HomeMy WebLinkAboutResolution 2016-023 Replacing Resolution 2015-009 and Adopting a Revised Fee Schedule RESOLUTION NO. 2016-023
A RESOLUTION REPLACING RESOLUTION NO.2015-009,
AND ADOPTING A REVISED FEE SCHEDULE
WHEREAS, the City Council, through ordinance, has adopted regulations requiring certain
actions and services; and,
WHEREAS, these various ordinances set forth that fees shall be set by resolution; and,
WHEREAS, the cost of providing these various services consistent with applicable codes,
regulations, and policies periodically increase or decrease, or certain services or practices are
discontinued and fees are no longer needed; and,
WHEREAS, it is the intent of the City of Arlington to charge appropriate fees and charges
that are consistent with the services provided and to cover the public cost of providing these various
services so that the public is not subsidizing individual benefits derived therefrom;
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
ARLINGTON AS FOLLOWS:
The following rates, fees, and charges for various services provided, actions performed, or items
sold by the city and/or its contract service providers, and fines levied against code violators, are
hereby adopted:
Section 1. Fees and Charles—General.
1.1 Fees. Fees are intended to cover the normal, recurring costs associated with
providing a given service. Fees are non-refundable.
1.2 Prices.In some instances,the City provides certain goods and merchandise for sale.
Prices for these goods may be included in this resolution.
1.3 Payment Due. Fees are due at the time the action is requested (e.g., at time of
application) or occurs (e.g., prior to a specific action). An applicant may pay all
fees of a multi-phased project in advance; however, doing so does not vest
applicable fees due. Fees due are those in effect at the time the specific action or
phase of an action is requested or occurs.
1.4 Waivers. Upon petition by the applicant, the City Council may waive any of the
fees, or portions thereof, for any non-profit organization or government agency.
Page 1
CITY OF ARLINGTON FEE SCHEDULE RESOLUTION#2016-023
Section 2. Land Use Fees. Fees for various services, actions, and permits regarding land use,
as per AMC Title 20 Land Use Code, shall be as listed in Table 1: Land Use Fees
Table 1: Land Use Fees
Action 2016 Fee $) 2017 Fee $
Land Use Permits
Zoning Permit 2,222 2,300.00
Special Use Permit 3,306 plus actual cost of 3,400.00 plus actual cost of
Hearing Examiner(if Hearing Examiner (if
re 'd) re 'd
Conditional Use Permit 3,862 plus actual cost of 4,000.00 plus actual cost of
Hearin Examiner Hearing Examiner
Administrative Conditional Use Permit
Temporary/ Seasonal Event 102 125.00
Homeless Encampment 508 500.00
Preliminary Plats
Conditional Use Permit for a Long Plat 6,983 plus actual cost of 7,000.00 plus actual cost of
Hearing Examiner Hearing Examiner
Zoning Permit for a Short Plat 3,068 3,100.00
Final Plats
Long Plat 3,389 3,400.00
Short Plat 1,823 2,000.00
Binding Site Plans
Conditional Use Permit for Binding 7,000.00 plus actual cost of
Site Plans> 10 lots HE
Zoning Permit for Binding Site Plans< 3,100.00
9 lots
Text and/or Design Deviation 741 750.00
Lot Line Adjustment or Changes to 1,323 1,400.00
Number of Lots
Development Agreements 3,862 plus actual cost of $4,000.00 plus actual cost
Hearing Examiner(if of Hearing Examiner (if
re 'd) req'd)
Master Plan 12,500 12,500.00
Design Review
Administrative 212 300.00
Design Review Board 423 450.00
Forest Practices Permits
Permit Review 423 450.00
Forest Practices Permit Application Fee 106 plus 106 per acre 125.00 plus 125.00 per
acre
Review Fee for Conversion Option 106 plus 106 per acre 125.00 plus 125.00 per
Harvest Plan Approval acre
Review Fee To Lift Moratorium 300 300.00
Inspection Fee 127 per hour plus 106 per 150.00 per hour plus
acre 125.00per acre
Page 2
