HomeMy WebLinkAbout04-10-17 Council Workshop
SPECIAL ACCOMMODATIONS: The City of Arlington strives to provide accessible meetings for people with disabilities. Please contact the
ADA coordinator at (360) 403‐3441 or 1‐800‐833‐8388 (TDD only) prior to the meeting date if special accommodations are required.
CALL TO ORDER
Mayor Barb Tolbert
PLEDGE OF ALLEGIANCE
ROLL CALL
Mayor Barb Tolbert – Deana
APPROVAL OF THE AGENDA
Mayor Pro Tem Debora Nelson
INTRODUCTION OF SPECIAL GUESTS AND PRESENTATIONS
Brenda White, Snohomish PUD ‐ Arlington Project Updates
WORKSHOP ITEMS – NO FINAL ACTION WILL BE TAKEN
1. Authority to purchase Sensus vehicle gateway base station ATTACHMENT A
drive‐by unit for meter reading
Staff Presentation: Jim Kelly
Council Liaison: Mayor Pro Tem Debora Nelson
2. 67th Avenue overlay apparent low bid ATTACHMENT B
Staff Presentation: Jim Kelly
Council Liaison: Debora Nelson/Jesica Stickles
3. Adopting a revised Cemetery Fee Resolution ATTACHMENT C
Staff Presentation: Jim Kelly
Council Liaison: Sue Weiss
4. Appointments to boards and commissions ATTACHMENT D
Staff Presentation: Kristin Banfield
Council Liaison: Mayor Pro Tem Debora Nelson
5. Airport tractor purchase ATTACHMENT E
Staff Presentation: Jay Downing
Council Liaison: Chris Raezer/Jan Schuette
6. Miscellaneous council items
Arlington City Council Workshop
Monday, April 10, 2017 at 7:00 pm
City Council Chambers – 110 E 3rd Street
SPECIAL ACCOMMODATIONS: The City of Arlington strives to provide accessible meetings for people with disabilities. Please contact the ADA
coordinator at (360) 403-3441 or 1-800-833-8388 (TDD only) prior to the meeting date if special accommodations are required.
EXECUTIVE SESSION
RECONVENE
PUBLIC COMMENT
For members of the public who wish to speak to the Council. Please limit your remarks to three minutes.
ADJOURNMENT
Mayor Barb Tolbert
To open all attachments, click here
City of Arlington
Council Agenda Bill
Item:
WS #1
Attachment
A
COUNCIL MEETING DATE:
April 10, 2017
SUBJECT:
Vehicle Base Station Drive‐by Unit
ATTACHMENTS:
Estimate for Sensus Vehicle Gateway Base Station Package
DEPARTMENT OF ORIGIN
Public Works Department – Jim Kelly
EXPENDITURES REQUESTED: $23,565.60 (includes sales tax)
BUDGET CATEGORY: Water Capital Fund
LEGAL REVIEW:
DESCRIPTION:
As part of the meter replacement program, the water department is looking to purchase a vehicle based
meter reader that will enable the meters to be safely read from a moving vehicle.
HISTORY:
As part of the Capital Improvement Program, the water department has been upgrading and replacing
meters each year with newer technology that allows the meters to be read via radio frequency (Drive‐by
meter reading). Staff has been completing the monthly drive‐by meter reading using hand‐held meter
reading devices designed for a walking meter route. The hand‐held units are five years old and nearing the
end of their life expectance and a drive‐by meter reading device is necessary for worker safety while
reading meters from a moving vehicle.
The City negotiated a purchase package Ferguson Waterworks for a drive‐by meter reading device, a hand‐
held meter reading device, necessary software, and 25 water meters with radio transponders. The existing
Sole Source Resolution (#2017‐003) for water meters and appurtenances allows the water department to
purchase this unit from Ferguson Waterworks in order for the equipment to be compatible with existing
equipment and meters.
This was not a budgeted item for 2017, however there are funds in the 2017 Water Capital Budget.
ALTERNATIVES
Remand to staff for further consideration.
RECOMMENDED MOTION:
Workshop; discussion only. At the April 17, 2017 council meeting the motion will be: “I move to have
council approve the purchase of the Vehicle Base Station Drive‐by Unit package from Ferguson
Waterworks.”
