HomeMy WebLinkAboutResolution 2015-003 Fee Resolution FINAL 4-20-15 RESOLUTION NO. 2015-003
A RESOLUTION REPLACING RESOLUTION NO.2012-009,
AND ADOPTING A REVISED FEE SCHEDULE
WHEREAS, the City Council, through ordinance, has adopted regulations requiring certain
actions and services; and,
WHEREAS, these various ordinances set forth that fees shall be set by resolution; and,
WHEREAS, the cost of providing these various services consistent with applicable codes,
regulations, and policies periodically increase or decrease, or certain services or practices are
discontinued and fees are no longer needed; and,
WHEREAS, it is the intent of the City of Arlington to charge appropriate fees and charges
that are consistent with the services provided and to cover the public cost of providing these various
services so that the public is not subsidizing individual benefits derived therefrom;
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
ARLINGTON AS FOLLOWS:
The following rates, fees, and charges for various services provided, actions performed, or items
sold by the city and/or its contract service providers, and fines levied against code violators, are
hereby adopted:
Section 1. Fees and Charges—General.
1.1 Fees. Fees are intended to cover the normal, recurring costs associated with
providing a given service. Fees are non-refundable.
1.2 Prices. In some instances,the City provides certain goods and merchandise for sale.
Prices for these goods may be included in this resolution.
1.3 Payment Due. Fees are due at the time the action is requested (e.g., at time of
application) or occurs (e.g., prior to a specific action). An applicant may pay all
fees of a multi-phased project in advance; however, doing so does not vest
applicable fees due. Fees due are those in effect at the time the specific action or
phase of an action is requested or occurs.
1.4 Waivers. Upon petition by the applicant, the City Council may waive any of the
fees, or portions thereof, for any non-profit organization or government agency.
Page 1
CITY OF ARLINGTON FEE SCHEDULE RESOLUTION#2015-003
Section 2. Land Use Fees. Fees for various services, actions, and permits regarding land use,
as per AMC Title 20 Land Use Code, shall be as listed in Table 1: Land Use Fees
Table 1: Land Use Fees
Action Fee ($
Land Use Permits
Zoning Permit 2,222
Special Use Permit 3,306 plus actual cost of Hearing
Examiner(if re 'd)
Conditional Use Permit 3,862 plus actual cost of Hearing
Examiner
Administrative Conditional Use Permit
Seasonal/Special Event 102
Homeless Encampment 508
Preliminary Plats and Binding Site Plans
Conditional Use Permit for a Long Plat 6,983 plus actual cost of Hearing
Examiner
Zoning Permit for a Short Plat 3,068
Final Plats and Binding Site Plans
Long Plat 3,389
Short Plat 1,823
Development Agreements 3,862 plus actual cost of Hearing
Examiner if re 'd
Master Plan 12,500
Design Review
Administrative 212
Design Review Board 423
Forest Practices Permits
Permit Review 423
Forest Practices Permit Application Fee 106 plus 106 per acre
Review Fee for Conversion Option Harvest Plan Approval 106 plus 106 per acre
Review Fee To Lift Moratorium 300
Inspection Fee 127 per hour plus 106 per acre
Appeals
To City Council 212
To Planning Commission 212
To Hearing Examiner 582 plus actual cost of Hearing
Examiner
To Shoreline Hearings Board 582
Reconsideration of Decision by:
Community Development Director and/or a designee 79
Planning Commission 106
Hearing Examiner 212 plus actual cost of Hearing
Examiner
City Council 132
Page 2
CITY OF ARLINGTON FEE SCHEDULE RESOLUTION#2015-003
Action Fee $
Permit Extension
Extension 53
Amendment to or Modification of Permit
Insignificant Design Deviations 53
Minor Amendment 317
Major Amendment 1,067 plus cost of Hearing
Examiner if re 'd)
Binding Site Plans
Text and/or Design Deviation 741
Lot Line Adjustment or Changes to Number of Lots 1,323
