Loading...
HomeMy WebLinkAbout11-23-2015 Council WorkshopSPECIAL ACCOMMODATIONS: The City of Arlington strives to provide accessible meetings for people with disabilities. Please contact the ADA coordinator at (360) 403-3441 or 1-800-833-8388 (TDD only) prior to the meeting date if special accommodations are required. CALL TO ORDER Mayor Barb Tolbert PLEDGE OF ALLEGIANCE ROLL CALL Mayor Barb Tolbert - Wendy APPROVAL OF THE AGENDA Mayor Pro Tem Chris Raezer WORKSHOP ITEMS – NO FINAL ACTION WILL BE TAKEN 1. Strategies 360 Services Agreement ATTACHMENT A Staff Presentation: Kristin Banfield Council Liaison: Mayor Pro Tem Chris Raezer 2. Amendment to AMC 2.04 to Implement Citizen Salary ATTACHMENT B Commission Decision Staff Presentation: Kristin Banfield Council Liaison: Mayor Pro Tem Chris Raezer 3. Amendment to Public Defender Contract ATTACHMENT C Staff Presentation: Kristin Banfield Council Liaison: Mayor Pro Tem Chris Raezer 4. Board Appointment to Planning Commission ATTACHMENT D Staff Presentation: Chris Young Council Liaison: Marilyn Oertle 5. MSA Design Contract for design of 2016 Waterline ATTACHMENT E and Pavement Preservation Staff Presentation: Jim Kelly Council Liaison: Austin DeFreece 6. Authority to Bid Bio Solids Hauling Contract ATTACHMENT F Staff Presentation: Jim Kelly Council Liaison: Austin DeFreece Arlington City Council Workshop Monday, November 23, 2015 at 7:00 p.m. City Council Chambers – 110 E Third St SPECIAL ACCOMMODATIONS: The City of Arlington strives to provide accessible meetings for people with disabilities. Please contact the ADA coordinator at (360) 403-3441 or 1-800-833-8388 (TDD only) prior to the meeting date if special accommodations are required. 7. Surplus Vehicles Resolution ATTACHMENT G Staff Presentation: Jim Kelly Council Liaison: Austin DeFreece 8. Public Works Surplus Meters/Scrap Metal Resolution ATTACHMENT H Staff Presentation: Jim Kelly Council Liaison: Austin DeFreece 9. September and October 2015 Financial Report ATTACHMENT I Staff Presentation: Kristin Garcia 10. Miscellaneous Council Items EXECUTIVE SESSION RECONVENE PUBLIC COMMENT For members of the public to speak to the Council regarding matters on the Council Workshop agenda. Please limit your remarks to three minutes. ADJOURNMENT Mayor Barb Tolbert To open all attachments, click here City of Arlington Council Agenda Bill Item: WS #1 Attachment A COUNCIL MEETING DATE: November 23, 2015 SUBJECT: Authorization to Contract with Strategies 360 for Lobbying Services for 2016 ATTACHMENTS: Draft Contract DEPARTMENT OF ORIGIN Administration EXPENDITURES REQUESTED: $36,000 BUDGET CATEGORY: GF—Other General Government Services LEGAL REVIEW: DESCRIPTION: The attached contract and scope of work describes the work to be done by Strategies 360 at the state and federal level from January 1 through December 31, 2016. Strategies 360 has been working on our behalf in Olympia and Washington, D.C. to address some of our immediate and long-term transportation improvement goals, as well as assist us in economic development and other areas. The continuation of the contract ensures that our best interests are represented in the decision-making processes of the Washington State Legislature, the Washington State Department of Transportation, the United States Congress, as well as other state and federal agencies. The City budgeted $36,000 for an entire year of lobbying services during the 2015 budget process. HISTORY: The City has been a direct client of Strategies 360 starting in Fall 2012. Prior to that, the City was a client through our participation in the SR9 Coalition. ALTERNATIVES None RECOMMENDED MOTION: Workshop; discussion only. At the December 7 Council Meeting, the proposed motion will be, “I move to approve the contract with Strategies 360 for Lobbying Services for 2016 and authorize the Mayor to sign it.” City of Arlington Council Agenda Bill Item: WS #2 Attachment B COUNCIL MEETING DATE: November 23, 2015 SUBJECT: Ordinance Amending AMC Chapter 2.04 to Implement Citizen Salary Commission Decision ATTACHMENTS: Ordinance 2015-005 Memo to Kristin Banfield from Citizen Salary Commission (as amended) Proposed ordinance amending AMC Chapter 2.04 Memo to Council from City Attorney DEPARTMENT OF ORIGIN City Clerk EXPENDITURES REQUESTED: N/A BUDGET CATEGORY: N/A LEGAL REVIEW: DESCRIPTION: Council is asked to adopt an ordinance to implement the Citizen Salary Commission’s recommendation. HISTORY: The Citizen Salary Commission was created by the City Council in January of 2015 as an independent body to set salaries for the mayor and council. The Commission met this summer to make their recommendations. To try to obtain a better understanding of the parameters of their decision, the City Attorney met with the Commission to review and clarify their decision. The AMC needs to be modified to implement their decision and to avoid inconsistency. ALTERNATIVES The decision of the Commission is binding on the Council per AMC 2.89. The Ordinance could be remanded to staff to address questions or concerns. RECOMMENDED MOTION: Workshop; discussion only. Memo From: Citizen Salary Commission1 To: Kristin Banfield, City Clerk Date: June 29, 201511/16/2015 Re: Mayor and Council Compensation On Monday, June 29, 2015, the Citizen Salary Commission voted on the following items . Additional clarification was requested and the following is the determination of the salary review commission : Effective January 1, 2016: Mayor: $1500 per month Regional meetings compensationexpense reimbursement: $75 each Local Non-regional meetings compensationexpense reimbursement: $50 each CompensationMeeting expense reimbursement to be capped at a maximum of 20 meetings. Councilmembers: Council meetings and workshops compensation, up to four per month: $150 each Regional meetings compensationexpense reimbursement: $75 each All otherNon-regional meetings compensationexpense reimbursement: $50 each CompensationMeeting expense reimbursement to be capped at a maximum of 8 meetings. Regional meetings are identified as: (referenced see AMC 2.04.027(1)-(3) per the attached proposed ordinance) 1. National League of Cities 2. Association of Washington Cities (AWC) 3. Snohomish County Cities (SCC) 4. Snohomish County Tomorrow 5. Meetings in Olympia (that address issues with legislature, governor, state departments/boards) 6. Economic Alliance of Snohomish County (EASC) 7. Puget Sound Regional Council (PSRC) 8. Meetings with Snohomish County (personnel or elected officials) 9. Mayors’ Association 10. Community Transit 11.Snohomish County Committee for Improved Transportation (SCCIT). 