City of Arlington
Council Agenda Bill
Item:
WS #2
Attachment
B
COUNCIL MEETING DATE:
April 10, 2017
SUBJECT:
Apparent low bid for the 67th Avenue Overlay Project
ATTACHMENTS:
Preliminary Bid Tab from bid opening
DEPARTMENT OF ORIGIN
Public Works – Jim Kelly
EXPENDITURES REQUESTED: $ 460,846.65 (Apparent Low Bid)
BUDGET CATEGORY: PSRC Grant and TBD Funds
LEGAL REVIEW:
DESCRIPTION:
Review of preliminary bid tabulation for the 67th Avenue Overlay Project.
HISTORY:
The City of Arlington applied for funding through PSRC in 2014 and were awarded $184,838 for 67th Avenue
Pavement Preservation Project. Work on this project includes constructing an asphalt overlay from the
southern city limits to 180th St NE and the replacement of ADA curb ramps at Highland View Drive, Upland
Drive, and Bovee Lane.
The engineers estimate for this project was $380,000.
The 67th Avenue Overlay Project was recently advertised for construction and bids were opened on Tuesday
April 4th. Three (3) bid packages were received and the apparent low bid is from Lakeside Industries in the
amount of $460,846.65.
ALTERNATIVES
Reject Bid, re‐advertise the project
Remand to staff for further evaluation
RECOMMENDED MOTION:
Workshop; discussion only. At the April 17, 2017 council meeting the motion will be: “I move to award the
67th Avenue Overlay Project to Lakeside Industries and authorize the Mayor to sign the Construction
Contract, pending review by the City Attorney.”
City of Arlington
Council Agenda Bill
Item:
WS #3
Attachment
C
COUNCIL MEETING DATE:
April 10, 2017
SUBJECT:
Cemetery Fee Resolution Amendment
ATTACHMENTS:
Draft Resolution
DEPARTMENT OF ORIGIN
Cemetery – Jim Kelly
EXPENDITURES REQUESTED: None
BUDGET CATEGORY: Cemetery
LEGAL REVIEW: Pending final review by the City Attorney
DESCRIPTION:
To help increase Cemetery operating revenue, the Cemetery Board is recommending that the
Endowment Fund diversion be reduced from 20% of sale price to 10% of sale price.
HISTORY:
The Cemetery Board, along with staff, has been working on a plan to help increase revenue to the
cemetery operating fund. Per RCW 68.40.010, a cemetery authority shall deposit in an
endowment care fund not less than ten percent (10%) of the gross sales price for each grave,
niche, or crypt sold. The current cemetery fee schedule has twenty percent (20%) of the sale of
each grave, niche, or crypt being deposited in the Endowment Fund.
The board is recommending that the current fee resolution be amended to allow for a larger
portion of the sale of each lot or niche be retained in the operating fund.
ALTERNATIVES
Do not amend the current resolution
RECOMMENDED MOTION:
Workshop; discussion only. At the following Council meeting the motion will be: “I move to
approve the proposed fee resolution authorizing the Arlington Cemetery to reduce the
percentage transferred to the Endowment Fund for the sale of each lot or niche, pending final
review by the city attorney.”
RESOLUTION NO. 20162017-XXX 1
RESOLUTION NO. 20162017-XXX
A RESOLUTION OF THE CITY OF ARLINGTON, WASHINGTON REPLACING
RESOLUTION NO. 2016-009 AND ADOPTING A REVISED CEMETERY FEE SCHEDULE
WHEREAS, the City Council, through ordinance, has adopted regulations requiring certain actions
and services; and,
WHEREAS, these various ordinances set forth that fees shall be set by resolution; and,
WHEREAS, the cost of providing these various services consistent with applicable codes,
regulations, and policies periodically increase or decrease, or certain services or practices are
discontinued and fees are no longer needed; and,
WHEREAS, it is the intent of the City of Arlington to charge appropriate fees and charges that are
consistent with the services provided and to cover the public cost of providing these various services so
that the public is not subsidizing individual benefits derived therefrom;
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
ARLINGTON AS FOLLOWS:
The following rates, fees, and charges for cemetery services provided, actions performed, or items sold
by the city and/or its contract service providers, are hereby adopted:
Section 1. Fees and Charges—General.
1.1 Fees. Fees are intended to cover the normal, recurring costs associated with providing a
given service. Fees are non-refundable.
1.2 Prices. In some instances, the City provides certain goods and merchandise for sale. Prices
for these goods may be included in this resolution.