Development Agreement 741 plus actual cost of Hearing
Examiner (if re 'd)
Boundary Line Adjustment
Boundary Line Adjustment 1,664
Land Use Ordinance Amendment
Amendment to Text of Land Use Ordinance 741
Amendment to Zoning Map (rezone)
< 5 acres 1,111
> or= 5 acres 1,957
Comprehensive Plan Amendment
Minor Amendment (annual cycle) 1,428
Major Amendment (5-year cycle) 2,116
Annexations
Submission of 10% Petition 106
Submission of 60% Petition 1,058
If it goes to BRB hearing 794
Shoreline Development Permit
SDP in conjunction with a Land Use Permit 529
SDP not in conjunction with a Land Use Permit 1,058
Variance
Administrative 635
If it goes to hearing (fee in addition to that paid for 1,217 plus actual cost of
Admin. Decision) Hearing Examiner
Miscellaneous Actions/Items
Zoning Interpretation 106
Pre-Application Meetings
1 st two hours 0
Subsequent meetings 317 per meeting
SEPA Review (note: review of checklist included in
Land Use Permit fee )
SEPA Only (no land use permit required) 529
Review of requested studies (i.e. traffic, wetland, etc) 159
Page 3
CITY OF ARLINGTON FEE SCHEDULE RESOLUTION#2015-003
Action Fee $
Review of requested studies (i.e, drainage, geo-tech, etc) 711
Environmental Impact Statement (EIS) 1,058 plus actual cost of consultant
Request of Utility Services Outside City
Single-Family Residence/Duplex 212
Other Development 635
Section 3. Public Works Fees. Fees for various services, actions and permits shall be as
listed in Tables 2-1: Review Fees, 2-2: Grading Plan Review Fees, 2-3: Grading Permit Fees,
and 2-4: Public Works Labor and Equipment Charges,
Table 2-1: Review Fees
Action Fee ($)
Site Civil Review 6% E.E.C.0 with a minimum charge of 1,587
Additional Plan Review Fee 212 each
Miscellaneous Engineering Fee 529 each
As-Built Review Fee Included in the site civil review fee
Final Plat Review Fee Included in the site civil review fee
Inspection Fee 127 per hour-1/2 hour minimum
Outside Consultant Review Fee Actual cost
Simple Site Plan Review 265 per lot
Right of Way 6% E.E.C.CZ or maximum 1,058 with a
1,E.E.C.0 Engineer's Estimated Cost of Construction-Includes labor, equipment, material, overhead and profit.
Prices shall be from RS Means(latest edition) data adjusted for the Snohomish County area or from local sources if
not included in the RS Means database.
* Simple Site Plan Review-No water or sewer extension -Single family residence with maximum of 2 lots.
* Additional plan review applies when there is a change, addition or revision to the plan.
* Additional plan review fees will be charged at any point in the project when more than 2 reviews are required.
* Inspection Fee-commercial and residential plats(storm drainage, landscape,right-of-way and bond
inspections).
* Outside Consultant Review Fee.
* Water Availability Certificate Fee.
* Engineering Meetings(first 2 hours are no charge).
* Miscellaneous engineering fee-traffic and storm water report/design reviewed in-house.
2 E.E.C.0 Engineer's Estimated Cost of Construction-Includes labor, equipment, material, overhead and profit.
Prices shall be from RS Means (latest edition)data adjusted for the Snohomish County area or from local sources if
not included in the RS Means database.
* Simple Site Plan Review-No water or sewer extension - Single family residence with maximum of 2 lots.
* Additional plan review applies when there is a change,addition or revision to the plan.
* Additional plan review fees will be charged at any point in the project when more than 2 reviews are required.
* Inspection Fee-commercial and residential plats(storm drainage, landscape, right-of-way and bond
inspections).
* Outside Consultant Review Fee.
* Water Availability Certificate Fee.
* Engineering Meetings(first 2 hours are no charge).
* Miscellaneous engineering fee-traffic and storm water report/design reviewed in-house.