1 The “redlined” revisions to this memo were prepared by the City Attorney based on the duly noted meeting of the Salary Review Commission on July 29, 2015 (attended by Heather Logan, Sheri McCarthy and Frank Barden). For purposes of this decision, “Non-regional meetings” are those meetings identified as set forth in AMC 2.04.027(4)-(7) per the attached proposed ordinance. For purpose of the above-referenced meeting compensation, the following definitions and limitations apply: (1) a “regional meeting” shall include telephonic attendance at meetings of any of the above -listed organizations which have adopted formal rules permitting attendance by telephone; (2) a “non-regional meeting” shall require in-person attendance; and (1)(3) “non-regional meetings” shall exclude voluntary attendance at political functions and regularly scheduled community events. ORDINANCE NO. 2015-XXX 1 ORDINANCE NO. 2015-XXX AN ORDINANCE OF THE CITY OF ARLINGTON, WASHINGTON AMENDING CHAPTER 2.04 OF THE ARLINGTON MUNICIPAL CODE TO CLARIFY SALARIES AND EXPENSE REIMBURSEMENT AS ESTABLISHED BY THE CITIZEN SALARY REVIEW COMMISSION WHEREAS, the City of Arlington, Washington, has created a citizens salary review commission; and WHEREAS, state law and the requirements of AMC 2.89 make the revisions to city salaries automatic upon filing of the salary commission recommendations; and WHEREAS, the provisions of RCW Chapter 2.04 need to be revised to reflect the salary commission’s determination; NOW, THEREFORE, the City Council of the City of Arlington, Washington, does ordain as follows: Section 1. Arlington Municipal Code Section 2.04.025 shall be and hereby is modified to read as follows: 2.04.025 - Compensation. The salaries for elected officials shall be as established by the salary commission as set forth in AMC Chapter 2.89. Each city council member will be paid two hundred dollars for each regular meeting of the city council attended by such council member, not to exceed four hundred dollars per calendar month. The mayor will be paid one thousand five hundred dollars for each calendar month during which the mayor performs his or her duties. . Section 2. Arlington Municipal Code Section 2.04.027 shall be and hereby is modified to read as follows: 2.04.027 - Expense reimbursement. (a) In addition to the compensation provided for by AMC 2.04.025, the mayor and council members will be entitled to reimbursement for reasonable and necessary expenses incurred in attendance at meetings required by virtue of their office. Such reimbursement shall include a per meeting expense as authorized by RCW 35A.12.070 in the amount established by the salary commission as set forth ORDINANCE NO. 2015-XXX 2 in AMC Chapter 2.89of fifty dollars per meeting for attendance of city council members or the mayor at only the following meetings, excluding the four (4) regularly scheduled city council meetings and workshops and excluding city council work sessions immediately preceding or immediately after regular city council meetings, but in any event not to exceed eight meetings in any month for a council member and twenty meetings in any month for the mayor: (1) Attendance at official functions of the following organizations to which the city belongs: National League of Cities, Association of Washington Cities, Snohomish County Association of Cities and Towns (SCC), and Snohomish County Tomorrow, Economic Alliance of Snohomish County (EASC), Puget Sound Regional Council (PSRC), Snohomish County Committee for Improved Transportation (SCCIT), or Community Transit (CT); (2) Attendance at meetings not previously enumerated where the council member or mayor is appointed or elected to attend by the mayor, city council, Snohomish County association of cities and towns, the Snohomish county executive, Snohomish county council, the Governor, or State Legislature, if the reason for the appointment was because of the individual's status as an elected official; (2)(3) Attendance at meetings in Olympia that address city of Arlington issues with the legislature, governor, or state departments or boards; (3)(4) City council retreats, “Fifth Monday” joint workshops with the Arlington School District Board or Cascade Valley Hospital District Board; emergency special city council meetings, or city council workshops; provided, that no reimbursement shall occur for these meetings when they occur immediately before or immediately after regularly scheduled council meetings; (4)(5) Any function within the city limits of Arlington at which the individual is representing the city at the request of the mayor or by action of the city council; (65) City facility dedications and city-sponsored graduations and award ceremonies; and (67) City council subcommittee meetings.Meetings between Department Directors or City Boards or Commissions and the City Council liaison member where attendance is required by virtue of the liaison position. (b) Notwithstanding the provisions of Subsection (a), reimbursement will not be authorized by virtue of this section for attendance at political functions or regularly scheduled community events. (c) For purposes of this section, telephonic attendance at meetings shall entitle a Council member to expense reimbursement only for the meetings identified in subsections (a)(1) through (a)(3), above, where the organization has adopted rules or regulations permitting attendance telephonically. ORDINANCE NO. 2015-XXX 3 Section 3. Effective Date. The title of this ordinance which summarizes the contents shall be published in the official newspaper of the City. The ordinance shall take effect and be in full force five (5) days after the date of publication. PASSED BY THE CITY COUNCIL at a Regular Meeting thereof on the ______ day of August____________________, 2015. CITY OF ARLINGTON, WASHINGTON _________________________________ Barbara Tolbert, Mayor ATTEST/AUTHENTICATED: _______________________________ Kristin Banfield, City Clerk APPROVED AS TO FORM: ________________________________ Steven J. Peiffle, City Attorney MEMORANDUM Date: 11/16/2015 From: Steve Peiffle, City Attorney To: Mayor Tolbert City Council Subject: Citizen Salary Review Commission The Council appointed a Citizen Salary Review Commission, which met and made a decision in accordance with the ordinances creating it (Ordinance No. 2015-005 and 2015-010, now codified in AMC Chapter 2.89) prior to the end of June. The Council had questions and sought clarification on a number of issues. I had some concerns about the intentions of the Commission with respect to their intent of regional vs. non-regional meetings, among other things. I met with the Commission at a duly noticed meeting occurring on July 29, 2015. Three of the five salary review commission members were in attendance. Together they explained their intent with respect to the 2016 meeting compensation. Following the meeting I noted that the municipal code sections relating to the Council compensation needed to be amended to reflect the changes from the Commission recommendation. I have now drafted that for Council review and consideration based on my understanding of the Commission’s intent. Attached to this memo are the following: 1.A proposed ordinance changing portions of AMC 2.04 pertaining to the Council and Mayor compensation and expense reimbursement; and 2.A “redlined” memo from the Commission. Note that the redlines were prepared by me based on the discussion of the Commission on that date. Since a majority of the Commission was in attendance and they were unanimous about the intent of these revisions, this should now reflect the decision of the Commission. These two documents really go hand in hand with each other. We will invite the salary review commission members to attend