Loading...
HomeMy WebLinkAboutResolution 2015-003 Fee Resolution FINAL 4-20-15 RESOLUTION NO. 2015-003 A RESOLUTION REPLACING RESOLUTION NO.2012-009, AND ADOPTING A REVISED FEE SCHEDULE WHEREAS, the City Council, through ordinance, has adopted regulations requiring certain actions and services; and, WHEREAS, these various ordinances set forth that fees shall be set by resolution; and, WHEREAS, the cost of providing these various services consistent with applicable codes, regulations, and policies periodically increase or decrease, or certain services or practices are discontinued and fees are no longer needed; and, WHEREAS, it is the intent of the City of Arlington to charge appropriate fees and charges that are consistent with the services provided and to cover the public cost of providing these various services so that the public is not subsidizing individual benefits derived therefrom; NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ARLINGTON AS FOLLOWS: The following rates, fees, and charges for various services provided, actions performed, or items sold by the city and/or its contract service providers, and fines levied against code violators, are hereby adopted: Section 1. Fees and Charges—General. 1.1 Fees. Fees are intended to cover the normal, recurring costs associated with providing a given service. Fees are non-refundable. 1.2 Prices. In some instances,the City provides certain goods and merchandise for sale. Prices for these goods may be included in this resolution. 1.3 Payment Due. Fees are due at the time the action is requested (e.g., at time of application) or occurs (e.g., prior to a specific action). An applicant may pay all fees of a multi-phased project in advance; however, doing so does not vest applicable fees due. Fees due are those in effect at the time the specific action or phase of an action is requested or occurs. 1.4 Waivers. Upon petition by the applicant, the City Council may waive any of the fees, or portions thereof, for any non-profit organization or government agency. Page 1 CITY OF ARLINGTON FEE SCHEDULE RESOLUTION#2015-003 Section 2. Land Use Fees. Fees for various services, actions, and permits regarding land use, as per AMC Title 20 Land Use Code, shall be as listed in Table 1: Land Use Fees Table 1: Land Use Fees Action Fee ($ Land Use Permits Zoning Permit 2,222 Special Use Permit 3,306 plus actual cost of Hearing Examiner(if re 'd) Conditional Use Permit 3,862 plus actual cost of Hearing Examiner Administrative Conditional Use Permit Seasonal/Special Event 102 Homeless Encampment 508 Preliminary Plats and Binding Site Plans Conditional Use Permit for a Long Plat 6,983 plus actual cost of Hearing Examiner Zoning Permit for a Short Plat 3,068 Final Plats and Binding Site Plans Long Plat 3,389 Short Plat 1,823 Development Agreements 3,862 plus actual cost of Hearing Examiner if re 'd Master Plan 12,500 Design Review Administrative 212 Design Review Board 423 Forest Practices Permits Permit Review 423 Forest Practices Permit Application Fee 106 plus 106 per acre Review Fee for Conversion Option Harvest Plan Approval 106 plus 106 per acre Review Fee To Lift Moratorium 300 Inspection Fee 127 per hour plus 106 per acre Appeals To City Council 212 To Planning Commission 212 To Hearing Examiner 582 plus actual cost of Hearing Examiner To Shoreline Hearings Board 582 Reconsideration of Decision by: Community Development Director and/or a designee 79 Planning Commission 106 Hearing Examiner 212 plus actual cost of Hearing Examiner City Council 132 Page 2 CITY OF ARLINGTON FEE SCHEDULE RESOLUTION#2015-003 Action Fee $ Permit Extension Extension 53 Amendment to or Modification of Permit Insignificant Design Deviations 53 Minor Amendment 317 Major Amendment 1,067 plus cost of Hearing Examiner if re 'd) Binding Site Plans Text and/or Design Deviation 741 Lot Line Adjustment or Changes to Number of Lots 1,323 Development