Page 4
CITY OF ARLINGTON FEE SCHEDULE RESOLUTION#2015-003
Action Fee ($)
minimum charge of 106 plus inspection fees
Right of Way Vacation 1,058
Miscellaneous Staff Time 127 per hour per person-1/2 hour minimum
Engineering Meetings-after 2 hours 317 per meeting
Water Availability Certificate SFR 32—Non-SFR 106
Recovery Contract 1,058 plus actual cost
GIS
Zoning and Land Use Maps 10.00
l lxl7 5.00
20 13.00
30 19.00
3x4 25.00
Map CD 26.00
Data CDs/FTP 26.00 per client
Hourly Rate for Custom Work 127 per hour, '/z hour minimum
Laminating 3/sq ft
Shipping 5.00
Fee none
Table 2-2: Grading Plan Review Fees
Fee M
50 Cubic Yards or less No fee
51 to 100 cubic yards 25.50
101 to 1,000 cubic yards 40.00
1,001 to 100,000 cubic yards
First 1,000 cubic yards 53.35
Plus - for each additional
10,000 yards or fraction thereof 26.50
100,001 to 200,000 cubic yards
For the first 100,000 cubic yards 292.00
Plus - for each additional
10,000 yards or fraction thereof _ 14.40
200,001 cubic yards or more
For the first 200,000 cubic yards 435.45
Plus - for each additional 10,000 cubic yards or fraction
thereof 7.85
Other Fees: Additional plan review required by changes,
additions or revisions to approved plans (minimum 54.703
charge— 1/2 hour) Per hour
3 0r the total hourly cost to the City, whichever is the greatest. This cost shall include supervision, overhead,
equipment, hourly wages and fringe benefits of the employees involved.
Page 5
CITY OF ARLINGTON FEE SCHEDULE RESOLUTION#2015-003
Table 2-3: Grading Permit Fees
Fee ($)
50 cubic yards or less 25.50
51 to 100 cubic yards 40.00
101 to 1,000 cubic yards
First 100 cubic yards 40.00
Plus —for each additional 100 cubic yards or fraction
thereof 18.90
1,001 to 10,000 cubic yards
For the first 1,000 cubic yards 210.50
Plus - for each additional
1,000 yards or fraction thereof 15.70
10,001 to 100,000 cubic yards
For the First 10,000 cubic yards 351.80
Plus - for each additional
10,000 yards or fraction thereof 71.40 _
100,001 or more cubic yards or more
For the first 100,000 cubic yards 994.80
Plus - for each additional 10,000 cubic yards or fraction
thereof 39.50
Table 2-4: Public Works Labor and Equipment Charges
A. Services and work included in the below schedule will be charged a 15%
administrative/overhead fee for accounting, billing and general City administrative costs.
B. All work or services not included in the below schedule must be mutually agreed upon
prior to the commencement of work.
C. Equipment and machinery that is not explicitly included in the below schedule will be
charged at the rate set forth in the most current Rental Rate Blue Book for Construction
Equipment ("Blue Book"). If the equipment or machinery rate is not available in the Blue
Book, the City will determine an appropriate fee or rate based on the original cost of the
asset plus operating and maintenance cost and/or comparable rates charged by other
organizations.
Page 6
CITY OF ARLINGTON FEE SCHEDULE RESOLUTION#2015-003
Item Fee ($)
Labor Rate Cost
Lead Maintenance Worker Hourly $ 60.00
Sr. Maintenance Worker Hourly $ 55.00
Maintenance Worker Hourly $ 50.00
PW Inspector Hourly $ 60.00
Administrative Staff Hourly $ 45.00
Equipment
Pick-up Truck Hourly $ 15.00
Dump Truck Hourly $ 75.00
Back-hoe Hourly $ 55.00
Vactor-Jetter Truck Hourly $ 105.00
Snow Plow Hourly $ 75.00
Street Sweeper Hourly $ 55.00
Section 4. Building Permit Fees. For determining the value of a structure, the most current
issue of the Building Safety Journal Magazine, which offers the legacy building valuation data
fee schedule as published by the International Code Council, is adopted by reference. Fees
shall be as listed in Tables 3-1: Building Permit Fees, 3-2: Miscellaneous Building Inspection
Fees and 3-3: Miscellaneous Building Permit Fees.