the Council meeting at which this ordinance is adopted in the event the Council has any questions or concerns, and to ensure the process is transparent. City of Arlington Council Agenda Bill Item: WS #3 Attachment C COUNCIL MEETING DATE: November 23, 2015 SUBJECT: Contract amendment with Feldman & Lee for indigent defense services ATTACHMENTS: Proposed contract amendment with Feldman & Lee for indigent defense services DEPARTMENT OF ORIGIN Administration / Legal – Contact Kristin Banfield, 360-403-3444; Steve Peiffle EXPENDITURES REQUESTED: $16,000 per month BUDGET CATEGORY: General Fund – Criminal Justice LEGAL REVIEW: DESCRIPTION: The City’s contract with Feldman & Lee for indigent defense services covers the term from January 1, 2015 through December 31, 2016. Included in the agreement approved earlier this year was a provision to reopen the contract after a review of the caseload after six months. The City’s case load was close to exceeding the 450 case limit at that six month review, triggering the need to add additional counsel to provide services to qualifying individuals. The State Supreme Court has limited caseloads for indigent defense services to 400 cases per attorney. In addition, last year’s federal court ruling in Wilbur v. City of Mount Vernon has required the City to make additional improvements to our provision of indigent defense services. HISTORY: The law firm of Feldman & Lee has served as the City’s indigent defense counsel since 2007. Feldman & Lee had a fee increase in early 2014 to address some improvements made to indigent defense services for compliance with recent state supreme court mandates and the results of the Mount Vernon federal case. The City entered into a new agreement as of January 1, 2015. ALTERNATIVES N/A RECOMMENDED MOTION: Workshop; discussion only. At the December 7th Council meeting the proposed motion will be “I move to approve the contract amendment with Feldman & Lee for indigent defense services and authorize the Mayor to sign it.” City of Arlington Council Agenda Bill Item: WS #4 Attachment D COUNCIL MEETING DATE: November 23, 2015 SUBJECT: Planning Commission Appointment ATTACHMENTS: Redacted applications of Planning Commission interviewees DEPARTMENT OF ORIGIN Community & Economic Development – Chris Young EXPENDITURES REQUESTED: -0- BUDGET CATEGORY: N/A LEGAL REVIEW: DESCRIPTION: Two applicants were interviewed on 11/17/15 to fill one vacant Planning Commission position. The interviews were held prior to a regularly scheduled Planning Commission Meeting so that the applicants had the opportunity to attend the meeting. The interview panel, which consisted of two Planning Commission members, a council liaison, and 2 staff members, recommend the appointment of Kevin Scott Hughes to the Planning Commission. HISTORY: A vacancy occurred due to the resignation of commission member Tony La Salata. The appointment will fill the unexpired term of Mr. La Salata until April 1, 2021, and bring the commission to a full seven members. ALTERNATIVES Approve staff’s recommendation with modifications Table staff’s recommendation Deny staff’s recommendation RECOMMENDED MOTION: Workshop; discussion only. ✔ (Attach page for additional space) I am a retired general manager of private Country clubs. I have managed 3 prominent clubs in the Seattle metro area over a period of 22 years and consulted in the industry for 5 years following retirement. These positions required knowledge in various disciplines including accounting, restaurant management, golf course maintenance, human relations and many more. Each one of these clubs had over 100 employees under my direction. Since retiring I volunteered at Pioneer elementary school mentoring student and at Arlington police dept. for almost 6 years. I am married to my wife of 55 years and have one daughter and two grandchildren. I have an interest in art and have many years experience in planning events and landscape maintenance which among other things I feel would qualify me to hold a position on this committee. Thank you for your consideration. Donald Williamson Donald Williamson Kevin Scott Hughes ✔ 9-1-2015 (Attach page for additional space) BS in Technology Education from Central Washington University MEd in Master Teacher program from Central Washington University 21 years experience as a Certificated Teacher K-12. Specializing in Technology Education 16 years experience in construction trades: Design, Framing, Excavation including 7 years as a Licensed Journeyman Electrician 6 years experience in manufacturing and as a Master Jeweler 4 years as BOC Certified Building Operator - Maintenance Several years experience as a professional musician and songwriter City of Arlington Council Agenda Bill Item: WS #5 Attachment E COUNCIL MEETING DATE: November 23, 2015 SUBJECT: Scope of Work (SOW) and Fee Estimate from consultant Murray, Smith and Associates, Inc. (MSA) for design of the 2016 water main replacement and pavement preservation projects. ATTACHMENTS: Scope of Work and Fee Estimate for 2016 water replacement and pavement preservation projects. DEPARTMENT OF ORIGIN Public Works EXPENDITURES REQUESTED: $109,689 BUDGET CATEGORY: Water CIP / Transportation Benefit District LEGAL REVIEW: DESCRIPTION: This is a proposal (SOW and fee estimate) from MSA Engineers to design the 2016 water main replacement work and pavement preservation work planned for 2016. HISTORY: In 2016 the City has planned and budgeted capital improvement projects to replace aged and failing water mains in several City streets and to resurface several roadways (preservation). Design work includes redesign of existing sidewalk ramps that do not meet current ADA requirements. Planned work is as follows: After reviewing Statement of Qualifications from three design firms, the City elected to enter into negotiations with Murray, Smith and Associates, Inc. (MSA) for design of the 2016 water main replacement and pavement preservation projects. The attached SOW and fee estimate is the result of the negotiations and will produce the documents needed for 2016 construction projects. Design Project Cost Funding  5th Ave & Highland Water $ 48,832.00 Water CIP  5th Ave Pavement & ADA $ 26,294.00 TBD  67th Ave Pavement & ADA $ 34,563.00 TBD  ALTERNATIVES Remand to staff for further discussion City of Arlington Council Agenda Bill Item: WS #5 Attachment E RECOMMENDED MOTION: Workshop; discussion only. At the December 7th council meeting, recommendation will be: “I move to accept the MSA proposal for design of the water main replacement and pavement preservation work planned for 2016 and authorize the mayor to sign the contract, pending final approval by the City Attorney.” DRAFT – REV 11/6/15 City of Arlington MURRAY, SMITH & ASSOCIATES, INC. 2016 Water Improvement November 2015 Engineers/Planners Page 1 Scope of Work & Fee Estimate Engineering Services 2016 Water Improvement Project and 67th Avenue NE Pavement Preservation Project City of Arlington, Washington Project Description Murray, Smith & Associates, Inc. (MSA) has developed the following scope of work for the 2016 Water Improvement and the 67th Avenue Pavement Preservation projects. The scope of work and associated fee estimate has been developed based on our discussions with the City of Arlington (City) staff, project understanding and project approach. 