1.3 Payment Due. Fees are due at the time the action is requested (e.g., at time of
application) or occurs (e.g., prior to a specific action). An applicant may pay all fees of a
multi-phased project in advance; however, doing so does not vest applicable fees due.
Fees due are those in effect at the time the specific action or phase of an action is
requested or occurs.
Section 2. Cemetery Fees. Fees and prices for various services, actions, and merchandise for
cemetery use shall be as listed in Table 1: Cemetery Fees and Prices.
RESOLUTION NO. 2016-XXX 2
Table 1: Cemetery Fees and Prices
Product / Service / Action Fee ($)
Traditional Burial
Burial Lot 1,2001350.00
Burial Lot Endowment Fee 300150.00
Opening & Closing (during business hours) 1,000.00
Opening & Closing (after business hours) 1,500.00
Concrete Grave Liner 800.00
Traditional Vaults
Wilbert Bronze 18,395.00
Bronze Triune 4,895.00
Copper Triune 4,695.00
Monticello / Salute 1,295.00
Continental 1,595.00
Venetian 2,395.00
Cameo Rose / SST Triune / Veteran 2,695.00
Wilbert Way Saturday Service fee 325.00
Urn Vaults
Bronze Triune 950.00
Copper Triune 950.00
Cameo Rose / SST Triune / Veteran 850.00
Venetian 750.00
Monticello 650.00
Universal 450.00
Urns
Tribute 295.00
Regal 295.00
Inurnment
Urn Garden 520585.00
Urn Garden Endowment Fee 13065.00
Second Right Inurnment 400450.00
Second Right Inurnment Endowment Fee 10050.00
Opening & Closing (during business hours) 445.00
Opening & Closing (after business hours) 695.00
Concrete Urn Liner 310.00
Childrens Garden
Children’s Garden Lot 317357.00
Children’s Garden Lot Endowment Fee 8040.00
Opening & Closing (all times) 488.00
Children’s Garden Liner 396.00
Niche
Niche Wall II, rows 4-6 bottom half 750810.00
RESOLUTION NO. 2016-XXX 3
Niche Wall II, rows 4-6 bottom half Endowment Fee 15090.00
Niche Wall III, rows 1-3 top half 1,0191,139.00
Niche Wall III, rows 1-3 top half Endowment Fee 250130.00
Niche Wall III, rows 4-6 bottom half 869979.00
Niche Wall III, rows 4-6 bottom half Endowment Fee 220110.00
Opening & Closing (during business hours) 445.00
Opening & Closing (after business hours) 695.00
Second Right Niche Wall 436490.00
Second Right Niche Wall Endowment Fee 10955.00
Tent and Chairs for Inurnment 163.00
Flower Vase for Niche Wall 195.00
Replacement Flower Vase (vase only) 20.00
Inscriptions
Niche Inscription – Single 363.00
Niche Inscription – Double (both names and 1st DOD, 2nd DOD later) 563.00
Flat Marker Final DOD Inscription & Re-Installation (off-site) 495.00
Flat Marker Final DOD Inscription (on site) 363.00
Monument or Slant “single” Final DOD Inscription (off-site) 550.00
Monument or Slant “companion” Final DOD Inscription (off site) 550.00
Monument or Slant Final DOD Inscription (on site) 363.00
Headstones & Monuments
Various Headstones, Memorials, Monuments, Benches, Pillows, Slants, etc. Call for Pricing
Installation Fees (includes inspection fee)
Flat Markers
Flat Marker– Children’s Garden (up to 24” x 12”) 175.00
Flat Marker– 30” x 18” or smaller 275.00
Flat Marker – 28” x 34” or larger 375.00
Flat Marker Re-Installation Fee – All sizes 175.00
Upright Monuments, Slants, Pillows and Benches
Standard Size “Individual” & Foundation 575.00
Standard Size “Companion” & Foundation 675.00
Standard Bench 575.00
Monubench 675.00
Other Company’s Merchandise Call for Quote
Miscellaneous Fees
Standard Inspection Fee (headstone, bench, vault, liner, etc.) 100.00
Administration Service Fee 50.00
Temporary Marker 30.00
Other Services
Memorial Tree w/ garden marker 800.00
Disinterment / Traditional Burial 1,995.00
Disinterment / Cremation 650.00
Pressure Washing 40.00 for first headstone
25.00 for each additional
headstone
RESOLUTION NO. 2016-XXX 4
Section 3. Traditional Burial Package Pricings. Fees and prices for packages of cemetery
services, actions, and merchandise shall be set per the attached Exhibit A.