CITY OF ARLINGTON FEE SCHEDULE RESOLUTION#2016-023
Action 2016 Fee ($) 2017 Fee ($)
Appeals
To City Council 212 250.00
To Planning Commission 212 250.00
To Hearing Examiner 582 plus actual cost of 600.00 plus actual cost of
Hearing Examiner Hearing Examiner
To Shoreline Hearings Board 582 600.00
Reconsideration of Decision by:
Community Development Director 79 100.00
and/or a designee
Planning Commission 106 150.00
Hearing Examiner 212 plus actual cost of 250.00 plus actual cost of
Hearing Examiner Hearing Examiner
City Council 132 150.00
Permit Extension
Extension 53 200.00
Resubmittal Extension 125.00
Amendment to or Modification of
Permit
Insignificant Design Deviations 53 60.00
Minor Amendment 317 325.00
Major Amendment 1,067 plus cost of Hearing 1,100.00 plus actual cost of
Examiner(if req'd) Hearing Examiner (if
re 'd
Development Agreement 741 plus actual cost of 750.00 plus actual cost of
Hearing Examiner (if Hearing Examiner (if
re 'd) re 'd)
Boundary Line Adjustment
Boundary Line Adjustment/ Lot Line 1,664 1,700.00
Elimination
Land Use Ordinance Amendment
Amendment to Text of Land Use 741 750.00
Ordinance
Amendment to Zoning Map (rezone)
< 5 acres 1,111 1,200.00
> or= 5 acres 1,957 2,000.00
Comprehensive Plan Amendment
Minor Amendment (annual cycle) 1,428 1,500.00
Major Amendment (5-year cycle) 2,116 2,200.00
Annexations
Submission of 10% Petition 106 150.00
Submission of 60% Petition 1,058 1,100,00
If it goes to BRB hearing 794 800.00
Page 3
CITY OF ARLINGTON FEE SCHEDULE RESOLUTION#2016-023
Action 2016 Fee ($) 2017 Fee ($
Shoreline Development Permit
(SDP)
SDP in conjunction with a Land Use 529 550.00
Permit
SDP not in conjunction with a Land 1,058 1,100.00
Use Permit
Variance
Administrative 635 700.00
If it goes to hearing (fee in addition to 1,217 plus actual cost 1,300.00 plus actual
that paid for Admin. Decision) of Hearing Examiner cost of Hearing Examiner
Miscellaneous Actions/Items
Pre-Application Meetings/General
Information Meeting
1 st two hours 0 0.00
Subsequent meetings 317 per meeting 325.00 per meeting
SEPA Review (note: review of
checklist included in Land Use
Permit fee)
SEPA Only (no land use permit 529 550.00
required)
Review of requested studies (i.e. 159 175.00
traffic, wetland, etc.)
Review of requested studies (i.e. 711 750.00
drainage, geo-tech, etc.)
Environmental Impact Statement(EIS) 1,058 plus actual cost of 1,100.00 plus actual cost of
consultant consultant
Deferral of Impact Fee
Application $200.00
Request of Utility Services Outside
City
Single-Family Residence/Duplex 212 225.00
Other Development 635 650.00
Property Tax Exemption Certificate
Processing Fee 500.00
Recording
Recording Fees /Conformed Copies Actual cost paid directly to
the Snohomish County
Auditor.
Processing/Technology Fee
Added to all Land Use, Site Civil & 25.00
Building Permits
Page 4
CITY OF ARLINGTON FEE SCHEDULE RESOLUTION#2016-023
Section 3. Public Works Fees. Fees for various services, actions and permits shall be as
listed in Tables 2-1: Review Fees, 2-2: Grading Plan Review Fees, 2-3: Grading Permit Fees,
and 2-4: Public Works Labor and Equipment Charges.
Table 2-1: Review Fees
Action 2016 Fee ($) 2017 Fee ($)
Site Civil Review 6% E.E.C.C' with a 6% E.E.C.C. with a
minimum charge of 1,587 minimum charge of
1,600.00
Administrative Review Fee 212 each 250.00 each
Miscellaneous Engineering Fee 529 each 550.00 each
As-Built Review Fee Included in the site civil Included in the site civil
review fee review fee
Final Plat Review Fee Included in the site civil Included in the site civil
review fee review fee
Inspection Fee 127 per hour-1/2 hour 150.00 per hour, '/z hour
minimum minimum
Outside Consultant Review Fee Actual cost Actual cost
Simple Site Plan Review 265 per lot 275.00 er lot
1,E.E.C.0 Eneineer's Estimated Cost of Construction-Includes labor, equipment, material, overhead and profit.