2016 Water Improvement Project – This project consists of asbestos cement water main replacement at two project sites identified by the City: Approximately 1,925 ft of new 12-inch diameter ductile iron water main along 5th Street from North Macleod Avenue to North Alcazar Avenue. Approximately 1,230 ft of new 8-inch diameter ductile iron water main along N. Gifford Avenue, Washington Avenue, and N. Stillaguamish Avenue from 4th Street to 5th Street. Approximately 3,500 ft of new 12-inch diameter ductile iron water main along East Highland Drive from South Hazel Street to Medical Center Drive. Approximately 3,300 ft of pavement replacement and preservation along 5th Street from North Macleod to the end of the roadway past Post Middle School, including replacement of up to 29 curb ramps. Storm drain catch basin and sanitary sewer manhole repair or replacement along 5th Street and Highland Drive as identified by the City. 67th Ave NE Pavement Preservation Project – This project consists of pavement preservation at one area identified by the City that has received WSDOT administered Surface Transportation Program (STP) funding: Approximately 4,700 ft of pavement preservation along 67th Ave. NE from 158th St. NE (City limits) to 180th St. NE. Project Approach The Project Management and Data Gathering portions of both these projects will be performed under the same tasks, Task 201 and Task 202. However, phasing the remaining tasks into two distinct elements is recommended. The projects are divided as shown: Task 201 - Project Management Task 202 - Data Gathering and Utility Coordination Task 211- Preliminary Design – 2016 Water Improvement Project Task 212 - Final Design – 2016 Water Improvement Project Task 221 - Preliminary Design – 67th Ave NE Pavement Preservation - 2016 Task 222 - Final Design – 67th Ave NE Pavement Preservation - 2016 City of Arlington MURRAY, SMITH & ASSOCIATES, INC. 2016 Water Improvement November 2015 Engineers/Planners Page 2 Task 231 - Bidding and Award Scope Of Work MSA’s proposed work program is detailed below. Task 201 - Project Management and Coordination This task provides for management of the project and coordination with the project team. Elements of this task will include: 201.1 Correspondence and Coordination with City - All communication will be coordinated through the City’s Project Manager. Correspondence with the City Project Manager via phone conversations and e-mail will include the communication of project decisions, project status, work activities, and issues requiring City input. 201.2 Budget, Schedule, Invoices and Progress Reports - MSA’s Project Manager will monitor project costs, manage budget and project schedule, including preparation and submission of monthly invoices and progress reports. 201.3 Staff Management - MSA’s Project Manager will manage project staff and subconsultants to ensure all services are in conformance with the scope of services, fee estimate, and schedule. 201.4 Project Coordination Meetings - Prepare for and conduct up to two project coordination or review meetings with City staff to discuss project elements during design. Prepare meeting agenda and record meeting summary to document items discussed and transmit to City. 201.5 Quality Assurance/Quality Control (QA/QC) - Coordinate and perform in-house quality assurance reviews of all deliverables. MSA Deliverables to City Meeting agendas and minutes Monthly billing statements and activity reports City Responsibilities: Attend project coordination meetings City of Arlington MURRAY, SMITH & ASSOCIATES, INC. 2016 Water Improvement November 2015 Engineers/Planners Page 3 Task 202 - Data Gathering and Utility Coordination This task consists of data gathering and utility coordination work. Elements of this task will include: 202.1 Data Collection and Review - Work under this subtask includes gathering and reviewing all relevant data to complete the preliminary engineering tasks. A number of documents and reports will be requested and reviewed as part of this task, including record drawings and previous studies or reports, GIS, aerial photographs. MSA will use a formal “Request for Information” process and coordinate with the City during data collection to ensure all necessary information is gathered for the project. 202.2 Utility Coordination and Analysis - Acquire utility system mapping, perform a utility conflict analysis and identify potential utility conflicts. Develop a list of potential conflict locations to obtain specific utility information, including dimensions, location and depth, utilizing potholing techniques on an as-needed basis. 202.3 Kick-off Meeting and Site Visits for 2016 Water Improvement and 67th Ave Pavement Preservation Projects - Prepare for and conduct project kick-off meeting with City staff and key team members to discuss project, review project schedule and discuss key elements of the project. Following kick-off meeting meet with City Engineer and operations staff in the field to review the preliminary water main alignments, sanitary sewer manhole and catch basin repair/replacement, and pavement restoration considerations at each site. Assumptions: City will perform potholing on an as needed basis. City will coordinate directly with Snohomish County PUD for any required utility pole relocations. City Responsibilities: Provide all available as-built documents for City facilities, available engineering reports and other requested data. MSA Deliverables to City: Electronic copy of formal “Request for Information” Documentation of utility conflict analysis Task 211 - Preliminary Design – 2016 Water Improvement Project This task provides for preliminary engineering design services for the proposed waterline 211.1 ADA Compliance Review - Establish which curb ramps on 5th Street need to be modified or replaced to meet ADA requirements. This task is not required for the work along Highland Dr. City of Arlington MURRAY, SMITH & ASSOCIATES, INC. 2016 Water Improvement November 2015 Engineers/Planners Page 4 Complete office desktop review at each street crossing within paving limits utilizing readily available aerial and streetview imagery. Determine where existing curb ramps exist and where new curb ramps are needed. Where sidewalks do not exist, no curb ramps are required for ADA compliance. Document existing/future ramp locations and initial review findings for each ramp utilizing FHWA checklist for ADA compliancy. Complete follow-up field evaluation of existing curb ramps and take measurements using FHWA checklist to determine ADA compliancy. This will be completed under Task 202.3. 211.2 Plans (50% Design Completion Level) - Using the project information developed in the previous tasks and subtasks, prepare preliminary design drawings to the 50% design completion. Preliminary drawings will show plan views and major project elements. Utility drawings will be developed at 1-inch = 20-feet scale and pavement preservation drawings will be developed at 1-inch = 30-feet scale in AutoCAD electronic format. The drawings will be prepared and submitted to the City for review and comment. 