1. Station 48 Change Order No. 4 ATTACHMENT A
Staff Presentation: Paul Ellis
Council Liaison: Marilyn Oertle
2. Resolution Amending the Customer Support Program ATTACHMENT B
Staff Presentation: Kristin Garcia
Council Liaison: Mayor Pro Tem Jan Schuette
3. Review of 2022 Budget Modifications ATTACHMENT C
Staff Presentation: Kristin Garcia
Council Liaison: Mayor Pro Tem Jan Schuette
4. Resolution for Proposed 2022 Regular Property Tax Levy ATTACHMENT D
Staff Presentation: Kristin Garcia
Council Liaison: Mayor Pro Tem Jan Schuette
reg
Arlington City Council Workshop
Monday, October 25, 2021 at 7:00 pm
5. September Financial Report ATTACHMENT E
Staff Presentation: Kristin Garcia
6. September Community and Economic Development Monthly Report ATTACHMENT F
Staff Presentation: Marc Hayes
ADMINISTRATOR & STAFF REPORTS
MAYOR’S REPORT
COMMENTS FROM COUNCILMEMBERS/COUNCILMEMBER REPORTS
PUBLIC COMMENT
For members of the public who wish to speak to the Council. Please limit your remarks to three minutes.
REVIEW OF CONSENT AGENDA ITEMS FOR NEXT MEETING
EXECUTIVE SESSION
RECONVENE
ADJOURNMENT
Mayor Pro Tem Jan Schuette / Mayor Barb Tolbert
City of Arlington Council Agenda Bill Item: WS #1 Attachment A
These funds will be taken from the project contingency at 10% of the construction cost. The total of all Change Orders for this project is $206,471.54. The contingency budget of 10% is $369,000. This is the
116 E. Fir Street, Suite A Mount Vernon, WA 98273 (360)424-0394 Fax (360)424-5726
Change Order
Project: City of Arlington Fire Station 48 Change Order No.: 4
Fire Station 48
4228 Airport Blvd.
Arlington, WA 98223
The Contract is changed as follows:
Per attached COP’s #20, 21, 22, 23, 24, 25 and 26.
The original Contract Sum:
Net change by previously authorized Change Orders:
Contract Sum prior to this Change Order:
The Contract Sum shall be (increased) (decreased) (unchanged):
The new Contract Sum including this Change Order:
The Contract Time shall be (increased) (decreased) (unchanged):
The Date of Substantial Completion is:
$3,690,000.00
$189,049.31
$3,879,049.31
$17,422.23
$3,896,471.54
24 days
September 24, 2021
Architect: Contractor: Owner:
Carletti Architects, P.S. HB Hansen Const., Inc. City of Arlington
116 E. Fire Street, Suite A P.O. Box 266 238 North Olympic Avenue
Mount Vernon, WA 98273 Lynden, WA 98264 Arlington, WA 98223
By: _____________________ By: ________________ By: ______________________
Peter Carletti Phil Lohrer Paul Ellis
Date: ______________ Date: _____________ Date: _________________
9/24/2021
Peter Carletti
9/24/21
City of Arlington Station 48 9/22/2021
CO
COP #Description AMOUNT DAYS STATUS Number CO Amounts
1 PUD power service to the project site 34,139.93$ 0 Approved 1 54,598.23$ CO 1
2 Roller shades 2,488.91$ 0 Approved 1
3 PUD electrical service added scope 9,826.91$ 0 Approved 1
4 PUD electrical service rework 8,142.48$ 0 Approved 1
5 Gas Piping to dryer Room 134 906.40$ 0 Approved 2 47,575.18$ CO2
6 (3) D-ring tie offs gabled roof areas Owner 1,373.57$ 0 Approved 2
7 D ring for rope anchor/Steel ladder support Owner 3,030.17$ 0 Approved 2 102,173.41$
8 RFI#34 HSS column/additional strapping shear walls 3,182.81$ 0 Approved 2
9R Conduit pathway to future gate Owner 22,617.32$ 0 Approved 2