Agreement 741 plus actual cost of Hearing Examiner (if re 'd) Boundary Line Adjustment Boundary Line Adjustment 1,664 Land Use Ordinance Amendment Amendment to Text of Land Use Ordinance 741 Amendment to Zoning Map (rezone) < 5 acres 1,111 > or= 5 acres 1,957 Comprehensive Plan Amendment Minor Amendment (annual cycle) 1,428 Major Amendment (5-year cycle) 2,116 Annexations Submission of 10% Petition 106 Submission of 60% Petition 1,058 If it goes to BRB hearing 794 Shoreline Development Permit SDP in conjunction with a Land Use Permit 529 SDP not in conjunction with a Land Use Permit 1,058 Variance Administrative 635 If it goes to hearing (fee in addition to that paid for 1,217 plus actual cost of Admin. Decision) Hearing Examiner Miscellaneous Actions/Items Zoning Interpretation 106 Pre-Application Meetings 1 st two hours 0 Subsequent meetings 317 per meeting SEPA Review (note: review of checklist included in Land Use Permit fee ) SEPA Only (no land use permit required) 529 Review of requested studies (i.e. traffic, wetland, etc) 159 Page 3 CITY OF ARLINGTON FEE SCHEDULE RESOLUTION#2015-003 Action Fee $ Review of requested studies (i.e, drainage, geo-tech, etc) 711 Environmental Impact Statement (EIS) 1,058 plus actual cost of consultant Request of Utility Services Outside City Single-Family Residence/Duplex 212 Other Development 635 Section 3. Public Works Fees. Fees for various services, actions and permits shall be as listed in Tables 2-1: Review Fees, 2-2: Grading Plan Review Fees, 2-3: Grading Permit Fees, and 2-4: Public Works Labor and Equipment Charges, Table 2-1: Review Fees Action Fee ($) Site Civil Review 6% E.E.C.0 with a minimum charge of 1,587 Additional Plan Review Fee 212 each Miscellaneous Engineering Fee 529 each As-Built Review Fee Included in the site civil review fee Final Plat Review Fee Included in the site civil review fee Inspection Fee 127 per hour-1/2 hour minimum Outside Consultant Review Fee Actual cost Simple Site Plan Review 265 per lot Right of Way 6% E.E.C.CZ or maximum 1,058 with a 1,E.E.C.0 Engineer's Estimated Cost of Construction-Includes labor, equipment, material, overhead and profit. Prices shall be from RS Means(latest edition) data adjusted for the Snohomish County area or from local sources if not included in the RS Means database. * Simple Site Plan Review-No water or sewer extension -Single family residence with maximum of 2 lots. * Additional plan review applies when there is a change, addition or revision to the plan. * Additional plan review fees will be charged at any point in the project when more than 2 reviews are required. * Inspection Fee-commercial and residential plats(storm drainage, landscape,right-of-way and bond inspections). * Outside Consultant Review Fee. * Water Availability Certificate Fee. * Engineering Meetings(first 2 hours are no charge). * Miscellaneous engineering fee-traffic and storm water report/design reviewed in-house. 2 E.E.C.0 Engineer's Estimated Cost of Construction-Includes labor, equipment, material, overhead and profit. Prices shall be from RS Means (latest edition)data adjusted for the Snohomish County area or from local sources if not included in the RS Means database. * Simple Site Plan Review-No water or sewer extension - Single family residence with maximum of 2 lots. * Additional plan review applies when there is a change,addition or revision to the plan. * Additional plan review fees will be charged at any point in the project when more than 2 reviews are required. * Inspection Fee-commercial and residential plats(storm drainage, landscape, right-of-way and bond inspections). * Outside Consultant Review Fee. * Water Availability Certificate Fee. * Engineering Meetings(first 2 hours are no charge). * Miscellaneous engineering fee-traffic and storm water report/design reviewed in-house. Page 4 CITY OF ARLINGTON FEE SCHEDULE RESOLUTION#2015-003 Action Fee ($) minimum charge of 106 plus inspection fees Right of Way Vacation 1,058 Miscellaneous Staff Time 127 per hour per person-1/2 hour minimum Engineering Meetings-after 2 hours 317 per meeting Water Availability Certificate SFR 32—Non-SFR 106 Recovery Contract 1,058 plus actual cost GIS Zoning and Land Use Maps 10.00 l lxl7 5.00 20 13.00 30 19.00 3x4 25.00 Map CD 26.00 Data CDs/FTP 26.00 per client Hourly Rate for Custom Work 127 per hour, '/z hour minimum Laminating 3/sq ft Shipping 5.00 Fee none Table 2-2: Grading Plan Review Fees Fee M 50 Cubic Yards or less No fee 51 to 100 cubic yards 25.50 101 to 1,000 cubic yards 40.00 1,001 to 100,000 cubic yards First 1,000 cubic yards 53.35 Plus - for each additional 10,000 yards or fraction thereof 26.50 100,001 to 200,000 cubic yards For the first 100,000 cubic yards 292.00 Plus - for each additional 10,000 yards or fraction thereof _ 14.40 200,001 cubic yards or more For the first 200,000 cubic yards 435.45 Plus - for each additional 10,000 cubic yards or fraction thereof 7.85 Other Fees: Additional plan review required by changes, additions or revisions to approved plans (minimum 54.703 charge— 1/2 hour) Per hour 3 0r the total hourly cost to the City, whichever is the greatest. This cost shall include supervision, overhead, equipment, hourly wages and fringe benefits of the employees involved. Page 5 CITY OF ARLINGTON FEE SCHEDULE RESOLUTION#2015-003 Table 2-3: Grading Permit Fees Fee ($) 50 cubic yards or less 25.50 51 to 100 cubic yards 40.00 101 to 1,000 cubic yards First 100 cubic yards 40.00 Plus —for each additional 100 cubic yards or fraction thereof 18.90 1,001 to 10,000 cubic yards For the first 1,000 cubic yards 210.50 Plus - for each additional 1,000 yards or fraction thereof 15.70 10,001 to 100,000 cubic yards For the First 10,000 cubic yards 351.80 Plus - for each additional 10,000 yards or fraction thereof 71.40 _ 100,001 or more cubic yards or more For the first 100,000 cubic yards 994.80 Plus - for each additional 10,000 cubic yards or fraction thereof 39.50 Table 2-4: Public Works Labor and Equipment Charges A. Services and work included in the below schedule will be charged a 15% administrative/overhead fee for accounting, billing and general City administrative costs. B. All work or services not included in the below schedule must be mutually agreed upon prior to the commencement of work. C. Equipment and machinery that is not explicitly included in the below schedule will be charged at the rate set forth in the most current Rental Rate Blue Book for Construction Equipment ("Blue Book"). If the equipment or machinery rate is not available in the Blue Book, the City will determine an appropriate fee or rate based on the original cost of the asset plus operating and maintenance cost and/or comparable rates charged by other organizations. Page 6 CITY OF ARLINGTON FEE SCHEDULE RESOLUTION#2015-003 Item Fee ($) Labor Rate Cost Lead Maintenance Worker Hourly $ 60.00 Sr. Maintenance Worker Hourly $ 55.00 Maintenance Worker Hourly $ 50.00 PW Inspector Hourly $ 60.00 Administrative Staff Hourly $ 45.00 Equipment Pick-up Truck Hourly $ 15.00 Dump Truck Hourly $ 75.00 Back-hoe Hourly $ 55.00 Vactor-Jetter Truck Hourly $ 105.00 Snow Plow Hourly $ 75.00 Street Sweeper Hourly $ 55.00 Section 4. Building Permit Fees. For determining the value of a structure, the most current issue of the Building Safety Journal Magazine, which offers the legacy building valuation data fee schedule as published by the International Code Council, is adopted by reference. Fees shall be as listed in Tables 3-1: Building Permit Fees, 3-2: Miscellaneous Building Inspection Fees and 3-3: Miscellaneous Building Permit Fees. Table 3-1: Building Permit Fees Total 2013 2014 2015 2016 Fee ($) Valuation($) 1.00- 500.00 30.50 31.00 31.50 32.00 0.00 to 500.00 501.00-2,000.00 30.50 31.00 31.50 32.00 For the first 500.00 plus 3.98 4.06 4.14 