211.3 Engineer’s Opinion of Probable Construction Cost - A preliminary engineer’s opinion of probable construction cost to 50% design completion level will be developed and include a schedule of estimated quantities, unit prices, and total preliminary construction cost for each project site. Assumptions: The complete Project Contract Document package (front end, specifications, appendices, etc.) will not be prepared for the preliminary design phase. Detailed water main connection details will be developed and submitted for review during the final design phase. 5th Street restoration will include a combination of overlay and pavement reconstruction and curb ramp replacement. E. Highland Drive restoration will include a City standard trench patch only. City has determined that no additional pavement preservation or curb ramp replacement is necessary at this time. The City has determined that geotechnical services are not necessary for the project based on known suitable soil conditions for the project site. City to provide direction on desired pavement section for restoration. No work is anticipated within WSDOT Highway 9 right-of-way. City Responsibilities: City will retain project surveyor and utility locator. City will provide MSA the survey basemap to MSA for use in preliminary and final design. Complete review of the preliminary design drawings, engineer’s opinion of probable construction cost and all supporting documentation with verbal or written comments. City review period is assumed to be 2 weeks. Participate in review meetings, site visits and workshops. MSA Deliverables to City: City of Arlington MURRAY, SMITH & ASSOCIATES, INC. 2016 Water Improvement November 2015 Engineers/Planners Page 5 50% complete plans and estimate will be prepared and submitted to the City in electronic format (AutoCAD, PDF and Word) for review and comment. Task 212 - Final Design – 2016 Water Improvement Project This task will produce final plans for projects based on comments from the City’s review of the preliminary design. Final design plans will be presented at the 90% completion level for City review. Final bid ready plans at the 100% completion level will incorporate all prior review comments and will be suitable for bidding. Elements of this task will include: 212.1 Plans, Specifications and Estimate (PS&E) - 90% Design Completion Level The preliminary design drawings (50% design completion level) will be revised and further developed to incorporate comments from the City’s review of the preliminary design. Develop design plans and engineer’s opinion of probable construction cost estimate to approximately the 90% design completion level. City will prepare draft technical specifications and appendices to support the design and will include in the project Contract Documents. Specifications will be prepared based on the City’s standard special provisions to the WSDOT 2014 Standard Specifications. MSA will review and complete the technical specifications and contractual documents. An engineer’s opinion of probable construction cost will be developed and will include a schedule of estimated quantities, unit prices, and total construction cost for each project site. Submit 90% design package, including complete plan set, specifications, project schedule and engineer’s opinion of probable construction cost, to the City for review and comment. 212.2 Final 100% Bid Ready Plans and Specifications The 90% design package will be revised and further developed to incorporate comments from the City’s review of the 90% design. Develop design plans, project schedule and engineer’s opinion of probable construction cost that are ready for bidding. Revise bid proposal quantities to reflect a bid-ready design package. Submit stamped and signed bid-ready Contract Documents to City for distribution. Assumptions: MSA shall apply a Washington Professional Engineer’s stamp with signature and date on the final bid-ready edition of the design plans and specifications. City will take the lead in preparing permits, easements, and coordinating project elements with key stakeholders, including franchise utilities and public as affected by the project. Review comments will be received in a complete, single submittal. Multiple rounds of review comments on the same design completion submittal are not anticipated. Contractor will be responsible for the development of traffic control and erosion control plans. No Critical Areas Study is required. Approximately 29 curb ramps will be replaced along 5th Street. Curb ramps will be designed to meet ADA requirements, though will not be fully modeled in AutoCAD. City of Arlington MURRAY, SMITH & ASSOCIATES, INC. 2016 Water Improvement November 2015 Engineers/Planners Page 6 Design plans are anticipated to include up to 20 sheets as indicated in the preliminary drawing list included with this scope of work. City standard details will be included in the Contract Provisions, not on the design sheets. City Responsibilities: Complete technical review of the documents at 90% design completion level with verbal or written comments. City review period for the submittal is 2 weeks. Provide electronic files, and periodic updates, of text, forms, schedules and other components of the contract documents, including preferred front-end sections. City will prepare draft special provisions and “front-end” documents to be incorporated into the contract documents. City to provide AutoCAD drawings of standard details to be incorporated into the contract documents. City to coordinate and submit bid-ready contract documents to Builders Exchange or similar service. MSA Deliverables to City: 90% complete plans, specifications and estimate will be prepared and submitted to the City in electronic format (AutoCAD, PDF and Word) for review and comment. Three full size (22”x34”) final stamped design plans, specifications, and engineer’s final construction cost estimate will be prepared and submitted to the City as well as all documents in electronic format (AutoCAD, PDF, and Word). Task 221 - Preliminary Design – 67th Ave NE Pavement Preservation Project During this phase MSA will develop plans, which reflect typical grind, inlay and overlay treatment. The plans will establish appropriate project limits, identify the design sections, edge and longitudinal treatment details, address catch basin treatments to appropriately manage bicycle safety and drainage concerns, and identify signal loops that may be impacted. 211.1 Plans (50% Design Completion Level) - Using the project information developed in the previous tasks and subtasks, prepare preliminary design drawings to the 50% design completion. Preliminary drawings will show plan views and major project elements. Pavement preservation drawings will be developed at 1-inch = 30-feet scale in AutoCAD electronic format. The drawings will be prepared and submitted to the City for review and comment. 