Table 3-1: Building Permit Fees
Total 2013 2014 2015 2016 Fee ($)
Valuation($)
1.00- 500.00 30.50 31.00 31.50 32.00 0.00 to 500.00
501.00-2,000.00 30.50 31.00 31.50 32.00 For the first 500.00 plus
3.98 4.06 4.14 4.22 For each additional 100.00, or
fraction thereof, to and including
2,000.00
2001.00- 90.20 91.90 93.60 95.30 For the first 2,000.00 plus
25,000.00 18.31 18.67 19.05 19.43 For each additional 1,000.00, or
fraction thereof, to and including
25,000.00
25,001.00- 511.33 521.31 531.75 542.19 For the first 25,000.00 plus
50,000.00 13.27 13.53 13.80 14.08 For each additional 1,000.00, or
fraction thereof, to and including
50,000.00
50,001.00- 843.08 859.56 876.75 894.19 For the first 50,000.00 plus
100,000.00 9.23 9.42 9.61 9.80 For each additional 1,000.00, or
fraction thereof, to and including
100,000.00
Page 7
CITY OF ARLINGTON FEE SCHEDULE RESOLUTION#2015-003
100,001.00- 1,304.58 1,330.56 1,357.25 1,384.19 For the first 100,000.00 plus
500,000.00 7.32 7.47 7.62 7.77 For each additional 1,000.00, or
fraction thereof, to and including
500,000.00
500,001.00- 4,232.58 4,318.56 4,405.25 4,492.19 For the first 500,000.00 plus
1,000,000.00 6.26 6.39 6.51 6.64 For each additional 1,000,00, or
fraction thereof, to and including
1,000,000.00
1,000,001.00 7,362.58 7,513.56 7,660.25 7,819.19 For the first 1,000,000.00 plus
and up 4.78 4.87 4.97 5.07 For each additional 1,000.00, or
fraction thereof
Total 2017 2018 2019 2020 Fee ($)
Valuation $
1.00- 500.00 32.50 33.00 33.50 34.00 0.00 to 500.00
501.00-2,000.00 32.50 33.00 33.50 34.00 For the first 500.00 plus
4.31 4.39 4.48 4.57 For each additional 100.00, or
fraction thereof, to and including
_ 2,000.00
2001.00- 95.17 98.85 100.70 102.55 For the first 2,000.00 plus
25,000.00 19.81 20.21 20.62 21.03 For each additional 1,000.00, or
fraction thereof, to and including
_ 25,000.00
25,001.00- 552.78 563.68 574.96 586.24 For the first 25,000.00 plus
50,000.00 14.36 14.65 14.94 15.24 For each additional 1,000.00, or
fraction thereof, to and including
50,000.00
50,001.00- 911.78 929.93 948.46 967.24 For the first 50,000.00 plus
100,000.00 9.99 10.19 10.40 10.61 For each additional 1,000.00, or
fraction thereof, to and including
100,000.00
100,001.00- 1,411.28 1,439.43 1,468.46 1,497.74 For the first 100,000.00 plus
500,000.00 7.93 8.08 8.25 8.41 For each additional 1,000.00, or
fraction thereof, to and including
500,000.00
500,001.00- 4,583.28 4,671.43 4,768.46 4,861.74 For the first 500,000.00 plus
1,000,000.00 6.78 6.91 7.05 7.19 For each additional 1,000.00, or
fraction thereof, to and including
1,000,000.00
1,000,001.00 and 7,973.28 8,126.43 8,293.46 8,456.74 For the first 1,000,000.00 plus
up 5.17 5.27 5.38 5.49 For each additional 1,000.00, or
fraction thereof
Page 8
CITY OF ARLINGTON FEE SCHEDULE RESOLUTION#2015-003
Table 3-2: Miscellaneous Building Inspection Fees
Action Fee $
Inspections outside of normal business hours 50.00 per hour (minimum charge 1 hour)
Reinspection fees assessed under provisions of the 50.00 per hour
current IBC
Inspection for which no fee is specifically indicated 50.00 per hours (minimum charge-1 hour
Additional plan review required by changes, 50.00 per hour' (minimum charge-1 hour)
additions or revised plans
For use of outside consultants for plan review and Actual costs
inspections, or both.
-Stop work order (working withoutpermit)a
Table 3-3: Miscellaneous Building Permit Fees
Action Fee ($
Change lot after plan review completed 100.00
Change plans during or after plan review. New Plan Review Fee
Change or revise plans after issuance of Current hourly rate per IBC or new plan review fee
permit.
Action Fee $
Commercial or industrial re-roof IBC value or bid amount
Demolitions 100.00
Espresso carts (portable and stand alone) 250.00
Fences over 6 feet in height Current hourly rate per IBC for plan review plus 20.00
permit fee
Mobile homes 500.00
Modular offices lJob shacks) 350.00
Moved buildings 100.00 prior to moving together with a building permit
fee based on the IBC valuation for new building and
cost of moved building.