4.22 For each additional 100.00, or fraction thereof, to and including 2,000.00 2001.00- 90.20 91.90 93.60 95.30 For the first 2,000.00 plus 25,000.00 18.31 18.67 19.05 19.43 For each additional 1,000.00, or fraction thereof, to and including 25,000.00 25,001.00- 511.33 521.31 531.75 542.19 For the first 25,000.00 plus 50,000.00 13.27 13.53 13.80 14.08 For each additional 1,000.00, or fraction thereof, to and including 50,000.00 50,001.00- 843.08 859.56 876.75 894.19 For the first 50,000.00 plus 100,000.00 9.23 9.42 9.61 9.80 For each additional 1,000.00, or fraction thereof, to and including 100,000.00 Page 7 CITY OF ARLINGTON FEE SCHEDULE RESOLUTION#2015-003 100,001.00- 1,304.58 1,330.56 1,357.25 1,384.19 For the first 100,000.00 plus 500,000.00 7.32 7.47 7.62 7.77 For each additional 1,000.00, or fraction thereof, to and including 500,000.00 500,001.00- 4,232.58 4,318.56 4,405.25 4,492.19 For the first 500,000.00 plus 1,000,000.00 6.26 6.39 6.51 6.64 For each additional 1,000,00, or fraction thereof, to and including 1,000,000.00 1,000,001.00 7,362.58 7,513.56 7,660.25 7,819.19 For the first 1,000,000.00 plus and up 4.78 4.87 4.97 5.07 For each additional 1,000.00, or fraction thereof Total 2017 2018 2019 2020 Fee ($) Valuation $ 1.00- 500.00 32.50 33.00 33.50 34.00 0.00 to 500.00 501.00-2,000.00 32.50 33.00 33.50 34.00 For the first 500.00 plus 4.31 4.39 4.48 4.57 For each additional 100.00, or fraction thereof, to and including _ 2,000.00 2001.00- 95.17 98.85 100.70 102.55 For the first 2,000.00 plus 25,000.00 19.81 20.21 20.62 21.03 For each additional 1,000.00, or fraction thereof, to and including _ 25,000.00 25,001.00- 552.78 563.68 574.96 586.24 For the first 25,000.00 plus 50,000.00 14.36 14.65 14.94 15.24 For each additional 1,000.00, or fraction thereof, to and including 50,000.00 50,001.00- 911.78 929.93 948.46 967.24 For the first 50,000.00 plus 100,000.00 9.99 10.19 10.40 10.61 For each additional 1,000.00, or fraction thereof, to and including 100,000.00 100,001.00- 1,411.28 1,439.43 1,468.46 1,497.74 For the first 100,000.00 plus 500,000.00 7.93 8.08 8.25 8.41 For each additional 1,000.00, or fraction thereof, to and including 500,000.00 500,001.00- 4,583.28 4,671.43 4,768.46 4,861.74 For the first 500,000.00 plus 1,000,000.00 6.78 6.91 7.05 7.19 For each additional 1,000.00, or fraction thereof, to and including 1,000,000.00 1,000,001.00 and 7,973.28 8,126.43 8,293.46 8,456.74 For the first 1,000,000.00 plus up 5.17 5.27 5.38 5.49 For each additional 1,000.00, or fraction thereof Page 8 CITY OF ARLINGTON FEE SCHEDULE RESOLUTION#2015-003 Table 3-2: Miscellaneous Building Inspection Fees Action Fee $ Inspections outside of normal business hours 50.00 per hour (minimum charge 1 hour) Reinspection fees assessed under provisions of the 50.00 per hour current IBC Inspection for which no fee is specifically indicated 50.00 per hours (minimum charge-1 hour Additional plan review required by changes, 50.00 per hour' (minimum charge-1 hour) additions or revised plans For use of outside consultants for plan review and Actual costs inspections, or both. -Stop work order (working withoutpermit)a Table 3-3: Miscellaneous Building Permit Fees Action Fee ($ Change lot after plan review completed 100.00 Change plans during or after plan review. New Plan Review Fee Change or revise plans after issuance of Current hourly rate per IBC or new plan review fee permit. Action Fee $ Commercial or industrial re-roof IBC value or bid amount Demolitions 100.00 Espresso carts (portable and stand alone) 250.00 Fences over 6 feet in height Current hourly rate per IBC for plan review plus 20.00 permit fee Mobile homes 500.00 Modular offices lJob shacks) 350.00 Moved buildings 100.00 prior to moving together with a building permit fee based on the IBC valuation for new building and cost of moved building. Residential re-roofs 0 if plan review required 50.00 Retaining walls (permit not required under 100.00 or IBC valuation, whichever is greater four(4) feet Signs IBC valuation, using permit fee only a Or the total hourly cost to the City,whichever is greatest.This cost shall include supervision,overhead,equipment,hourly wages, and benefits of the employees involved. 