Loading...
HomeMy WebLinkAbout5024 Cemetery Rd_BLD045951_2025 INSPECTION REPORT y1N G TO Permit No.: o `/' S g 5/ Lot#: 3 Address: 5 o z V Gd�— f�z_ Contractor: mv O Owner: IN � Date: APPROVAL ❑ PARTIAL APPROVAL ❑ VIOLATION ❑ CORRECTION REQUESTED ❑ Corrections listed below MUST BE MADE before work can be approved. ❑ Please contact inspector. ❑ Was not able to perform inspection. ❑ CALL 435-0674 FOR RE-INSPECTION -24 hour notice required. �� lV ?ram ':'!V� ✓ib r � S Inspector: Date: TYPE OF INSPECTION REQUESTED ❑ Under-floor ❑ Framing ❑ Gas Piping ❑ Footing ❑ Drywall, Nailing ❑ Consultation ❑ Foundation ❑ Shear Nailing ❑ Groundwork ❑ Mechanical ❑ Grid ❑ Struct. Slab ❑ Wood Stove ❑ Rough-in R-X Final ❑ Masonry ❑ Drainage ❑ Insulation ❑ Other: INSPECTION REPORT �"N G r Permit No.: ,`�y51 Lot#: 0 Address: Z Contractor: �O Owner: I TN-4�' Date: ❑ APPROVAL �ARTIAL APPROVAL ❑ VIOLATION ❑ CORRECTION REQUESTED ❑ Corrections listed below MUST BE MADE before work can be approved. ❑ Please contact inspector. ❑ Was not able to perform inspection. ElCALL 435-0674 FOR RE-INSPECTION - 24 hour notice required. t Date: Inspector: TYPE OF INSPECTION REQUESTED ❑ Framing El Gas Piping ❑ Under-floor ❑ Drywall, Nailing ❑ Consultation ❑ Footing ❑ Groundwork ❑ Foundation ❑ Shear Nailing ❑ Struct. Slab ❑ Mechanical ❑ Grid ❑ Rough-in Ad Final El Wood Stove ❑ Insulation ❑ Masonry ❑ Drainage ❑ Other: INSPECTION REPORT ram_<C/ S I Date: �d 6ZS Y Permit No: j Address/Lot No: Contractor: Owner: Supervisor: ❑ Correction Required ❑ Approval ❑ Corrections listed below MUST BE MADE before work can be approved ❑ Please contact inspector ❑ Was not able to perform inspection ❑ Call 360.435.0674 for re-inspection - 24-hour notice required Date: �e �� Inspector: r" TYPE OF INSPECTION REQUIRED ROAD LANDSCAPIN TESC STORM DRAIN ❑Sub-grade ❑Irrigation ❑Slit Fence ❑Pipe ❑Rock ❑Soil ❑Check Dam ❑catch Basin(s) Curb&Gutter ❑Fertilizer ❑Inlet Protection ❑Manhole(s) Sidewalk ❑Bark ❑Temp.Sed ❑Oil n Spouts ❑Approach(s) ❑Plants ❑Sheeting ❑Down Spouts ❑ATB ❑Trees ❑Straw ❑Trash Rack/Overflow ❑Cl.B Asphalt ❑Root Barriers ❑Seeding ❑Restrictor ❑Striping ❑Play Equipment ❑Final ❑Level Spreader ❑Signing ❑Final ❑Treatment 0 Signing ❑Infiltration INSPECTION REPORT ¢�tN G TD Permit No.: n U Lot #: Q' Address: S o 2 If 6 C- M ' Contractor: AA �.,� oc'��Cz Owner:IN Date: i o-Z43�o ❑ APPROVAL ❑ PARTIAL APPROVAL ❑ VIOLATION CORRECTION REQUESTED ;4 6 rrections listed below MUST BE MADE before work can be approved. r ❑ Please contact inspector. ❑ Was not able to perform inspection. ❑ CALL 435- 674 FOR RE-INSPECTION - 24 hour notice required. e Date: c% 1 spector: ' TYPE OF INSPECTION REQUESTED ❑ Framing ❑ Gas Piping ❑ Under-floor ❑ Drywall, Nailing ❑ Consultation ❑ Footing ❑ Shear Nailing ❑ Groundwork ❑ Foundation ❑ Grid ❑ Struct. Slab ❑ Mechanical ❑ Rough-in Final ❑ Wood Stove ❑ Insulation ❑ Masonry ❑ Drainage ❑ Other: INSPECTION REPORT �ZN G p Permit No.: d 3 54,5I Lot#: Address: -7 C o 3 Q Z Contractor: P •� «^P— O Owner: 95� I N�'� Date: S v ❑ APPROVAL ❑ PARTIAL APPROVAL ❑ VIOLATION rj4-CORRECTION REQUESTED ❑ Corrections listed below MUST BE MADE before work can be approved. ❑ Please contact inspector. ❑ Was not able to perform inspection. ❑ CALL 435-0674 FOR RE-INSPECTION -24 hour notice required. Inspector: ` Date: TYPE OF INSPECTION REQUESTED ❑ Under-floor ❑ Framing ❑ Gas Piping ❑ Footing f&Drywall, Nailing ❑ Consultation ❑ Foundation ❑ Shear Nailing ❑ Groundwork ❑ Mechanical ❑ Grid ❑ Struct. Slab ❑ Wood Stove ❑ Rough-in ❑ Final ❑ Masonry ❑ Drainage ❑ Insulation ❑ Other: INSPECTION REPORT 'IN N G 1' Permit No.: o'f S�5 f Lot#: Address: 5 Z Contractor: 4 Owner: gs4I N G� Date: A--I APPROVAL ❑ PARTIAL APPROVAL ❑ VIOLATION ❑ CORRECTION REQUESTED ❑ Corrections listed below MUST BE MADE before work can be approved. ❑ Please contact inspector. ❑ Was not able to perform inspection. ❑ CALL 435-0674 FOR RE-INSPECTION -24 hour notice required. Date: Inspector: r TYPE OF INSPECTION REQUESTED ❑ Framing ❑ Gas Piping ❑ Under-floor❑ Footing Drywall, Nailing ❑ Consultation ❑ Foundation ❑ Shear Nailing ❑ Groundwork ❑ Mechanical ❑ Grid ❑ Struct. Slab ❑ Rough-in ❑ Final ❑ Wood Stove ❑ Insulation ❑ Masonry ❑ Drainage ❑ Other: INSPECTION REPORT ¢1,1N G?'O Permit No.: Lot#: 3 Address: D Z Contractor: O Owner: I N G� Date: 73 -,i}'APPROVAL ❑ PARTIAL APPROVAL ❑ VIOLATION ❑ CORRECTION REQUESTED ❑ Corrections listed below MUST BE MADE before work can be approved. ❑ Please contact inspector. ❑ Was not able to perform inspection. ❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required. Date: Inspector: TYPE OF INSPECTION REQUESTE ❑ Framing ❑ Gas Piping ❑ Under-floor ❑ Drywall, Nailing ❑ Consultation ❑ Footing ❑ Groundwork ❑ Foundation ❑ Shear Nailing ❑ Grid ❑ Struct. Slab ❑ Mechanical ❑ Final ❑ Wood Stove ❑ Rough-in ❑ Drainage — sulation ❑ Masonry 1� ❑ Other: INSPECTION REPORT ¢1,1N G?'O Permit No.: ©q 59 s i Lot#: 3 F' Address: S o 2-Y Gc - � s Z Contractor: qs ,SO Owner: PIING Date: 7- — 0 ❑ APPROVAL 9 PARTIAL APPROVAL ❑ VIOLATION ,�k CORRECTION REQUESTED Corrections listed below MUST BE MADE before work can be approved. ❑ Please contact inspector. ❑ Was not able to perform inspection. CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required. carvir AA 1 2-1 Inspector: S � � — Date:-7 TYPE OF INSPECTION REQUESTED ❑ Under-floor (Z.