4. Provide an officer to the School District on all school days. If the assigned School Resource Officer will be out for an extended time, a reasonable attempt will be made to provide another officer in his/her absence.   5. Follow legally appropriate procedures prior to seeking access to student records or searching student property.   6. Respond as soon as personnel levels permit to reports of civil disorder or riots on school district property or at school functions within the city limits.   B. School Resource Officer (SRO):   1. The Police Department and the School District recognize the value of a School Resource Officer position. The SRO position will be assigned to schools as mutually agreed upon by both parties.   2. The School District will pay 100% of the SRO’s pay and benefits on a pro-rated basis for those days the officer is actually at the school or on school business for the period beginning September 1, 2014 2017 and ending the last day of school in June, 20172020. Additionally, the School District will cover up to four (4) days of approved leave per school year.   3. The Chief of Police or designee shall oversee the officer assigned above, perform scheduled and unscheduled visits to the schools and work with the School District in coordinating and developing the program.   C. Regular Duty Hours of School Resource Officers   1. The SRO shall be assigned to the schools on a full-time basis during the school year.   2. School principals, while having no direct authority over the SRO, may request the SRO to assist in additional tasks, that are mutually agreed upon by the principal and Chief of Police or designee, that do not violate the terms of this agreement.   D. Instructional Responsibilities for the School Resource Officer 1. The SRO shall act as an instructor or guest speaker for specialized, short-term programs when invited to do so by a principal or other School District staff. Inter-Local Agreement – School Resource Officer Arlington School District No. 16/City of Arlington Police Department Page 3 of 7 October   2. The SRO shall make available to the school staff and students, a variety of law- related presentations.   E. Additional Responsibilities of the School Resource Officer   1. The SRO shall coordinate programs and presentations with principals and staff members concerned and will seek permission, advice, and guidance prior to enacting any program within the school. These activities and programs shall be approved by the Chief of Police.   2. The SRO shall develop expertise in presenting various subjects to students. Such subjects shall include basic understanding of the Revised Code of Washington, the role of the police, and community policing.   3. The SRO shall encourage individual and small group discussions with students, based upon material presented in class to further establish rapport with students.   4. When requested and approved by the Chief of Police or designee, the SRO shall attend parent/staff meetings to solicit support and understanding of the program, as well as to assist parents and staff members in law enforcement related problems involving students.   5. The SRO shall make himself/herself available for student, parent, and staff member conferences in order to assist with solving problems of a law enforcement or crime-related nature.   6. The SRO shall become familiar with all community agencies which offer assistance to children, youths, and their families (e.g. mental health clinics, drug treatment centers, etc.). The SRO shall make referrals when appropriate.   7. The SRO shall assist principals in developing emergency plans and strategies to prevent and/or minimize dangerous situations, and shall serve on the School District’s emergency management team.   8. Should it become necessary to conduct formal police interviews or investigations with students, the SRO shall adhere to those legal requirements, policies, and procedures established by law, the Arlington Police Department and the School District.   9. The SRO shall give assistance to other law enforcement officers in matters regarding the SRO’s school assignment.   10. The SRO shall, whenever possible and approved by the Chief of Police or designee, participate in/attend school functions.   11. The SRO shall take law enforcement action as required. As soon as practical, the SRO shall make school administrators aware of such action. At a school administrator’s request, the SRO shall take appropriate law enforcement action against intruders and unwanted guests who may appear at the school or related school functions, to the extent the SRO may do so under the authority of the law.   12. The SRO shall not act as a school disciplinarian, as disciplining students is a school responsibility. However, if a school administrator believes that an incident Inter-Local Agreement – School Resource Officer Arlington School District No. 16/City of Arlington Police Department Page 4 of 7 October   is a violation of the law, the administrator may contact the SRO and the SRO shall then determine whether law enforcement action is appropriate.   13. The SRO is not to be used for regularly assigned lunchroom duty, bus duty, hall monitor, or other monitoring duties. The SRO is also not to be used as a crossing guard for continuing vehicle traffic control. However, if there is a temporary problem, the SRO may assist the school until the problem is resolved.     ARTICLE III. SCHOOL DISTRICT RESPONSIBILITIES   A. The School District agrees to:   1. Promptly notify the Police Department when infractions of school rules or criminal law related to physical intimidation, violence, or possession of weapons or drugs on school district property or at school-related activities are brought to the attention of a school administrator. A written statement will be completed and submitted to the Police Department in a timely manner.   2. Give full cooperation and access to school district property or school functions to police officials responding to a request for investigation of reported acts of violence or physical intimidation or possession of weapons on school district property or at school functions within the city limits of Arlington.   3. Permit law enforcement access to personal records of students when legally appropriate procedures are followed.   4. Provide to law enforcement officers, the names, addresses, and phone numbers of parents when requested.   5. Permit free access to school district property for police responding to civil disorder or riot, or for arrest of students for whom probable cause for an arrest exists.   6. The School District shall provide to the full-time SRO the following materials and facilities which are necessary to the performance of the SRO’s duties:   a. Access to a heated and properly lighted private office, which contains a telephone with a separate private line that may be used for general business purposes.   b. A location for files and records, which can be properly locked and secured.   c. A desk with drawers, a chair, and office supplies as needed.   d. Access to a computer with Internet access. Inter-Local Agreement – School Resource Officer Arlington School District No. 16/City of Arlington Police Department Page 5 of 7 October   ARTICLE IV. AGREEMENT BETWEEN BOTH PARTIES   A. Both the School District and the Police Department agree:   1. To work cooperatively to proactively address school security issues and to provide students, staff, and parents with quality law enforcement services and the safest learning environment possible.   2. That the SRO is at all times an employee of the Arlington Police Department and will remain responsive to the chain of command of the Police Department.   3. That the SRO is a law enforcement officer and not a school administrator or employee. In all matters related to the performance of law enforcement functions such as criminal incident investigations and on-campus arrests, the officer shall be subject to all policies and procedures of the Police Department and applicable local, state, or federal law.   4. No separate legal or administrative entity is being created to administer this agreement. To the extent required by RCW 39.34.030, this agreement shall be administered jointly by the Superintendent and the Police Chief. The parties agree to follow the process set forth in Article VII to resolve differences between the parties.   5. Nothing in this agreement is intended to create any new legal duties between the parties hereto and the public, or to alter any existing legal duties between the parties and the public.       