10 Cascade Natural Gas revisions 5,900.68$ 0 Approved 2
11 Plumbing changes 3,703.77$ 0 Approved 2
12 Ceiling framing for HVAC and plumbing 6,860.46$ 0 Approved 2 86,875.90$ CO3
13 Card swipes and door hardware Owner 54,779.13$ 0 Approved 3
14 CMU cap 1,673.46$ 0 Approved 3
15R Data Fiber Conduits as per City request 11,718.81$ 0 Approved 3
16 Footing and reinforcing beneath CMU screen wall 7,243.56$ 0 Approved 3 41,173.70$ 3,731,173.70$
17 Sliding window at office 137 -$ 0 Declined 0.11%3,690,000.00$
18 Wifi modications 1,333.12$ 0 Approved 3 1%
19 Culvert crossing at main driveway entrance 10,127.82$ 0 Approved 3 36,900.00$
20 Condensate electrical RFI49 883.68$ 0 Approved CO4 pending 883.68
21 add 4 power receptacles 1 data port in the upper storage area 3,291.75$ 0 Approved CO4 pending 3291.75
22 install additional cord drop in apparatus bay 2,006.18$ 0 Approved CO4 pending 2006.18
23 Added requirements from final insepecton 8,967.80$ 0 Approved CO4 pending 8,967.80$ CO4
24 Added electrical and connection to security panel not on plans 758.03$ 0 Approved CO4 pending 758.03$
25 Adjustments to countertop at Reports library 1,073.36$ 0 Approved CO4 pending 1,073.36$
26 Added CI cover and removal asphalt at future gate area 441.43$ 0 Approved CO4 pending 441.43$
SUBTOTAL 206,471.54$
WSs City of Arlington Council Agenda Bill Item: WS #2 Attachment B COUNCIL MEETING DATE: October 25, 2021 SUBJECT: Resolution Amending the Utility Customer Support Program and Authorizing a Utility Credit Program ATTACHMENTS: Resolution DEPARTMENT OF ORIGIN Finance; Kristin Garcia, Director 360-403-3431 EXPENDITURES REQUESTED: N/A BUDGET CATEGORY: N/A BUDGETED AMOUNT: N/A LEGAL REVIEW: DESCRIPTION: On July 2, the Governor issued Proclamation 20-23.6 extending the prohibition of residential disconnects and late fees until September 30, 2021. That proclamation is now expired, so disconnects may now be applied to delinquent accounts within parameters of state law. RCW 35.21.290 has been amended to allow for liens and disconnects to be applied to accounts that are more than four months past due (within certain specified timeframes). Based on suggested guidance from the State, and amended RCW 35.21.290, staff is proposing a long term repayment plan of 12 months to assist customers facing financial hardship because of COVID-19 impacts. Additionally, to further assist customers with economic recovery, staff is requesting authorization of a utility credit program which will be implemented in two phases. Phase 1 will address those accounts that are currently delinquent. Phase 2 will address
residents within the City of Arlington. On April 6, 2020, City Council passed resolution 2020-004 providing economic relief to city residents which authorized a waiver for utility late fees and shut off through June 30, 2020. On May 29, 2020, the Governor issued Proclamation 20-23.4 prohibiting residential disconnects, refusal to
Workshop; discussion only. At the November 1, 2021 Council meeting, the recommended motion will be, “I move to approve the Resolution of the City of Arlington amending the city’s customer support program, and authorizing a utility credit program and authorize the Mayor to sign the r esolution.”
