HomeMy WebLinkAboutOrdinance No. 2021-003 An Ordinance of the City of Arlington, Washington Amending Arlington Municipal Code Chapter 13.12 Pertaining to Utility Rates ORDINANCE NO. 2021-003
AN ORDINANCE OF THE CITY OF ARLINGTON, WASHINGTON
AMENDING ARLINGTON MUNICIPAL CODE CHAPTER 13.12
PERTAINING TO UTILITY RATES
WHEREAS, the City of Arlington has the authority to set rates and charges for its utility
system; and
WHEREAS, the City's Public Works department conducted a utility billing analysis in
2018 to determine the cost of service to provide water and wastewater services to Arlington's
utility customers; and
WHEREAS, based on further analysis completed by staff in 2020, the City proposes to
maintain the current 2020 rates for 2021 for all customer classes; and
WHEREAS, the City Council considered this amendment at their workshop on January
11, 2021 and at their regular meeting held on January 19, 2021, and determined approving the
amendment was in the best interest of the City and its citizens;
NOW, THEREFORE, the City Council of the City of Arlington do hereby ordain as
follows:
Section 1. Arlington Municipal Code Section 13.12.040 shall be and hereby is amended
to read as follows:
13.12.040 - Water rates and charges.
Applicable state and city utility taxes are included in the following rates and
charges for water service. The total monthly water charges for every service shall
include the Base Charge, and the consumption charge, as set forth below.
Beginning on January 15, 2022, the rates set forth for the year 2021 shall be
increased annually by the October reported percentage increase of the consumer
price index (CPI) for the Seattle-Tacoma-Bremerton area for all urban consumers,
or other measure commonly used by the city should it change; provided, however,
that no CPI adjustment shall be made for the period from January 15, 2021 to
January 14, 2022; and provided further, however, that notwithstanding any
reduction in the CPI, rates shall not decrease.
ORDINANCE NO. 2021-003 1
(1 Minimum monthly Base Charge schedule:
Basic Charge By Meter Size 2021 RATES
5/8 "—3/4" $32.15
1" $44.96
1.5" $57.78
2" $93.07
3" $353.50
4" $450.05
(2) Monthly rate schedule charged for water consumption:
Consumption Rate per 2021 RATES
100 cubic feet(cf)
$2.94
Note -Included in Base
First 300 cf Charge for SFR and
Commercial water
services only
Next 700 cf , $2.94
Over 1,000 cf $3.10
Over 3,000 cf $3.10
(3) Fair and equitable minimum rates for water consumers having meters
larger than four inches shall be fixed by the city council and written agreements
shall be entered with the users setting forth said rates. The city council may enter
into contracts with water users deviating from such rates where special
circumstances dictate; provided that, such rates shall not be discriminatory.
(4) Temporary water service. Temporary water service for construction
purposes, or for any other purpose temporary in nature that will not require a
permanent service installation must be obtained through a Fire Hydrant Use
Permit as stipulated in AMC 13.04.1 00(e). Charges for temporary use of water
shall be as follows:
Temporary Water Services Charges
Security Deposit $750.00
Monthly Equipment Rental Fee ('/4" $50.00
meter)
ORDINANCE NO. 2021-003 2
Usage Rate
First 300 cubic feet (cf) Included in
base rate
Next 700 cubic feet $2.94
Over 1,000 cubic feet $3.10
Over 3,000 cubic feet $3.10
(A) The security deposit shall be refunded to the customer after the equipment
has been returned and inspected for any damages; customer shall be solely
responsible for all damages. Customers shall be billed on a monthly basis for
monthly equipment rental charges and usage fees from the date of temporary
service installation.
(B) The usage rates set forth for temporary water service shall be increased
annually by the October reported percentage increase of the consumer price index
(CPI) for the Seattle-Tacoma-Bremerton area for all urban consumers, or other
measure commonly used by the city should it change; provided, however, that no
CPI adjustment shall be made for the period from January 15, 2021 to January 14,
2022, and provided further, however, that notwithstanding any reduction in the
CPI, rates shall not decrease.
Section 2. Arlington Municipal Code Section 13.12.130 shall be and hereby is
amended to read as follows:
13.12.130 - Residential sewer rates and charges.
Applicable state and city utility taxes are included in the following rates
and charges for sewer service. The total monthly sewer charges for every SFR and
MFR service shall be a flat fee and not based on metered water consumption.