— Framing ❑ Gas Piping ❑ Footing ❑ Drywall, Nailing ❑ Consultation ❑ Foundation ❑ Shear Nailing ❑ Groundwork ❑ Mechanical ❑ Grid ❑ Struct. Slab ❑ Wood Stove ❑ Rough-in ❑ Final ❑ Masonry ❑ Drainage XInsulation ❑ Other: INSPECTION REPORT y1N G p Permit No.: t Lot#: Q 'L Address: Z Contractor: O Owner: 41NO� Date: ❑ APPROVAL PARTIAL APPROVAL ❑ VIOLATION XCORRECTION REQUESTED ❑ Corrections listed below MUST BE MADE before work can be approved. ❑ Please contact inspector. ❑ Was not able to perform inspection. ❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required. v T /LiIF ti v' �4 4N i Date: `7 Inspector: TYPE OF INSPECTION REQUESTED Framing ❑ Gas Piping ❑ Under-floor ❑ Drywall, Nailing ❑ Consultation ❑ Footing ❑ Shear Nailing ❑ Groundwork ❑ Foundation ❑ Struct. Slab Q Mechanical ❑ Grid ❑ Rough-in ❑ Final El Wood Stove ❑ Insulation ❑ Masonry ❑ Drainage ❑ Other: N_ INSPECTION REPORT 0 G Permit No.: 04 515 f Lot#: - -� Address: S C 647-m r � s Contractor: µ � L�_o O Owner: 9s�IN G� Date: `7 " 3" :,`f ❑ APPROVAL �-PARTIAL APPROVAL El VIOLATION ❑ CORRECTION REQUESTED 0 Corrections listed below MUST BE MADE before work can be approved. ❑ Please contact inspector. ❑ Was not able to perform inspection. ❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required. i.r I G 4c�►it cc' L4 N A Inspector: Date: TYPE OF INSPECTION REQUESTED ❑ Under-floor ❑ Framing 4 Gas Piping ❑ Footing ❑ Drywall, Nailing ❑ Consultation ❑ Foundation ❑ Shear Nailing ❑ Groundwork W_Mechanical ❑ Grid ❑ Struct. Slab ❑ Wood Stove ❑ Rough-in ❑ Final ❑ Masonry ❑ Drainage ❑ Insulation ❑ Other: NSPECTION REPORT irr Permit No.: o y S9 5 1 Lot#:Address: 5oZy �="aContractor: M ti try�O Owner: N Date: 6 -3a>©q EJ--APPROVAL ❑ PARTIAL APPROVAL ❑ VIOLATION ❑ CORRECTION REQUESTED ❑ Corrections listed below MUST BE MADE before work can be approved. ❑ Please contact inspector. ❑ Was not able to perform inspection. ❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required. V t�t2..h,iJ _20 Inspector: ->� Date: TYPE OF INSPECTION REQUESTED ❑ Under-floor ❑ Framing ❑ Gas Piping ❑ Footing ❑ Drywall, Nailing ❑ Consultation ❑ Foundation ❑ Shear Nailing ❑ Groundwork ❑ Mechanical ❑ Grid ❑ Struct. Slab ❑ Wood Stove fi(Rough-in ❑ Final ❑ Masonry ❑ Drainage ❑ Insulation ❑ Other: , �✓ 'NSPECTION REPORT E� 4T.-I permitNo.: o S i 5 Lot#.Address: S 0 zK•ZContractor: M�O Owner: �s4IO Date: to _29 oy "PPROVAL ❑ PARTIAL APPROVAL EO VIOLATION ❑ CORRECTION REQUESTED ❑ Corrections listed below MUST BE MADE before work can be approved. ❑ Please contact inspector. ❑ Was not able to perform inspection. ❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required. U &2 ,� Date: Inspector: TYPE OF INSPECTION REQUESTED ❑ Under-floor ❑ Framing ❑ Gas Piping ❑ Footing ❑ Drywall, Nailing ❑ Consultation ❑ Foundation A Shear Nailing ❑ Groundwork ❑ Mechanical ❑ Grid ❑ Struct. Slab ❑ Wood Stove ❑ Rough-in ❑ Final ❑ Masonry ❑ Drainage ❑ Insulation ❑ Other: INSPECTION REPORT y1N G?' Permit No.: o�( 59S 1 Lot #. 