5 Or the total hourly cost to the City, whichever is greatest.This cost shall include supervision,overhead,equipment,hourly wages,and benefits of the employees involved. 6 Or the total hourly cost to the City, whichever is greatest.This cost shall include supervision,overhead,equipment,hourly wages,and benefits of the employees involved. 7 Actual costs include administrative and overhead costs. 8 Stop work order(SWO): failure to obtain a valid permit within 48 hour of a SWO will result in double permit fees or a fine of $500 whichever is less. A permit applied for within the 48 hour timeframe may be subject to a fine and/or fee at the discretion of the building official. Page 9 CITY OF ARLINGTON FEE SCHEDULE RESOLUTION#2015-003 4.2 Plumbing Fees. Plumbing fees shall be as listed in Table 3-4: Plumbing Fees. Table 3-4: Plumbing Permit Fees Action Fee $ PERMIT ISSUANCE Plumbing Permit Base Fee 25.00 Medical Gas Systems 100.00 Fixtures and Vents For each plumbing fixture or trap or set of fixtures on one trap (including water, drainage 12.00 piping and backflow protection thereof) Sewers Disposal Systems and Interceptors For each industrial waste pretreatment interceptor, including its trap and vent, except 25.00 kitchen-type grease interceptors functioning as fixture traps Water Piping and Water Heaters For each water heater including vent 25.00 Lawn Sprinklers,Vacuum Breakers and Backflow Protection Devices For each lawn sprinkler system on any one meter, including backflow protection devices 25.00 thereof Swimming Pools For each swimming pool ors a: Public pool 90.00 Public spa 90.00 Private pool 60.00 Private spa 30.00 Miscellaneous For each appliance or piece of equipment regulated by the Plumbing Code but not 12.00 classed in other appliance categories, or for which no other fee is listed in this code 4.3 Mechanical Permit Fees.Mechanical permit and inspection shall be as listed in Table 3-5: Mechanical Permit and Inspection Fees. Table 3-5: Mechanical Permit & Inspection Fees Action Fee ($) PERMIT ISSUANCE AND HEATERS Mechanical Permit Base Fee 25.00 Furnaces 25.00 Appliance Vents For the installation, relocation or replacement of each appliance vent installed and not 10.00 included in an appliance permit Boilers 25.00 AHU's and Condensing Units 100.00 Evaporative Coolers & Heat Pumps 25.00 Ventilation and Exhaust For each ventilation fan connected to a single duct 10.00 Page 10 CITY OF ARLINGTON FEE SCHEDULE RESOLUTION#2015-003 Action Fee $ Refrigeration Systems 50.00 For each gas piping system of 1 to 5 outlets 10.00 For each additional outlet over 5, each 1.00 Miscellaneous For each appliance or piece of equipment regulated by the Mechanical Code but not 25.00 classed in other appliance categories, or for which the fee is listed in the table Table 3-6: Plumbing & Mechanical Plan Review Fees LESS THAN$500.00 ROUND DOWN TO NEAREST$1,000. GREATER THAN $500.00 ROUND UP TO NEAREST$1,000. Total Valuation Fee ($ Less than $1,000.00 150.00 $1,000.00 to $9,999.99 200.00 $10,000 to $19,999.99 250.00 $20,000.00 to $29,999.99 300.00 $30,000.00 to $39,999.99 350.00 $40,000.00 to $49,999.99 400.00 $50,000.00 to $59,999.99 450.00 $60,000.00 to $69,999.99 500.00 $70,000.00 to $79,999.99 550.00 $80,000.00 to $89,999.99 600.00 $90,000.00 to $99,999.99 650.00 $100,000.00 to $199,999.99 700.00 $200,000,00 to $299,999.99 800.00 $300,000.00 to $399,999.99 900.00 $400,000.00 to $499,999.99 1,000.00 $500,000.00 to $599,999.99 1,100.00 $600,000.00 to $699,999.99 1,200.00 $700,000,00 to $799,999.99 1,300.00 $800,000.00 to $899,999.99 1,400.00 $900,000.00 to $999,999.99 