Residential re-roofs 0
if plan review required 50.00
Retaining walls (permit not required under 100.00 or IBC valuation, whichever is greater
four(4) feet
Signs IBC valuation, using permit fee only
a Or the total hourly cost to the City,whichever is greatest.This cost shall include supervision,overhead,equipment,hourly wages,
and benefits of the employees involved.
5 Or the total hourly cost to the City, whichever is greatest.This cost shall include supervision,overhead,equipment,hourly
wages,and benefits of the employees involved.
6 Or the total hourly cost to the City, whichever is greatest.This cost shall include supervision,overhead,equipment,hourly
wages,and benefits of the employees involved.
7 Actual costs include administrative and overhead costs.
8 Stop work order(SWO): failure to obtain a valid permit within 48 hour of a SWO will result in double permit fees or a fine of
$500 whichever is less. A permit applied for within the 48 hour timeframe may be subject to a fine and/or fee at the discretion of
the building official.
Page 9
CITY OF ARLINGTON FEE SCHEDULE RESOLUTION#2015-003
4.2 Plumbing Fees. Plumbing fees shall be as listed in Table 3-4: Plumbing Fees.
Table 3-4: Plumbing Permit Fees
Action Fee $
PERMIT ISSUANCE
Plumbing Permit Base Fee 25.00
Medical Gas Systems 100.00
Fixtures and Vents
For each plumbing fixture or trap or set of fixtures on one trap (including water, drainage 12.00
piping and backflow protection thereof)
Sewers Disposal Systems and Interceptors
For each industrial waste pretreatment interceptor, including its trap and vent, except 25.00
kitchen-type grease interceptors functioning as fixture traps
Water Piping and Water Heaters
For each water heater including vent 25.00
Lawn Sprinklers,Vacuum Breakers and Backflow Protection Devices
For each lawn sprinkler system on any one meter, including backflow protection devices 25.00
thereof
Swimming Pools For each swimming pool ors a:
Public pool 90.00
Public spa 90.00
Private pool 60.00
Private spa 30.00
Miscellaneous
For each appliance or piece of equipment regulated by the Plumbing Code but not 12.00
classed in other appliance categories, or for which no other fee is listed in this code
4.3 Mechanical Permit Fees.Mechanical permit and inspection shall be as listed in Table
3-5: Mechanical Permit and Inspection Fees.
Table 3-5: Mechanical Permit & Inspection Fees
Action Fee ($)
PERMIT ISSUANCE AND HEATERS
Mechanical Permit Base Fee 25.00
Furnaces 25.00
Appliance Vents
For the installation, relocation or replacement of each appliance vent installed and not 10.00
included in an appliance permit
Boilers 25.00
AHU's and Condensing Units 100.00
Evaporative Coolers & Heat Pumps 25.00
Ventilation and Exhaust
For each ventilation fan connected to a single duct 10.00
Page 10
CITY OF ARLINGTON FEE SCHEDULE RESOLUTION#2015-003
Action Fee $
Refrigeration Systems 50.00
For each gas piping system of 1 to 5 outlets 10.00
For each additional outlet over 5, each 1.00
Miscellaneous
For each appliance or piece of equipment regulated by the Mechanical Code but not 25.00
classed in other appliance categories, or for which the fee is listed in the table
Table 3-6: Plumbing & Mechanical Plan Review Fees
LESS THAN$500.00 ROUND DOWN TO NEAREST$1,000.
GREATER THAN $500.00 ROUND UP TO NEAREST$1,000.