ARTICLE V. TERM AND TERMINATION   This agreement shall become effective upon execution and shall expire no later than June 30, 20172020. This agreement is binding on each party’s successors and assigns. This agreement may be terminated by either party upon ninety (90) days written notice that any other party has failed to substantially perform in accordance with the terms and conditions of this agreement. This agreement may be terminated without cause by either party upon one hundred eighty (180) days written notice. Termination of this agreement may only be accomplished as provided herein unless otherwise agreed in writing. Inter-Local Agreement – School Resource Officer Arlington School District No. 16/City of Arlington Police Department Page 6 of 7 October   ARTICLE VI. NOTICES   Whenever any party desires or is required by law to give notice unto the other party, notice shall be sent by certified mail or hand delivered to:     Superintendent Arlington School District No. 16 315 N French Ave Arlington, WA 98223         Chief of Police City of Arlington 238 N Olympic Ave Arlington, WA 98223       ARTICLE VII. GOOD FAITH       The Superintendent, the Chief of Police, their agents and employees agree to cooperate in good faith in fulfilling the terms of this agreement. Unforeseen difficulties or questions will be resolved by negotiation between the Superintendent and the Chief of Police or their designees prior to referring issues to the elected officials of each party.       ARTICLE VIII. MODIFICATION       This document constitutes the full understanding of the parties and no terms, conditions, understandings, or agreements purporting to modify or vary the terms of this document shall be binding unless hereafter made in writing and signed by all parties.       ARTICLE IX. NON-ASSIGNMENT       This agreement, and each and every covenant herein, shall not be capable of assignment, unless the express written consent of the Superintendent and the Chief of Police, or their respective designees is obtained. Inter-Local Agreement – School Resource Officer Arlington School District No. 16/City of Arlington Police Department Page 7 of 7 October   ARTICLE X. MERGER       This agreement constitutes a final written expression of all terms of this agreement and is a complete and exclusive statement of those terms, and shall supersede the Inter-Local Agreement executed by the parties in August 20122014.       IN WITNESS WHEREOF, the parties have caused the execution of this agreement on the day, month, and year above first written.     SCHOOL DISTRICT     By: Dr. Chrys SweetingDr. Kristine McDuffy, Superintendent Arlington School District No. 16       CITY OF ARLINGTON       By: Barbara Tolbert, Mayor Date:                   Date: Formatted: Font: Not Bold City of Arlington Council Agenda Bill Item: WS #7 Attachment G COUNCIL MEETING DATE: May 22, 2017 SUBJECT: Arlington Valley Road – Quiet Title Action ATTACHMENTS: Maps (2) depicting right of way DEPARTMENT OF ORIGIN Legal EXPENDITURES REQUESTED: $3,000 – 10,000 (estimated) BUDGET CATEGORY: BUDGETED AMOUNT: LEGAL REVIEW: DESCRIPTION: Council is being asked to authorize the filing of a “quiet title” lawsuit in conjunction with the proposed Arlington Valley Road. A “quiet title” lawsuit is used when the ownership of real estate is unclear and it is necessary to have a court declare the rights and interests in the property. HISTORY: The City’s Public Works staff and City Attorney have been working on the proposed acquisition of right of way for the Arlington Valley Road. Two sections of the road in question as shown on the attached maps have been used for roadway purposes and maintained by the City for many years, but have significant ownership questions. A title search was done by First American Title Company which identified the vested owners of the property. One identified owner is “Arlington Valley Land Co.”, a company that is defunct and previously went into bankruptcy. Another group of owners are trustees of profit sharing plan entities with whom the City has worked in the past and is continuing to try to work with to obtain deeds for the right of way. ALTERNATIVES: Do not proceed with Arlington Valley Road in its proposed alignment; Do not proceed with project at all. RECOMMENDED MOTION: Workshop; discussion only. At the June 5 City Council meeting, the recommended motion will be “I move to authorize the City Attorney to file a quiet title action or other litigation which are or might be necessary to secure the right of way for the Arlington Valley Road”. FEET 0200 200 Exhibit B CITY OF ARLINGTON PUBLIC WORKS 12/02/16ILLUSTRATIVE EXHIBIT FOR PUBLIC ROADWAY EASEMENT PARCEL 1 FEET 0200 200 Exhibit B CITY OF ARLINGTON PUBLIC WORKS 12/06/16ILLUSTRATIVE EXHIBIT FOR PUBLIC ROADWAY EASEMENT PARCEL 2 City of Arlington Council Agenda Bill Item: WS #8 Attachment H COUNCIL MEETING DATE: May 22, 2017 SUBJECT: Hayden Park Utility Extension Agreement ATTACHMENTS: DRAFT Utility Extension Agreement DEPARTMENT OF ORIGIN Public Works – Jim Kelly EXPENDITURES REQUESTED: None BUDGET CATEGORY: N/A BUDGETED AMOUNT: N/A LEGAL REVIEW: DESCRIPTION: This is an agreement governing a developer funded extension of water utility infrastructure to serve a development within the City of Arlington’s water service area that currently has no water service infrastructure. HISTORY: The City of Arlington’s Water Service Area (WSA) extends past City Limits, however not all of the City’s WSA is completely served with water infrastructure. When a developer within the City’s WSA requests water service where there is currently no water infrastructure, the City can allow the developer to perform the design, permitting and construction of the water infrastructure necessary to serve this development. After the infrastructure is installed and tested, the developer assigns all interest in ownership maintenance and operation to the City. The Utility Extension Agreement governs the terms and conditions for the performance of this utility extension. Hayden Park is a 19 lot development located off of 91st Ave near 156th St, this utility extension agreement will allow that development to move forward. ALTERNATIVES: ‐ Agree to the Utility Extension Agreement ‐ Do not grant the Utility Extension Agreement RECOMMENDED MOTION: Workshop; discussion only. At the following Council meeting the motion will be: “I move to approve the Hayden Park Utility Extension Agreement and authorize the mayor to sign, pending final review by the City Attorney.” AFTER RECORDING RETURN TO: CITY OF ARLINGTON 238 N OLYMPIC AVE ARLINGTON, WA 98223 CITY FILE NO. PWD868 UTILITY EXTENSION AGREEMENT GRANTOR(S): HAYDEN PARK I, LLC GRANTEE(S): CITY OF ARLINGTON LEGAL (abbrev.): Ptn. NE ¼ NW ¼ S. 36, T 31 N., R. 5 E. W.M. and Ptn. NW ¼ NE ¼ S. 36, T 31 N., R. 5 E. W.M. ASSESSOR'S TAX NO. 011655-000-001-00; 011655-000-002-00; 011655-000-003-00; 011655-000-004-00; 011655-000-005-00; 011655-000-006-00; 011655-000-007-00; 011655-000-008-00; 011655-000-009-00; 011655-000-010-00; 011655-000-011-00; 011655-000-012-00; 011655-000-013-00; 011655-000-014-00; 011655-000-015-00; 011655-000-016-00; 011655-000-017-00; 011655-000-018-00; 011655-000-019-00 REFERENCE NO. THIS AGREEMENT is made and entered into this ___ day of __________, 2017, by and between Hayden Park I, LLC, (hereinafter "Owner") and the City of Arlington, Washington (hereinafter "City"). WHEREAS, the Owner is the owner of certain Properties (the "Properties"), legally described as set forth on the attached Exhibit "A", incorporated herein by this reference, which Properties are located outside of the City limits but inside the City's Coordinated Water System Plan Service Area, and Owner wishes to connect to the City's water utility system(s); and WHEREAS, the City wishes to agree to the extension of utilities to the Owner, on certain terms and conditions, NOW, THEREFORE, for valuable consideration, the receipt of which is hereby acknowledged, it is agreed by and between the parties hereto as follows: 1. Title. The Owner warrants that the Owner is the owner of the Properties and is authorized to enter into this agreement. 2. Review. The City of Arlington has reviewed the Owner's proposed development as more particularly described on the Plat of Hayden Park, a Rural Cluster Subdivision, as per the plat recorded under Snohomish County Auditor’s File No. 201703085001. Said proposed development must comply with all of the Snohomish County land use code and development regulations applicable to said proposed development. Any deviations from the recorded plat under Snohomish County Auditor’s File No. 201703085001 that are not approved by the City shall be considered a breach of this covenant and shall render this agreement null and void. 3. Extension Authorized On Certain Terms and Conditions. The City hereby authorizes the Owner to extend utilities to the Properties. The Owner hereby agrees to promptly connect to the utility systems when they become available. The Owner agrees to comply with, be bound by, and be subject to the City's ordinances, regulations, and policies concerning such service. 