3 4' Address: 5 o 2--1 C' m t!i' Contractor: my c—�O O Owner: IN�'� Date: APPROVAL C3 PARTIAL APPROVAL ❑ VIOLATION ❑ CORRECTION REQUESTED ❑ Corrections listed below MUST BE MADE before work can be approved. ❑ Please contact inspector. ❑ Was not able to perform inspection. ❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required. i Inspector: Date: TYPE OF INSPECTION REQUESTED ❑ Under-floor ❑ Framing ❑ Gas Piping ❑ Footing ❑ Drywall, Nailing ❑ Consultation ❑ Foundation ❑ Shear Nailing ❑ Groundwork ❑ Mechanical ❑ Grid ❑ Struct. Slab ❑ Wood Stove ❑ Rough-in ❑ Final ❑ Masonry Drainage ❑ Insulation ❑ Other: INSPECTION REPORT ti1N G P Permit No.: Lot#: O Address: Z Contractor: y �O Owner: S C� SFII N G Date: t APPROVAL ❑ PARTIAL APPROVAL ❑ VIOLATION ❑ CORRECTION REQUESTED ❑ Corrections listed below MUST BE MADE before work can be approved. ❑ Please contact inspector. ❑ Was not able to perform inspection. ❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required. L( �0L Date: Inspector: TYPE OF INSPECTION REQUESTED Under-floor ❑ Framing ❑ Gas Piping Footing ❑ Drywall, Nailing ❑ Consultation ❑ Foundation ❑ Shear Nailing ❑ Groundwork ❑ Mechanical ❑ Grid ❑ Struct. Slab ❑ Wood Stove ❑ Rough-in ❑ Final ❑ Masonry ❑ Drainage ❑ Insulation ❑ Other: INSPECTION REPORT TA 1,1N G l Permit No.: Lot#: Q O Address: Cv e �? Contractor: m E L �O Owner: 4ING Date: ,APPROVAL ❑ PARTIAL APPROVAL ❑ VIOLATION ElCORRECTION REQUESTED ❑ Corrections listed below MUST BE MADE before work can be approved. ❑ Please contact inspector. ❑ Was not able to perform inspection. ❑ CALL 435-0674 FOR RE-INSPECTION -24 hour notice required. Date: Inspector: TYPE OF INSPECTION REQUESTED ❑ Framing ❑ Gas Piping ❑ Under-floor❑ Footing ❑ Drywall, Nailing ❑ Consultation 11�oundation ❑ Shear Nailing ❑ Groundwork Mechanical ❑ Grid ❑ Struct. Slab ❑ Rough-in ❑ Final ❑ Wood Stove ❑ Insulation ❑ Masonry ❑ Drainage ❑ Other: NSPECTION REPORT �C 59,51 tiZN G T Permit No.: o y %70" Lot#: = Address: 5 ®Z_-e Contractor: 14AV yF c 0 �O Owner: Date: 5"2--7" A APPROVAL ❑ PARTIAL APPROVAL ❑ VIOLATION ❑ CORRECTION REQUESTED ❑ Corrections listed below MUST BE MADE before work can be approved. ❑ Please contact inspector. ❑ Was not able to perform inspection. ❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required. ISE Date: S Inspector: TY11 PE OF INSPECTION REQUESTED ❑ Framing ❑ Gas Piping ❑ Under-floor 0,Footing ❑ Drywall, Nailing ❑ Consultation ❑ Shear Nailing ❑ Groundwork ❑ Foundation ❑ Struct. Slab ❑ Mechanical ❑ Grid ❑ Rough-in ❑ Final ❑ Wood Stove ❑ Insulation ❑ Masonry ❑ Drainage ❑ Other: Ci I _F'f C3F= ARL I t iC3TC7t i CC)IVSTRUC-F I PER1-1 I -v I=3EFRM I -I t4C] _ L7�4—L59 55 i Orner: HINDS, LEE PO BOX 1012 EVE:RET`T 96206 Value of Work: $167, 000. 00 Tax ID: 310516-001-015-00 Phone: 386-9611 Describe Work: CONSTRUCT NEW DUPLEX Proposed Use: SFR-2 Legal Description: Job Address: 5024 CEMETERY RD Contractor's Dame Type Address License# MY ED CONSTRUCTION GEN PO BOX i012 r3YE.i%CI055cs- PUGET HEATING CC INC. hCP FO FOX 3_i6 LK STEV PUG£TH*2646D EMERALD PLUMBING PLE 1511 5 GRAI'1 Equipment and Fixtures Number Fee Total Charge ---------------------- - -- - -- - -- ---- -- -- - --- -- --- - --- --- - - ' ' PLUMBING FIXTURES 20-1 - $10. 