Prices shall be from RS Means (latest edition)data adjusted for the Snohomish County area or from local sources if
not included in the RS Means database.
* Simple Site Plan Review-No water or sewer extension -Single family residence with maximum of 2 lots.
* Additional plan review applies when there is a change, addition or revision to the plan.
* Additional plan review fees will be charged at any point in the project when more than 2 reviews are required.
* Inspection Fee-commercial and residential plats(storm drainage, landscape,right-of-way and bond
inspections).
* Outside Consultant Review Fee.
* Water Availability Certificate Fee.
* Engineering Meetings(first 2 hours are no charge).
* Miscellaneous engineering fee-traffic and storm water report/design reviewed in-house.
Page 5
CITY OF ARLINGTON FEE SCHEDULE RESOLUTION#2016-023
Action 2016 Fee ($) 2017 Fee ($)
Right of Way 6% E.E.C.C2 or maximum 6% E.E.C.C. or maximum
1,058 with a minimum 1,100.00 with a minimum
charge of 106 plus charge of 125.00 plus
inspection fees inspection fees
Right of Way Vacation 1,058 1,100.00
Miscellaneous Staff Time 127 per hour per person- 150.00 per hour per person,
1/2 hour minimum '/z hour minimum
Engineering Meetings-after 2 hours 317 per meeting 350.00 per meetin
Water Availability Certificate SFR 32—Non-SFR 106 SFR 50,00
Non-SRF 125.00
Recovery Contract 1,058 plus actual cost 1 1,100.00 plus actual cost
Table 2-2: Grading Plan Review Fees
Action Fee ($)
50 Cubic Yards or less No fee
51 to 100 cubic yards 25.50
101 to 1,000 cubic yards 40.00
1,001 to 100,000 cubic yards
First 1,000 cubic yards 53.35
Plus - for each additional 10,000 yards or fraction thereof 26.50
100,001 to 200,000 cubic yards
For the first 100,000 cubic yards 292.00
Plus - for each additional 10,000 yards or fraction thereof 14.40
200,001 cubic yards or more
For the first 200,000 cubic yards 435.45
Plus - for each additional 10,000 cubic yards or fraction thereof 7.85
Other Fees: Additional plan review required by changes, additions or 54.70'
revisions to approved plans (minimum charge— 1/2 hour) Per hour
2 E.E.C.0 Engineer's Estimated Cost of Construction-Includes labor, equipment, material, overhead and profit.
Prices shall be from RS Means(latest edition)data adjusted for the Snohomish County area or from local sources if
not included in the RS Means database.
* Simple Site Plan Review-No water or sewer extension- Single family residence with maximum of 2 lots.
* Additional plan review applies when there is a change,addition or revision to the plan.
* Additional plan review fees will be charged at any point in the project when more than 2 reviews are required.
* Inspection Fee-commercial and residential plats(storm drainage, landscape, right-of-way and bond
inspections).
* Outside Consultant Review Fee.
* Water Availability Certificate Fee.
* Engineering Meetings(first 2 hours are no charge).
* Miscellaneous engineering fee-traffic and storm water report/design reviewed in-house.
3 Or the total hourly cost to the City,whichever is the greatest. This cost shall include supervision,overhead,
equipment,hourly wages and fringe benefits of the employees involved.
Page 6
CITY OF ARLINGTON FEE SCHEDULE RESOLUTION#2016-023
Table 2-3: Grading Permit Fees
Action Fee ($)
50 cubic yards or less 25.50
51 to 100 cubic yards 40.00
101 to 1,000 cubic yards
First 100 cubic yards 40.00
Plus—for each additional 100 cubic yards or fraction thereof
18.90
1,001 to 10,000 cubic yards
For the first 1,000 cubic yards 210.50
Plus - for each additional
1,000 yards or fraction thereof 15.70
10,001 to 100,000 cubic yards
For the First 10,000 cubic yards 351.80
Plus - for each additional
10,000 yards or fraction thereof 71._40
100,001 or more cubic yards or more
For the first 100,000 cubic yards 994.80
Plus - for each additional 10,000 cubic yards or fraction thereof
39.50
Table 2-4: Public Works Labor and Equipment Charges
A. Services and work included in the below schedule will be charged a 15%
administrative/overhead fee for accounting, billing and general City administrative costs.