1,500,00 $1,000,000.00 to $1,999,999.99 1,600.00 $2,000,000.00 to $2,999,999.99 1,700.00 $3,000,000.00 to $3,999,999.99 1,800.00 $4,000,000.00 to $4,999,999.99 1,900.00 5 Million and Up 2,000.00 for the first $5M plus $1.00 for each additional $1,000.00 or fraction thereof Page 11 CITY OF ARLINGTON FEE SCHEDULE RESOLUTION#2015-003 Table 3-7: Fire Permit Fees Action Fee $ Fire Sprinklers Plan Review Fee 100.00 Permit Fee Based on Valuation Fire Alarms Plan Review Fee 100.00 Permit Fee _ Based on Valuation Commercial Hoods (Type I & Type II Plan Review Fee 100.00 Permit Fee Based on Valuation Other Fire Safety System Plan Review Fee 100.00 Permit Fee Based on Valuation Section 5. Fire Department Life-Safety Inspection Fees. Fees for re-inspections for life- safety issues conducted by the Fire Department shall be as listed in Table 4: Fire Department Life-Safety Inspection Fees. Table 4: Fire Department Life-Safety Inspection Fees Action Fee $ Life /Safety Inspections of Businesses Initial Inspection 0.00 First reins ection for corrections 0.00 Second reins ection for corrections 100.00 Third reins ection for corrections 150.00 Additional inspections to complete life/safety corrections 250.00 and attain compliance Section 6. Cemetery Fees. Fees and prices for various services, actions, and merchandise for cemetery use shall be as listed in Table 5: Cemetery Fees and Prices. Table 5: Cemetery Fees and Prices Product/Service/Action Fee $ Traditional Burial _ Burial Lot $1,200 Burial Lot Endowment Fee $300 Opening & Closing (during business hours) $1,000 Opening & Closing after business hours) $1,500 Concrete Grave Liner $800 Traditional Vaults Wilbert Bronze $18,395 Page 12 CITY OF ARLINGTON FEE SCHEDULE RESOLUTION 42015-003 Bronze Triune $4,895 Copper Triune $4,695 Monticello / Salute $1,295 Continental $1,595 Venetian $2,395 Cameo Rose/ SST Triune /Veteran $2,695 Wilbert Way Saturday Service fee $325 Urn Vaults Bronze Triune $950 Copper Triune $950 Cameo Rose/ SST Triune/Veteran $850 Venetian $750 Monticello $650 Universal $450 Urns Tribute $295 Regal $295 Inurnment Urn Garden $520 Urn Garden Endowment Fee $130 Second Right Inurnment $400 Second Right Inurnment Endowment Fee $100 Opening & Closing (during business hours) $445 Opening & Closing after business hours $695 Concrete Urn Liner $310 Childrens Garden Children's Garden Lot $317 Children's Garden Lot Endowment Fee $80 Opening & Closing (all times) $488 Children's Garden Liner $396 Niche Niche Wall I1, rows 4-6 bottom half $750 Niche Wall I1, rows 4-6 bottom half Endowment Fee $150 Niche Wall III, rows 1-3 top half $1,019 Niche Wall III, rows 1-3 top half Endowment Fee $250 Niche Wall III, rows 4-6 bottom half $869 Niche Wall III, rows 4-6 bottom half Endowment Fee $220 Opening & Closing (during business hours) $445 Opening & Closing (after business hours) $695 Second Right Niche Wall $436 Second Right Niche Wall Endowment Fee $109 Tent and Chairs for Inurnment $163 Page 13 CITY OF ARLINGTON FEE SCHEDULE RESOLUTION 42015-003 Flower Vase for Niche Wall $195 Replacement Flower Vase (vase only) $20 Inscriptions Niche Inscription— Single $363 Niche Inscription—Double (both names and I" DOD, 2°d DOD later) $563 Flat Marker Final DOD Inscription & Re-Installation off-site) $495 Flat Marker Final DOD Inscription (on site) $363 Monument or Slant"single" Final DOD Inscription (off-site) $550 Monument or Slant "companion" Final DOD Inscription (off site) $550 Monument or Slant Final DOD Inscription (on site) $363 Headstones & Monuments Various Headstones, Memorials, Monuments, Benches, Pillows, Slants, etc. Call for Pricing Installation Fees includes inspection fee Flat Markers Flat Marker— Children's Garden (up to 24" x 12") $175 Flat Marker— 30" x 18" or smaller $275 Flat Marker—28" x 34" or larger $375 Flat Marker Re-Installation Fee—All sizes $175 Upright Monuments, Slants, Pillows and Benches