Loading...
HomeMy WebLinkAboutResolution No. 2017-021 Adopting a Work Plan for Development of a 'Complete Streets' Program to Ensure that all Transportation Projects Include Safe and Appropriate Facilities... RESOLUTION NO. 2017-021 A RESOLUTION OF THE CITY OF ARLINGTON ADOPTING A WORK PLAN FOR DEVELOPMENT OF A "COMPLETE STREETS" PROGRAM TO ENSURE THAT ALL TRANSPORTATION PROJECTS INCLUDE SAFE AND APPROPRIATE FACILITIES FOR PEDESTRIANS, BICYCLISTS, AND TRANSIT USERS, ACCOMODATING PERSONS OF ALL AGES AND ABILITIES. WHEREAS: The term "Complete Streets" describes a comprehensive, integrated transportation network with infrastructure and design that allows safe and convenient travel along and across streets for all users, including pedestrians, bicyclists, transit riders, and motorists that accommodates people of all ages and abilities; and WHEREAS: Much of Arlington's existing roadway system was built to facilitate access to destinations by personal automobile, resulting in streets that are uninviting and impractical for other users; and WHEREAS: The goal of the Transportation Element in the 2015 Arlington Comprehensive Plan is to provide a balanced multi-modal transportation system with various accessible transportation choices, including transit, bicycles, and walking, in addition to automobiles, that will support existing and future residential and employment growth; and WHEREAS: The Arlington Comprehensive Plan provides that non-motorized transportation should be developed in tandem with motorized transportation systems, recognizing safety and user diversity, and WHEREAS: Complete Streets improve public health and safety by reducing the risk of injuries and fatalities from traffic collisions for users of all modes of transportation; and WHEREAS: Streets that are designed with the safety and convenience of pedestrians and bicyclists in mind increases the number of people walking and bicycling thereby providing the opportunity for a healthier community; and WHEREAS: Council recognizes that in support of implementing an effective Complete Streets Policy it will be beneficial to provide guidance to City Commissions and Departments as to project planning, design standards, implementation and monitoring. NOW, THEREFORE, BE IT RESOLVED, BY THE CITY COUNCIL OF THE CITY OF ARLINGTON, WASHINGTON AS FOLLOWS: 1) The City shall develop a safe, reliable, efficient, integrated and connected multi-modal transportation system plan that will promote access, mobility and health for users of all ages and abilities, and will assure that the safety and convenience of all users of the transportation system are accommodated, including pedestrians, bicyclists, transit users, motorists, emergency responders, and freight providers. 2) The Departments of Public Works and Community and Economic Development will work collaboratively to prepare for Council consideration a comprehensive Complete Streets RESOLUTION NO. 2017-021 1 Program. The organizing principle of this Complete Streets Program will be based on the connectivity both within the City and with neighboring jurisdictions of each transportation mode with appropriate metrics across all modes of transportation, which will include, but not be limited to the following elements: a. Pedestrian connectivity; b. Bicycle connectivity; c. Transit availability based on both current and future projected Land Use patterns; and d. Auto connectivity. 3) In addition, the Complete Streets Program will include specific design standards detailing the following Public Rights-of Way requirements: a. Low Impact Development storm water facilities; b. Utility placement; c. Street lighting; and d. Detailed landscaping and planting standards consistent with pedestrian comfort and bicycle safety. 4) City staff is directed to add items to the future planning docket all work required for the development of a Complete Streets Program identified above within the following time schedule allowing the opportunity for meaningful public input and Council review. Phase one will commence 10 days after approval of this referendum: a. Phase I — Plan Outline i. Plan outline will include major plan component descriptions including metrics for each element. ii. Determination of lead department and role definition for each department involved, including scope of initial research topics. iii. Phase I will be completed in 90 days. b. Phase II — Priorities, feasibility, and financing i. Completion of initial research as defined in Phase I Item 2. ii. Completion of compiled research, including costs and financing options for Program elements. iii. Preparation of priority list based on need and feasibility. iv. Phase II will be completed in six months. c. Phase III — Complete Streets Plan Draft i. Complete Streets Program draft preparation based on Council priorities. ii. Phase III will be completed within one year. PASSED BY the City Council and APPROVED by the Mayor this 20 day of November, 2017, RESOLUTION NO. 2017-021 2 CITY OF ARLINGTON R 0 1/k'-Z�n))c Barbara Tolbert, Mayor Attest: Kristi anfield, City Jerk Approved as to form: N,--- Steybn J. Pk#fe ` CityWtorney RESOLUTION NO. 2017-021 3