Total Valuation Fee ($
Less than $1,000.00 150.00
$1,000.00 to $9,999.99 200.00
$10,000 to $19,999.99 250.00
$20,000.00 to $29,999.99 300.00
$30,000.00 to $39,999.99 350.00
$40,000.00 to $49,999.99 400.00
$50,000.00 to $59,999.99 450.00
$60,000.00 to $69,999.99 500.00
$70,000.00 to $79,999.99 550.00
$80,000.00 to $89,999.99 600.00
$90,000.00 to $99,999.99 650.00
$100,000.00 to $199,999.99 700.00
$200,000,00 to $299,999.99 800.00
$300,000.00 to $399,999.99 900.00
$400,000.00 to $499,999.99 1,000.00
$500,000.00 to $599,999.99 1,100.00
$600,000.00 to $699,999.99 1,200.00
$700,000,00 to $799,999.99 1,300.00
$800,000.00 to $899,999.99 1,400.00
$900,000.00 to $999,999.99 1,500,00
$1,000,000.00 to $1,999,999.99 1,600.00
$2,000,000.00 to $2,999,999.99 1,700.00
$3,000,000.00 to $3,999,999.99 1,800.00
$4,000,000.00 to $4,999,999.99 1,900.00
5 Million and Up 2,000.00 for the first $5M plus
$1.00 for each additional
$1,000.00 or fraction thereof
Page 11
CITY OF ARLINGTON FEE SCHEDULE RESOLUTION#2015-003
Table 3-7: Fire Permit Fees
Action Fee $
Fire Sprinklers
Plan Review Fee 100.00
Permit Fee Based on Valuation
Fire Alarms
Plan Review Fee 100.00
Permit Fee _ Based on Valuation
Commercial Hoods (Type I & Type II
Plan Review Fee 100.00
Permit Fee Based on Valuation
Other Fire Safety System
Plan Review Fee 100.00
Permit Fee Based on Valuation
Section 5. Fire Department Life-Safety Inspection Fees. Fees for re-inspections for life-
safety issues conducted by the Fire Department shall be as listed in Table 4: Fire Department
Life-Safety Inspection Fees.
Table 4: Fire Department Life-Safety Inspection Fees
Action Fee $
Life /Safety Inspections of Businesses
Initial Inspection 0.00
First reins ection for corrections 0.00
Second reins ection for corrections 100.00
Third reins ection for corrections 150.00
Additional inspections to complete life/safety corrections 250.00
and attain compliance
Section 6. Cemetery Fees. Fees and prices for various services, actions, and merchandise for
cemetery use shall be as listed in Table 5: Cemetery Fees and Prices.
Table 5: Cemetery Fees and Prices
Product/Service/Action Fee $
Traditional Burial
_ Burial Lot $1,200
Burial Lot Endowment Fee $300
Opening & Closing (during business hours) $1,000
Opening & Closing after business hours) $1,500
Concrete Grave Liner $800
Traditional Vaults
Wilbert Bronze $18,395
Page 12
CITY OF ARLINGTON FEE SCHEDULE RESOLUTION 42015-003
Bronze Triune $4,895
Copper Triune $4,695
Monticello / Salute $1,295
Continental $1,595
Venetian $2,395
Cameo Rose/ SST Triune /Veteran $2,695
Wilbert Way Saturday Service fee $325
Urn Vaults
Bronze Triune $950
Copper Triune $950
Cameo Rose/ SST Triune/Veteran $850
Venetian $750
Monticello $650
Universal $450
Urns
Tribute $295
Regal $295
Inurnment
Urn Garden $520
Urn Garden Endowment Fee $130
Second Right Inurnment $400
Second Right Inurnment Endowment Fee $100
Opening & Closing (during business hours) $445
Opening & Closing after business hours $695
Concrete Urn Liner $310
Childrens Garden
Children's Garden Lot $317
Children's Garden Lot Endowment Fee $80
Opening & Closing (all times) $488
Children's Garden Liner $396
Niche
Niche Wall I1, rows 4-6 bottom half $750
Niche Wall I1, rows 4-6 bottom half Endowment Fee $150
Niche Wall III, rows 1-3 top half $1,019
Niche Wall III, rows 1-3 top half Endowment Fee $250
Niche Wall III, rows 4-6 bottom half $869
Niche Wall III, rows 4-6 bottom half Endowment Fee $220
Opening & Closing (during business hours) $445
Opening & Closing (after business hours) $695
Second Right Niche Wall $436
Second Right Niche Wall Endowment Fee $109
Tent and Chairs for Inurnment $163
Page 13
CITY OF ARLINGTON FEE SCHEDULE RESOLUTION 42015-003
Flower Vase for Niche Wall $195
Replacement Flower Vase (vase only) $20
Inscriptions
Niche Inscription— Single $363
Niche Inscription—Double (both names and I" DOD, 2°d DOD later) $563
Flat Marker Final DOD Inscription & Re-Installation off-site) $495
Flat Marker Final DOD Inscription (on site) $363
Monument or Slant"single" Final DOD Inscription (off-site) $550
Monument or Slant "companion" Final DOD Inscription (off site) $550
Monument or Slant Final DOD Inscription (on site) $363
Headstones & Monuments
Various Headstones, Memorials, Monuments, Benches, Pillows, Slants, etc. Call for Pricing
Installation Fees includes inspection fee
Flat Markers
Flat Marker— Children's Garden (up to 24" x 12") $175
Flat Marker— 30" x 18" or smaller $275
Flat Marker—28" x 34" or larger $375
Flat Marker Re-Installation Fee—All sizes $175
Upright Monuments, Slants, Pillows and Benches
Standard Size "Individual" & Foundation $575
Standard Size "Companion" & Foundation $675
Standard Bench $575
Monubench $675
Other Company's Mechandise Call for Quote
Miscellaneous Fees
Standard Inspection Fee (headstone, bench, vault, liner, etc.) $100
Administration Service Fee $50
Temporary Marker $30
Other Services
Memorial Tree w/ garden marker $800
Disinterment/Traditional Burial $1,995
Disinterment/ Cremation $650
Pressure Washing $ 40 for first headstone
$ 25 for each additional
headstone
Section 7. Fees for the Use of City Owned Facilities. Fees for various services, actions, and
permits regarding use of City owned facilities shall be as listed in Table 6: Fees for the Use
of City Owned Facilities.