B. All work or services not included in the below schedule must be mutually agreed upon
prior to the commencement of work.
C. Equipment and machinery that is not explicitly included in the below schedule will be
charged at the rate set forth in the most current Rental Rate Blue Book for Construction
Equipment ("Blue Book"). If the equipment or machinery rate is not available in the Blue
Book, the City will determine an appropriate fee or rate based on the original cost of the
asset plus operating and maintenance cost and/or comparable rates charged by other
organizations.
Page 7
CITY OF ARLINGTON FEE SCHEDULE RESOLUTION#2016-023
Item Fee ($)
Labor Rate Cost
Lead Maintenance Worker Hourly 60.00
Sr. Maintenance Worker Hourly 55.00
Maintenance Worker Hourly 50.00
PW Inspector Hourly 60.00
Administrative Staff Hourly 45.00
Equipment Rate Cost
Pick-up Truck Hourly 15.00
Dump Truck Hourly 75.00
Back-hoe Hourly 55.00
Vactor-Jetter Truck Hourly 105.00
Snow Plow Hourly 75.00
Street Sweeper Hourly 55.00
Section 4. Building Permit Fees. For determining the value of a structure, the most current
issue of the Building Safety Journal Magazine,which offers the legacy building valuation data
fee schedule as published by the International Code Council, is adopted by reference. Fees
shall be as listed in Tables 3-1: Building Permit Fees, 3-2: Building Plan Fees, 3-3:
Miscellaneous Building Inspection Fees and 3-4: Miscellaneous Building Permit Fees.
Table 3-1: Building Permit Fees
Total 2016 2017 2018 2019 2020 Fee Calculation ($)
Valuation $
1.00- 500.00 32.00 32.50 33.00 33.50 34.00 0.00 to 500.00
501.00-2,000.00 32.00 32.50 33.00 33.50 34.00 For the first 500.00
4.22 4.31 4.39 4.48 4.57 PLUS for each additional
100.00, or fraction thereof,
to and including 2,000.00
2001.00- 95.30 95.17 98.85 100.70 102.55 For the first 2,000.00
25,000.00 19.43 19.81 20.21 20.62 21.03 PLUS for each additional
1,000,00, or fraction thereof,
to and including 25,000.00
25,001.00- 542.19 552.78 563.68 574.96 586.24 For the first 25,000.00
50,000.00 14.08 14.36 14.65 14.94 15.24 PLUS for each additional
1,000.00, or fraction thereof,
to and including 50,000.00
50,001.00- 894.19 911.78 929.93 948.46 967.24 For the first 50,000.00
100,000.00 9.80 9.99 10.19 10.40 10.61 PLUS for each additional
1,000.00, or fraction thereof,
to and including 100,000.00
Page 8
CITY OF ARLINGTON FEE SCHEDULE RESOLUTION#2016-023
100,001.00— 1,384.1 1,411.2 1,439.4 1,468.4 1,497.7 For the first 100,000.00
500,000.00 9 8 3 6 4 PLUS for each additional
7.77 7.93 8.08 8.25 8.41 1,000.00, or fraction thereof,
to and including 500,000.00
500,001.00— 4,492.1 4,583.2 4,671.4 4,768.4 4,861.7 For the first 500,000.00
1,000,000.00 9 8 3 6 4 PLUS for each additional
6.64 6.78 6.91 7.05 7.19 1,000.00, or fraction thereof,
to and including
1,000,000.00
1,000,001.00 and 7,819.1 7,973.2 8,126.4 8,293.4 8,456.7 For the first 1,000,000.00
up 9 8 3 6 4 PLUS for each additional
5.0 5.17 5.27 5.38 5.49 1,000,00, or fraction thereof
7
Table 3-2: Building Plan Fees
Total 2016 2017 2018 2019 2020
Valuation $
All valuations 65% of 65% of 65% of 65% of 65% of
Building Building Building Building Building
Permit Fee Permit Fee Permit Fee Permit Fee Permit Fee
Table 3-3: Miscellaneous Building Inspection Fees
Action Fee $
Inspections outside of normal business hours 50.00 per hour' (minimum charge 1 hour)
Reinspection fees assessed under provisions of the 50.00 per hourl
current IBC
Inspection for which no fee is specifically indicated 50.00 per hour5 (minimum charge-1 hour)
Additional plan review required by changes, 50.00 per hour6 (minimum charge-1 hour)
additions or revised plans
For use of outside consultants for plan review and Actual costs
inspections, or both.