Section 4. Cremation Package Pricings. Fees and prices for packages of cemetery services,
actions, and merchandise shall be set per the attached Exhibit B.
Section 5.. Repeal of Previous Cemetery Fee Resolution. Resolution No. 2016-009 is
hereby repealed.
Section 56. Effective Date. This resolution will become effective immediately upon
passage.
PASSED by the City Council and APPROVED by the Mayor this _____ day of
______________________ 20162017.
CITY OF ARLINGTON
_________________________________
Barbara Tolbert, Mayor
ATTEST:
_________________________________
Kristin Banfield, City Clerk
APPROVED AS TO FORM:
_______________________________
Steve Peiffle, City Attorney
Formatted: Font: Not Bold, No underline
City of Arlington
Council Agenda Bill
Item:
WS #4
Attachment
D
COUNCIL MEETING DATE:
April 10, 2017
SUBJECT:
Board and Commission Appointments ‐ Parks, Arts, and Recreation Commission and Lodging Tax
Advisory Commission
ATTACHMENTS:
Redacted applications of Jessica Ronhaar, Jennifer Holocker, and Erik Granroth; memo from Kristin Garcia
to Mayor Tolbert
DEPARTMENT OF ORIGIN
Administration: Kristin Banfield, City Clerk 360‐403‐3444
EXPENDITURES REQUESTED: None
BUDGET CATEGORY: N/A
LEGAL REVIEW:
DESCRIPTION:
Jessica Ronhaar was interviewed for an expiring position on PARC on March 28. The interview committee
is recommending Jessica be appointed for the PARC term April 2017‐April 1, 2021.
Two members of the Lodging Tax Advisory Committee along with City staff met on April 4 to interview
the five applicants for the two current vacancies on the committee. The interview committee is
recommending the appointments of Erik Granroth and Jennifer Holocker to fill the two vacancies.
HISTORY:
The PARC serves as an advisory commission to the Mayor and City Council with respect to Parks, Arts and
Recreation facilities and programs within the City, as well as changes, expansion or new acquisition of
both facilities and programs. Terms for the seven members are four years (staggered).
The Lodging Tax Advisory Committee (LTAC) is comprised of 5 members: two from businesses that
collect the tax, two from organizations that are eligible to receive the funds, and one member from the
City Council. The committee is charged with making recommendations to the full council for allocation of
the hotel‐motel tax funds collected. The LTAC needs two members from recipients of the grant funding in
order to fulfill its mission and be compliant with state law.
ALTERNATIVES
Table the recommendations until a later date.
RECOMMENDED MOTION:
Workshop; discussion only. The recommended motion at the April 17, 2017 council meeting will be, “I
move to appoint Jesica Ronhaar to the Parks, Arts, and Recreation Commission, and Jennifer Holocker and
Erik Granroth to the Lodging Tax Advisory Committee”.
Jessica Ronhaar
✔
(Attach page for additional space)
I have worked with the City and other organizations to plan the Easter Egg Hunt, Hometown
Holidays, 4th of July activities, Harvest Festival and the Eagle Festival.
I am the Vice President of the Arlington- Smokey Point Chamber of Commerce, PR Director of
the Rotary Club of Arlington, and Secretary for the Community Chest, the Arlington Drug
Awareness Coalition and the Arlington Community Resource Center Advisory Council.
I am the Director for Arlington Youth Dynamics and am committed to the Community of
Arlington. I love this community and am invested with 3 small children, I am committed to
making this community a place for my children to grow and live.
Lodging Tax applicants must attach a letter of support from the organization they are
representing.
City of Arlington
Council Agenda Bill
Item:
WS #5
Attachment
E
COUNCIL MEETING DATE:
April 10, 2017
SUBJECT:
Capital Purchase – Tractor for Airport Mowing
ATTACHMENTS:
Quote from Washington Tractor
DEPARTMENT OF ORIGIN
Airport/M&O – Jay Downing
EXPENDITURES REQUESTED: Not to Exceed $70,559.19
BUDGET CATEGORY: Equipment Replacement Fund‐Airport
LEGAL REVIEW:
DESCRIPTION:
Staff is requesting approval to purchase a new John Deere 5115M Utility tractor for the primary purpose
of maintaining the grass height of maximum of 6‐12 inches, per Wildlife Hazard Assessment
recommendations and management plan. The new tractor will be an addition to the current fleet.