4. Construction. The City's City Engineer shall review and approve in writing the plans, specifications, and drawings of the Extension before construction commences. All construction of the Extension shall be completed in accordance with City standards now existing or as hereafter amended. The Owner shall permit the City to inspect th e construction and installation of the Extension at any time before, during, or after connection is made to the City System. The City may reject any construction and installation not conforming to the approved design of the Extension and the requirements of this Agreement. 5. Permits, Easements and Licenses. The Owner shall secure and obtain at the Owner's sole cost and expense any necessary permits, easements and licenses to construct the Extension, including without limitation all necessary easements, excavation permits, street use permits or other permits required by state, county and City governmental departments, including without limitation the State Department of Ecology, Snohomish County Public Works Department, Snohomish County Planning and Development Services Department, Snohomish County Boundary Review Board and the City's Public Works Department. 6. Costs. The Owner shall pay all costs of designing, engineering and constructing the Extension and all costs incurred by the City in reviewing plans for and inspecting construction of the Extension. The Owner shall bear the risk of loss for or damage to all finished or partially finished work on the Extension until the City accepts the Extension. Performance and/or maintenance bonds or other security in a form acceptable to the City may be required for any work at the discretion of the City. The amount of such security, if any, shall be established pursuant to City code. 7. Connection Charges. The Owner agrees to pay: (a) connection charges for utilities at the rate schedules applicable at the time the Owner connects the Properties to the City System; (b) any inspection costs of the City; and (c) plan review costs. 8. Service Charges. In addition to the connection charges, the Owner agrees to pay for utility service rendered by the City in accordance with rates charged that are uniform for the class of customer or service supplied, as such rates exist or as they may be hereafter amended or modified, together with any utility taxes levied from time to time. The Owner acknowledges that service charges may consist of base charges as well as charges determined in accordance with the level of service provided. 9. Covenant to Annex. This agreement constitutes an irrevocable notice to the City of intention to commence annexation procedures. The Owner waives all applicable time requirements that require the City Council to meet within a prescribed time after receipt of this notice to decide whether the City will accept the Properties for annexation. With full knowledge and understanding of the consequences of annexation and with full knowledge and understanding of the Owner's decision to forego opposition to annexation of the Properties to the City, the Owner agrees to sign a petition for annexation to the City of the Properties as provided in RCW 35A.14.120, as it now exists or may hereafter be amended, at such time as the Owner is requested by the City to do so. The Owner also agrees and appoints the Mayor of the City as the Owner's attorney-in-fact to execute an annexation petition on the Owner's behalf in the event that the Owner shall fail or refuse to do so and agrees that such signature shall constitute full authority from the Owne r for annexation as if the Owner had signed the petition. If the Owner is a corporation, an officer authorized to execute deeds or encumbrances on behalf of the Owner shall execute this Agreement, and there shall be attached to this Agreement as Exhibit C a certified excerpt from the bylaws of the Owner showing such authority. This Agreement shall be deemed to be continuing, and if the Owner's Properties are not annexed for whatever reason, including a decision by the City not to annex, the Owner agrees to sign any and all subsequent petitions for annexation and agrees not to litigate, challenge or in any manner contest any such subsequent annexation to the City. 10. Covenant Running with Land. This Agreement shall be recorded with the Snohomish County Auditor and shall constitute a covenant running with the land as to the Properties and shall be binding on the Owner and the Owner's heirs, successors and assigns. All costs of recording this Agreement shall be borne by the Owner. In the event that any or all of the Properties is subdivided into smaller lots, the provisions of this Agreement shall bind the purchasers of each subdivided lot. 11. Termination. In the event the Owner fails to comply with any term or condition of this Agreement, in addition to any other remedies available, the City shall have the right to (a) terminate this Agreement upon ten days' written notice to the Owner and (b) terminate utility service to the Properties. 12. Attorney's Fees. In any suit or action seeking to enforce any provision of this Agreement, the prevailing party shall be entitled to reasonable attorney's fees and costs, in addition to any other remedy provided by law or this Agreement. 13. Amendment/Assignment. This Agreement may be amended or modified only by a written instrument executed by the Owner and the City. The Owner shall not assign this Agreement or sell or contract to sell all or any portion of the Properties prior to notifying the City in writing of such assignment or sale. 14. Severability. If any portion of any term or provision of this Agreement, or any action taken pursuant thereto or the application thereof shall, to any extent, be finally determined invalid or unenforceable by a court of competent jurisdiction, the remainder of this Agreement shall not be affected thereby, and each term and provision of this Agreement shall be valid and be enforced to the fullest extent permitted by law. 15. Governing Law. This Agreement shall be governed and construed in accordance with the laws of the State of Washington, and venue in connection with any legal proceeding affecting this Agreement shall lie in the Superior Court of the State of Washington for Snohomish County. DATED this _____ day of ____________, 2017. GRANTOR: HAYDEN PARK I, LLC By: ____________________ Martin Robinett, Member GRANTEE: CITY OF ARLINGTON, WASHINGTON _______________________________ Barbara Tolbert, Mayor ATTEST: ___________________________ Kristin Banfield, City Clerk STATE OF WASHINGTON ) ) ss: COUNTY OF SNOHOMISH ) On this _____ day of ______________, 2017, before me, the undersigned, a Notary Public in and for the State of Washington, duly commissioned and sworn, personally appeared Martin Robinett, to me known to be the individual described in and who executed the within and foregoing instrument, and on oath stated that he was authorized to execute the instrument and acknowledged it as the Member of Hayden Park I, LLC, to be the free and voluntary act of such party for the uses and purposes mentioned in the instrument. Witness my hand and official seal hereto affixed the day and year first above written __________________________________ NOTARY PUBLIC in and for the State of Washington, residing at ______________ My commission expires: ______________ Printed name: ______________________ STATE OF WASHINGTON ) ) ss: COUNTY OF SNOHOMISH ) On this ______ day of ______________, 2017, before me, the undersigned, a Notary Public in and for the State of Washington, duly commissioned and sworn, personally appeared Barbara Tolbert and Kristin Banfield, to me known to be the Mayor and City Clerk of the City of Arlington, Washington, the municipal corporation that executed the foregoing instrument and acknowledged the said instrument to be the free and voluntary act and deed of said municipal corporation, for the uses and purposes herein mentioned. Witness my hand and official seal hereto affixed the day and year first above written. __________________________________ NOTARY PUBLIC in and for the State of Washington, residing at ______________ My commission expires: ______________ Printed name: ______________________ EXHIBIT “A” (LEGAL DESCRIPTION OF PROPERTIES) Parcel B of Snohomish County Boundary Line Adjustment No. 13-115822, recorded under Auditor’s File No 201412160521, being a portion of the Northeast ¼ of the Northwest ¼, and the Northwest ¼ of the Northeast ¼, of Section 36, Township 31 North, Range 5 East, W.M. Situate in the County of Snohomish, State of Washington (also known as Lots 1-19 of the rural cluster subdivision of Hayden Park, recorded under Snohomish County Auditor’s File No. 201703085001) City of Arlington Council Agenda Bill Item: WS #9 Attachment I COUNCIL MEETING DATE: May 22, 2017 SUBJECT: Villas at Arlington – Rezone from current RMD to RHD ATTACHMENTS: Staff Report, Area Map, Vicinity Map, PC Findings of Fact DEPARTMENT OF ORIGIN Community & Economic Development – Marc Hayes, 360‐403‐3457 EXPENDITURES REQUESTED: None BUDGET CATEGORY: N/A BUDGETED AMOUNT: LEGAL REVIEW: DESCRIPTION: This is a request from applicant, AVS Communities, for an amendment to the Comprehensive Plan, Land Use Map with a concurrent amendment to the City’s