Stop work order (working without permit)'
'Or the total hourly cost to the City,whichever is greatest.This cost shall include supervision,overhead,equipment,hourly wages,
and benefits of the employees involved,
5 Or the total hourly cost to the City,whichever is greatest.This cost shall include supervision,overhead,equipment,hourly
wages,and benefits of the employees involved.
6 Or the total hourly cost to the City,whichever is greatest.This cost shall include supervision,overhead,equipment,hourly
wages,and benefits of the employees involved.
7 Actual costs include administrative and overhead costs.
8 Stop work order(SWO): failure to obtain a valid permit within 48 hour of a SWO will result in double permit fees or a fine of
$500 whichever is less. A permit applied for within the 48 hour timeframe may be subject to a fine and/or fee at the discretion of
the building official.
Page 9
CITY OF ARLINGTON FEE SCHEDULE RESOLUTION#2016-023
Table 3-4: Miscellaneous Building Permit Fees
Action Fee $
Change lot after plan review completed 100.00
Change plans during or after plan review. New Plan Review Fee
Change or revise plans after issuance of Current hourly rate per IBC or new plan review fee
permit.
Commercial or industrial re-roof IBC value or bid amount
Demolitions 100.00
Espresso carts (portable and stand alone) 250.00
Fences over 6 feet in height Current hourly rate per IBC for plan review plus 20.00
permit fee
Mobile homes 500.00
Modular offices Oob shacks 350.00
Moved buildings 100.00 prior to moving together with a building permit
fee based on the IBC valuation for new building and
cost of moved building.
Residential re-roofs 0.00
if plan review required 50.00
Retaining walls (permit not required under 100.00 or IBC valuation, whichever is greater
four(4) feet
Signs IBC valuation, using permit fee only]
4.2 Plumbing Fees. Plumbing fees shall be as listed in Table 3-4: Plumbing Fees.
Table 3-4: Plumbing Permit Fees
Action Fee ($
PERMIT ISSUANCE
Plumbing Permit Base Fee 25.00
Medical Gas Systems 100.00
Fixtures and Vents
For each plumbing fixture or trap or set of fixtures on one trap (including water, drainage 12.00
piping and backflow protection thereof)
Sewers, Disposal Systems and Interceptors
For each industrial waste pretreatment interceptor, including its trap and vent, except 25.00
kitchen-type grease interceptors functioning as fixture traps
Water Piping and Water Heaters
For each water heater including vent 25.00
Lawn Sprinklers, Vacuum Breakers and Backflow Protection Devices
For each lawn sprinkler system on any one meter, including backflow protection devices 25.00
thereof
Swimming Pools For each swimming pool or spa:
Public pool 90.00
Public spa 90.00
Private pool 60.00
Private spa 30.00
Page 10
CITY OF ARLINGTON FEE SCHEDULE RESOLUTION 42016--023
Action Fee ($) �
Miscellaneous
For each appliance or piece of equipment regulated by the Plumbing Code but not 12.00
classed in other appliance categories, or for which no other fee is listed in this code
4.3 Mechanical Permit Fees.Mechanical permit and inspection shall be as listed in Table
3-5: Mechanical Permit and Inspection Fees.
Table 3-5: Mechanical Permit & Inspection Fees
Action Fee $
PERMIT ISSUANCE AND HEATERS
Mechanical Permit Base Fee 25.00
Furnaces 25.00
Appliance Vents
For the installation, relocation or replacement of each appliance vent installed and not 10.00
included in an appliance permit
Boilers 25.00
AHU's and Condensing Units 100.00
Evaporative Coolers & Heat Pumps 25.00
Ventilation and Exhaust
For each ventilation fan connected to a single duct 10.00
Refrigeration Systems 50.00
For each gas piping system of 1 to 5 outlets 10.00
For each additional outlet over 5, each 1.00
Miscellaneous
For each appliance or piece of equipment regulated by the Mechanical Code but not 25.00
classed in other appliance categories, or for which the fee is listed in the table
Table 3-6: Plumbing & Mechanical Plan Review Fees
LESS THAN$500.00 ROUND DOWN TO NEAREST$1,000.