The effective dates for the following sewer rates will be based on the city's
billing cycle for use beginning on January 1, 2021. Beginning on January 15,
2022, the rates set forth for the year 2021 shall be increased annually by the
October reported percentage increase of the consumer price index (CPI) for the
Seattle-Tacoma-Bremerton area for all urban consumers, or other measure
commonly used by the city should it change; provided, however, that
notwithstanding any reduction in the CPI, rates shall not decrease.
Monthly charge (sewer) I 2021 RATE
Single Family Residential $70.15
Multi-Family Residential $54.00
ORDINANCE NO. 2021-003 3
Section 3. Arlington Municipal Code Section 13.12.140 shall be and hereby is
amended to read as follows:
13.12.140 - Commercial sewer rates and char.
(a) All sanitary sewer services connected to any public or private premises
that are defined as "Commercial classification" in Section 13.12.110 shall be
charged for sanitary sewer service upon the basis of water consumption. State and
city utility taxes are included in the following rates and charges for sewer service.
The effective dates for the following rates will be based on the city's billing cycle
for use beginning on January 1, 2021. Each user shall pay a minimum monthly
charge of one base rate plus a volume rate for all consumption over three hundred
cubic feet per month.
Monthly charge (sewer) 2021 RATE
Base rate (includes 300 cubic feet of $70.15
water consumption)
Volume rate (per 100 cubic feet of $7 25
metered water consumption)
(b) Beginning on January 15, 2022, and on January 15th each year thereafter
the rates set forth for the year 2021 shall be increased annually by the October
reported percentage increase of the consumer price index (CPI) for the Seattle-
Tacoma-Bremerton area for all urban consumers, or other measure commonly
used by the city should it change, provided, however, that notwithstanding any
reduction in the CPI, rates shall not decrease.
Section 4. Arlington Municipal Code Section 13.12.150 shall be and hereby is amended
to read as follows:
13.12.150 - Industrial user classification and charges.
The rates and charges for industrial users, as defined in Sections
13.08.240, 13.08.250, and Chapter 13.36, shall be as follows:
(1) All user charges shall be based upon equitable unit charges
established for flow BOD (biochemical oxygen demand) loading and TSS (total
suspended solids) loading, based upon the average BOD, TSS and other
parameter(s) concentrations (as established by the public works director)
monitored for the industrial user and the flow recorded in the monitoring manhole
ORDINANCE NO. 2021-003 4
or water use.
(2) A minimum monthly charge will be established by the city to
cover the basic sewer costs and monitoring of the industrial user's wastewater
discharge, and in the event the monthly sewer bill does not exceed this amount the
industrial user shall agree to pay the estimated minimum monthly charge. This
charge shall be reviewed from time to time and adjusted to ensure the charge is
covering the monitoring services and sewer costs provided and must be reviewed
every two years. Initially, the monthly charges shall be based on the following,
unless otherwise established in the negotiated discharge permit:
(A) For an industrial user with waste strength less than two
hundred fifty mg/l, measured as five-day BOD and TSS, and other
parameters within limits established in Sections 13.08.240, 13.08.250,
[and Chapter] 13.36, and whose discharge does not require regular
monitoring other than flow,the minimum monthly charge is as set forth
below:
Sewer Charges (monthly) 2021 RATE
Waste strength<250 mg/1 $429.00
(B) For an industrial user with waste strength in excess of two
hundred fifty mg/1 for two months or more per year, the minimum
monthly charge is as set forth below:
Sewer Charges (monthly) 2021 RATE
Waste strength>250 mg/1 —7—$1,715.00
(C) Beginning January 15, 2022, and each January 15th
thereafter, the charges set forth in subsections (1)(A) and (1)(B), shall be
increased annually, by the October reported percentage increase of the
consumer price index (CPI) for the Seattle-Tacoma-Bremerton area for all
urban consumers, or other measure commonly used by the city should it
change; provided, however, that notwithstanding any reduction in the CPI,
rates shall not decrease.
(3) Until such time as a sewer user charge analysis can be conducted
to establish equitable charges under a negotiated discharge permit between the
city and the industrial user, the following shall be used as the basis for industrial
user charges:
(A) Flow based charge per cubic foot of wastewater discharged;
(B) BOD charge per pound of BOD discharged; and
(C) TSS charge per pound of TSS discharged, pursuant to the
following table:
ORDINANCE NO. 2021-003 5
Sewer charge (monthly) 2021 RATE
Flow-based charge (per cubic foot) $0.02051
BOD charge (per pound BOD) $0.645
TSS charge (per pound TSS) $0.431
(D) Beginning January 15, 2022, and each January 15th
thereafter, the charges set forth in subsection (c), shall be increased
annually, by the October reported percentage increase of the consumer
price index (CPI) for the Seattle-Tacoma-Bremerton area for all urban
consumers, or other measure commonly used by the city should it change;
provided, however, that notwithstanding any reduction in the CPI, rates
shall not decrease.