Page 14
CITY OF ARLINGTON FEE SCHEDULE RESOLUTION 42015-003
Table 6: Fees for the Use of City Owned Facilities
Use/Activity Fee $
Hadley Hall at the Arlington Community Youth Center,
Stillaguamish Conference Room at Public Works
Administration (154 W. Cox).
*Please note that the Stillaguamish Conference Room does NOT have a
kitchen facility available for use. _
Without Kitchen
One to three hours 15 per hour
Over three hours 75
With Kitchen
One to three hours 20 per hour
Over three hours 125
Athletic Fields
League
Baseball
Youth, resident team 7.50 per youth per season
Youth, non-resident team 10 per team per use
Adult 25 per use
Softball
Youth, resident team 7.50 per youth per season
Youth, non-resident team 10 per team per use
Adult 25 per use
Soccer
Youth, resident team 7.50 per youth per season
Youth, non-resident team 10 per team per use
Adult 25 per use
Other
Youth, resident team 7.50 per youth per season
Youth, non-resident team 10 per team per use
Adult 25 per use
Tournament
Baseball
Youth, resident team 7.50 per youth per tournament
Youth, non-resident team 10 per team per use
Adult 25 per use
Softball
Youth, resident team 7.50 per youth per tournament
Youth, non-resident team 10 per team per use
Adult 25 per use
Soccer
Youth, resident team 7.50 per youth per tournament
Youth, non-resident team 10 per team per use
Adult 25 per use
Page 15
CITY OF ARLINGTON FEE SCHEDULE RESOLUTION#2015-003
Other
Youth, resident team 7.50 per youth per season
Youth, non-resident team 10 per team per use
Adult 25 per use
Lighting
Youth 3 per hour
Adult 6 per hour
Scheduling Fee for League and Tournament
League 15 per team
Tournament 15 per tournament
Concession Sales
League 50 per season
Tournament 25 er day
7.1 Definitions.
A. "Youth" is defined as any person 18 years of age or younger.
B. "Resident" is defined as any team composed of at least 51% Arlington
residents.
Section 8.Appeal Fees for Violations and Abatement. Fees for various services and actions
regarding violations and abatement as per Chapter 11.01 of the Arlington Municipal Code
shall be as listed in Table 7: Appeal Fees for Violations and Abatement.
Table 7: Appeal Fees for Violations and Abatement
Action Fee $
Appeals
To Hearing Examiner 582 plus actual cost of Hearing Examiner
Fines
Forest Practice Violation Fine 317
Section 9. Licensing Fees. Licensing fees for various licenses issued under various sections
of the Arlington Municipal Code shall be as listed in Table 8:- Licensing Fees.
Table 8: Licensing Fees
License/Activity Fee ($)
New application/renewal business license under AMC Chapter 60.00
5.28
Late payment penalty for business license under AMC Chapter 5.28 120.00
For new applications applied for between October 1st through 45.00
December 3 1"
For new applications applied for between January lst through March 30.00
31st
Page 16
CITY OF ARLINGTON FEE SCHEDULE RESOLUTION 42015-003
For new applications applied for April I" through June 30` (Note: 75.00
$15 for the remainder of the current business license year and $60
for the new business license year for a total of $75, making the
business license valid thru June 301h of the following ear.)