GREATER THAN$500.00 ROUND UP TO NEAREST$1,000.
Total Valuation Fee $
Less than $1,000.00 150.00
$1,000.00 to $9,999.99 200.00
$10,000 to $19,999.99 250.00
$20,000.00 to $29,999.99 300.00
$30,000.00 to $39,999.99 350.00
$40,000.00 to $49,999.99 400.00
$50,000.00 to $59,999.99 450.00
$60,000.00 to $69,999.99 500.00
$70,000.00 to $79,999.99 550.00
$80,000.00 to $89,999.99 600.00
$90,000.00 to $99,999.99 650.00
$100,000.00 to $199,999.99 700.00
Page 11
CITY OF ARLINGTON FEE SCHEDULE RESOLUTION 02016--023
Total Valuation Fee $
$200,000.00 to $299,999.99 _ 800.00
$300,000.00 to $399,999.99 900.00
$400,000.00 to $499,999.99 1,000.00
$500,000.00 to $599,999.99 1,100.00
$600,000.00 to $699,999.99 1,200.00
$700,000.00 to $799,999.99 1,300.00
$800,000.00 to $899,999.99 1,400.00
$900,000.00 to $999,999.99 1,500.00
$1,000,000.00 to $1,999,999.99 1,600.00
$2,000,000.00 to $2,999,999.99 1,700.00
$3,000,000.00 to $3,999,999.99 1,800.00
$4,000,000.00 to $4,999,999.99 1,900.00
5 Million and Up 2,000.00 for the first $5M plus
$1.00 for each additional
$1,000.00 or fraction thereof
Table 3-7: Fire Permit Fees
Action Fee $
Fire Sprinklers
Plan Review Fee 100.00
Permit Fee Based on Valuation
Fire Alarms
Plan Review Fee 100.00
Permit Fee Based on Valuation
Commercial Hoods (Type I & Type II
Plan Review Fee 100.00
Permit Fee Based on Valuation
Other Fire Safety System
Plan Review Fee 100.00
Permit Fee Based on Valuation
Section 5. Fire Department Life-Safety Inspection Fees. Fees for re-inspections for life-
safety issues conducted by the Fire Department shall be as listed in Table 4: Fire Department
Life-Safety Inspection Fees.
Page 12
CITY OF ARLINGTON FEE SCHEDULE RESOLUTION#2016--023
Table 4: Fire Department Life-Safety Inspection Fees
Action Fee $
Life/ Safety Inspections of Businesses
Initial Inspection 0.00
First reins ection for corrections 0.00
Second reins ection for corrections 100.00
Third reins ection for corrections 150.00
Additional inspections to complete life/safety corrections 250.00
and attain compliance
Fireworks Stand Inspection 50.00
Section 6. Fees for the Use of City Owned Facilities. Fees for various services, actions, and
permits regarding use of City owned facilities shall be as listed in Table 6: Fees for the Use
of City Owned Facilities,
Table 5: Fees for the Use of City Owned Facilities
Use/Activity Fee $
Hadley Hall at the Arlington Community Youth Center,
Stillaguamish Conference Room* at Public Works
Administration (154 W. Cox).
*This facility does NOT have a kitchen facility available for use.
Room usage fees for community youth related activities and
Neighborhood Watch meetings may be waived.