00 $200. 00 ! ! FURNACE/UNIT HEATER 2 i�i15. 00 $30, 00 VENTILATION FANS a $7. 00 $56. 00 ' DRYER 2 sl i. 00 $22. 00 I ' METAL FIREPLACE & CHIMNEY 2 $11. 00 WATER HEATER 2 Si5. 00 $30. 00 ' GAS PIPING 1-5 OUTLETS 2 6. 00 '-912. 00 ' S U B T O T A L. . . . . . $372.00 TOTALS Fee Permit Fee $1, 512. 65 School Mitigation $0. 00 Equipment $172. 00 Fixture $200. 00 Mech Permit $24. 00 Plan Fee 5963. 22 Park Mitigation $3, 324. 00 Plumb Permit $25. 00 State fee $4. 50 Traffic Mitigation -S2, 0'76. 00 5I6HATUR TOTAL FEE. . . . . . . . . . . . . . . $8, 321. 37 I HEREBY ER . I r: T. I HA:_ A:_ READ AMD EXAMINED THIS APPLICATION AND PAYMENTS. . . . . . . . . . . . . . . . $980. 00 KNOW THE SAME TO BE TRUE AND COR- RE: ALL PROVISIONS OF LAWS AND TOTAL DUE. . . . . . . . . . . . . . $7, 341. 37 OR.WIF,_ GOVERNING THIS TYPE 17P WE +_ dr WITH WHETHER biODATE sDRECEIPT # /J /v7UI I I I L N CITY OF ARLINGTON CONSTRUCTION PERMIT ❑ COMBINATION BUILDING ❑ MECHANICAL ❑ PLUMBING ❑ SIGN PERMI-NO. MAIL ADDRESS CITY ZIP PHONE fEr6�1 S f��05� /67/Z 98��ok -/f -�f.2Z-e:- 3�__I/ ARCHITECT ORDESI,GNER MAIL'ADDRESS CITY ZIP PHONE S , / ✓— GENERAL CONTRACTOR ) MAIL ADDRESS 4.11 CITY ZIP �10dE LIC CSC ME.CHANI AL CONTRACTOR MAIL ADDRESS CITY ZIP PHONE�1S' LICENSE IT t i PLU 81NG NTRACTOR MAIL ADDRESS CITY ZIP PHONE LICENSE 1 /5L/ S �N a /'vr>e /zo..Fs 4S �z CLASS OF WORK lZNLW ❑AUDITION ❑ALTERATION ❑REPAIR ❑ ❑BUILDING RELOCATION 3COd�3g�w VALUAI ION OF WORK I. ) U7 , L � DESCRIBE WORK I PRUPOSt U OSL OF BUILDING I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICA- TION AND KNOW THE SAME TO BE TRUE AND CORRECT ALL PROVI- LLUAL DE SCRlPl ION Of PROPLRTY(SHOWN BELOW OR ATTACH FOUR COPIES) SIONS OF LAWS AND ORDINANCES GOVERNING THIS TYPE OF WORK LOI BLOCK OF WILL BE COMPLIED WITH WHETHER SPECIFIED HERIN OR NOT.THE GRANTING OF A PERMIT DOES NOT PRESUME TO GIVE AUTHORITY TO VIOLATE OR CANCEL THE PROVISIONS OF ANY OTHER STATE OR TAX ID NUMBER LOCAL LAW REGULATING CONSTRUCTION OFTHE PERFORMANCE OF CONSTRUCTION.PERMIT EXPIRES 1 EAR FROM DATE OF ISSUANCE. SIGNATURE OF CON RACIOR O ZHORIZf NT DATE )OB ADDRLSS /Z'/eV (OFFICE USE ONLY) PLUMBING MECHANICAL NO TYPE OF FIXTURE FEE NO. TYPE OF EQUIPMENT FEE WATER CLOSET (TOILLI) AIR COND.UNITS -H.P. EA. BAIHIUB REFRIGERATION UNITS-H.P.EA. LAVAIORY (WASH BASIN) BOILERS- H.P. EA SHOWER GAS FIRED A.C. UNITS-TONNAGE EA. �.L KI ICHLN SINK& DISP. d.C_ FORCED AIR SYSTEMS- B.T.0 MEA _.L DISHWASHER WALL HEATERS-B.T.0 M LAUNDRY T RAY UN11 HEATERS- B.T.U. M L CLOIHLS WASHER EVAPORAI IVE COOLERS W'AIER HEATER ' CLOIHES DRYERS URINAL VENTILATICN FAN DRINKING FUUN I AIN RANGE HOOD COMMERCIAL FLUOR