Official Zoning Map that would change the land‐use designation and zoning classification from Residential Moderate Density to Residential High Density on their single lot. The City recommended an additional parcel to be included with this rezone. (see Exhibit I). HISTORY: Subject property is undeveloped and abuts a larger RHD zoned area, 22 acres, including the Stillaguamish Senior Center. Applicant proposes to construct an “attainable housing” multi‐family residential project. ALTERNATIVES: Deny the proposed rezone RECOMMENDED MOTION: Workshop; discussion only. At the June 5th 2017 Council Meeting the proposed motion will be ”I move to approve the rezone from Residential Moderate Density to Residential High Density for the Villas at Arlington proposal”. Staff Report & Recommendation Villas at Arlington Land Use Map Amendment & Concurrent Rezone – PLN#313 Page 1 of 5 Community and Economic Development Planning Division 18204 59th Avenue NE, Arlington, WA 98223 STAFF REPORT & RECOMMENDATION TO THE PLANNING COMMISSION Minor Land‐Use Map Amendment & Concurrent Rezone Villas at Arlington Rezone – PLN#313 Report Prepared By: Amy Rusko, Associate Planner Report Issued: March 28, 2017 A. APPLICATION DESCRIPTION This is a request from Applicant, AVS Communities for an amendment to the Comprehensive Plan, Land Use Map with a concurrent amendment to the City’s Official Zoning Map that would change the land‐use designation and zoning classification from Residential Moderate Density to Residential High Density on his single lot. The City recommended additional parcels to be included with this rezone, as neighboring parcels have the same split zoning as the Applicant’s property (see Exhibit I). B. SITE AND SITUATION The subject 13.60 acre lot (APN 31052000104100, 31052000104200 and 31052000100800) is located at 18506 Smokey Point Boulevard. The additional parcel is located at 18406 Smokey Point Boulevard, with associated parcel number: 31052000100900. The topography is flat and forested. The soils on site and in the vicinity consist of Lynnwood loamy sand, 0 to 3 percent, which drains well, and is suitable for urban development according to the USDA Soil Survey of Snohomish County. The parcels are considered under‐developed, based on the size of the parcels and the current use of single family residences (see Exhibit II) and there are currently no active land‐use or development proposals on file with the City for these properties. The parcels are situated on the west side of Smokey Point Boulevard, just northwest of the intersection of Smokey Point Boulevard and 35th Avenue NE. Direct access is taken from Smokey Point Boulevard. Smokey Point Boulevard is an unimproved arterial. The City’s Comprehensive Plan calls for improving Smokey Point Boulevard with sidewalks and planter strips. Smokey Point Boulevard is also designated with a future corridor plan. The subject lots are currently zoned Residential Moderate Density and are 3 of 4 parcels that are included in the rezone. Lots to the north, east and west are zoned Residential Moderate Density, with lots to the south zoned Residential High Density. Residential properties to the north, east and west are developed with single family dwellings. Residential properties to the south are developed with multi‐family dwelling units. Staff Report & Recommendation Villas at Arlington Land Use Map Amendment & Concurrent Rezone – PLN#313 Page 2 of 5 C. APPLICATION REVIEW PROCESS Arlington Municipal Code allows for any person to petition the Planning Commission and City Council to amend the City’s Comprehensive Plan and/or Land Use Code. The City’s requirements for proposing amendments are found in Arlington Municipal Code (AMC) Chapter 20.96 (Amendments). The Future Land Use Map is a required element of the City’s Comprehensive Plan (see RCW 36.70A.070). The Future Land Use Map shows the City’s desired land use patterns by geographical area within both City limits and in unincorporated Urban Growth Areas. The City’s Official Zoning Map is based off of the Future Land Use Map found in the City’s Comprehensive Plan. Since the City’s Comprehensive Plan serves as the foundation for the City’s Land Use Code (Title 20), inclusive of the City’s Official Zoning Map, State law requires that the City’s Land Use Code be consistent with the City’s Comprehensive Plan (see RCW 36.70A.130(1)(d)). If a proposed amendment to the City’s Land Use Code is not consistent with the City’s Comprehensive Plan, the proposal must either be denied or the Comprehensive Plan must also be concurrently amended to preserve consistency between the Comprehensive Plan and the Land Use Code. State and City regulations prohibit the Comprehensive Plan from being amended more frequently than once per year; therefore, the City has established a docketing process so that all proposed amendments to the Comprehensive Plan can be considered concurrently(see RCW 36.70A.130 and AMC 20.96.010(d)). The proposal will be made to the 2017 annual update to the City’s Comprehensive Plan, all proposed amendments are being considered as part of the City’s annual docketing procedures. This will ensure that amendments to the Comprehensive Plan only occur once in 2017. Amendment proposals to the City’s Comprehensive Plan may be initiated by the City or private party. Applications for Comprehensive Plan Amendments (CPAs) are due by the last working day of January to be considered that year. During the year staff reviews the proposed amendments for compatibility with the Comprehensive Plan and conformance with the requirements of AMC Chapter 20.96 and presents their findings and recommendations to the Planning Commission at an open record public hearing as required by AMC Section 20.96.030(a). The Planning Commission’s recommendation is then forwarded to the City Council which then takes final action at a closed record hearing. D. STAFF ANALYSIS The Applicant submitted their application requesting a rezone on January 19, 2017, meeting the January 31, 2017 deadline for consideration. Because this rezone request is inconsistent with the Future Land‐Use Map contained within the Comprehensive Plan, an amendment to the Future Land‐ Use Map is necessary if the rezone request is to be approved. Staff Report & Recommendation Villas at Arlington Land Use Map Amendment & Concurrent Rezone – PLN#313 Page 3 of 5 AMC Section §20.96.024 establishes criteria that an amendment proposal must meet in order to be considered. AMC Section §20.96.024(a)(1) states: “If the proposed amendment is site specific, the subject property is suitable for development in general conformance with adjacent land use and the surrounding development pattern, and with zoning standards under the potential zoning classifications.” Staff found that the proposed Future Land‐Use Map amendment and concurrent rezone request meet this requirement and have included it for consideration as part of the 2017 annual Comprehensive Plan update. 1. CRITERIA OF AMC 20.96.060. In deciding whether to approve any amendment to the City’s Comprehensive Plan, the approval body must base its decision solely on whether the proposed amendment advances the public health, safety, or welfare. All other arguments relating to the proposed amendment are irrelevant according to AMC §20.96.060. a. Public Health With regards to public health, a change in the Future Land‐Use Map for the subject property from Residential Moderate Density designation to a Residential High Density designation would advance the public health by allowing for the development of higher residential densities within close proximity and walking distance from residences to commercial businesses located in Smokey Point and to future commercial businesses that could be located along the Smokey Point Boulevard corridor. Easy access from residences to commercial businesses promotes walking, social interaction, and community support of businesses. b. Public Safety With regards to public safety, a change in the Future Land‐Use Map for the subject property from a Residential Moderate Density designation to a Residential High Density designation would advance the public safety by allowing for the development of higher residential densities, making the potential residents more accessible to the police and fire departments. Residents of a multi‐family development can provide safety to their neighbors by being “the eyes on the street” to protect personal property. c. Public Welfare With regards to public welfare, a change in the Future Land‐Use Map for the subject property from a Residential Moderate Density designation to a Residential High Density designation would advance the public welfare by providing the potential of diverse housing options that would be available for a wide range of individuals. 