211.2 Engineer’s Opinion of Probable Construction Cost - A preliminary engineer’s opinion of probable construction cost to 50% design completion level will be developed and include a schedule of estimated quantities, unit prices, and total preliminary construction cost for each project site. Assumptions: The complete Project Contract Document package (front end, specifications, appendices, etc.) will not be prepared for the preliminary design phase. City of Arlington MURRAY, SMITH & ASSOCIATES, INC. 2016 Water Improvement November 2015 Engineers/Planners Page 7 The City has determined that surveying services are not necessary for the project. Design drawings will be prepared based on record drawings, GIS, aerial photographs and site reconnaissance. The City has determined that no curb ramp replacement is required as part of the pavement preservation work on 67th Ave NE. Design plans are anticipated to include up to 20 sheets as indicated in the preliminary drawing list included with this scope of work. City Responsibilities: Complete review of the preliminary design drawings, engineer’s opinion of probable construction cost and all supporting documentation with verbal or written comments. City review period is assumed to be 2 weeks. Participate in review meetings, site visits and workshops. MSA Deliverables to City: 50% complete plans and estimate will be prepared and submitted to the City in electronic format (AutoCAD, PDF and Word) for review and comment. Task 222 - Final Design - 67th Ave NE Pavement Preservation Project This task will produce final plans for projects based on comments from the City’s review of the preliminary design. Final design plans will be presented at the 90% completion level for City review. Final bid ready plans at the 100% completion level will incorporate all prior review comments and will be suitable for bidding. Elements of this task will include: 222.1 Plans, Specifications and Estimate (PS&E) - 90% Design Completion Level The preliminary design drawings (50% design completion level) will be revised and further developed to incorporate comments from the City’s review of the preliminary design. Develop design plans and engineer’s opinion of probable construction cost estimate to approximately the 90% design completion level. City will prepare draft technical specifications and appendices to support the design and will include in the project Contract Documents. Specifications will be prepared based on the City’s standard special provisions to the WSDOT 2014 Standard Specifications. MSA will review and complete the technical specifications and contractual documents. An engineer’s opinion of probable construction cost will be developed and will include a schedule of estimated quantities, unit prices, and total construction cost for each project site. Submit 90% design package, including complete plan set, specifications, project schedule and engineer’s opinion of probable construction cost, to the City for review and comment. 222.2 Final 100% Bid Ready Plans and Specifications The 90% design package will be revised and further developed to incorporate comments from the City’s review of the 90% design. Develop design plans, project schedule and engineer’s opinion of probable construction cost that are ready for bidding. Revise bid proposal quantities to reflect a bid-ready design package. City of Arlington MURRAY, SMITH & ASSOCIATES, INC. 2016 Water Improvement November 2015 Engineers/Planners Page 8 Submit stamped and signed bid-ready Contract Documents to City for distribution. Assumptions: MSA shall apply a Washington Professional Engineer’s stamp with signature and date on the final bid-ready edition of the design plans and specifications. City will take the lead in preparing permits, easements, and coordinating project elements with key stakeholders, including franchise utilities and public as affected by the project. Review comments will be received in a complete, single submittal. Multiple rounds of review comments on the same design completion submittal are not anticipated. No Critical Areas Study is required. Site specific traffic control plans will be developed for this project. City Responsibilities: Complete technical review of the documents at 90% design completion level with verbal or written comments. City review period for the submittal is 2 weeks. Provide electronic files, and periodic updates, of text, forms, schedules and other components of the contract documents, including preferred front-end sections. City will prepare draft special provisions and “front-end” documents to be incorporated into the contract documents. City to provide AutoCAD drawings of standard details to be incorporated into the contract documents. City to coordinate and submit bid-ready contract documents to Builders Exchange or similar service. MSA Deliverables to City: 90% complete plans, specifications and estimate will be prepared and submitted to the City in electronic format (AutoCAD, PDF and Word) for review and comment. Three full size (22”x34”) final stamped design plans, specifications, and engineer’s final construction cost estimate will be prepared and submitted to the City as well as all documents in electronic format (AutoCAD, PDF, and Word). Task 231 - Bidding and Award Under this task, assistance will be provided to the City during the project bidding and award process for two separate bid packages, 2016 Water Improvement and the 67th Ave Pavement Preservation projects. MSA will provide typical services as outlined below: 231.1 Bidder Inquiries - With direction from City, respond to questions from bidders, subcontractors, equipment suppliers and other vendors regarding the project and plans and specifications. Maintain a written record of communications during bidding process. 231.2 Addenda - Assist the City in the preparation of any addenda as necessary to clarify the contract documents. City shall coordinate distribution of addenda. City of Arlington MURRAY, SMITH & ASSOCIATES, INC. 2016 Water Improvement November 2015 Engineers/Planners Page 9 Task 300 - Construction Phase Services Under this task, engineering services will be provided to the City during construction of the project. The extent of these services to be provided, if any, and the associated budget will be determined at a later date and the agreement modified accordingly to provide for these additional services. The following is an inventory of construction phase services that MSA typically provides. These services are provided from the notice of award of a construction contract to the contractor to the final acceptance of the project. Subtasks include: Shop Drawings & Submittals Review Monthly Pay Request Processing Requests for Information Clarifications Process Change Orders Monthly Project Status Reports and Project Meetings On-Site Construction Observation Final Inspection Project Close-Out Record Drawings Preparation Warranty Inspection Preliminary Estimated Schedule MSA shall begin work immediately upon receipt of Notice to Proceed from the City and proceed according to the preliminary estimated schedule presented below, which reflects the City's desire to complete all design and construction work by August 2016. MSA will proceed according to the work program shown below, however the schedule may change due to the grouping and phasing of projects that