RESOLUTION NO. 2021-XXX
RESOLUTION NO. 2021-XXX
A RESOLUTION OF THE CITY OF ARLINGTON AMENDING THE CITY’S UTILITY CUSTOMER
SUPPORT PROGRAM AND AUTHORIZING A UTIILTY CREDIT PROGRAM
WHEREAS, on February 29, 2020, the Governor of the State of Washington
proclaimed that a State of Emergency existed in all counties in the State of Washington
due to the outbreak of novel coronavirus (COVID-19); and
WHEREAS, on March 18, 2020, the Governor issued an initial proclamation
waiving, suspending and prohibiting certain activities relating to utility services; and
WHEREAS, on July 2, 2020 the Governor issued Proclamation 20 – 23.6 extending
the prohibition on residential disconnects, refusal to reconnect and charging late fees
until August 1, 2020 and further requiring utilities to review existing disconnect,
reconnect and payment arrangement policies and to post a Customer Support Program
by August 1, 2020; and
WHEREAS, on July 6, 2020 City Council adopted Resolution 2020-010 Authorizing
an Extension of COVID-19 Economic Relief which waived late fees and shut off for utility
customers until July 28, 2020; and
WHEREAS, on July 20, 2020 the City Council adopted Resolution 2020-012
Authorizing a Utility Customer Support Program; and
WHEREAS, on October 5, 2020, the City Council adopted Resolution 2020-028
Amending Resolutions 2020-010 and 2020-012; and
WHEREAS, on July 2, 2021, the Governor issued Proclamation 20 – 23.16 extending
the prohibition of residential disconnects and late fees until September 30, 2021, and
WHEREAS, on September 30, 2021, Proclamation 20 – 23.16, which previously
prohibited disconnecting utility service or imposing late fees expired; and
WHEREAS, RCW 35.21.290 has been amended to allow for liens to be applied to
utility accounts that are more than four months past due; and
WHEREAS, this resolution will amend Resolution 2020-028 to remove the
prohibition of disconnecting utility service for non-payment and late fees and will update
the city’s Customer Support Program; and
RESOLUTION NO. 2021-XXX
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ARLINGTON,
WASHINGTON AS FOLLOWS:
The following provisions are adopted as the City’s Customer Support Program
relating to collection of utility accounts:
A. Repayment Arrangements:
Any account with a past due balance as of September 30, 2021 can enter into a long term
repayment arrangement. The repayment period will be for twelve (12) months beginning
the date the repayment arrangement is signed. Payment arrangements must be entered
into by November 29, 2021 in order to avoid future disconnection of water service and
late fees. In order to stay current with the payment arrangement, an amount must be
paid on the delinquent balance in addition to current charges. The amount each customer
agrees to pay will be documented on the payment arrangement form. Accounts that are
current as of September 30, 2021 and become delinquent after that date will be subject
to the standard 10 (ten) day payment arrangement.
B. Water/Sewer Accounts – Disconnection of Service/Late Fee Process:
1. Disconnection of water service will resume in January 2022 for any accounts
that are past due and have not entered into a payment arrangement. Said
accounts need to be paid in full, plus a shut off processing fee, to restore service.
2. For accounts that have entered into a payment arrangement prior to November
29, 2021, disconnection of water service will resume January 2022 for accounts
that have failed to meet the terms of the payment arrangement. For any
accounts that are more than 4 months past due as of September 30, 2021, shut
off will resume the third month after failing to meet the terms of the payment
arrangement. Said accounts need to be paid in full, plus a shut off processing
fee, to restore service.
3. If a disconnection does occur under the twelve (12) month repayment
arrangement, the account must be paid in full, plus a shut off processing fee, to
restore service.
4. Late fees shall be waived for all charges for service through December 31, 2021.
5. Late fees will be applied to all accounts beginning February 2022 for any unpaid
charges for service dated January 1, 2022 or later.
RESOLUTION NO. 2021-XXX
6. Late fees will be suspended for accounts that are current with their payment
arrangement. If terms of the payment arrangement are not met at any time
during the duration of the agreement, late fees will be applied to charges
incurred on or after January 1, 2022.
C. Storm Only Accounts:
1. Delinquent accounts referred to collection will resume in January 2022 for any
accounts that are past due and have not entered into a payment arrangement.
2. The collection process will resume January 2022 for accounts that have failed to
meet the terms of the payment arrangement. For any accounts that are more
than 6 months past due, accounts will be sent to collection the third month after
failing to meet the terms of the payment arrangement.
3. Late fees shall be waived for all charges for service through December 31, 2021.
4. Late fees will be applied to all accounts beginning February 2022 for any unpaid
charges for service dated January 1, 2022 or later.
5. Late fees will be suspended for accounts that are current with their payment
arrangement. If terms of the payment arrangement are not met at any time
during the duration of the agreement, late fees will be applied to any charges
incurred on or after January 1, 2022.