2. CRITERIA OF AMC 20.96.026. In deciding whether to approve, modify, defer, or deny any proposed amendment to the City’s Official Zoning Map, the City Council shall base their decision on the following criteria (see 20.96.026): a. The proposed amendment is consistent with the goals, objectives, and policies of the Comprehensive Plan. The Future Land Use Map in the Comprehensive Plan would need to be amended to change the land use designation from Residential Moderate Density to Residential High Density for the rezone of the subject parcels from Residential Moderate Density to Residential High Density to be consistent with the Comprehensive Plan. Staff Report & Recommendation Villas at Arlington Land Use Map Amendment & Concurrent Rezone – PLN#313 Page 4 of 5 The City has many goals and policies directly related to the re‐designation/rezoning of properties to Residential High Density in the 2015 Comprehensive Plan. The Goals and Policies that support this amendment; GO‐3, GH‐1, GH‐5, GH‐8, GL‐4, GL‐7, GT‐5, PO‐6.1, PH‐2.1, PH‐4.2, PH‐5.1, PH‐8.1, PL‐1.4, PL‐4.3, PL‐4.8, PL‐7.2, PL‐8.1. b. The proposed amendment is consistent with the scope and purpose of the city's zoning ordinances and the description and purpose of the zone classification applied for. Zone descriptions and purposes are outlined in AMC Chapter 20.36 and the Comprehensive Plan. The description and purpose of the Residential High Density zone as listed in AMC Chapter 20.36 is “… to accommodate higher density multi‐family developments and recreational, quasi‐public, and public uses that customarily serve residential development in areas served by public sewer and water facilities.” The description and purpose of the Residential Moderate Density zone as listed in AMC Chapter 20.36 is “…to accommodate detached or attached single‐family residential uses at medium densities and recreational, quasi‐public, and public uses that customarily serve residential development in areas served by public sewer and water facilities. Some types of two‐family residences are allowed in this district on larger lots.” The proposed amendment (rezone) to the Zoning Map is consistent with the description and purpose of the Residential High Density zone provided the Future Land Use Map is amended to designate the subject lot as Residential High Density. c. Circumstances have changed substantially since the establishment of the current zoning map or district to warrant the proposed amendment. Circumstances have changed since the establishment of the current zoning map. The City has a need for providing a diverse housing stock to the citizens. The City needs to comply with Vision 2040 and the Buildable Lands Analysis per Snohomish County Ordinance 16‐ 077. The City has insufficient land capacity to accommodate the 2035 population estimates. The AHA Housing Profile for Arlington indicated a deficiency in the amount of diversified and multi‐family housing available in the City. d. The proposed zoning is consistent and compatible with the uses and zoning of surrounding property. The proposed zoning is consistent and compatible with the uses and zoning of surrounding property. The subject parcels are adjacent to Residential Moderate Density and Residential High Density zoned land to the north, east, west and south. For a comparison of allowed uses between the Residential Moderate Density zone and the Residential High Density zone, see Exhibit III. e. The property that is the subject of the amendment is suited for the uses allowed in the proposed zoning classification. The subject parcels are suitable for the allowed uses in the Residential High Density zone because of its site and situation. Staff Report & Recommendation Villas at Arlington Land Use Map Amendment & Concurrent Rezone – PLN#313 Page 5 of 5 f. Adequate public services could be made available to serve the full range of proposed uses in that zone. Adequate public services are available to serve the full range of allowable uses in the Residential High Density zone on this site. E. STAFF CONCLUSION & RECOMMENDATION 1. Staff concludes that this proposal meets the criterion of the Comprehensive Plan and Arlington Municipal Code for re‐designation and rezoning of the subject lot from Residential Moderate Density to Residential High Density and recommends that the Planning Commission recommend approval of the proposed amendment to the City Council. Distributed to the following parties: 1. AVS Communities, Applicant 2. Carmel Gregory, Contact 3. The City Planning Commission 4. Marc Hayes, CED Director 5. Katie Heim, GIS Analyst 6. Jim Kelly, Public Works Director EXHIBIT I 184TH PL NE 185TH PL NE 187TH PL NE 183RD PL NE 183RD PLNE 184TH PL NE 186TH PL NE 29TH AVE NE I-5 186TH PL NE I-5 SMOKEY POINT BLVD SMOKEY POINT BLVD 35TH AVE NE 31ST AVE NE RHD NC RMD HC NC City of Arlington Maps and GIS data are distributed “AS-IS” without warranties of any kind, either express or implied,including but not limited to warranties of suitability for a particular purpose or use. Map data are compiledfrom a variety of sources which may contain errors and users who rely upon the information do so at theirown risk. Users agree to indemnify, defend, and hold harmless the City of Arlington for any and all liabilityof any nature arising out of or resulting from the lack of accuracy or correctness of the data, or the use ofthe data presented in the maps. kdh VillasAtArlRezone11x17_17 1/23/2017 Scale: Date: File: Cartographer: Legend Proposed Rezone Area Public Roads Private Roads Assessor Parcels Villas at ArlingtonRezone 0 230 460115 FeetRHD rezone area RMD = Moderate Density Residential RHD = High Density Residential NC = Neighborhood Commercial HC = Highway Commercial EXHIBIT II   EXHIBIT III Permissible Use RHD RMD 1.000 RESIDENTIAL 1.100 SINGLE FAMILY RESIDENCES 1.110 SINGLE FAMILY DETACHED, ONE DWELLING UNIT PER LOT RHD RMD 1.111 Site-Built & Modular Structures RHD RMD 1.112 Class A Mobile Home1 RHD RMD 1.113 Class B Mobile Home1 RHD RMD 1.120 SINGLE FAMILY ATTACHED DETACHED, MORE THAN ONE DWELLING UNIT PER LOT 1.121 Mobile Home Park RMD 1.122 Cottage Housing RHD RMD 1.200 TWO-FAMILY RESIDENCES 1.210 Two-Family Conversion2 RHD RMD 1.220 Accessory Dwelling Unit2,12 RHD RMD 1.230 Duplex2 RHD RMD 1.300 MULTI-FAMILY RESIDENCES 1.310 Multi-Family Conversions RHD 1.320 Multi-Family Townhouses RHD 1.330 Multi-Family Apartments RHD 1.400 HOMES EMPHASIZING SPECIAL SERVICES, TREATMENT OR SUPERVISION 1.410 LOCATED IN A SINGLE FAMILY RESIDENCE 1.411 Homes for Handicapped or Infirm7 RHD RMD 1.412 Nursing Care, Intermediate Care Homes7 RHD RMD 1.413 Special Needs Child Care Homes7 RHD RMD 1.414 Halfway Houses7 RHD RMD 1.415 Adult Family Homes (6 or fewer adults) RHD RMD 1.420 LOCATED IN A MULTI-FAMILY RESIDENCE (OCCUPYING SINGLE OR MULTIPLE DWELLING UNITS) 1.421 Homes for Handicapped or Infirm7 RHD 1.422 Nursing Care, Intermediate Care Homes7 RHD 1.423 Special Needs Child Care Homes7 RHD 1.424 Halfway Houses7 RHD 1.425 Adult Family Homes (6 or fewer adults) RHD RMD 1.500 MISCELLANEOUS, ROOMS FOR RENT SITUATIONS 1.510 Rooming Houses or Boarding Houses RHD RMD 1.520 Tourist Homes and Other Temporary Residences Rented By the Day or Week RHD RMD 1.600 IN-HOME CHILD DAY CARE RHD RMD 2.000 SALES AND RENTAL OF GOODS, MERCHANDISE AND EQUIPMENT 2.300 Transient Merchant Sales (vending carts, food and ice cream trucks, mobile delivery, peddlers)3 RHD RMD 5.000 EDUCATIONAL, CULTURAL, RELIGIOUS, PHILANTHROPIC, SOCIAL OR FRATURAL USES 5.100 SCHOOLS 5.110 Elementary and Secondary Schools (including associated grounds, athletic and other facilities)18 RHD RMD 5.120 Trade or Vocational Schools RHD 5.130 Colleges, Universities, Community Colleges (included associated facilities such as dormitories, office buildings athletic fields17 RHD RMD 5.200 Religious Assembly as Principle On-Site Use (including associated residential structures for religious personnel and associated buildings but not including elementary school or secondary school buildings)17 RHD RMD 5.210 Religious Assembly Accessory to an Existing On-Site Non-Religious Principle Use RHD RMD 5.300 LIBRARIES, MUSEUMS, ART GALLERIES, ART CENTERS AND SIMILAR USES (INCLUDING ASSOCIATED EDUCATIONAL AND INSTUCTIONAL ACTIVITIES 5.310 Located Within a Building Designed and Previously Legally Occupied as a Residence RHD RMD 5.320 Located Within any Permissible Building RHD RMD 6.000 RECREATION, AMUSEMENT, ENTERTAINMENT 6.200 ACTIVITIES CONDUCTED PROMARILY OUTSIDE ENCLOSED BUILDINGS OR STRUCTURES 6.210 Privately Owned Outdoor Recreational Facilities (golf and country clubs, swimming or tennis clubs) RHD RMD 6.220 Publicly Owned and Operated Outdoor Recreational Facilities (athletic fields, golf courses, tennis courts, swimming pools and parks) RHD RMD 6.230 Golf Driving Ranges not Accessory to Golf Courses, Par 3 Golf Coursed, Miniature Golf, Skateboard Parks and Water Slides17 RHD RMD 7.000 INSTITUTIONAL RESIDENCE OR CARE OR CONFINEMENT FACILITIES 7.100 Hospitals, Clinics, Other Medical (including mental health)17,18 RHD 7.200 Nursing Care Institutions, Intermediate Care Institutions, Handicapped or Infirm Institutions, Child Care Institutions17,18 RHD RMD 7.300 Institutions (other than halfway