will be determined by MSA and the City early in the project. Factors beyond MSA’s control may also require schedule modifications. – City of Arlington MURRAY, SMITH & ASSOCIATES, INC. 2016 Water Improvement November 2015 Engineers/Planners Page 10 Preliminary Drawing List 1 G1 Title Sheet 1 G1 Title Sheet 2 G2 Abbreviations, Symbols and Legend, General Notes 2 G2 Abbreviations, Symbols and Legend, General Notes 3 W1 5th St Water-1 3 R1 Pavement Preservation-1 4 W2 5th St Water-2 4 R2 Pavement Preservation-2 5 W3 5th St Water-3 5 R3 Pavement Preservation-3 6 W4 Gifford, Washington Water 6 R4 Pavement Preservation-4 7 W5 Stillagumish Water 7 R5 Pavement Preservation-5 8 W6 Highland Dr Water-1 8 R6 Pavement Preservation-6 9 W7 Highland Dr Water-2 9 CH1 Channelization Plans-1 10 W8 Highland Dr Water-3 10 CH2 Channelization Plans-2 11 W9 Highland Dr Water-4 11 CH3 Channelization Plans-3 12 WD1 Water/Storm/Sewer Details-1 12 CH4 Channelization Plans-4 13 R1 5th St Pavement Preservation-1 13 CH5 Channelization Plans-5 14 R2 5th St Pavement Preservation-2 14 CH6 Channelization Plans-6 15 R3 5th St Pavement Preservation-3 15 TC1 Traffic Control Plan-1 16 RD1 Roadway Details/Curb Ramps-1 16 TC2 Traffic Control Plan-2 17 RD2 Roadway Details/Curb Ramps-2 17 TC3 Traffic Control Plan-3 18 RD3 Roadway Details/Curb Ramps-3 18 TC4 Traffic Control Plan-4 19 RD4 Roadway Details/Curb Ramps-4 19 TC5 Traffic Control Details 20 RD5 Roadway Details/Curb Ramps-5 20 TC6 Traffic Control Details DRAFT LABOR CLASSIFICATION (HOURS)ESTIMATED FEES Principal Engineer IV Professional Engineer VII Professional Engineer IV Professional Engineer IV Technician IV Administrative I Hours Total $213 $166 $139 $139 $131 $80 TCL NPH AHG JLTA HCM JR Task 201 - Project Management and Coordination Task 201.1 - Correspondence and Coordination with City 8 4 12 1,884$ -$ 1,884$ Task 201.2 - Budget, Schedule, Invoices and Progress Reports 4 4 4 12 1,540$ 20$ 1,560$ Task 201.3 - Staff and Subconsultant Management 8 4 12 1,884$ -$ 1,884$ Task 201.4 - Project Coordination Meetings (2 total)4 6 1 11 1,578$ 60$ 1,638$ Task 201.5 - Quality Assurance/Quality Control (QA/QC) 16 16 3,408$ -$ 3,408$ Task 201 Subtotal 16 24 0 18 0 5 63 10,294$ 80$ 10,374$ Task 202 - Data Gathering and Utility Coordination Task 202.1 - Data Collection and Review 1 12 13 1,834$ 20$ 1,854$ Task 202.2 - Utility Coordination and Analysis 1 10 2 13 1,818$ 36$ 1,854$ Task 202.3 - Kick-Off Meeting and Site Visits (2016 Water and 67th Ave Pavement)2 8 12 2 24 3,374$ 66$ 3,440$ Task 202 Subtotal 0 4 8 34 4 0 50 7,026$ 122$ 7,148$ Task 211 - Preliminary Design - 2016 Water Imp. Project Task 211.1 - ADA Compliance Review 1 4 4 9 1,278$ 1,278$ Task 211.2 - Plans (50% Design Completion Level) 1 8 32 72 24 2 139 19,301$ 432$ 19,733$ Task 211.3 - Engineer’s Opinion of Probable Construction Cost 2 4 12 18 2,556$ -$ 2,556$ Task 211 Subtotal 1 11 40 88 24 2 166 23,135$ 432$ 23,567$ Task 212 - Final Design - 2016 Water Imp. Project Task 212.1 - 90% PS&E A. Plans 1 6 32 60 20 1 120 16,697$ 360$ 17,057$ B. Specifications 1 4 2 12 4 23 3,143$ -$ 3,143$ C. Opinion of Cost 1 2 4 7 1,000$ -$ 1,000$ Task 212.2 - 100% Final Bid Ready PS&E A. Plans 1 6 16 32 12 1 68 9,533$ 416$ 9,949$ B. Specifications 1 2 2 8 4 17 2,255$ 50$ 2,305$ C. Opinion of Cost 1 1 2 4 583$ -$ 583$ Task 212 Subtotal 4 20 55 118 32 10 239 33,211$ 826$ 34,037$ Task 221 - Preliminary Design - 67th Ave Pvmnt Pres. Project Task 221.1 - Plans (50% Design Completion Level) 1 8 16 24 24 2 75 10,405$ 432$ 10,837$ Task 221.2 - Engineer’s Opinion of Probable Construction Cost 2 2 8 12 1,722$ -$ 1,722$ Task 221 Subtotal 1 10 18 32 24 2 87 12,127$ 432$ 12,559$ Task 222 - Final Design - 67th Ave Pvmnt Pres. Project Task 222.1 - 90% PS&E A. Plans 1 4 12 16 8 1 42 5,897$ 144$ 6,041$ B. Specifications 1 2 2 8 4 17 2,255$ -$ 2,255$ C. Opinion of Cost 1 2 4 7 1,000$ -$ 1,000$ Task 222.2 - 100% Final Bid Ready PS&E A. Plans 1 4 8 16 8 1 38 5,341$ 344$ 5,685$ B. Specifications 1 2 2 8 4 17 2,255$ 50$ 2,305$ C. Opinion of Cost 1 1 2 4 583$ -$ 583$ Task 222 Subtotal 4 14 27 54 16 10 125 17,331$ 538$ 17,869$ Task 231 - Bidding Assistance (As Needed) Task 231.1 - Bidder Inquiries 1 2 2 8 1 14 2,015$ 2,015$ Task 231.2 - Addenda 2 8 4 1 15 2,048$ 72$ 2,120$ Task 231 Subtotal 1 4 2 16 4 2 29 4,063$ 72$ 4,135$ TOTAL - ALL TASKS 27 87 150 360 104 31 759 107,187$ 2,502$ 109,689$ FEE ESTIMATE 2016 WATER IMPROVEMENT AND 67th AVE NE PAVEMENT PRESERVATION PROJECTS EXHIBIT B MSA ExpensesMSA Labor 11/06/2015 CITY OF ARLINGTON City of Arlington Murray, Smith & Associates, Inc. Engineers/Planners Page 1 City of Arlington Council Agenda Bill Item: WS #6 Attachment F COUNCIL MEETING DATE: November 23, 2015 SUBJECT: Authority to advertise a Request for Proposal (RFP) for the hauling and land application of biosolids. ATTACHMENTS: DRAFT RFP for hauling and land application of bio solids. DEPARTMENT OF ORIGIN Public Works EXPENDITURES REQUESTED: Annual expenditure varies, estimate a cost not to exceed $80,000.00 per year. BUDGET CATEGORY: Fund 401 – Sewer Operating Fund LEGAL REVIEW: DESCRIPTION: The City must contract with a Department of Ecology licensed contractor for the hauling and land application of bio solids in excess of what the City’s Biosolids Compost Facility (BCF) can process. HISTORY: The City has been under contract with Cascade Materials, Inc. for the hauling and land application of biosolids in excess of what the City’s Biosolids Compost Facility (BCF) can process. Cascade Materials has ceased business operations and the City is currently contracting with a firm on a short term basis. The City needs to find a replacement contractor to haul and land apply biosolids. Staff is requesting authority to advertise for Request for Proposal to licensed contractors. ALTERNATIVES Postpone Authorization of RFP Remand to staff for further evaluation RECOMMENDED MOTION: Workshop; discussion only. At the following council meeting the recommendation will be: “I move to authorize staff to advertise for Requests for Proposals for the hauling and land application of biosolids, subject to final review by the City Attorney”. REQUEST FOR PROPOSAL Transportation and Land Application of Biosolids and Other Related Services RFP ISSUE DATE: December XX 2015 SCOPE OF SERVICES: Contractor will provide the following: ­ Provide for the entire management and operation of the biosolids land application program ­ Provide all necessary equipment (trailers, etc) that will be staged at a secured City facility and loaded with biosolids by City of Arlington Staff; haul dates and times will be coordinated with Contractor ­ Collect and test soil samples on application sites ­ Complete all required biosolids reports, annual or otherwise, related to the land application as required by the State of Washington Department of Ecology (DOE) and the United States Environmental Protection Agency (EPA) ­ Obtain and maintain all necessary state and federal permits through DOE for the required land application sites ­ Comply with all applicable state and federal laws and regulations regarding its services hereunder ­ Provide copies of the above data, tests and reports and reports to the