D. Utility Credits – Phase 1:
The City of Arlington has $310,000 in available funding for a utility credit program to
provide economic relief to those households that experienced financial hardships
resulting from COVID-19. The utility credit program will take place in two phases. The
first phase will address those accounts that are delinquent, the second phase will address
all other accounts that have also experienced financial hardships from COVID-19. Funding
will be available until December 31, 2024 or until this amount has been fully utilized,
whichever occurs first. The utility credit program is made possible by funding from the
Federal Treasury American Rescue Plan Act. Residential customers that turn in an
application and meet eligibility criteria will receive a one-time credit on their water/sewer
account equal to 100% of their delinquent balance. Commercial customers that turn in
an application and meet eligibility criteria will receive a one-time credit on their
water/sewer account equal to 100% of their delinquent balance. If the account becomes
past due at any time during the 12 months after the credit has been applied, the entire
amount of the credit must be paid back. If the credit is not paid back, in full, within three
RESOLUTION NO. 2021-XXX
months, the balance will be turned over to collection. Utility credits are not applicable to
stormwater and irrigation only accounts.
Residential Eligibility Criteria (must meet all of the following):
• The applicant must submit a utility credit application with all required
documentation.
• A credit pay back agreement must be signed and turned in with the utility credit
application.
• The applicant must have a utility account with the City of Arlington and water
and/or sewer services are billed.
• The water/sewer service address must be within the City of Arlington city limits.
• The applicant must have been negatively impacted financially by COVID-19
pandemic either through loss of a job or reduced hours. Proof of job loss or a
reduction of hours will be required (e.g. unemployment statements, W-2’s,
paystubs, etc).
• The account must have been delinquent beginning no earlier than 4/1/2020
through 9/30/2021.
• Applicants must be the utility account holder or property owner listed on the
account.
Business Eligibility Criteria (must meet all of the following):
• The applicant must submit a utility credit application with all required
documentation.
• A credit pay back agreement must be signed and turned in with the utility credit
application.
• The applicant must have a physical location in Arlington city limits (not including
home occupancy businesses).
• The applicant must have a utility account with the City of Arlington and water
and/or sewer services are billed.
• The water/sewer service address must be within the City of Arlington city limits.
• The applicant must have a current City of Arlington business license at the time
of application.
• The applicant must have been negatively impacted financially by COVID-19 due
to business closure or reduced operating hours. Proof of financial impacts will
be required (e.g. financial statements, tax returns, etc).
• The account must have been delinquent beginning no earlier than 4/1/2020
through 9/30/2021.
• The applicant must be the utility account holder or property owner listed on the
account.
RESOLUTION NO. 2021-XXX
ADOPTED by the City Council and APPROVED by the Mayor this 1st day of
November, 2021.
CITY OF ARLINGTON
_______________________________
Barbara Tolbert, Mayor
ATTEST:
________________________________
Wendy Van Der Meersche, City Clerk
APPROVED AS TO FORM:
________________________________
Steven J. Peiffle, City Attorney
City of Arlington Council Agenda Bill Item: WS #3 Attachment C
reduce by ($1,827,508) and all other funds combined will increase by $8,479,619. The modifications fall into three major categories, capital projects (primarily transportation), transfers to reserves or transfer between funds and a budget reduction for both the general fund and EMS fund due to the RFA annexation of the Fire/EMS departments. A final review
City of Arlington Council Agenda Bill Item: WS #4 Attachment D
amount from the previous year. If the city is reducing the levy or taking no increase from last year, the resolution must only show that it is a zero dollar and zero percent increase. The levy certification is the document that shows what amount of levy the city is requesting to be collected. annexation process, the council suggested that the levy rate for 2022 be set at $.75 to mitigate any potential tax increases resulting from the RFA annexation. The city cannot set a levy rate but can request a levy amount at a level to achieve a targeted levy rate. The levy rate is determined based on a variety of factors including the final certified assessed valuation and the levy amount requested. The preliminary assessed valuation to be used for 2022 taxes is $3,672,174,251. Setting a levy amount of $2,750,000 is expected to result in a levy rate of approximately $.75. Calculated as follows; ($2,750,000/$3,672,174,251)*1000 =
RESOLUTION NO. 2021 - XX
A RESOLUTION OF THE CITY OF ARLINGTON
ESTABLISHING THE 2022 REGULAR PROPERTY TAX LEVY
WHEREAS, the City Council of the City of Arlington has met and considered its biennial budget
for the years 2021-2022; and
WHEREAS, the City’s Regular Property Tax actual levy amount from the previous year (2021)
was $4,497,963.53; and
WHEREAS, the population of the City of Arlington is more than 10,000, and
BE IT RESOLVED by the City Council of the City of Arlington that an increase in the regular
property tax levy is hereby authorized for the levy to be collected in the 2022 tax year.