Without Kitchen
One to three hours 15.00 per hour
Over three hours 75.00
With Kitchen
One to three hours 20.00 per hour
Over three hours 125.00
Athletic Fields
League
Baseball
Youth, resident team 3.75 per youth per season
Youth, non-resident team 5.00 per team per use
Adult 12.50 per use
Softball
Youth, resident team 3.75 per youth per season
Youth, non-resident team 5.00 per team per use
Adult 12.50 per use
Soccer
Youth, resident team 3.75 per youth per season
Youth, non-resident team 5.00 per team per use
Adult 12.50 per use
Page 13
CITY OF ARLINGTON FEE SCHEDULE RESOLUTION#2016--023
Use/Activity Fee ($)
Other
Youth, resident team 3.75 per youth per season
Youth, non-resident team 5.00 per team per use
Adult 12.50 per use
Tournament
Baseball
Youth, resident team 3.75 per youth per tournament
Youth, non-resident team 5.00 per team per use
Adult 12.50 per use
Softball
Youth, resident team 3.75 per youth per tournament
Youth, non-resident team 5.00 per team per use
Adult 12.50 per use
Soccer
Youth, resident team 3.75 per youth per tournament
Youth, non-resident team 5.00 per team per use
Adult 12.50 per use
Other
Youth, resident team 3.75 per youth per season
Youth, non-resident team 5.00 per team per use
Adult 12.50 per use
Lighting
Youth 3.00 per hour
Adult 6.00 per hour
Scheduling Fee for League and Tournament
League 15.00 per team
Tournament 15.00 per tournament
Concession Sales
League 50.00 per season
Tournament 25.00 per day
6.1 Definitions.
A. "Youth" is defined as any person 18 years of age or younger.
B. "Resident" is defined as any team composed of at least 51% Arlington
residents.
Section 7.Appeal Fees for Violations and Abatement.Fees for various services and actions
regarding violations and abatement as per Chapter 11.01 of the Arlington Municipal Code
shall be as listed in Table 6: Appeal Fees for Violations and Abatement.
Page 14
CITY OF ARLINGTON FEE SCHEDULE RESOLUTION#2016--023
Table 6: Appeal Fees for Violations and Abatement
Action Fee $
Appeals
To Hearing Examiner 582.00 plus actual cost of Hearing Examiner
Fines
Forest Practice Violation Fine 317.00
Section 8. Licensing Fees. Licensing fees for various licenses issued under various sections
of the Arlington Municipal Code shall be as listed in Table 7:- Licensing Fees.
Table 7: Licensing Fees
License/Activity Fee ($)
New application/renewal business license under AMC Chapter 60.00
5.28
Late payment penalty for business license under AMC Chapter 5.28 120.00
For new applications applied for between October 1st through 45.00
December 31 st
For new applications applied for between January I"through March 30.00
31 St
For new applications applied for April I" through June 30th (Note: 75.00
$15 for the remainder of the current business license year and $60
for the new business license year for a total of $75, making the
business license valid thru June 30th of the following year.)
Businesses with offices located outside of city limits but conducting 20.00
business within city limits (AMC Chapter 5.28)
Peddlers & Solicitors License under AMC Chapter 5.04 _ _ _ 25.00
Vehicles for Hire License under AMC Chapter 5.12
- First vehicle 35.00
- Each vehicle thereafter 15.00
Cabaret License under AMC Chapter 5.16 (annual) 75.00
Section 9. EMS Fees and Charges.
9.1 Fees and Mileage Charges Established.For purposes of AMC Chapter 3.06,
fees and mileage for EMS services shall be set as set forth in Table 8: Emergency
Medical Services Rates and Charges.
9.2 Beginning on January 1, 2013, the rates set forth for the year 2012 shall be
increased annually effective January 1 of each succeeding year by the June reported
percentage increase of the Consumer Price Index (CPI) for the Seattle-Tacoma-
Bremerton area for All Urban Consumers,or other measure commonly used by the city
should it change; provided, however, that notwithstanding any reduction in the CPI,
rates shall not decrease.
9.3 EMS Transport Fees. In accordance with the requirements of 42 Code of
Federal Regulations (CFR) Parts 410 and 414, which provides that Medicare fees and
charges shall apply to Medicare recipients;
Page 15
CITY OF ARLINGTON FEE SCHEDULE RESOLUTION#2016--023
A. Unmet(excess fee) Part B Deductible and Part B coinsurance amounts. In
accordance with the provisions of 42 CFR Parts 410 and 414,the City shall
bill the patient for any unmet or excess fee to the extent authorized by
federal law.
B. Inability to Pay Excess Fee. Individuals who are on fixed or low incomes
or do not have the ability to pay the differential because of financial
difficulties may submit a request to waive the differential to the City with
supporting documentation of the inability to pay.