Generator to document compliance GENERATOR WILL PROVIDE: City of Arlington will provide the following: ­ The basis for this proposal is for the hauling and land application of approximately 25 to 150 wet tons per month ­ Sampling, testing and reporting on biosolids according to the standards set forth by DOE ­ Certification that biosolids meet, at a minimum, Class B standards and vector attraction reduction standards set forth by the DOE and USEPA ­ All labor and associated costs for dewatering biosolids ­ Loading of transport units (trailers) that are stored at a city secured facility INSTRUCTIONS: A non-mandatory site visit is being offered on December XX, 2015, please call (360)403- 3526 to confirm attendance and request directions for the Arlington Biosolids Compost Facility. All questions must be submitted in writing to the below address (email questions are acceptable) no later than December XX, 2015 at 3:00pm (pst) Contact: Fred Rapelyea Wastewater Utility Supervisor City of Arlington 154 West Cox Ave Arlington WA 98223 frapelyea@arlingtonwa.gov City of Arlington Council Agenda Bill Item: WS #7 Attachment G COUNCIL MEETING DATE: November 23, 2015 SUBJECT: DRAFT Resolution Authorizing Surplus of Utility Property ATTACHMENTS: Resolution declaring utility property as surplus DEPARTMENT OF ORIGIN Public Works EXPENDITURES REQUESTED: None BUDGET CATEGORY: N/A LEGAL REVIEW: DESCRIPTION: Staff is requesting that Council approve a resolution declaring miscellaneous Water and Sewer Utility vehicles as surplus. HISTORY: State law requires that a public hearing be held prior to the surplus of “land, property, or equipment originally acquired for public utility purposes” (RCW 35.94.040). At the December 7, 2015 Council meeting a public hearing will be held to solicit public discussion and input regarding proposed action of declaring the following vehicles as surplus: Year Item VIN ID #  1996 Ford Ranger  1FTCR14U2TPA40341 #W‐93  1995 Chevrolet S‐10 1GCDT19Z1S8257317 #NR‐1  1999 Ford Ranger 1FTZR15V9XTA68412 #WW‐99  ALTERNATIVES Do not surplus equipment Remand to staff for further consideration RECOMMENDED MOTION: Workshop; discussion onl . RESOLUTION NO. 2015-XXX 1 RESOLUTION NO. 2015-XXX A RESOLUTION OF THE CITY OF ARLINGTON DECLARING CERTAIN UTILITY PROPERTY AS SURPLUS AND AUTHORIZING ITS SALE WHEREAS, the City has purchased the vehicles listed on the attached Exhibit “A”; and WHEREAS, the items identified on Exhibit “A” are surplus to the needs of the City; and WHEREAS, the City conducted a public hearing on December 7, 2015 and thereafter determined approval of this resolution was in the best interests of the City and citizens; NOW, THEREFORE, the City of Arlington, acting by and through its City Council, does hereby resolve as follows: 1. The equipment described on the attached Exhibit “A” is declared surplus to the needs of the City. 2. Staff is instructed to trade in all items for the best available price, sell all items for the best available price or properly dispose of items that it is unable to sell. Staff is further authorized to dispose of the property via an intergovernmental transfer pursuant to RCW 39.33.010. Passed by the City Council of the City of Arlington at a regular meeting on this 21st day of December, 2015. ________________________________ Barbara Tolbert Mayor ATTEST: ___________________________ Kristin Banfield, City Clerk APPROVED AS TO FORM: ___________________________ Steven J. Peiffle, City Attorney RESOLUTION NO. 2015-XXX 2 EXHIBIT A City of Arlington Council Agenda Bill Item: WS #8 Attachment H COUNCIL MEETING DATE: November 23, 2015 SUBJECT: DRAFT Resolution Declaring used water meters and scrap metals as surplus and authorizing its sale. ATTACHMENTS: Resolution declaring used water meters and scrap metals as surplus DEPARTMENT OF ORIGIN Public Works EXPENDITURES REQUESTED: None BUDGET CATEGORY: N/A LEGAL REVIEW: DESCRIPTION: Staff is requesting that Council approve a resolution declaring used and broken water meters and scrap metals accumulated during 2016 and 2017 as surplus and authorize it to be sold at salvage value. HISTORY: As part of performin normal business activities, the water and sewer utilities accumulate used and broken water meters and other scrap metal that is no longer useful and need to be disposed of. These items have no value other than scrap metal value and are therefore surplus to the needs of the City. The water and sewer utilities have been previously authorized to dispose of the used and broken water meters and other scrap metal at salvage value. The salvage yard will issue a check to the City of Arlington for salvaged water meters and scrap metals in compliance with Title 19 RCW. The water and sewer utilities are requesting authorization to surplus broken water meters and scrap metals for 2016 and 2017. ALTERNATIVES Do not surplus equipment Remand to staff for further consideration RECOMMENDED MOTION: Workshop; discussion onl . At the December 7th council meetin the motion will be: “I move for council to approve Resolution 2015-XXXX, declaring used water meters and scrap metal as surplus and authorizing its sale for years 2016 and 2017.” RESOLUTION NO. 2015-XXX 1 RESOLUTION NO. 2015-XXX A RESOLUTION OF THE CITY OF ARLINGTON DECLARING USED WATER METERS AND SCRAP METAL AS SURPLUS AND AUTHORIZING ITS SALE WHEREAS, the City frequently comes into the possession of used water meters and other scrap metal that have no value except scrap value; and WHEREAS, the used meters and metal are a potential liability due to thieves finding the scrap value to be worth attempting to enter city facilities to steal the used meters or metal; and WHEREAS, the used water meters and scrap metal are of no use to the City and are therefore surplus to the needs of the City; NOW, THEREFORE, the City of Arlington, acting by and through its City Council, does hereby resolve as follows: 1. Any used water meters or scrap metals which come into the possession of the City be and hereby are declared surplus to the needs of the City. 2. Staff is instructed to sell all used water meters and scrap metal for the best available price at private sale or properly dispose of those that it is unable to sell. 3. This resolution is valid for calendar years 2016 and 2017. Passed by the City Council of the City of Arlington at a regular meeting on this 7th day of December, 2015. ________________________________ Barbara Tolbert Mayor ATTEST: ___________________________ Kristin Banfield, City Clerk APPROVED AS TO FORM: ___________________________ Steven J. Peiffle, City Attorney City of Arlington Council Agenda Bill Item: WS #9 Attachment I COUNCIL MEETING DATE: November 23, 2015 SUBJECT: September and October 2015 Financial Report ATTACHMENTS: Financial Reports – Narrative Revenue Charts General Fund Operating Statement Other Fund Operating Statements DEPARTMENT OF ORIGIN Finance: Kristin Garcia – Finance Director EXPENDITURES REQUESTED: 0 BUDGET CATEGORY: N/A LEGAL REVIEW: DESCRIPTION: Attached is September and October 2015 Financial Report. Staff will give a brief PowerPoint presentation and answer questions. HISTORY: ALTERNATIVES RECOMMENDED MOTION: Workshop; discussion only.