houses) where Mentally Ill Persons are Confined17,18 RHD RMD 9.000 MOTOR VEHICLE RELATED SALES AND SERVICE OPERATIONS 9.180 Electric Vehicle Infrastructure23 RHD RMD 13.000 EMERGENCY SERVICES 13.100 Police Stations18 RHD RMD 13.200 Fire Stations18 RHD RMD 13.300 Rescue Squad or Ambulance Services18 RHD RMD 13.400 Civil Defense Operation RHD RMD 15.000 MISCELLANEOUS PUBLIC OR SEMI-PUBLIC FACILITIES 15.500 Temporary Mobile or Modular Structures Used For Public Services (mobile classrooms, civic services, public health centers, emergency response centers)4 RHD RMD 17.000 UTILITY FACILITY 17.100 Neighborhood RHD RMD 17.200 Community or Regional RHD RMD 18.000 TOWERS AND RELATED STRUCTURES 18.100 NON COMMERCIAL TOWERS 18.110 Towers and Antennas 50 Feet Tall or Less RHD RMD 18.120 Towers and Antennas More Than 50 Feet Tall and Receive-Only Earth Stations RHD RMD 18.200 COMMERCIAL TELECOMMUNICATIONS TOWERS & MONOPOLES 18.230 Micro Facilities8 RHD RMD 18.240 Mini Facilities8 RHD 18.250 Macro Facilities8 RHD 21.100 CEMETERY17 RHD RMD 22.000 COMMERCIAL NURSERY SCHOOLS OR DAY CARE CENTERS17 RHD RMD 23.000 NEW OR IMPROVED STREETS RHD RMD 26.000 SPECIAL EVENTS RHD RMD 28.000 SUBDIVISIONS AND BOUNDARY ADJUSTMENTS 28.100 Major RHD RMD 28.200 Short RHD RMD 28.300 Boundary Line Adjustment RHD RMD 28.400 Unit Lot RHD 29.000 COMBINATION USES RHD RMD 32.000 LAND CLEARING, LOGGING IN CONFORMANCE WITH CHAPTER 20.88 (ENVIRONMENTALLY CRITICAL AREAS) BUT OF MORE THAN 10,000 FT2 OF PROPERTY WITHIN ONE YEAR9 RHD RMD 33.000 USES PERMISSIBLE IN CRITICAL AREAS (SEE CHAPTER 20.93) RHD RMD   *The highlighted areas are the differences between the Residential High Density (RHD) zone and Residential Moderate Density (RMD) zone.  Findings of Fact City of Arlington Planning Commission Villas at Arlington Rezone Page 1 of 1 City of Arlington Community and Economic Development Planning Commission 18204 59th Avenue NE, #B Arlin ton, WA 98223 Regarding: Villas at Arlington Rezone Summary: The Planning Commission held a Public Hearing on April 18, 2017 for the Villas at Arlington Rezone. The Planning Commission transmits the following findings and recommendation to the City Council: Findings: 1. State law (RCW 36.70A.130) allows Cities to amend their Comprehensive Plans once annually. The Council recently updated and clarified the docketing process for review of all proposed amendments as part of an effort to insure that these proposed changes were considered together. 2. In addition, AMC 20.96.024 establishes qualifying criteria for amendments to the Comprehensive Plan that must be met for inclusion on the Docket. 3. Comprehensive Plan amendments can be proposed either by private parties, or by the City. In either case, the proposed amendment is subject to the same docketing procedures. The only exception is for emergency amendments, none of which were proposed for the 2017 docket. 4. The items included on the 2017 Comprehensive Plan Amendment Docket all meet the submission requirements and specific criterial contained in AMC 20.96 sections 010 through 060. Conclusion and Recommendation: Based on the foregoing findings and testimony received at the hearing, the Planning Commission herby recommends that the City Council approve the proposed Villas at Arlington Rezone. Respectfully submitted through the Department of Community and Economic Development to the City Council this seventeenth day of May 2017 by: ____________________________________________________ Bruce Angell City of Arlington Planning Commission Chair City of Arlington Council Agenda Bill Item: WS #10 Attachment J COUNCIL MEETING DATE: May 22, 2017 SUBJECT: Stewart – Rezone from current RMD to RHD ATTACHMENTS: Staff Report, Area Map, Vicinity Map, PC Findings of Fact DEPARTMENT OF ORIGIN Community & Economic Development – Marc Hayes, 360‐403‐3457 EXPENDITURES REQUESTED: None BUDGET CATEGORY: N/A BUDGETED AMOUNT: LEGAL REVIEW: DESCRIPTION: This is a request from applicant, Greg Stewart, for an amendment to the Comprehensive Plan, Land Use Map with a concurrent amendment to the City’s Official Zoning Map that would change the land‐ use designation and zoning classification from a split zone of Residential Moderate Density / Residential High Density to Residential High Density on his single lot. The City recommended additional parcels to be included with this rezone, as neighboring parcels have the same split zoning as the Applicant’s property (see Exhibit I). HISTORY: The subject 2 acre lot (APN 31051100401700 and 31051100401701) is located at 606 E Highland Drive. The additional parcels are located at 624, 704, 722, 730 E Highland Drive and 502 83rd Avenue NE, with associated parcel numbers: 31051100401600, 31051100401500, 31051100405900, 31051100401100, 31051100401000, and 31051100400900 ALTERNATIVES: Deny the proposed rezone RECOMMENDED MOTION: Workshop; discussion only. At the June 5th 2017 council meeting, the proposed motion will be ”I move to approve the rezone from Residential Moderate Density to Residential High Density for the “Stewart” Rezone as described in the staff report”. Staff Report & Recommendation Stewart Land Use Map Amendment & Concurrent Rezone – PLN#274 Page 1 of 5 Community and Economic Development Planning Division 18204 59th Avenue NE, Arlington, WA 98223 STAFF REPORT & RECOMMENDATION TO THE PLANNING COMMISSION Minor Land‐Use Map Amendment & Concurrent Rezone Stewart Rezone – PLN#274 Report Prepared By: Amy Rusko, Associate Planner Report Issued: March 28, 2017 A. APPLICATION DESCRIPTION This is a request from Applicant, Greg Stewart for an amendment to the Comprehensive Plan, Land Use Map with a concurrent amendment to the City’s Official Zoning Map that would change the land‐use designation and zoning classification from a split zone of Residential Moderate Density / Residential High Density to Residential High Density on his single lot. The City recommended additional parcels to be included with this rezone, as neighboring parcels have the same split zoning as the Applicant’s property (see Exhibit I). B. SITE AND SITUATION The subject 2 acre lot (APN 31051100401700 and 31051100401701) is located at 606 E Highland Drive. The additional parcels are located at 624, 704, 722, 730 E Highland Drive and 502 83rd Avenue NE, with associated parcel numbers: 31051100401600, 31051100401500, 31051100405900, 31051100401100, 31051100401000, and 31051100400900 The topography is flat and mostly cleared. There is less than a one (1) percent slope from the northern property line to the southern property line. There is a steep slope along the southern property line that has an approximate nineteen (19) percent slope. The soils on site and in the vicinity consist of Ragner sandy loam, which drains well, and is suitable for urban development according to the USDA Soil Survey of Snohomish County. The parcels are considered under‐developed, based on the size of the parcels and the current use of single family residences (see Exhibit II) and there are currently no active land‐use or development proposals on file with the City for these properties. The parcels are situated on the south side of Highland Drive just west of the intersection of Stillaguamish Avenue and Highland Drive. Direct access is taken from Highland Drive. Highland Drive is an unimproved future collector arterial. The City’s Comprehensive Plan calls for improving Highland Drive with sidewalks and planter strips from Stillaguamish Avenue to Highway 9. In 2016 Highland Drive was improved by installing new water and sewer lines and repaving of the street. Staff Report & Recommendation Stewart Land Use Map Amendment & Concurrent Rezone – PLN#274 Page 2 of 5 The subject lot is currently zoned both Residential Moderate Density / Residential High Density and is one of seven parcels that are zoned both Residential Moderate Density and Residential High Density through split zoning over single parcels. Lots to the north and west are zoned Residential Medium Density, with lots to the south and east are zoned Residential Moderate Density and Residential High Density. Residential properties to the north and west are developed with single family dwellings. Residential properties to the east are developed with single family dwellings and a church. Residential properties to the south are developed with multi‐family dwelling units. Water and Sewer lines are within Highland Drive and are accessible to these properties. C. APPLICATION REVIEW PROCESS Arlington Municipal Code allows for any person to petition the Planning Commission and City Council to amend the City’s Comprehensive Plan and/or Land Use Code. The City’s requirements for proposing amendments are found in Arlington Municipal Code (AMC) Chapter 20.96 (Amendments). The Future Land Use Map is a required element of the City’s Comprehensive Plan (see RCW 36.70A.070). The Future Land Use Map shows the City’s desired land use patterns by geographical area within both City limits and in unincorporated Urban Growth Areas. The City’s Official Zoning Map