Standard Size "Individual" & Foundation $575 Standard Size "Companion" & Foundation $675 Standard Bench $575 Monubench $675 Other Company's Mechandise Call for Quote Miscellaneous Fees Standard Inspection Fee (headstone, bench, vault, liner, etc.) $100 Administration Service Fee $50 Temporary Marker $30 Other Services Memorial Tree w/ garden marker $800 Disinterment/Traditional Burial $1,995 Disinterment/ Cremation $650 Pressure Washing $ 40 for first headstone $ 25 for each additional headstone Section 7. Fees for the Use of City Owned Facilities. Fees for various services, actions, and permits regarding use of City owned facilities shall be as listed in Table 6: Fees for the Use of City Owned Facilities. Page 14 CITY OF ARLINGTON FEE SCHEDULE RESOLUTION 42015-003 Table 6: Fees for the Use of City Owned Facilities Use/Activity Fee $ Hadley Hall at the Arlington Community Youth Center, Stillaguamish Conference Room at Public Works Administration (154 W. Cox). *Please note that the Stillaguamish Conference Room does NOT have a kitchen facility available for use. _ Without Kitchen One to three hours 15 per hour Over three hours 75 With Kitchen One to three hours 20 per hour Over three hours 125 Athletic Fields League Baseball Youth, resident team 7.50 per youth per season Youth, non-resident team 10 per team per use Adult 25 per use Softball Youth, resident team 7.50 per youth per season Youth, non-resident team 10 per team per use Adult 25 per use Soccer Youth, resident team 7.50 per youth per season Youth, non-resident team 10 per team per use Adult 25 per use Other Youth, resident team 7.50 per youth per season Youth, non-resident team 10 per team per use Adult 25 per use Tournament Baseball Youth, resident team 7.50 per youth per tournament Youth, non-resident team 10 per team per use Adult 25 per use Softball Youth, resident team 7.50 per youth per tournament Youth, non-resident team 10 per team per use Adult 25 per use Soccer Youth, resident team 7.50 per youth per tournament Youth, non-resident team 10 per team per use Adult 25 per use Page 15 CITY OF ARLINGTON FEE SCHEDULE RESOLUTION#2015-003 Other Youth, resident team 7.50 per youth per season Youth, non-resident team 10 per team per use Adult 25 per use Lighting Youth 3 per hour Adult 6 per hour Scheduling Fee for League and Tournament League 15 per team Tournament 15 per tournament Concession Sales League 50 per season Tournament 25 er day 7.1 Definitions. A. "Youth" is defined as any person 18 years of age or younger. B. "Resident" is defined as any team composed of at least 51% Arlington residents. Section 8.Appeal Fees for Violations and Abatement. Fees for various services and actions regarding violations and abatement as per Chapter 11.01 of the Arlington Municipal Code shall be as listed in Table 7: Appeal Fees for Violations and Abatement. Table 7: Appeal Fees for Violations and Abatement Action Fee $ Appeals To Hearing Examiner 582 plus actual cost of Hearing Examiner Fines Forest Practice Violation Fine 317 Section 9. Licensing Fees. Licensing fees for various licenses issued under various sections of the Arlington Municipal Code shall be as listed in Table 8:- Licensing Fees. Table 8: Licensing Fees License/Activity Fee ($) New application/renewal business license under AMC Chapter 60.00 5.28 Late payment penalty for business license under AMC Chapter 5.28 120.00 For new applications applied for between October 1st through 45.00 December 3 1" For new applications applied for between January lst through March 30.00 31st Page 16 CITY OF ARLINGTON FEE SCHEDULE RESOLUTION 42015-003 For new applications applied for April I" through June 30` (Note: 75.00 $15 for the remainder of the current business license year and $60 for the new business license year for a total of $75, making the business license valid thru June 301h of the following ear.) Businesses with offices located outside of city limits but conducting 20.00 business within city limits (AMC Chapter 5.28) Peddlers & Solicitors License under AMC Chapter 5.04 25.00 Vehicles for Hire License under AMC Chapter 5.12 - First vehicle 35.00 - Each vehicle thereafter 15.00 Cabaret License under AMC Chapter 5.16 (annual) 75.00 Section 10. EMS Fees and Charges. 