DRAIN AIR HANDLING UNIT- CPM VACUUM BREAKERS STOVE ROOF DRAINS - RAINLEADERS METAL FIREPLACE&CHIMNEY SINK (SERVICE - BAR,ETC.) WATER HEATER GAS PIPING SUBTOTAL f SUBTOTAL f PERMIT ; PERMIT f TOTALFEE $1 TOTAL FEE f SIUL YARD SL LACK STREET SETBACK REAR YARD SETBACK PLAN CHECK NUMBER F \T N CHECK FEE ��7 USE"/ON1 CJ�/1 LOT AREA VACANT SITE W ( I LN 1/ 157 40 q29 NYES ❑NO FEES VALUATION FEE 1 YPL OFr NS OCCU AN Y ROUPI NO.OF 0 LING UNITS PLAN CHECKING NG ✓ �+ ^" BU'LDING f SILE UFU�,� NO.OF STC$kILS MAX.(�E.LOAD //J 'xJ PLUMBING FIRE SPRINKLERS REQUIRED ❑YES NO MECHANICAL COMMENTS STATE BLDG.CODE ENERGY CODE SURCHARGE PENALTY U.B.C. SEC.303(a) RECEIVED WATER,SEWER FEES TOTAL APR 21 2004 PERMIT VALIDATION WHEN PROPERLY VALIDATED IIN THIS SPACEI THIS IS YOUR PERMIT&RECEIPT COA BUILUiNG DEPT PAID CRIi BY cc:ASSESSOR,APPLICANT,TREASURER,BLDG. DEPT BUILDING OFFICIAL DATE RECORDS COPY RE51 DENTI AL 51 TE PLAN A PORTION OF THE SE-1/4 N.E.I/4 SECTION 16, TOWNSHIP 31 NORTH, RANGE 05 EAST, W.M. N b'f•0423" E -- ss ss ss A O p � GF-METERY ROAD � _ w - W --G _ - W -- �_ G N 8'1.04123' E G 21022' 25A — g3.10' � • POKER POLE W/DROPS APPL I CANT: LEE H I N05 /vi J 51TE ADORES& 5024 CEMETERY ROAD RECEIVED ARLINSTON, WA 98223 TAX ACCOUNT NOt 31051600101500 APR 2 1 200 Z COA BUILDING DEPT 8 T, LOT I o LOT 2 .N EXISTING WATER, SITE IMPERVIOUS AREAS i SANITARY SEVER HOUSE/GARAGE 2963 50. FT. 25A0' SHARED CONCRETE WALKS/PORCH 165 90. FT. ACCESS 4 UTILITY DRIVEWAY I150 So. FT. >=ASE>�1T TOTAL 46M 50. FT. EXISTIN5 x POWER TRANSFORMER z i TELEPHONE PEDESTAL z 8 42DW N 8a•42'20" W ° cn N b4°II'20" E 10.66 •.N • . '.� cn N w _.^ O 5.00' BS.BL. I-- IoDO, BS.S.L. P0551BLE UGP � I wATER slue • . • I '�p PLEX ic3 T 5 ' 21,111 50. FT. GROSS \ 15,416 90. FT. NET I 20.00".,c � I PRE ss • '. ' PRop pSEp 17R1YEWAY • L - - - - - - - - - - - - a - - - - - - - - - J 89°4 'a0 w a .00 FjC15TINF `O APFti 1.T • . G C71^1GE a -� r ° • E,dyTIN6 EXISTING DUPLEX POWER VAULT 4 TELEPHONE VAULT LOT 4 EXISTING 55MFi N b9.4220' W �/►syo�l oZ �rC o S 210A0' 30 0 30 NOTES: I. DISTURBANCES 4 CLEARING LIMITSo NO AREA TO BE 1-0656ED OR CLEARED. 2. EROSION CONTROL SILT FENCE AS REQUIRED. 3. STOCKPILING SOIL: DIRT TO BE TEMPORARY STOCKPILED ON SITE WILL BE COVERED WITHIN 24 HOURS. 4. EXCAVATION MATERIAL PLACEMENTi EXCESS EXCAVATED MATERIAL TO BE REMOVED TO OFF-SITE LOCATION OR TO COMMERCIAL TOPSOIL COMPANY. 5. TISHTLINE FOOTING DRAINS SEPARATELY, TIC*MINE ROOF DRAINS TO COUNTY DITCH. 6. ARMORED CONSTRUCTION ENTRANCE (4"-&" QUARRY SPALL5. DRi1WN BY. J.S.M. FZ E51 DENT I AL 51 TE PLAN METRO14 JOB. NO. DATE: MARCH 2O04 FOR and ASSOCIATES INC. 04033 DWG. NO.: 04033.DWF LEE HINDS 307 N. OLYMPIC, STE. 205 A PORTION OF THE 5.E.1/4 N.E.1/4 SECTION 16, ARLINGTON, WASHINGTON 96223 APPROVED BY. T.E.B. TOWNSHIP 31 NORTH,RANGE.5 EAST,W.M. (360) 435-3777 OFFICE COP`