Existing tractor is a 2002 John Deere 6410 with approximately 9400 hours. The tractor will use a 22’ tow
behind flex wing mower (recently purchased per approved budget).
Mowing schedules will be modified so that both the tractor/mowers can be utilized without the need for
additional staffing.
Tractor purchase was not included in the 2017/2018 budget. Total cost for the tractor is $70,559.19.
Current Airport Equipment Replacement fund balance is $167,870. The tractor is on State Contract.
HISTORY:
In the past staff has not mowed certain areas of the airfield. This area was baled as hay. After adopting
the Wildlife Hazard Management Plan, best practices suggest a height of 6‐12 inches maximum in all
grass areas to deter wildlife.
The additional tractor will allow staff to more easily maintain compliance with Federal Wildlife Hazard
Assessment recommendations and adopted Management Plan. The additional tractor will also serve as a
much needed backup in the case of other equipment breakdowns.
ALTERNATIVES
Approve staff’s recommendation with modifications
Table staff’s recommendation
Deny staff’s recommendation
RECOMMENDED MOTION:
Workshop; discussion only.
ALL PURCHASE ORDERS MUST BE MADE OUT
TO (VENDOR):
Deere & Company
2000 John Deere Run
Cary, NC 27513
FED ID: 36-2382580; DUNS#: 60-7690989
ALL PURCHASE ORDERS MUST BE SENT
TO DELIVERING DEALER:
Washington Tractor, Inc.
4220 Old Highway 99 S
Mount Vernon, WA 98273
360-424-7995
mountvernon@washingtontractor.org
Confidential
Salesperson : X ______________Accepted By : X ______________
Quote Summary
Prepared For:
City Of Arlington Maintenance Department
66111 188th Pl Ne
Arlington, WA 98223
Business: 360-403-3421
idowning@arlingtonwa.gov
Delivering Dealer:
Washington Tractor, Inc.
Ryan Ostrom
4220 Old Highway 99 S
Mount Vernon, WA 98273
Phone: 360-424-7995
rostrom@washingtontractor.com
This quote is based on the Washington State Contract # 10212.
Your purchase order must be made out to John Deere
Company, 2000 John Deere Run, Cary, NC 27513. Purchase
order must also indicate Washington Tractor as the delivering
dealer. Reference the Washington State Contract # 10212 and
this quote ID number. Please email documents to Washington
Tractor at rostrom@washingtontractor.com or fax to
360-424-0403 and we will process the order with John Deere.
Quote ID:14762449
15 February 2017
15 February 2017
Created On:
Last Modified On:
Expiration Date:15 March 2017
Equipment Summary Selling Price Qty Extended
JOHN DEERE 5115M Utility Tractor $ 64,673.87 X 1 =$ 64,673.87
Contract: WA Lawn and Grounds 10212 (PG 4S)
Price Effective Date: February 15, 2017
Equipment Total $ 64,673.87
* Includes Fees and Non-contract items Quote Summary
Equipment Total $ 64,673.87
Trade In
SubTotal $ 64,673.87
Sales Tax - (9.10%)$ 5,885.32
Est. Service
Agreement Tax
$ 0.00
Total $ 70,559.19
Down Payment (0.00)
Rental Applied (0.00)
Balance Due $ 70,559.19
Quote Id: 14762449 Customer Name:CITY OF ARLINGTON MAINTENANCE DEPARTMENT
Selling Equipment
Confidential
ALL PURCHASE ORDERS MUST BE MADE OUT
TO (VENDOR):
Deere & Company
2000 John Deere Run
Cary, NC 27513
FED ID: 36-2382580; DUNS#: 60-7690989
ALL PURCHASE ORDERS MUST BE SENT
TO DELIVERING DEALER:
Washington Tractor, Inc.