Table 8: Emergency Medical Services Rates and Charges
Service 2016 Rate $ 2017 Rate $
BLS Non-emergent 558.80 568.86
BLS Emergent 558.80 568.86
ALS Emergent 965.20 982.57
ALS 2 965.20 982.57
ALS Response Fee 277.85 282.85
Specialty Care Transport Fee 965.20 982.57
Mileage (all categories) 16.77 per mile 17.07 per mile
Non-resident transport fee—additional fee charged to those 100.00 100.00
patients transported from outside of the Arlington EMS
service area.
Arlington EMS Service area includes Arlington City limits and the limits of Fire
District 19,Fire District 21 (Arlington Rural),Fire District 24,and Fire District 25
Section 10. Dog Licensing Fees.
10.1 Fees for dog licenses as called for in Arlington Municipal Code Chapter 8.09
shall be listed in Table 9: Dog Licensing Fees
10.2 Per RCW 49.60.380, the City of Arlington shall honor a request by a blind
person or hearing impaired person not to be charged a fee to license his or her guide
dog, or a request by a physically disabled person not to be charged a fee to license his
or her service animal.
10.3 All dogs require proof of current Rabies vaccination to be licensed.
10.4 Proof of alteration and micro-chip is required to receive reduced fees
Table 9: Dog Licensing Fees
License Annual Fee $
Dog - unaltered 20.00
Dog—altered 10.00
Do —altered (senior citizen owner) 5.00
Dog—altered & micro-chipped 5.00
Replacement Tag fee 5.00
Late Fee—for failure to purchase annual license before March 1 10.00
Section 11.Fees for Police Services. Fees for various services,actions,and permits for police
services shall be as listed in Table 10: Fees for Police Services.
Page 16
CITY OF ARLINGTON FEE SCHEDULE RESOLUTION#2016--023
Table 10: Police Services
Action/Service/License Fee M
Fingerprinting 20.00
Lamination of Concealed Weapons Permit 4.25
Anti-Harassment Order Service (Includes service, return of 80.00
service, mileage & fuel costs)
Fine for Parking:
1. Fine for parking as described in Arlington Municipal 50.00
Code 10.54.060, Prohibited Parking
2. Fine if paid within 24 hours of issuance 25.00
3. Fine if not paid within 15 days of issuance 100.00
Section 12. Fees for Duplication of Public Records. Fees for various services and actions
for duplication of public records shall be listed in Table 11: Public Records Services.
Table 11: Public Records Services
Action/ Service Fee $
In house copying of City documents for the public 0.15 per page
In house copying of City documents to PDF when original 0.10 per page
document is not in electronic format 1.00 to copy to CD
2.50 to copy to USB Flash Drive
In house duplication of City documents to CD or USB Flash 10 per CD or USB Flash Drive
Drive, such as Comprehensive Plan, Arlington Municipal Code
Title 20, Design Standards, Engineering Standards,
Development Standards, etc. _
Maps (For GIS specific services see below)
18" x 24" 1.50
22" x 34" 2.60
24" x 36" 3.00
30" x 30" 3.15
36" x 36" 4.50
Documents or CD/USB Flash Drive printed by outside party Actual cost to reproduce
Color Photos 0.40
Duplication of all other types of city media (e.g. photographs, Actual cost to reproduce
audio/video tapes, blueprints)
Certified copy of a public record 5.00 for the first page; 1.00 for
each page thereafter
GIS
Zoning and Land Use Maps 10.00
l lxl7 5.00
2x3 13.00
3x3 19.00
3x4 25.00
Map CD 26.00
Page 17
CITY OF ARLINGTON FEE SCHEDULE RESOLUTION#2016--023
Data CDs/FTP 26.00 per client
Hourly Rate for Custom Work 127.00 per hour, '/z hour minimum
Laminating 3.00/sq ft
Shipping 5.00
Fee 0.00
Section 13. Repeal of Previous Fee Resolution. Resolution 2015-009 is hereby repealed.
Section 14. Effective Date. This resolution will become effective immediately upon
passage.
PASSED by the City Council and APPROVED by the Mayor this 19`h day of December, 2016.
CITY OF ARLINGTON
Barbara Tolbert, Mayor
ATTEST:
t l
Kristin hanfield, City Clerk
APPROVED AS TO FORM:
Steve P ' 4 , N Attorney
Page 18