Businesses with offices located outside of city limits but conducting 20.00
business within city limits (AMC Chapter 5.28)
Peddlers & Solicitors License under AMC Chapter 5.04 25.00
Vehicles for Hire License under AMC Chapter 5.12
- First vehicle 35.00
- Each vehicle thereafter 15.00
Cabaret License under AMC Chapter 5.16 (annual) 75.00
Section 10. EMS Fees and Charges.
10.1 Fees and Mileage Charges Established. For purposes of AMC Chapter 3.06,
fees and mileage for EMS services shall be set as set forth in Table 9: Emergency
Medical Services Rates and Charges.
10.2 Beginning on January 1, 2013,the rates set forth for the year 2012 shall be
increased annually by the June reported percentage increase of the Consumer Price
Index (CPI)for the Seattle-Tacoma-Bremerton area for All Urban Consumers, or other
measure commonly used by the city should it change; provided, however, that
notwithstanding any reduction in the CPI, rates shall not decrease.
10.3 EMS Transport Fees. In accordance with the requirements of 42 Code of
Federal Regulations (CFR) Parts 410 and 414, which provides that Medicare
fees and charges shall apply to Medicare recipients;
A. Unmet (excess fee) Part B Deductible and Part B coinsurance amounts. In
accordance with the provisions of 42 CFR Parts 410 and 414,the City shall
bill the patient for any unmet or excess fee to the extent authorized by
federal law.
B. Inability to Pay Excess Fee. Individuals who are on fixed or low incomes
or do not have the ability to pay the differential because of financial
difficulties may submit a request to waive the differential to the City with
supporting documentation of the inability to pay.
Page 17
CITY OF ARLINGTON FEE SCHEDULE RESOLUTION#2015-003
Table 9: Emergency Medical Services Rates and Charges
Service 2011 Rate $ 2012 Rate $
BLS Non-emergent 476.00 550.00
BLS Emergent 476.00 550.00
ALS Emergent 741.00 950.00
ALS 2 846.00 950.00
ALS Response Fee 265.00 273.48
Specialty Care Transport Fee 846.00 950.00
Mileage (all categories) 16.00 per mile _ 16,51 per mile
Non-resident transport fee—applies to those 100.00
transported from outside of the Arlington
EMS service area.
Arlington EMS Service area includes Arlington City limits
and the limits of Fire District 19,Fire District 21 (Arlington
Rural), Fire District 24,and Fire District 25
Section 11. Dog Licensing Fees.
11.1 Fees for dog licenses as called for in Arlington Municipal Code Chapter 8.09
shall be listed in Table 10: Dog Licensing Fees
11.2 Per RCW 49.60.380, the City of Arlington shall honor a request by a blind
person or hearing impaired person not to be charged a fee to license his or her guide
dog, or a request by a physically disabled person not to be charged a fee to license his
or her service animal.
11.3 All dogs require proof of current Rabies vaccination to be licensed.
11.4 Proof of alteration and micro-chip is required to receive reduced fees
Table 10: Dog Licensing Fees
License Annual Fee ($
Dog - unaltered $ 20
Do — altered $ 10
Do — altered senior citizen owner $ 5
Dog— altered & micro-chipped $ 5
Replacement Tag fee $ 5
Late Fee—for failure to purchase annual license before March 1 $ 10
Section 12. Fees for the Police Services. Fees for various services, actions, and permits for
shall be as listed in Table 11: Fees for Police Services.
Page 18
CITY OF ARLINGTON FEE SCHEDULE RESOLUTION#2015-003
Table 11: Police Services
License Annual Fee $
Fingerprinting $20
Lamination of Concealed Weapons Permit $4.25
Anti-Harassment Order Service (Includes service, return of $80
service, mileage & fuel costs
Section 13. Repeal of Previous Fee Resolution. Resolution 2012-009 is hereby repealed.
Section 14. Effective Date. This resolution will become effective immediately upon
passage.
PASSED by the City Council and APPROVED by the Mayor this day of
l 2015.
CITY OF ARLINGTON
Barbara Tolbert, Mayor
ATTEST:
CUL
Kristin nfield, City Cler
APPROVED AS TO FORM:
Steve cif , tjy Attorney
Page 19