The dollar amount of the increase over the actual levy amount from the previous year shall be $0
which is a percentage increase of 0% from the previous year. This increase is exclusive of
additional revenue resulting from new construction, improvements to property, newly
constructed wind turbines, any increase in the value of state assessed property, any annexations
that have occurred and refunds made.
PASSED and APPROVED by the Mayor and City Council of the City of Arlington, at a regular
meeting held on the 1st day of November, 2021.
Barbara Tolbert, Mayor
ATTEST:
______________________________
Wendy Van Der Meersche, City Clerk
APPROVED AS TO FORM:
______________________________
Steve Peiffle, City Attorney
Title of Form
REV 64 0100 (8/27/21) Page 1 of 1
In accordance with RCW 84.52.020, I (Name),
(Title), for (District name),
do hereby certify to the (Name of county) County legislative authority
that the (Commissioners, Council, Board, etc.) of said district requests
that the following levy amounts be collected in (Year of collection) as provided in the district’s
budget, which was adopted following a public hearing held on (Date of public hearing).
Regular levies
Levy General levy Other levy*
Total certified levy request
amount, which includes the
amounts below.
Administrative refund amount
Non-voted bond debt amount
Other*
Excess levies
Levy
General
(n/a for school
districts)
Bond
Enrichment
(school
districts only)
Cap. project Other levy*
Total certified levy
request amount,
which includes the
amounts below.
Administrative refund
amount
Other*
*Examples of other levy types may include EMS, school district transportation, or construction levies.
Examples of other amounts may include levy error correction or adjudicated refund amount. Please include
a description when using the “other” options.
Signature: _______________________________ Date: __________________
Levy Certification
Submit this document, or something similar, to the county legislative
authority on or before November 30 of the year preceding the year in which
the levy amounts are to be collected.
Courtesy copy may be provided to the county assessor.
This form is not designed for the certification of levies under RCW 84.52.070.
Form 64 0100
To request this document in an alternate format, please complete the form dor.wa.gov/AccessibilityRequest
or call 360-705-6705. Teletype (TTY) users please dial 711.
WS City of Arlington Council Agenda Bill Item: WS #5 Attachment E
General Fund Operating Statement
City of Arlington Council Agenda Bill Item: WS #6 Attachment F
Community and Economic Development
Monthly Status Report Reporting Period: September 2021
Staffing Report:
• CED staff interviewed two candidates for the Planner II position on
September 23rd via Zoom. We then held in person interviews with both
candidates the following week and have selected an individual to fulfill this
position. We are currently awaiting background and reference checks and
final negotiation for employment. As soon as this is completed and they are
employed, a full introduction will be made.
Update on Current Contracts:
• HKP Architects to present “draft” of Development Standards for the Old Town
Residential District to Planning Commission.
Challenges:
Opportunities:
• The application for the Transit Oriented Development grant has been
submitted to Commerce, and we should have notice of whether we were
successful or not by the end of October.
New Programs/General Information Meetings:
• CED met with applicant proposing to locate an espresso stand in the parking
lot of the Stillaguamish Senior Center. It appeared by what was shown to us
that this would be difficult to site and operate at this location. We have not
heard back from the applicant.
• CED met with the owner of the Shell station on West Avenue to discuss an
expansion of their convenience store.
• CED met with the landowner of 7423 204th St. regarding a proposed Mixed-
Use development. This parcel is situated south of Jensen Street and affronts SR
9 and has an existing warehouse building on the site. The project would
require a public roadway connection to Hazel Ave. and upgrades to both the
access off 204th. and the bridge over Portage Creek.
• CED met with the owner of 18601 35th Ave. who is proposing to build 6
duplexes on approximately ¾ acre. We are currently working with them on
the site layout.
Current Development Activity
Upcoming Planning Commission Items:
1. Discussion of the 2044 population and employment growth targets from
Snohomish County, based on the 2021 Buildable Lands Report.
Upcoming Council Items:
1. Two easement requests from Cascade Natural Gas for their High Pressure
Pipeline replacement project.
2. Request of dedication of real property from the City (Airport) for the
construction of the Roundabout at the intersection of SR 531/43rd Ave.