(4) Flow shall be based upon one hundred percent of the water
consumption or rate of flow of wastewater discharge into the sewer (measured in
an industrial user installed flow measurement and recording equipment installed
in control manhole, pursuant to Chapter 13.36). Strength of wastewater
discharged shall be established based upon twenty-four-hour composite samples
made by the city at the control manhole and tested by the city's wastewater
treatment plant laboratory or state certified testing laboratory. All testing shall be
in accordance with the latest edition of"Standard Methods for Examination of
Water and Wastewater," APHA, AWWA and WPCF. BOD and TSS, pounds per
day, shall be calculated based upon concentration of composite samples and
established flow rates.
(5) Appeal.
(A) If any user believes that a portion of the user's metered
flow, larger than ten percent, is not discharged into the sewer system
(when flow measurement is not provided in the control manhole), the user
should make written application to the public works director for review of
the user's flow of wastewater. If the public works director agrees that
charges for the user should be adjusted, they shall so notify the city
council, which may approve such change, or direct a recomputation of the
user's sewer rates.
(B) If the public works director does not agree to the
adjustment of user charges, the user may further appeal to the city
council, which may direct further study or take other appropriate action.
Section 5. Arlington Municipal Code Section 13.12.540 shall be and hereby is
amended to read as follows:
ORDINANCE NO. 2021-003 6
13.12.540 - Initial service charge rates.
In accordance with the rate structure established herein, there is hereby
levied upon all developed real property within the boundaries of the utility, the
following service charges:
(1) State and city utility taxes are included in the following rates and
charges for stormwater service. See Table 3.
(2) Beginning on January 15, 2022, the rates set forth for the year
2021 shall be increased annually by the October reported percentage increase of
the consumer price index (CPI) for the Seattle-Tacoma-Bremerton area for all
urban consumers, or other measure commonly used by the city should it change;
provided, however, that no annual increase shall exceed two percent; and
provided further,that notwithstanding any reduction in the CPI, rates shall not
decrease.
Stormwater charges (monthly) 2021
RATE
Base rate per ESU $6.89
(3) For all other developed property including multifamily,
condominiums and mobile home parks within the boundaries of the utility, except
as specified under Section 13.28.130, the monthly service charge shall be based
on the above table (Table 3) per month multiplied by the number of equivalent
service units determined by the utility to be contained in such parcel. For all
single-family property owners qualifying for the senior low-income utility
discount established in Section 13.12.140, the discount shall apply to stormwater
service charges.
Section 6. Severability. Should any section,paragraph, sentence, clause or phrase
of this Ordinance, or its application to any person or circumstance, be declared unconstitutional
or otherwise invalid for any reason, or should any portion of this Ordinance be preempted by
state or federal law or regulation, such decision or preemption shall not affect the validity of the
remaining portions of this Ordinance or its application to other persons or circumstances.
Section 7. Effective Date. This Ordinance or a summary thereof shall be published
in the official newspaper of the City. The Ordinance shall take effect and be in full force five (5)
days after the date of publication.
ORDINANCE NO. 2021-003 7
PASSED BY the City Council and APPROVED by the Mayor this 19th day of January,
2021.
CITY OF ARLINGTON
Twzwr-6—
Barbara Tolbert, Mayor
Attest:
Jv4iz,-,�
Wendy Van 15er Meersche, City Clerk
Approved as to form:
Stev PeWc
City Attorney
ORDINANCE NO. 2021-003 8
CERTIFICATION OF ORDINANCE
I, Wendy Van Der Meersche, being the duly appointed City Clerk of the City of Arlington,
Washington, a municipal corporation, do hereby certify that the following Ordinance No.
2021-003 was approved at the January 19, 2021 City Council meeting.
ORDINANCE NO. 2021-003
"AN ORDINANCE OF THE CITY OF ARLINGTON,WASHINGTON
AMENDING ARLINGTON MUNICIPAL CODE CHAPTER 13.12
PERTAINING TO UTILITY RATES"
A true and correct copy of the original ordinance is attached.
Dated this 20th day of January, 2021.
JQ v1i
7A-��
Wendy Van er Meersche
City Clerk for the City of Arlington