is based off of the Future Land Use Map found in the City’s Comprehensive Plan. Since the City’s Comprehensive Plan serves as the foundation for the City’s Land Use Code (Title 20), inclusive of the City’s Official Zoning Map, State law requires that the City’s Land Use Code be consistent with the City’s Comprehensive Plan (see RCW 36.70A.130(1)(d)). If a proposed amendment to the City’s Land Use Code is not consistent with the City’s Comprehensive Plan, the proposal must either be denied or the Comprehensive Plan must also be concurrently amended to preserve consistency between the Comprehensive Plan and the Land Use Code. State and City regulations prohibit the Comprehensive Plan from being amended more frequently than once per year; therefore, the City has established a docketing process so that all proposed amendments to the Comprehensive Plan can be considered concurrently(see RCW 36.70A.130 and AMC 20.96.010(d)). The proposal will be made to the 2017 annual update to the City’s Comprehensive Plan, all proposed amendments are being considered as part of the City’s annual docketing procedures. This will ensure that amendments to the Comprehensive Plan only occur once in 2017. Amendment proposals to the City’s Comprehensive Plan may be initiated by the City or private party. Applications for Comprehensive Plan Amendments (CPAs) are due by the last working day of January to be considered that year. During the year staff reviews the proposed amendments for compatibility with the Comprehensive Plan and conformance with the requirements of AMC Chapter 20.96 and presents their findings and recommendations to the Planning Commission at an open record public hearing as required by AMC Section 20.96.030(a). The Planning Commission’s recommendation is then forwarded to the City Council which then takes final action at a closed record hearing. Staff Report & Recommendation Stewart Land Use Map Amendment & Concurrent Rezone – PLN#274 Page 3 of 5 D. STAFF ANALYSIS The Applicant submitted their application requesting a rezone on September 29, 2016, meeting the January 31, 2017 deadline for consideration. Because this rezone request is inconsistent with the Future Land‐Use Map contained within the Comprehensive Plan, an amendment to the Future Land‐ Use Map is necessary if the rezone request is to be approved. AMC Section §20.96.024 establishes criteria that an amendment proposal must meet in order to be considered. AMC Section §20.96.024(a)(1) states: “If the proposed amendment is site specific, the subject property is suitable for development in general conformance with adjacent land use and the surrounding development pattern, and with zoning standards under the potential zoning classifications.” Staff found that the proposed Future Land‐Use Map amendment and concurrent rezone request meet this requirement and have included it for consideration as part of the 2017 annual Comprehensive Plan update. 1. CRITERIA OF AMC 20.96.060. In deciding whether to approve any amendment to the City’s Comprehensive Plan, the approval body must base its decision solely on whether the proposed amendment advances the public health, safety, or welfare. All other arguments relating to the proposed amendment are irrelevant according to AMC §20.96.060. a. Public Health With regards to public health, a change in the Future Land‐Use Map for the subject property from a split Residential Moderate Density / Residential High Density designation to a Residential High Density designation would advance the public health by allowing for the development of higher residential densities within close proximity and walking distance from residences to commercial businesses located along Olympic Avenue in Downtown Arlington and to commercial businesses located along Olympic Place and 204th Street. Easy access from residences to commercial businesses promotes walking, social interaction, and community support of businesses. b. Public Safety With regards to public safety, a change in the Future Land‐Use Map for the subject property from a split Residential Moderate Density / Residential High Density designation to a Residential High Density designation would advance the public safety by allowing for the development of higher residential densities, making the potential residents more accessible to the police and fire departments. Residents of a multi‐family development can provide safety to their neighbors by being “the eyes on the street” to protect personal property. c. Public Welfare With regards to public welfare, a change in the Future Land‐Use Map for the subject property from a split Residential Moderate Density / Residential High Density designation to a Residential High Density designation would advance the public welfare by providing the potential of diverse housing options that would be available for a wide range of individuals. Staff Report & Recommendation Stewart Land Use Map Amendment & Concurrent Rezone – PLN#274 Page 4 of 5 2. CRITERIA OF AMC 20.96.026. In deciding whether to approve, modify, defer, or deny any proposed amendment to the City’s Official Zoning Map, the City Council shall base their decision on the following criteria (see 20.96.026): a. The proposed amendment is consistent with the goals, objectives, and policies of the Comprehensive Plan. The Future Land Use Map in the Comprehensive Plan would need to be amended to change the land use designation from Residential Moderate Density to Residential High Density for the rezone of the subject parcels from Residential Moderate Density to Residential High Density to be consistent with the Comprehensive Plan. The City has many goals and policies directly related to the re‐designation/rezoning of properties to Residential High Density in the 2015 Comprehensive Plan. The Goals and Policies that support this amendment; GO‐3, GH‐1, GH‐5, GH‐8, GL‐4, GL‐7, GT‐5, PO‐6.1, PH‐2.1, PH‐4.2, PH‐5.1, PH‐8.1, PL‐1.4, PL‐4.3, PL‐4.8, PL‐7.2, PL‐8.1. b. The proposed amendment is consistent with the scope and purpose of the city's zoning ordinances and the description and purpose of the zone classification applied for. Zone descriptions and purposes are outlined in AMC Chapter 20.36 and the Comprehensive Plan. The description and purpose of the Residential High Density zone as listed in AMC Chapter 20.36 is “… to accommodate higher density multi‐family developments and recreational, quasi‐public, and public uses that customarily serve residential development in areas served by public sewer and water facilities.” The description and purpose of the Residential Moderate Density zone as listed in AMC Chapter 20.36 is “…to accommodate detached or attached single‐family residential uses at medium densities and recreational, quasi‐public, and public uses that customarily serve residential development in areas served by public sewer and water facilities. Some types of two‐family residences are allowed in this district on larger lots.” The proposed amendment (rezone) to the Zoning Map is consistent with the description and purpose of the Residential High Density zone provided the Future Land Use Map is amended to designate the subject lot as Residential High Density. c. Circumstances have changed substantially since the establishment of the current zoning map or district to warrant the proposed amendment. Circumstances have changed since the establishment of the current zoning map. The City has a need for providing a diverse housing stock to the citizens. The City needs to comply with Vision 2040 and the Buildable Lands Analysis per Snohomish County Ordinance 16‐ 077. The City has insufficient land capacity to accommodate the 2035 population estimates. The AHA Housing Profile for Arlington indicated a deficiency in the amount of diversified and multi‐family housing available in the City. Staff Report & Recommendation Stewart Land Use Map Amendment & Concurrent Rezone – PLN#274 Page 5 of 5 d. The proposed zoning is consistent and compatible with the uses and zoning of surrounding property. The proposed zoning is consistent and compatible with the uses and zoning of surrounding property. The subject parcels are adjacent to Residential Moderate Density and Residential High Density zoned land to the north, east, west and south. For a comparison of allowed uses between the Residential Moderate Density zone and the Residential High Density zone, see Exhibit III. e. The property that is the subject of the amendment is suited for the uses allowed in the proposed zoning classification. The subject parcels are suitable for the allowed uses in the Residential High Density zone because of its site and situation. f. Adequate public services could be made available to serve the full range of proposed uses in that zone. Adequate public services are available to serve the full range of allowable uses in the Residential High Density zone on this site. E. STAFF CONCLUSION & RECOMMENDATION 1. Staff concludes that this proposal meets the criterion of the Comprehensive Plan and Arlington