10.1 Fees and Mileage Charges Established. For purposes of AMC Chapter 3.06, fees and mileage for EMS services shall be set as set forth in Table 9: Emergency Medical Services Rates and Charges. 10.2 Beginning on January 1, 2013,the rates set forth for the year 2012 shall be increased annually by the June reported percentage increase of the Consumer Price Index (CPI)for the Seattle-Tacoma-Bremerton area for All Urban Consumers, or other measure commonly used by the city should it change; provided, however, that notwithstanding any reduction in the CPI, rates shall not decrease. 10.3 EMS Transport Fees. In accordance with the requirements of 42 Code of Federal Regulations (CFR) Parts 410 and 414, which provides that Medicare fees and charges shall apply to Medicare recipients; A. Unmet (excess fee) Part B Deductible and Part B coinsurance amounts. In accordance with the provisions of 42 CFR Parts 410 and 414,the City shall bill the patient for any unmet or excess fee to the extent authorized by federal law. B. Inability to Pay Excess Fee. Individuals who are on fixed or low incomes or do not have the ability to pay the differential because of financial difficulties may submit a request to waive the differential to the City with supporting documentation of the inability to pay. Page 17 CITY OF ARLINGTON FEE SCHEDULE RESOLUTION#2015-003 Table 9: Emergency Medical Services Rates and Charges Service 2011 Rate $ 2012 Rate $ BLS Non-emergent 476.00 550.00 BLS Emergent 476.00 550.00 ALS Emergent 741.00 950.00 ALS 2 846.00 950.00 ALS Response Fee 265.00 273.48 Specialty Care Transport Fee 846.00 950.00 Mileage (all categories) 16.00 per mile _ 16,51 per mile Non-resident transport fee—applies to those 100.00 transported from outside of the Arlington EMS service area. Arlington EMS Service area includes Arlington City limits and the limits of Fire District 19,Fire District 21 (Arlington Rural), Fire District 24,and Fire District 25 Section 11. Dog Licensing Fees. 11.1 Fees for dog licenses as called for in Arlington Municipal Code Chapter 8.09 shall be listed in Table 10: Dog Licensing Fees 11.2 Per RCW 49.60.380, the City of Arlington shall honor a request by a blind person or hearing impaired person not to be charged a fee to license his or her guide dog, or a request by a physically disabled person not to be charged a fee to license his or her service animal. 11.3 All dogs require proof of current Rabies vaccination to be licensed. 11.4 Proof of alteration and micro-chip is required to receive reduced fees Table 10: Dog Licensing Fees License Annual Fee ($ Dog - unaltered $ 20 Do — altered $ 10 Do — altered senior citizen owner $ 5 Dog— altered & micro-chipped $ 5 Replacement Tag fee $ 5 Late Fee—for failure to purchase annual license before March 1 $ 10 Section 12. Fees for the Police Services. Fees for various services, actions, and permits for shall be as listed in Table 11: Fees for Police Services. Page 18 CITY OF ARLINGTON FEE SCHEDULE RESOLUTION#2015-003 Table 11: Police Services License Annual Fee $ Fingerprinting $20 Lamination of Concealed Weapons Permit $4.25 Anti-Harassment Order Service (Includes service, return of $80 service, mileage & fuel costs Section 13. Repeal of Previous Fee Resolution. Resolution 2012-009 is hereby repealed. Section 14. Effective Date. This resolution will become effective immediately upon passage. PASSED by the City Council and APPROVED by the Mayor this day of l 2015. CITY OF ARLINGTON Barbara Tolbert, Mayor ATTEST: CUL Kristin nfield, City Cler APPROVED AS TO FORM: Steve cif , tjy Attorney Page 19