4220 Old Highway 99 S
Mount Vernon, WA 98273
360-424-7995
mountvernon@washingtontractor.org
JOHN DEERE 5115M Utility Tractor
Hours:
Stock Number:
Contract:WA Lawn and Grounds 10212 (PG 4S)
Price Effective Date:February 15, 2017
Selling Price *
$ 64,673.87
* Price per item - includes Fees and Non-contract items
Code Description Qty List Price Discount%Discount
Amount
Contract
Price
Extended
Contract
Price
254BLV 5115M Utility Tractor 1 $ 67,158.00 18.00 $ 12,088.44 $ 55,069.56 $ 55,069.56
Standard Options - Per Unit
0409 English Operator's Manual
and Decal Kit
1 $ 0.00 18.00 $ 0.00 $ 0.00 $ 0.00
1380 16F/16R PowrReverser
Transmission - 540/540E
1 $ 0.00 18.00 $ 0.00 $ 0.00 $ 0.00
2055 Standard Cab 1 $ 11,769.00 18.00 $ 2,118.42 $ 9,650.58 $ 9,650.58
2120 Standard Air Suspension
Swivel Seat
1 $ 849.00 18.00 $ 152.82 $ 696.18 $ 696.18
2400 Less Instructional Seat 1 $ 0.00 18.00 $ 0.00 $ 0.00 $ 0.00
3025 Deluxe Corner Post
Exhaust (Cab Only)
1 $ 603.00 18.00 $ 108.54 $ 494.46 $ 494.46
3320 Dual Stackable Rear Valve
with Lever Controls
1 $ 0.00 18.00 $ 0.00 $ 0.00 $ 0.00
3420 Dual Stackable Mid Valve
with Joystick Control
1 $ 0.00 18.00 $ 0.00 $ 0.00 $ 0.00
3820 Shiftable 540 / 540E Rear
PTO
1 $ 0.00 18.00 $ 0.00 $ 0.00 $ 0.00
4030 Electrohydraulic (EH) with
remote Left-hand (LH)
fender control
1 $ 475.00 18.00 $ 85.50 $ 389.50 $ 389.50
5103 22.5L - 16.1 in. 6PR R3
(Turf Special) Bias
1 $ -1,446.00 18.00 $ -260.28 $ -1,185.72 $ -1,185.72
5999 No Rear Tire Brand
Preference
1 $ 0.00 18.00 $ 0.00 $ 0.00 $ 0.00
6040 MFWD (4-Wheel Drive)1 $ 0.00 18.00 $ 0.00 $ 0.00 $ 0.00
6123 12L - 16 in. 6PR R3 (Turf
Special) Bias
1 $ -1,717.00 18.00 $ -309.06 $ -1,407.94 $ -1,407.94
6799 No Front Tire Brand
Preference
1 $ 0.00 18.00 $ 0.00 $ 0.00 $ 0.00
Quote Id: 14762449 Customer Name:CITY OF ARLINGTON MAINTENANCE DEPARTMENT
Selling Equipment
Confidential
ALL PURCHASE ORDERS MUST BE MADE OUT
TO (VENDOR):
Deere & Company
2000 John Deere Run
Cary, NC 27513
FED ID: 36-2382580; DUNS#: 60-7690989
ALL PURCHASE ORDERS MUST BE SENT
TO DELIVERING DEALER:
Washington Tractor, Inc.
4220 Old Highway 99 S
Mount Vernon, WA 98273
360-424-7995
mountvernon@washingtontractor.org
8955 Front Weight Support - (55
kg/121 lbs.)
1 $ 189.00 18.00 $ 34.02 $ 154.98 $ 154.98
Standard Options Total $ 10,722.00 $ 1,929.96 $ 8,792.04 $ 8,792.04
Dealer Attachments/Non-Contract/Open Market
LVB25022 Backup Alarm Kit 1 $ 162.80 18.00 $ 29.30 $ 133.50 $ 133.50
R262449 Front Weight Support, 187
Lbs
1 $ 0.00 18.00 $ 0.00 $ 0.00 $ 0.00
DZ102076 Engine Coolant Heater 1 $ 119.21 18.00 $ 21.46 $ 97.75 $ 97.75
LVB25110 Air Intake Heater Kit 1 $ 123.20 18.00 $ 22.18 $ 101.02 $ 101.02
11037 Dealer Prep Kit 1 $ 480.00 0.00 $ 0.00 $ 480.00 $ 480.00
Dealer Attachments Total $ 885.21 $ 72.94 $ 812.27 $ 812.27
Value Added Services
Total
$ 0.00 $ 0.00 $ 0.00
Suggested Price $ 64,673.87
Total Selling Price $ 78,765.21 $ 14,091.34 $ 64,673.87 $ 64,673.87