Municipal Code for re‐designation and rezoning of the subject lot from Residential Moderate Density/Residential High Density to Residential High Density and recommends that the Planning Commission recommend approval of the proposed amendment to the City Council. Distributed to the following parties: 1. Greg Stewart, Applicant 2. The City Planning Commission 3. Marc Hayes, CED Director 4. Katie Heim, GIS Analyst 5. Jim Kelly, Public Works Director EXHIBIT I MEDICAL CENTER DR TVEIT RD WESLEY ST S FRENCH AVE S STILLAGUAMISH AVE E HIGHLAND DR RMD MS P/SP RHD OTRD RMD RMD City of Arlington Maps and GIS data are distributed “AS-IS” without warranties of any kind, either express or implied,including but not limited to warranties of suitability for a particular purpose or use. Map data are compiledfrom a variety of sources which may contain errors and users who rely upon the information do so at theirown risk. Users agree to indemnify, defend, and hold harmless the City of Arlington for any and all liabilityof any nature arising out of or resulting from the lack of accuracy or correctness of the data, or the use ofthe data presented in the maps. µ kdh StewartRezoneRev11x17_17 5/12/2017 Scale: Date: File: Cartographer: Legend Proposed Rezone Public Roads Private Roads Assessor Parcels Stewart Rezonefor RMD Areas 0 130 26065 Feet RMD = Moderate Density Residential RHD = High Density Residential OTRD = Old Town Residential District P/SP = Public/Semi-Public MS = Medical Services RHD rezone area EXHIBIT II   EXHIBIT III Permissible Use RHD RMD 1.000 RESIDENTIAL 1.100 SINGLE FAMILY RESIDENCES 1.110 SINGLE FAMILY DETACHED, ONE DWELLING UNIT PER LOT RHD RMD 1.111 Site-Built & Modular Structures RHD RMD 1.112 Class A Mobile Home1 RHD RMD 1.113 Class B Mobile Home1 RHD RMD 1.120 SINGLE FAMILY ATTACHED DETACHED, MORE THAN ONE DWELLING UNIT PER LOT 1.121 Mobile Home Park RMD 1.122 Cottage Housing RHD RMD 1.200 TWO-FAMILY RESIDENCES 1.210 Two-Family Conversion2 RHD RMD 1.220 Accessory Dwelling Unit2,12 RHD RMD 1.230 Duplex2 RHD RMD 1.300 MULTI-FAMILY RESIDENCES 1.310 Multi-Family Conversions RHD 1.320 Multi-Family Townhouses RHD 1.330 Multi-Family Apartments RHD 1.400 HOMES EMPHASIZING SPECIAL SERVICES, TREATMENT OR SUPERVISION 1.410 LOCATED IN A SINGLE FAMILY RESIDENCE 1.411 Homes for Handicapped or Infirm7 RHD RMD 1.412 Nursing Care, Intermediate Care Homes7 RHD RMD 1.413 Special Needs Child Care Homes7 RHD RMD 1.414 Halfway Houses7 RHD RMD 1.415 Adult Family Homes (6 or fewer adults) RHD RMD 1.420 LOCATED IN A MULTI-FAMILY RESIDENCE (OCCUPYING SINGLE OR MULTIPLE DWELLING UNITS) 1.421 Homes for Handicapped or Infirm7 RHD 1.422 Nursing Care, Intermediate Care Homes7 RHD 1.423 Special Needs Child Care Homes7 RHD 1.424 Halfway Houses7 RHD 1.425 Adult Family Homes (6 or fewer adults) RHD RMD 1.500 MISCELLANEOUS, ROOMS FOR RENT SITUATIONS 1.510 Rooming Houses or Boarding Houses RHD RMD 1.520 Tourist Homes and Other Temporary Residences Rented By the Day or Week RHD RMD 1.600 IN-HOME CHILD DAY CARE RHD RMD 2.000 SALES AND RENTAL OF GOODS, MERCHANDISE AND EQUIPMENT 2.300 Transient Merchant Sales (vending carts, food and ice cream trucks, mobile delivery, peddlers)3 RHD RMD 5.000 EDUCATIONAL, CULTURAL, RELIGIOUS, PHILANTHROPIC, SOCIAL OR FRATURAL USES 5.100 SCHOOLS 5.110 Elementary and Secondary Schools (including associated grounds, athletic and other facilities)18 RHD RMD 5.120 Trade or Vocational Schools RHD 5.130 Colleges, Universities, Community Colleges (included associated facilities such as dormitories, office buildings athletic fields17 RHD RMD 5.200 Religious Assembly as Principle On-Site Use (including associated residential structures for religious personnel and associated buildings but not including elementary school or secondary school buildings)17 RHD RMD 5.210 Religious Assembly Accessory to an Existing On-Site Non-Religious Principle Use RHD RMD 5.300 LIBRARIES, MUSEUMS, ART GALLERIES, ART CENTERS AND SIMILAR USES (INCLUDING ASSOCIATED EDUCATIONAL AND INSTUCTIONAL ACTIVITIES 5.310 Located Within a Building Designed and Previously Legally Occupied as a Residence RHD RMD 5.320 Located Within any Permissible Building RHD RMD 6.000 RECREATION, AMUSEMENT, ENTERTAINMENT 6.200 ACTIVITIES CONDUCTED PROMARILY OUTSIDE ENCLOSED BUILDINGS OR STRUCTURES 6.210 Privately Owned Outdoor Recreational Facilities (golf and country clubs, swimming or tennis clubs) RHD RMD 6.220 Publicly Owned and Operated Outdoor Recreational Facilities (athletic fields, golf courses, tennis courts, swimming pools and parks) RHD RMD 6.230 Golf Driving Ranges not Accessory to Golf Courses, Par 3 Golf Coursed, Miniature Golf, Skateboard Parks and Water Slides17 RHD RMD 7.000 INSTITUTIONAL RESIDENCE OR CARE OR CONFINEMENT FACILITIES 7.100 Hospitals, Clinics, Other Medical (including mental health)17,18 RHD 7.200 Nursing Care Institutions, Intermediate Care Institutions, Handicapped or Infirm Institutions, Child Care Institutions17,18 RHD RMD 7.300 Institutions (other than halfway houses) where Mentally Ill Persons are Confined17,18 RHD RMD 9.000 MOTOR VEHICLE RELATED SALES AND SERVICE OPERATIONS 9.180 Electric Vehicle Infrastructure23 RHD RMD 13.000 EMERGENCY SERVICES 13.100 Police Stations18 RHD RMD 13.200 Fire Stations18 RHD RMD 13.300 Rescue Squad or Ambulance Services18 RHD RMD 13.400 Civil Defense Operation RHD RMD 15.000 MISCELLANEOUS PUBLIC OR SEMI-PUBLIC FACILITIES 15.500 Temporary Mobile or Modular Structures Used For Public Services (mobile classrooms, civic services, public health centers, emergency response centers)4 RHD RMD 17.000 UTILITY FACILITY 17.100 Neighborhood RHD RMD 17.200 Community or Regional RHD RMD 18.000 TOWERS AND RELATED STRUCTURES 18.100 NON COMMERCIAL TOWERS 18.110 Towers and Antennas 50 Feet Tall or Less RHD RMD 18.120 Towers and Antennas More Than 50 Feet Tall and Receive-Only Earth Stations RHD RMD 18.200 COMMERCIAL TELECOMMUNICATIONS TOWERS & MONOPOLES 18.230 Micro Facilities8 RHD RMD 18.240 Mini Facilities8 RHD 18.250 Macro Facilities8 RHD 21.100 CEMETERY17 RHD RMD 22.000 COMMERCIAL NURSERY SCHOOLS OR DAY CARE CENTERS17 RHD RMD 23.000 NEW OR IMPROVED STREETS RHD RMD 26.000 SPECIAL EVENTS RHD RMD 28.000 SUBDIVISIONS AND BOUNDARY ADJUSTMENTS 28.100 Major RHD RMD 28.200 Short RHD RMD 28.300 Boundary Line Adjustment RHD RMD 28.400 Unit Lot RHD 29.000 COMBINATION USES RHD RMD 32.000 LAND CLEARING, LOGGING IN CONFORMANCE WITH CHAPTER 20.88 (ENVIRONMENTALLY CRITICAL AREAS) BUT OF MORE THAN 10,000 FT2 OF PROPERTY WITHIN ONE YEAR9 RHD RMD 33.000 USES PERMISSIBLE IN CRITICAL AREAS (SEE CHAPTER 20.93) RHD RMD   *The highlighted areas are the differences between the Residential High Density (RHD) zone and Residential Moderate Density (RMD) zone.  Findings of Fact City of Arlington Planning Commission Stewart Rezone Page 1 of 1 City of Arlington Community and Economic Development Planning Commission 18204 59th Avenue NE, #B Arlin ton, WA 98223 Regarding: Stewart Rezone Summary: The Planning Commission held a Public Hearing on April 18, 2017 and a continued Public Hearing on May 16, 2017 for the Stewart Rezone. The Planning Commission transmits the following findings and recommendation to the City Council: Findings: 1. State law (RCW 36.70A.130) allows Cities to amend their Comprehensive Plans once annually. The Council recently updated and clarified the docketing process for review of all proposed amendments as part of an effort to insure that these proposed changes were considered together. 2. In addition, AMC 20.96.024 establishes qualifying criteria for amendments to the Comprehensive Plan that must be met for inclusion on the Docket. 3. Comprehensive Plan amendments can be proposed either by private parties, or by the City. In either case, the proposed amendment is subject to the same docketing procedures. The only exception is for emergency amendments, none of which were proposed for the 2017 docket. 4. The items included on the 2017 Comprehensive Plan Amendment Docket all meet the submission requirements and specific criterial contained in AMC 20.96 sections 010 through 060. 5. During the public hearing opened on April 18, 2017 and continued to May 16, 2017, considerable opposition to this rezone was expressed by residents living in the area potentially affected by the rezone. 6. During this public hearing, one Commissioner recused himself from the deliberation based on appearance of fairness considerations, leaving four Commissioners to vote on the staff recommendation. Conclusion and Recommendation: Based on the foregoing findings and testimony received at the hearing, the Planning Commission voted two in favor of the rezone and two opposed. The Planning Commission, therefore forwards the proposed Stewart Rezone to Council without a recommendation. Respectfully submitted through the Department of Community and Economic Development to the City Council this seventeenth day of May 2017 by: ____________________________________________________ Bruce Angell City of Arlington Planning Commission Chair